Professional Documents
Culture Documents
Institute Name: Indian Institute of Technology Kharagpur (IR-E-U-0573)
Institute Name: Indian Institute of Technology Kharagpur (IR-E-U-0573)
PG [3 Year Program(s)] 15 15 15 - - -
UG [4 Years 2251 224 2475 279 2191 5 356 1047 0 889 0 514
Program(s)]
PG [3 Year 24 3 27 6 21 0 0 6 0 3 0 3
Program(s)]
PG-Integrated 3287 352 3639 368 3267 4 448 1588 0 1224 0 812
PG-Integrated [5 Years Program(s)]: Placement & higher studies for previous 3 years
Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed selected for Higher
year the year graduates(Amount in Studies
Rs.)
Total Students
Part Time 0
Part Time 0 0 0
Financial Resources: Utilised Amount for the Capital expenditure for previous 3 years
Academic Year 2018-19 2017-18 2016-17
Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)
Library 220397215 (twenty two crore three lakh ninety seven thousand 175230715 (seventeen crore fifty two lakh thirty thousand 172773556 (seventeen crore twenty seven lakh seventy three
two hundred fifteen) seven hundred fifteen) thousand five hundred fifty six)
New Equipment for Laboratories 117316668 (eleven crore seventy three lakh sixteen thousand 284543926 (twenty eight crore forty five lakh forty three 286528589 (twenty eight crore sixty five lakh twenty eight
six hundred sixty eight) thousand nine hundred twenty six) thousand five hundred eighty nine)
Other expenditure on creation of Capital Assets (excluding 589182201 (fifty eight crore ninety one lakh eighty two 356546168 (thirty five crore sixty five lakh forty six thousand 153864540 (Fifteen crore thirty eight lakh sixty four thousand
expenditure on Land and Building) thousand two hundred one ) one hundred sixty eight) five hundred forty)
Financial Resources: Utilised Amount for the Operational expenditure for previous 3 years
Academic Year 2018-19 2017-18 2016-17
Salaries (Teaching and Non Teaching staff) 2483324100 (Two forty eight crore thirty three lakh twenty four 1570050808 (One fifty seven crore fifty thousand eight hundred 1408399530 (One forty crore eighty threelakh ninety nine
thousand one hundred) eight) thousand five hundred thirty)
Maintenance of Academic Infrastructure or consumables, 3118397838 (Three eleven crore eighty threelakh ninety seven 1769209628 (One seventy six crore ninety two lakh nine 2128002771 (TwentyTwo hundred twelve Crore Eighty Lakh
other running expenditures etc.(excluding maintenance of thousand eight hundred thirty eight) thousand six hundred twenty eight) Two housand Seven hundred seventy one)
hostels and allied services)
Seminars/Conferences/Workshops 45360958 (Four Crore Fifty Three Lakh Sixty Thousand Nine 64792095 (Six Crore Forty Seven Lakh Ninety Two Thousand 46233691 (Four Crore Sixty Two Lakh Thirty Three Thousand
Hundred Fifty Eight) Ninety Five) Six Hundred Ninety One)
2. Do your institution have provision for walking aids, includingwheelchairs and transportation from one building to another for Yes
handicapped students?
3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings