INSPECTION REPORT
NOTE:
INSPECTION REPORT
NOTE:
INSPECTION REPORT
NOTE:
INSPECTION REPORT
Customer : NTPC-RIHAND-CHP Date of Inspection : 20/06/2012
Supplier : M/s. GTV ENGG-GWL Report No : AGG-12-038
P.O. No : FLSM/F/20842 Contract No : 8001041018
QAP Ref : NTPC/RIHAND/SAC/006 Rev.00 Date:29.07.2011 Stage Final
Qty
Item Description of Items & Qty Qty Results
As per
No. Inspector’s Observations Inspected Accepted ( See Note )
P.O
24. All items flatness to be rectified and reoffered.
8 OBSERVATION: For Drive Base Frame-RH.
25. Orientation checked as per drawing found ok.
26. Dimension checked as per drawing found ok only
at bottom side hole and length, with and height.
27. Top side machining and holes to be done and
reoffered.
28. Flatness to be offered after machining.
9 OBSERVATION: For Drive Base Frame-LH .
29. Orientation checked as per drawing found ok.
30. Dimension checked as per drawing found ok
only at bottom side hole and length, with and
height.
31. Top side machining and holes to be done and
reoffered.
32. Flatness to be offered after machining
10 OBSERVATION: For Bottom Portion Support.
33. Orientation checked as per drawing found ok.
34. Dimension checked as per drawing found in SL
No.2-1/2 top side hole to hole diagonal and SL
No.2-2/2 Bottom side hole pitch was rectified
and found ok.
35. Other items dimensions are checked and found
ok.
NOTE:
INSPECTION REPORT
Customer : NTPC-RIHAND-CHP Date of Inspection : 20/06/2012
Supplier : M/s. GTV ENGG-GWL Report No : AGG-12-038
P.O. No : FLSM/F/20842 Contract No : 8001041018
QAP Ref : NTPC/RIHAND/SAC/006 Rev.00 Date:29.07.2011 Stage Final
Qty
Item Description of Items & Qty Qty Results
As per
No. Inspector’s Observations Inspected Accepted ( See Note )
P.O
11 OBSERVATION: For Platen Centering Beam.
36. Orientation checked as per drawing found ok.
37. Dimension checked as per drawing found 2nd set
Qty 02 Nos Ø18 hole was drilled and found ok.
38. Other dimensions checked and found ok.
CONCLUSION:
Items dimensional deviation to be rectified and
reoffered.
Weld visual found all items are welding fillet
size not as per drawing to be welded as per
drawing and reoffered except Item No.1, 2 &
11.
Item No. 1, 2 & 11 may cleared for further
process.
Identification marking to be done.
Internal inspection report to be submitted.
NOTE: