You are on page 1of 47

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Excavation

LOCATION: UGR-5 INSPECTION DATE:

STRUCTURE / FACILITIES:

DESIGN ACTUAL TOLERANCE


DESCRIPTION REMARKS
(mm) (mm) (mm)

P0+860

Level ▽ Right EL + 6.050 m ± 50

Center EL + 6.050 m ± 50

Left EL + 6.050 m ± 50

P0+875

Level ▽ Right EL + 6.050 m ± 50

Center EL + 6.050 m ± 50

Left EL + 6.050 m ± 50

P0+890

Level ▽ Right EL + 6.050 m ± 50

Center EL + 6.050 m ± 50

Left EL + 6.050 m ± 50

INSPECTED BY: (CTI Engineering International Co., Ltd. PREPARED BY: (KUBOTA Construction Co., Ltd.)
in association with Nippon Koei Co., Ltd.)

NAME: NAME:
SIGNATURE: SIGNATURE:
THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT
IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Gravel Bedding

LOCATION: UGR-5 INSPECTION DATE:

STRUCTURE / FACILITIES:

DESIGN ACTUAL TOLERANCE


DESCRIPTION REMARKS
(mm) (mm) (mm)

P0+800

Width 11,000 - 0

Thickness Right 200 - 30

Center 200 - 30

Left 200 - 30

P0+825

Width 11,000 - 0

Thickness Right 200 - 30

Center 200 - 30

Left 200 - 30

P0+850

Width 11,000 - 0

Thickness Right 200 - 30

Center 200 - 30

Left 200 - 30

Length 54,550 - 50

Gravel
t

INSPECTED BY: (CTI Engineering International Co., Ltd. PREPARED BY: (KUBOTA Construction Co., Ltd.)
in association with Nippon Koei Co., Ltd.)

NAME: NAME:
SIGNATURE: SIGNATURE:

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT


IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Leveling Concrete

LOCATION: UGR-5 INSPECTION DATE:

STRUCTURE / FACILITIES:

DESIGN ACTUAL TOLERANCE


DESCRIPTION REMARKS
(mm) (mm) (mm)

P0+800

Width 11,000 - 0

Thickness Right 100 - 30

Center 100 - 30

Left 100 - 30

P0+825

Width 11,000 - 0

Thickness Right 100 - 30

Center 100 - 30

Left 100 - 30

P0+850

Width 11,000 - 0

Thickness Right 100 - 30

Center 100 - 30

Left 100 - 30

Length 54,550 - 50

Leveling Concrete
t

INSPECTED BY: (CTI Engineering International Co., Ltd. PREPARED BY: (KUBOTA Construction Co., Ltd.)
in association with Nippon Koei Co., Ltd.)
NAME: NAME:

SIGNATURE: SIGNATURE:
THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT
IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Concrete Structures

LOCATION: UGR-5 INSPECTION DATE:

STRUCTURE / FACILITIES:

DESIGN ACTUAL TOLERANCE


DESCRIPTION REMARKS
(mm) (mm) (mm)

P0+860

Width 10,800 - 30

Elevation Right + 6.900 +- 30

Center + 6.900 +- 30

Left + 6.900 +- 30

P0+875

Width 10,800 - 30

Elevation Right + 6.900 +- 30

Center + 6.900 +- 30

Left + 6.900 +- 30

P0+890

Width 10,800 - 30

Elevation Right + 6.900 +- 30

Center + 6.900 +- 30

Left + 6.900 +- 30

Length 54,450 - 50

E.L. (L) E.L. (C) E.L. (R)

Bottom Slab

INSPECTED BY: (CTI Engineering International Co., Ltd. PREPARED BY: (KUBOTA Construction Co., Ltd.)
in association with Nippon Koei Co., Ltd.)

NAME: NAME:
SIGNATURE: SIGNATURE:

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT


IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Leveling Concrete

LOCATION: UGR-5 INSPECTION DATE:

STRUCTURE / FACILITIES:

DESIGN ACTUAL TOLERANCE


DESCRIPTION REMARKS
(mm) (mm) (mm)

P0+8600

Width 11,000 - 0

Thickness Right 100 - 30

Center 100 - 30

Left 100 - 30

P0+875

Width 11,000 - 0

Thickness Right 100 - 30

Center 100 - 30

Left 100 - 30

P0+890

Width 11,000 - 0

Thickness Right 100 - 30

Center 100 - 30

Left 100 - 30

Length - 50

Leveling Concrete
t

INSPECTED BY: (CTI Engineering International Co., Ltd. PREPARED BY: (KUBOTA Construction Co., Ltd.)
in association with Nippon Koei Co., Ltd.)
NAME: NAME:

SIGNATURE: SIGNATURE:
THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT
IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate

Location : UGR-5 Inspection Date :

Coordinate Tolerance
Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2)

1 1,279,438.603 1,279,438.603 492,189.981 ### ###


2 1,279,436.572 1,279,436.572 492,187.254 ### ###
3 1,279,434.661 1,279,434.661 492,184.687 ### ###
4 1,279,436.745 1,279,436.745 492,189.244 ### ###
5 1,279,434.775 1,279,434.775 492,186.597 ### ###
12 1,279,436.103 1,279,436.103 492,195.832 ### ###
13 1,279,434.192 1,279,434.192 492,193.265 ### ###
14 1,279,432.161 1,279,432.161 492,190.538 ### ###
15 1,279,430.250 1,279,430.250 492,187.972 ### ###
280 1,279,344.314 1,279,344.314 492,262.186 ### ###
281 1,279,342.343 1,279,342.343 492,259.539 ### ###
282 1,279,340.372 1,279,340.372 492,256.893 ### ###
283 1,279,344.427 1,279,344.428 -0.001 492,264.097 492,264.099 -0.002 0.003
284 1,279,342.516 1,279,342.516 492,261.530 ### ###
285 1,279,340.485 1,279,340.485 492,258.803 ### ###
286 1,279,338.574 1,279,338.579 -0.005 492,256.236 492,256.238 -0.002 0.005
S-1 1,279,440.886 1,279,440.886 492,183.168 ### ###
S-2 1,279,439.393 1,279,439.393 492,181.163 ### ###
S-5 1,279,437.518 1,279,437.518 492,185.677 ### ###
S-6 1,279,436.025 1,279,436.025 492,183.672 ### ###
P-1 1,279,444.220 1,279,444.220 492,196.770 ### ###
P-4 1,279,439.830 1,279,439.830 492,190.875 ### ###
P-9 1,279,441.493 1,279,441.493 492,198.801 ### ###
P-12 1,279,437.103 1,279,437.103 492,192.905 ### ###
PH-1 1,279,438.208 1,279,438.208 492,201.714 ### ###
PH-2 1,279,435.953 1,279,435.953 492,198.687 ### ###
off BR1 1,279,430.584 492,178.373
UGR5-T1 1,279,424.596 492,213.612
BR3

Inspected by : Prepared by :
CTI Engineering Co., Ltd. Kubota Construction Co., Ltd.
in consortium with Nippon Koei Co., Ltd.
Name : Name :

Signature : Signature :
+-0.100m

Judgment
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
good
Instrument
Back sight
Transit point
THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate (1/5)

Location : Inspection Date :

Coordinate Tolerance +-0.100m


Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2) Judgment
156 1,279,387.017 1,279,387.156 -0.139 492,232.383 492,232.451 -0.068 0.155 good

157 1,279,385.105 1,279,385.166 -0.061 492,229.817 492,229.778 0.039 0.072 good

158 1,279,383.075 1,279,383.061 0.014 492,227.090 492,227.022 0.068 0.069 good

159 1,279,381.164 1,279,381.084 0.080 492,224.523 492,224.500 0.023 0.083 good

160 1,279,385.653 1,279,385.741 -0.088 492,233.398 492,233.446 -0.048 0.100 good

161 1,279,383.742 1,279,383.724 0.018 492,230.832 492,230.800 0.032 0.037 good

162 1,279,381.711 1,279,381.736 -0.025 492,228.105 492,228.100 0.005 0.025 good

163 1,279,379.800 1,279,379.790 0.010 492,225.538 492,225.435 0.103 0.104 good

164 1,279,384.290 1,279,384.365 -0.075 492,234.414 492,234.316 0.098 0.124 good

165 1,279,382.378 1,279,382.393 -0.015 492,231.847 492,231.732 0.115 0.116 good

166 1,279,380.348 1,279,380.357 -0.009 492,229.120 492,229.058 0.062 0.063 good

167 1,279,378.437 1,279,378.349 0.088 492,226.554 492,226.483 0.071 0.112 good

168 1,279,382.926 1,279,382.884 0.042 492,235.429 492,235.376 0.053 0.068 good

169 1,279,381.015 1,279,380.991 0.024 492,232.862 492,232.865 -0.003 0.024 good

170 1,279,378.984 1,279,379.036 -0.052 492,230.135 492,230.042 0.093 0.107 good

171 1,279,377.073 1,279,377.104 -0.031 492,227.569 492,227.470 0.099 0.104 good

172 1,279,381.563 1,279,381.576 -0.013 492,236.444 492,236.362 0.082 0.083 good

173 1,279,379.651 1,279,379.654 -0.003 492,233.878 492,233.871 0.007 0.007 good

174 1,279,377.621 1,279,377.610 0.011 492,231.151 492,231.111 0.040 0.041 good

175 1,279,375.710 1,279,375.680 0.030 492,228.584 492,228.402 0.182 0.185 good

176 1,279,380.199 1,279,380.196 0.003 492,237.460 492,237.454 0.006 0.006 good

177 1,279,378.288 1,279,378.232 0.056 492,234.893 492,234.879 0.014 0.058 good

178 1,279,376.257 1,279,376.202 0.055 492,232.166 492,232.076 0.090 0.106 good

179 1,279,374.346 1,279,374.390 -0.044 492,229.599 492,229.489 0.110 0.119 good

180 1,279,378.835 1,279,378.840 -0.005 492,238.475 492,238.435 0.040 0.040 good

181 1,279,376.924 1,279,376.855 0.069 492,235.908 492,235.888 0.020 0.072 good

182 1,279,374.894 1,279,374.906 -0.012 492,233.181 492,233.185 -0.004 0.013 good


183 1,279,372.983 1,279,372.910 0.073 492,230.615 492,230.567 0.048 0.087 good

184 1,279,377.472 1,279,377.558 -0.086 492,239.490 492,239.511 -0.021 0.088 good

185 1,279,375.561 1,279,375.530 0.031 492,236.924 492,236.879 0.045 0.054 good

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate (2/5)

Location : Inspection Date :

Coordinate Tolerance +-0.100m


Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2) Judgment
186 1,279,373.530 1,279,373.462 0.068 492,234.197 492,234.189 0.008 0.069 good

187 1,279,371.619 1,279,371.543 0.076 492,231.630 492,231.599 0.031 0.082 good

188 1,279,376.108 1,279,376.196 -0.088 492,240.506 492,240.461 0.045 0.098 good

189 1,279,374.197 1,279,374.218 -0.021 492,237.939 492,237.997 -0.058 0.062 good

190 1,279,372.167 1,279,372.162 0.005 492,235.212 492,235.194 0.018 0.019 good

191 1,279,370.256 1,279,370.173 0.083 492,232.645 492,232.625 0.020 0.085 good

192 1,279,374.745 1,279,374.779 -0.034 492,241.521 492,241.544 -0.023 0.041 good

193 1,279,372.834 1,279,372.834 0.000 492,238.954 492,238.952 0.002 0.002 good

194 1,279,370.803 1,279,370.682 0.121 492,236.227 492,236.227 0.000 0.121 good

195 1,279,368.892 1,279,368.781 0.111 492,233.597 492,233.597 0.000 0.111 good

196 1,279,373.381 1,279,373.431 -0.050 492,242.536 492,242.604 -0.068 0.084 good

197 1,279,371.470 1,279,371.431 0.039 492,239.970 492,240.010 -0.041 0.056 good

198 1,279,369.440 1,279,369.411 0.028 492,237.243 492,237.268 -0.025 0.038 good

199 1,279,367.529 1,279,367.503 0.026 492,234.676 492,234.605 0.071 0.075 good

200 1,279,372.018 1,279,372.067 -0.049 492,243.552 492,243.528 0.023 0.055 good

201 1,279,370.107 1,279,370.175 -0.069 492,240.985 492,240.973 0.012 0.070 good

202 1,279,368.076 ### 492,238.258 ### ### good

203 1,279,366.165 1,279,366.082 0.083 492,235.691 492,235.651 0.040 0.092 good

204 1,279,370.654 1,279,370.658 -0.003 492,244.567 492,244.596 -0.029 0.029 good

205 1,279,368.743 1,279,368.708 0.036 492,242.000 492,242.088 -0.087 0.094 good

206 1,279,366.713 1,279,366.740 -0.028 492,239.273 492,239.243 0.030 0.041 good

207 1,279,364.802 1,279,364.768 0.034 492,236.707 492,236.652 0.055 0.064 good

208 1,279,369.291 1,279,369.365 -0.074 492,245.582 492,245.574 0.008 0.075 good

209 1,279,367.380 1,279,367.384 -0.004 492,243.016 492,243.033 -0.018 0.018 good


210 1,279,365.349 1,279,365.327 0.022 492,240.289 492,240.287 0.002 0.022 good

211 1,279,363.438 1,279,363.432 0.006 492,237.722 492,237.665 0.057 0.057 good

212 1,279,367.927 1,279,367.971 -0.044 492,246.597 492,246.644 -0.046 0.064 good

213 1,279,366.016 1,279,365.990 0.026 492,244.031 492,244.087 -0.056 0.062 good

214 1,279,363.986 1,279,363.981 0.005 492,241.304 492,241.325 -0.021 0.022 good

215 1,279,362.074 1,279,362.079 -0.005 492,238.737 492,238.685 0.052 0.053 good

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate (3/5)

Location : Inspection Date :

Coordinate Tolerance +-0.100m


Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2) Judgment
216 1,279,366.564 1,279,366.557 0.007 492,247.613 492,247.673 -0.060 0.060 good

217 1,279,364.653 1,279,364.704 -0.051 492,245.046 492,245.050 -0.004 0.052 good

218 1,279,362.622 1,279,362.658 -0.036 492,242.319 492,242.239 0.080 0.088 good

219 1,279,360.711 1,279,360.669 0.042 492,239.753 492,239.752 0.001 0.042 good

220 1,279,365.200 1,279,365.223 -0.023 492,248.628 492,248.645 -0.017 0.028 good

221 1,279,363.289 1,279,363.287 0.003 492,246.061 492,246.077 -0.015 0.016 good

222 1,279,361.259 1,279,361.310 -0.052 492,243.334 492,243.295 0.039 0.065 good

223 1,279,359.347 1,279,359.371 -0.024 492,240.768 492,240.741 0.026 0.035 good

224 1,279,363.837 1,279,363.840 -0.003 492,249.643 492,249.698 -0.054 0.054 good

225 1,279,361.926 1,279,361.999 -0.073 492,247.077 492,247.022 0.055 0.091 good

226 1,279,359.895 1,279,359.972 -0.077 492,244.350 492,244.279 0.071 0.105 good

227 1,279,357.984 1,279,357.935 0.049 492,241.783 492,241.798 -0.015 0.051 good

228 1,279,362.473 1,279,362.510 -0.037 492,250.659 492,250.655 0.004 0.037 good

229 1,279,360.562 1,279,360.659 -0.097 492,248.092 492,248.026 0.066 0.117 good

230 1,279,358.532 1,279,358.600 -0.068 492,245.365 492,245.323 0.042 0.080 good

231 1,279,356.620 1,279,356.593 0.027 492,242.798 492,242.760 0.038 0.047 good

232 1,279,361.110 1,279,361.159 -0.049 492,251.674 492,251.587 0.087 0.100 good

233 1,279,359.199 1,279,359.255 -0.056 492,249.107 492,249.077 0.030 0.064 good

234 1,279,357.168 1,279,357.182 -0.014 492,246.380 492,246.331 0.050 0.052 good

235 1,279,355.257 1,279,355.254 0.003 492,243.814 492,243.768 0.046 0.046 good

236 1,279,359.746 1,279,359.761 -0.015 492,252.689 492,252.641 0.048 0.050 good


237 1,279,357.835 1,279,357.919 -0.084 492,250.123 492,250.122 0.000 0.084 good

238 1,279,355.805 1,279,355.791 0.013 492,247.396 492,247.377 0.018 0.023 good

239 1,279,353.893 1,279,353.925 -0.032 492,244.829 492,244.767 0.062 0.070 good

240 1,279,358.383 1,279,358.415 -0.032 492,253.705 492,253.692 0.013 0.034 good

241 1,279,356.472 1,279,356.509 -0.037 492,251.138 492,251.110 0.028 0.046 good

242 1,279,354.441 1,279,354.464 -0.023 492,248.411 492,248.354 0.057 0.061 good

243 1,279,352.530 1,279,352.544 -0.014 492,245.844 492,245.732 0.112 0.113 good

244 1,279,357.019 1,279,357.045 -0.026 492,254.720 492,254.724 -0.004 0.026 good

245 1,279,355.108 1,279,355.122 -0.014 492,252.153 492,252.285 -0.132 0.132 good


THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate (4/5)

Location : Inspection Date :

Coordinate Tolerance +-0.100m


Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2) Judgment
246 1,279,353.078 1,279,353.168 -0.090 492,249.426 492,249.416 0.011 0.091 good

247 1,279,351.166 1,279,351.224 -0.058 492,246.860 492,246.803 0.057 0.081 good

248 1,279,355.656 1,279,355.674 -0.018 492,255.735 492,255.760 -0.025 0.031 good

249 1,279,353.745 1,279,353.804 -0.059 492,253.169 492,253.163 0.006 0.059 good

250 1,279,351.714 1,279,351.799 -0.085 492,250.442 492,250.389 0.053 0.100 good

251 1,279,349.803 1,279,349.779 0.024 492,247.875 492,247.825 0.050 0.055 good

252 1,279,354.292 1,279,354.308 -0.015 492,256.751 492,256.748 0.003 0.015 good

253 1,279,352.381 1,279,352.415 -0.034 492,254.184 492,254.141 0.043 0.055 good

254 1,279,350.351 1,279,350.413 -0.062 492,251.457 492,251.387 0.070 0.093 good

255 1,279,348.439 1,279,348.513 -0.074 492,248.890 492,248.793 0.097 0.122 good

256 1,279,352.929 1,279,352.936 -0.007 492,257.766 492,257.795 -0.030 0.030 good

257 1,279,351.018 1,279,351.100 -0.083 492,255.199 492,255.149 0.050 0.097 good

258 1,279,348.987 1,279,349.011 -0.024 492,252.472 492,252.430 0.042 0.048 good

259 1,279,347.076 1,279,347.105 -0.029 492,249.906 492,249.863 0.043 0.052 good

260 1,279,351.565 1,279,351.600 -0.035 492,258.781 492,258.870 -0.089 0.095 good

261 1,279,349.654 1,279,349.743 -0.089 492,256.215 492,256.178 0.036 0.096 good

262 1,279,347.624 1,279,347.655 -0.032 492,253.488 492,253.417 0.071 0.077 good

263 1,279,345.712 1,279,345.685 0.027 492,250.921 492,250.950 -0.029 0.040 good


264 1,279,350.202 1,279,350.193 0.009 492,259.796 492,259.799 -0.002 0.009 good

265 1,279,348.291 1,279,348.331 -0.040 492,257.230 492,257.211 0.019 0.044 good

266 1,279,346.260 1,279,346.264 -0.004 492,254.503 492,254.472 0.031 0.031 good

267 1,279,344.349 1,279,344.305 0.044 492,251.936 492,251.901 0.036 0.057 good

268 1,279,348.838 1,279,348.817 0.021 492,260.812 492,260.887 -0.075 0.078 good

269 1,279,346.927 1,279,347.000 -0.073 492,258.245 492,258.242 0.004 0.073 good

270 1,279,344.897 1,279,344.889 0.008 492,255.518 492,255.573 -0.055 0.055 good

271 1,279,342.985 1,279,342.907 0.079 492,252.952 492,252.965 -0.013 0.080 good

272 1,279,347.475 1,279,347.470 0.005 492,261.827 492,261.801 0.026 0.027 good


273 1,279,345.564 1,279,345.599 -0.035 492,259.260 492,259.303 -0.042 0.055 good

274 1,279,343.533 1,279,343.545 -0.012 492,256.533 492,256.465 0.068 0.069 good

275 1,279,341.622 1,279,341.622 0.000 492,253.967 492,253.966 0.000 0.000 good

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate (5/5)

Location : Inspection Date :

Coordinate Tolerance +-0.100m


Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2) Judgment
276 1,279,346.111 1,279,346.112 0.000 492,262.842 492,262.842 0.000 0.000 good

277 1,279,344.200 1,279,344.200 0.000 492,260.276 492,260.275 0.000 0.001 good

278 1,279,342.170 1,279,342.146 0.024 492,257.549 492,257.582 -0.033 0.041 good

279 1,279,340.258 1,279,340.259 0.000 492,254.982 492,254.982 0.000 0.001 good

280 1,279,344.314 1,279,344.314 0.000 492,262.186 492,262.186 0.000 0.001 good

281 1,279,342.343 1,279,342.392 -0.050 492,259.539 492,259.502 0.037 0.062 good

282 1,279,340.372 1,279,340.350 0.022 492,256.893 492,256.852 0.041 0.046 good

283 1,279,344.427 1,279,344.368 0.059 492,264.097 492,264.175 -0.078 0.098 good

284 1,279,342.516 1,279,342.566 -0.050 492,261.530 492,261.615 -0.085 0.099 good

285 1,279,340.485 1,279,340.405 0.080 492,258.803 492,258.845 -0.042 0.091 good

286 1,279,338.574 1,279,338.496 0.078 492,256.236 492,256.176 0.060 0.098 good


Instrument
Back sight
Fore sight

Inspected by : Prepared by :
CTI Engineering Co., Ltd. Kubota Construction Co., Ltd.
in consortium with Nippon Koei Co., Ltd.

Name : Name :

Signature : Signature :
THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate (1/5)

Location : UGR-5 Inspection Date : 23-Feb-08

Coordinate Tolerance +-0.100m


Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2) Judgment
156 1,279,387.017 1,279,387.056 0.039 492,232.383 492,232.451 0.068 0.079 good

157 1,279,385.105 1,279,385.166 0.061 492,229.817 492,229.778 -0.039 0.072 good

158 1,279,383.075 1,279,383.061 -0.014 492,227.090 492,227.022 -0.068 0.069 good

159 1,279,381.164 1,279,381.084 -0.080 492,224.523 492,224.500 -0.023 0.083 good

160 1,279,385.653 1,279,385.741 0.088 492,233.398 492,233.426 0.028 0.092 good

161 1,279,383.742 1,279,383.724 -0.018 492,230.832 492,230.800 -0.032 0.037 good

162 1,279,381.711 1,279,381.736 0.025 492,228.105 492,228.100 -0.005 0.025 good

163 1,279,379.800 1,279,379.790 -0.010 492,225.538 492,225.485 -0.053 0.054 good

164 1,279,384.290 1,279,384.365 0.075 492,234.414 492,234.360 -0.054 0.093 good

165 1,279,382.378 1,279,382.393 0.015 492,231.847 492,231.762 -0.085 0.086 good

166 1,279,380.348 1,279,380.357 0.009 492,229.120 492,229.058 -0.062 0.063 good

167 1,279,378.437 1,279,378.349 -0.088 492,226.554 492,226.513 -0.041 0.096 good

168 1,279,382.926 1,279,382.884 -0.042 492,235.429 492,235.376 -0.053 0.068 good

169 1,279,381.015 1,279,380.991 -0.024 492,232.862 492,232.865 0.003 0.024 good

170 1,279,378.984 1,279,379.006 0.022 492,230.135 492,230.042 -0.093 0.096 good

171 1,279,377.073 1,279,377.104 0.031 492,227.569 492,227.490 -0.079 0.085 good

172 1,279,381.563 1,279,381.576 0.013 492,236.444 492,236.362 -0.082 0.083 good

173 1,279,379.651 1,279,379.654 0.003 492,233.878 492,233.871 -0.007 0.007 good

174 1,279,377.621 1,279,377.610 -0.011 492,231.151 492,231.111 -0.040 0.041 good

175 1,279,375.710 1,279,375.680 -0.030 492,228.584 492,228.502 -0.082 0.087 good

176 1,279,380.199 1,279,380.196 -0.003 492,237.460 492,237.454 -0.006 0.006 good

177 1,279,378.288 1,279,378.232 -0.056 492,234.893 492,234.879 -0.014 0.058 good

178 1,279,376.257 1,279,376.222 -0.035 492,232.166 492,232.096 -0.070 0.078 good

179 1,279,374.346 1,279,374.390 0.044 492,229.599 492,229.539 -0.060 0.075 good

180 1,279,378.835 1,279,378.840 0.005 492,238.475 492,238.435 -0.040 0.040 good

181 1,279,376.924 1,279,376.855 -0.069 492,235.908 492,235.888 -0.020 0.072 good

182 1,279,374.894 1,279,374.906 0.012 492,233.181 492,233.185 0.004 0.013 good


183 1,279,372.983 1,279,372.910 -0.073 492,230.615 492,230.567 -0.048 0.087 good

184 1,279,377.472 1,279,377.558 0.086 492,239.490 492,239.511 0.021 0.088 good

185 1,279,375.561 1,279,375.530 -0.031 492,236.924 492,236.879 -0.045 0.054 good

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate (2/5)

Location : UGR-5 Inspection Date : 23-Feb-08

Coordinate Tolerance +-0.100m


Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2) Judgment
186 1,279,373.530 1,279,373.462 -0.068 492,234.197 492,234.189 -0.008 0.069 good

187 1,279,371.619 1,279,371.543 -0.076 492,231.630 492,231.599 -0.031 0.082 good

188 1,279,376.108 1,279,376.196 0.088 492,240.506 492,240.461 -0.045 0.098 good

189 1,279,374.197 1,279,374.218 0.021 492,237.939 492,237.997 0.058 0.062 good

190 1,279,372.167 1,279,372.162 -0.005 492,235.212 492,235.194 -0.018 0.019 good

191 1,279,370.256 1,279,370.173 -0.083 492,232.645 492,232.625 -0.020 0.085 good

192 1,279,374.745 1,279,374.779 0.034 492,241.521 492,241.544 0.023 0.041 good

193 1,279,372.834 1,279,372.834 0.000 492,238.954 492,238.952 -0.002 0.002 good

194 1,279,370.803 1,279,370.782 -0.021 492,236.227 492,236.232 0.005 0.022 good

195 1,279,368.892 1,279,368.821 -0.071 492,233.597 492,233.602 0.005 0.071 good

196 1,279,373.381 1,279,373.431 0.050 492,242.536 492,242.604 0.068 0.084 good

197 1,279,371.470 1,279,371.431 -0.039 492,239.970 492,240.010 0.041 0.056 good

198 1,279,369.440 1,279,369.411 -0.028 492,237.243 492,237.268 0.025 0.038 good

199 1,279,367.529 1,279,367.503 -0.026 492,234.676 492,234.605 -0.071 0.075 good

200 1,279,372.018 1,279,372.067 0.049 492,243.552 492,243.528 -0.023 0.055 good

201 1,279,370.107 1,279,370.175 0.069 492,240.985 492,240.973 -0.012 0.070 good

202 1,279,368.076 1,279,368.107 0.031 492,238.258 492,238.305 0.047 0.056 good

203 1,279,366.165 1,279,366.082 -0.083 492,235.691 492,235.651 -0.040 0.092 good

204 1,279,370.654 1,279,370.658 0.003 492,244.567 492,244.596 0.029 0.029 good

205 1,279,368.743 1,279,368.708 -0.036 492,242.000 492,242.088 0.087 0.094 good

206 1,279,366.713 1,279,366.740 0.028 492,239.273 492,239.243 -0.030 0.041 good

207 1,279,364.802 1,279,364.768 -0.034 492,236.707 492,236.652 -0.055 0.064 good

208 1,279,369.291 1,279,369.365 0.074 492,245.582 492,245.574 -0.008 0.075 good

209 1,279,367.380 1,279,367.384 0.004 492,243.016 492,243.033 0.018 0.018 good


210 1,279,365.349 1,279,365.327 -0.022 492,240.289 492,240.287 -0.002 0.022 good

211 1,279,363.438 1,279,363.432 -0.006 492,237.722 492,237.665 -0.057 0.057 good

212 1,279,367.927 1,279,367.971 0.044 492,246.597 492,246.644 0.046 0.064 good

213 1,279,366.016 1,279,365.990 -0.026 492,244.031 492,244.087 0.056 0.062 good

214 1,279,363.986 1,279,363.981 -0.005 492,241.304 492,241.325 0.021 0.022 good

215 1,279,362.074 1,279,362.079 0.005 492,238.737 492,238.685 -0.052 0.053 good

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate (3/5)

Location : UGR-5 Inspection Date : 23-Feb-08

Coordinate Tolerance +-0.100m


Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2) Judgment
216 1,279,366.564 1,279,366.557 -0.007 492,247.613 492,247.673 0.060 0.060 good

217 1,279,364.653 1,279,364.704 0.051 492,245.046 492,245.050 0.004 0.052 good

218 1,279,362.622 1,279,362.658 0.036 492,242.319 492,242.239 -0.080 0.088 good

219 1,279,360.711 1,279,360.669 -0.042 492,239.753 492,239.752 -0.001 0.042 good

220 1,279,365.200 1,279,365.223 0.023 492,248.628 492,248.645 0.017 0.028 good

221 1,279,363.289 1,279,363.287 -0.003 492,246.061 492,246.077 0.015 0.016 good

222 1,279,361.259 1,279,361.310 0.052 492,243.334 492,243.295 -0.039 0.065 good

223 1,279,359.347 1,279,359.371 0.024 492,240.768 492,240.741 -0.026 0.035 good

224 1,279,363.837 1,279,363.840 0.003 492,249.643 492,249.698 0.054 0.054 good

225 1,279,361.926 1,279,361.999 0.073 492,247.077 492,247.022 -0.055 0.091 good

226 1,279,359.895 1,279,359.972 0.077 492,244.350 492,244.299 -0.051 0.092 good

227 1,279,357.984 1,279,357.935 -0.049 492,241.783 492,241.798 0.015 0.051 good

228 1,279,362.473 1,279,362.510 0.037 492,250.659 492,250.655 -0.004 0.037 good

229 1,279,360.562 1,279,360.629 0.067 492,248.092 492,248.026 -0.066 0.094 good

230 1,279,358.532 1,279,358.600 0.068 492,245.365 492,245.323 -0.042 0.080 good

231 1,279,356.620 1,279,356.593 -0.027 492,242.798 492,242.760 -0.038 0.047 good

232 1,279,361.110 1,279,361.159 0.049 492,251.674 492,251.607 -0.067 0.083 good

233 1,279,359.199 1,279,359.255 0.056 492,249.107 492,249.077 -0.030 0.064 good

234 1,279,357.168 1,279,357.182 0.014 492,246.380 492,246.331 -0.050 0.052 good

235 1,279,355.257 1,279,355.254 -0.003 492,243.814 492,243.768 -0.046 0.046 good

236 1,279,359.746 1,279,359.761 0.015 492,252.689 492,252.641 -0.048 0.050 good


237 1,279,357.835 1,279,357.919 0.084 492,250.123 492,250.122 0.000 0.084 good

238 1,279,355.805 1,279,355.791 -0.013 492,247.396 492,247.377 -0.018 0.023 good

239 1,279,353.893 1,279,353.925 0.032 492,244.829 492,244.767 -0.062 0.070 good

240 1,279,358.383 1,279,358.415 0.032 492,253.705 492,253.692 -0.013 0.034 good

241 1,279,356.472 1,279,356.509 0.037 492,251.138 492,251.110 -0.028 0.046 good

242 1,279,354.441 1,279,354.464 0.023 492,248.411 492,248.354 -0.057 0.061 good

243 1,279,352.530 1,279,352.544 0.014 492,245.844 492,245.782 -0.062 0.064 good

244 1,279,357.019 1,279,357.045 0.026 492,254.720 492,254.724 0.004 0.026 good

245 1,279,355.108 1,279,355.122 0.014 492,252.153 492,252.235 0.082 0.083 good


THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate (4/5)

Location : UGR-5 Inspection Date : 23-Feb-08

Coordinate Tolerance +-0.100m


Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2) Judgment
246 1,279,353.078 1,279,353.168 0.090 492,249.426 492,249.416 -0.011 0.091 good

247 1,279,351.166 1,279,351.224 0.058 492,246.860 492,246.803 -0.057 0.081 good

248 1,279,355.656 1,279,355.674 0.018 492,255.735 492,255.760 0.025 0.031 good

249 1,279,353.745 1,279,353.804 0.059 492,253.169 492,253.163 -0.006 0.059 good

250 1,279,351.714 1,279,351.779 0.065 492,250.442 492,250.389 -0.053 0.084 good

251 1,279,349.803 1,279,349.779 -0.024 492,247.875 492,247.825 -0.050 0.055 good

252 1,279,354.292 1,279,354.308 0.015 492,256.751 492,256.748 -0.003 0.015 good

253 1,279,352.381 1,279,352.415 0.034 492,254.184 492,254.141 -0.043 0.055 good

254 1,279,350.351 1,279,350.413 0.062 492,251.457 492,251.387 -0.070 0.093 good

255 1,279,348.439 1,279,348.493 0.054 492,248.890 492,248.823 -0.067 0.086 good

256 1,279,352.929 1,279,352.936 0.007 492,257.766 492,257.795 0.030 0.030 good

257 1,279,351.018 1,279,351.100 0.083 492,255.199 492,255.149 -0.050 0.097 good

258 1,279,348.987 1,279,349.011 0.024 492,252.472 492,252.430 -0.042 0.048 good

259 1,279,347.076 1,279,347.105 0.029 492,249.906 492,249.863 -0.043 0.052 good

260 1,279,351.565 1,279,351.600 0.035 492,258.781 492,258.870 0.089 0.095 good

261 1,279,349.654 1,279,349.743 0.089 492,256.215 492,256.178 -0.036 0.096 good

262 1,279,347.624 1,279,347.655 0.032 492,253.488 492,253.417 -0.071 0.077 good

263 1,279,345.712 1,279,345.685 -0.027 492,250.921 492,250.950 0.029 0.040 good


264 1,279,350.202 1,279,350.193 -0.009 492,259.796 492,259.799 0.002 0.009 good

265 1,279,348.291 1,279,348.331 0.040 492,257.230 492,257.211 -0.019 0.044 good

266 1,279,346.260 1,279,346.264 0.004 492,254.503 492,254.472 -0.031 0.031 good

267 1,279,344.349 1,279,344.305 -0.044 492,251.936 492,251.901 -0.036 0.057 good

268 1,279,348.838 1,279,348.817 -0.021 492,260.812 492,260.887 0.075 0.078 good

269 1,279,346.927 1,279,347.000 0.073 492,258.245 492,258.242 -0.004 0.073 good

270 1,279,344.897 1,279,344.889 -0.008 492,255.518 492,255.573 0.055 0.055 good

271 1,279,342.985 1,279,342.907 -0.079 492,252.952 492,252.965 0.013 0.080 good

272 1,279,347.475 1,279,347.470 -0.005 492,261.827 492,261.801 -0.026 0.027 good


273 1,279,345.564 1,279,345.599 0.035 492,259.260 492,259.303 0.042 0.055 good

274 1,279,343.533 1,279,343.545 0.012 492,256.533 492,256.465 -0.068 0.069 good

275 1,279,341.622 1,279,341.632 0.010 492,253.967 492,253.950 -0.017 0.020 good

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile Position Coordinate (5/5)

Location : UGR-5 Inspection Date : 23-Feb-08

Coordinate Tolerance +-0.100m


Pile Northing ( m ) Easting ( m ) e=
No. Design Actual dN Design Actual dE SQR(dN2+dE2) Judgment
276 1,279,346.111 1,279,346.115 0.004 492,262.842 492,262.849 0.007 0.008 good

277 1,279,344.200 1,279,344.208 0.008 492,260.276 492,260.270 -0.006 0.010 good

278 1,279,342.170 1,279,342.146 -0.024 492,257.549 492,257.582 0.033 0.041 good

279 1,279,340.258 1,279,340.250 -0.008 492,254.982 492,254.994 0.012 0.015 good

280 1,279,344.314 1,279,344.316 0.002 492,262.186 492,262.182 -0.004 0.005 good

281 1,279,342.343 1,279,342.392 0.050 492,259.539 492,259.502 -0.037 0.062 good

282 1,279,340.372 1,279,340.350 -0.022 492,256.893 492,256.852 -0.041 0.046 good

283 1,279,344.427 1,279,344.368 -0.059 492,264.097 492,264.170 0.073 0.094 good

284 1,279,342.516 1,279,342.566 0.050 492,261.530 492,261.602 0.072 0.088 good

285 1,279,340.485 1,279,340.405 -0.080 492,258.803 492,258.845 0.042 0.091 good

286 1,279,338.574 1,279,338.496 -0.078 492,256.236 492,256.183 -0.053 0.094 good


Instrument
Back sight
Fore sight

Inspected by : Prepared by :
CTI Engineering Co., Ltd. Kubota Construction Co., Ltd.
in consortium with Nippon Koei Co., Ltd.

Name : Name :

Signature : Signature :
THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile top Level (1/3)

Location : UGR-5 Inspection Date :

Pile Elevation Tolerance +-0.050m Pile Elevation Tolerance +-0.050m

No. Design Actual dH Judgment No. Design Actual dH Judgment


156 6.450 6.452 0.002 good 186 6.450 6.448 -0.002 good

157 6.450 6.456 0.006 good 187 6.450 6.440 -0.010 good

158 6.450 6.471 0.021 good 188 6.450 6.435 -0.015 good

159 6.450 6.481 0.031 good 189 6.450 6.444 -0.006 good

160 6.450 6.445 -0.005 good 190 6.450 6.441 -0.009 good

161 6.450 6.454 0.004 good 191 6.450 6.441 -0.009 good

162 6.450 6.475 0.025 good 192 6.450 6.442 -0.008 good

163 6.450 6.455 0.005 good 193 6.450 6.435 -0.015 good

164 6.450 6.441 -0.009 good 194 6.450 6.436 -0.014 good

165 6.450 6.499 0.049 good 195 6.450 6.456 0.006 good

166 6.450 6.446 -0.004 good 196 6.450 6.452 0.002 good

167 6.450 6.451 0.001 good 197 6.450 6.442 -0.008 good

168 6.450 6.437 -0.013 good 198 6.450 6.442 -0.008 good

169 6.450 6.440 -0.010 good 199 6.450 6.439 -0.011 good

170 6.450 6.448 -0.002 good 200 6.450 6.442 -0.008 good

171 6.450 6.452 0.002 good 201 6.450 6.440 -0.010 good

172 6.450 6.440 -0.010 good 202 6.450 6.440 -0.010 good

173 6.450 6.445 -0.005 good 203 6.450 6.446 -0.004 good

174 6.450 6.440 -0.010 good 204 6.450 6.442 -0.008 good

175 6.450 6.446 -0.004 good 205 6.450 6.440 -0.010 good

176 6.450 6.444 -0.006 good 206 6.450 6.434 -0.016 good

177 6.450 6.452 0.002 good 207 6.450 6.441 -0.009 good

178 6.450 6.452 0.002 good 208 6.450 6.446 -0.004 good

179 6.450 6.448 -0.002 good 209 6.450 6.441 -0.009 good

180 6.450 6.444 -0.006 good 210 6.450 6.439 -0.011 good

181 6.450 6.435 -0.015 good 211 6.450 6.445 -0.005 good

182 6.450 6.441 -0.009 good 212 6.450 6.432 -0.018 good

183 6.450 6.440 -0.010 good 213 6.450 6.284 -0.166 good
184 6.450 6.442 -0.008 good 214 6.450 6.433 -0.017 good

185 6.450 6.445 -0.005 good 215 6.450 6.447 -0.003 good

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile top Level (2/3)

Location : UGR-5 Inspection Date :

Pile Elevation Tolerance +-0.050m Pile Elevation Tolerance +-0.050m

No. Design Actual dH Judgment No. Design Actual dH Judgment


216 6.450 6.453 0.003 good 246 6.450 6.441 -0.009 good

217 6.450 6.447 -0.003 good 247 6.450 6.484 0.034 good

218 6.450 6.431 -0.019 good 248 6.450 6.459 0.009 good

219 6.450 6.462 0.012 good 249 6.450 6.440 -0.010 good

220 6.450 6.440 -0.010 good 250 6.450 6.446 -0.004 good

221 6.450 6.451 0.001 good 251 6.450 6.480 0.030 good

222 6.450 6.433 -0.017 good 252 6.450 6.432 -0.018 good

223 6.450 6.465 0.015 good 253 6.450 6.455 0.005 good

224 6.450 6.437 -0.013 good 254 6.450 6.462 0.012 good

225 6.450 6.445 -0.005 good 255 6.450 6.496 0.046 good

226 6.450 6.427 -0.023 good 256 6.450 6.437 -0.013 good

227 6.450 6.484 0.034 good 257 6.450 6.437 -0.013 good

228 6.450 6.441 -0.009 good 258 6.450 6.447 -0.003 good

229 6.450 6.443 -0.007 good 259 6.450 6.466 0.016 good

230 6.450 6.435 -0.015 good 260 6.450 6.436 -0.014 good

231 6.450 6.434 -0.016 good 261 6.450 6.438 -0.012 good

232 6.450 6.444 -0.006 good 262 6.450 6.446 -0.004 good

233 6.450 6.442 -0.008 good 263 6.450 6.431 -0.019 good

234 6.450 6.441 -0.009 good 264 6.450 6.376 -0.074 good

235 6.450 6.469 0.019 good 265 6.450 6.436 -0.014 good

236 6.450 6.446 -0.004 good 266 6.450 6.450 0.000 good

237 6.450 6.436 -0.014 good 267 6.450 6.436 -0.014 good

238 6.450 6.438 -0.012 good 268 6.450 6.226 -0.224 good

239 6.450 6.486 0.036 good 269 6.450 6.436 -0.014 good

240 6.450 6.453 0.003 good 270 6.450 6.446 -0.004 good
241 6.450 6.480 0.030 good 271 6.450 6.436 -0.014 good

242 6.450 6.438 -0.012 good 272 6.450 6.435 -0.015 good

243 6.450 6.481 0.031 good 273 6.450 6.436 -0.014 good

244 6.450 6.447 -0.003 good 274 6.450 6.453 0.003 good

245 6.450 6.461 0.011 good 275 6.450 6.431 -0.019 good

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Pile top Level (3/3)

Location : UGR-5 Inspection Date :

Pile Elevation Tolerance +-0.050m Pile Elevation Tolerance +-0.050m

No. Design Actual dH Judgment No. Design Actual dH Judgment


276 6.450 6.440 -0.010 good

277 6.450 6.432 -0.018 good

278 6.450 6.455 0.005 good

279 6.450 6.431 -0.019 good

280 6.450 6.440 -0.010 good

281 6.450 6.447 -0.003 good

282 6.450 6.446 -0.004 good

283 6.450 6.433 -0.017 good

284 6.450 6.416 -0.034 good

285 6.450 6.436 -0.014 good

286 6.450 6.431 -0.019 good


Instrument
Back sight
Fore sight

Inspected by : Prepared by :
CTI Engineering Co., Ltd. Kubota Construction Co., Ltd.
in consortium with Nippon Koei Co., Ltd.

Name : Name :

Signature : Signature :
Chittagong Water Supply Improvement & Sanitation Project (CWSISP)
(IDA Credit No.6093-BD)
Construction of Water Transmission Main from Kalurghat to Patenga BPS
and related Distribution Pipelines CWSISP/W-5

Reinforcing Bar Arrangement Inspection

LOCATION: CH: To INSPECTION DATE:


STRUCTURE / FACILITIES:

DIA.@SPACING LENGTH COVER


QUANTITY
NO. DESCRIPTION (mm) (mm) (mm)

DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL

Reinforcing Bar

REMARK:

PREPARED BY: INSPECTED BY:


SWEG-TCEL-FSL JV. Engineers Representative

NAME: NAME:
SIGNATURE: SIGNATURE:
KARNAPHULI WATER SUPPLY PROJECT KWSP C-2

Form work Inspection

LOCATION: INSPECTION DATE: / /

STRUCTURE / FACILITIES:

WIDTH LENGTH ALIGNMENT CLEANING


(mm) (mm)
NO. DESCRIPTION

DESIGN ACTUAL DESIGN ACTUAL Good No good Good No good

REMARK:

PREPARED BY: INSPECTED BY:


KUBOTA-MARUBENI JV NJS/BETS Consultants.

NAME: NAME:
SIGNATURE: SIGNATURE:
THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Elevation of top of Steel Sheet Pile (1/4)

Location : Chakto Mukh Theatre Revetment Inspection Date :

Pile Elevation Tolerance +-50 mm Pile Elevation Tolerance +-50 mm

No. Design Actual dH Judgment No. Design Actual dH Judgment


1 2.600 31 2.600

2 2.600 32 2.600

3 2.600 33 2.600

4 2.600 34 2.600

5 2.600 35 2.600

6 2.600 36 2.600

7 2.600 37 2.600

8 2.600 38 2.600

9 2.600 39 2.600

10 2.600 40 2.600

11 2.600 41 2.600

12 2.600 42 2.600

13 2.600 43 2.600

14 2.600 44 2.600

15 2.600 45 2.600

16 2.600 46 2.600

17 2.600 47 2.600

18 2.600 48 2.600

19 2.600 49 2.600

20 2.600 50 2.600

21 2.600 51 2.600

22 2.600 52 2.600

23 2.600 53 2.600

24 2.600 54 2.600

25 2.600 55 2.600

26 2.600 56 2.600

27 2.600 57 2.600

28 2.600 58 2.600
29 2.600 59 2.600

30 2.600 60 2.600

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Elevation of top of Steel Sheet Pile (2/4)

Location : Chakto Mukh Theatre Revetment Inspection Date :

Pile Elevation Tolerance +-50 mm Pile Elevation Tolerance +-50 mm

No. Design Actual dH Judgment No. Design Actual dH Judgment


61 2.600 91 2.600

62 2.600 92 2.600

63 2.600 93 2.600

64 2.600 94 2.600

65 2.600 95 2.600

66 2.600 96 2.600

67 2.600 97 2.600

68 2.600 98 2.600

69 2.600 99 2.600

70 2.600 100 2.600

71 2.600 101 2.600

72 2.600 102 2.600

73 2.600 103 2.600

74 2.600 104 2.600

75 2.600 105 2.600

76 2.600 106 2.600

77 2.600 107 2.600

78 2.600 108 2.600

79 2.600 109 2.600

80 2.600 110 2.600

81 2.600 111 2.600

82 2.600 112 2.600

83 2.600 113 2.600

84 2.600 114 2.600

85 2.600 115 2.600


86 2.600 116 2.600

87 2.600 117 2.600

88 2.600 118 2.600

89 2.600 119 2.600

90 2.600 120 2.600

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Elevation of top of Steel Sheet Pile (2/4)

Location : Chakto Mukh Theatre Revetment Inspection Date :

Pile Elevation Tolerance +-50 mm Pile Elevation Tolerance +-50 mm

No. Design Actual dH Judgment No. Design Actual dH Judgment


121 2.600 151 2.600

122 2.600 152 2.600

123 2.600 153 2.600

124 2.600 154 2.600

125 2.600 155 2.600

126 2.600 156 2.600

127 2.600 157 2.600

128 2.600 158 2.600

129 2.600 159 2.600

130 2.600 160 2.600

131 2.600 161 2.600

132 2.600 162 2.600

133 2.600 163 2.600

134 2.600 164 2.600

135 2.600 165 2.600

136 2.600 166 2.600

137 2.600 167 2.600

138 2.600 168 2.600

139 2.600 169 2.600

140 2.600 170 2.600

141 2.600 171 2.600

142 2.600 172 2.600


143 2.600 173 2.600

144 2.600 174 2.600

145 2.600

146 2.600

147 2.600

148 2.600

149 2.600

150 2.600

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Elevation of top of Steel Sheet Pile (4/4)

Location : Chakto Mukh Theatre Revetment Inspection Date :

Pile Elevation Tolerance +-50 mm Pile Elevation Tolerance +-50 mm

No. Design Actual dH Judgment No. Design Actual dH Judgment


P1 2.430

P2 2.230

P3 2.030

P4 1.830

P5 1.630

P6 1.430

P7 2.430

P8 2.230

P9 2.030

P10 1.830

P11 1.630

P12 1.430
Inspected by : Prepared by :
CTI Engineering Co., Ltd. Kubota Construction Co., Ltd.
in consortium with Nippon Koei Co., Ltd.

Name : Name :

Signature : Signature :
THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Center line of Steel Sheet Pile (1/4)

Location : Chakto Mukh Theatre Revetment Inspection Date :

Pile Center line Tolerance +-100 mm Pile Center line Tolerance +-100 mm

No. Design Actual Judgment No. Design Actual Judgment


1 -- 31 --

2 -- 32 --

3 -- 33 --

4 -- 34 --

5 -- 35 --

6 -- 36 --

7 -- 37 --

8 -- 38 --

9 -- 39 --

10 -- 40 --

11 -- 41 --

12 -- 42 --

13 -- 43 --

14 -- 44 --

15 -- 45 --

16 -- 46 --

17 -- 47 --

18 -- 48 --

19 -- 49 --

20 -- 50 --

21 -- 51 --

22 -- 52 --

23 -- 53 --

24 -- 54 --

25 -- 55 --

26 -- 56 --

27 -- 57 --

28 -- 58 --
29 -- 59 --

30 -- 60 --

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Center line of Steel Sheet Pile (2/4)

Location : Chakto Mukh Theatre Revetment Inspection Date :

Pile Center line Tolerance +-100 mm Pile Center line Tolerance +-100 mm

No. Design Actual Judgment No. Design Actual Judgment


61 -- 91 --

62 -- 92 --

63 -- 93 --

64 -- 94 --

65 -- 95 --

66 -- 96 --

67 -- 97 --

68 -- 98 --

69 -- 99 --

70 -- 100 --

71 -- 101 --

72 -- 102 --

73 -- 103 --

74 -- 104 --

75 -- 105 --

76 -- 106 --

77 -- 107 --

78 -- 108 --

79 -- 109 --

80 -- 110 --

81 -- 111 --

82 -- 112 --

83 -- 113 --

84 -- 114 --

85 -- 115 --
86 -- 116 --

87 -- 117 --

88 -- 118 --

89 -- 119 --

90 -- 120 --

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Center line of Steel Sheet Pile (2/4)

Location : Chakto Mukh Theatre Revetment Inspection Date :

Pile Center line Tolerance +-100 mm Pile Center line Tolerance +-100 mm

No. Design Actual Judgment No. Design Actual Judgment


121 -- 151 --

122 -- 152 --

123 -- 153 --

124 -- 154 --

125 -- 155 --

126 -- 156 --

127 -- 157 --

128 -- 158 --

129 -- 159 --

130 -- 160 --

131 -- 161 --

132 -- 162 --

133 -- 163 --

134 -- 164 --

135 -- 165 --

136 -- 166 --

137 -- 167 --

138 -- 168 --

139 -- 169 --

140 -- 170 --

141 -- 171 --

142 -- 172 --
143 -- 173 --

144 -- 174 --

145 --

146 --

147 --

148 --

149 --

150 --

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE IMPROVEMENT

IN THE MUNICIPALITY OF PHNOM PENH (PHASE II)

Inspection for Center line of Steel Sheet Pile (4/4)

Location : Chakto Mukh Theatre Revetment Inspection Date :

Pile Center line Tolerance +-100 mm Pile Center line Tolerance +-100 mm

No. Design Actual Judgment No. Design Actual Judgment


P1 --

P2 --

P3 --

P4 --

P5 --

P6 --

P7 --

P8 --

P9 --

P10 --

P11 --

P12 --

[ Length ]

Length Tolerance -200 mm Length Tolerance -200 mm

Design Actual Judgment Design Actual Judgment


No.1 ~ No.149 Total

59.65 m 74.42 m

No.150 ~ No.174
9.97 m

P1 ~ P6
2.40 m
P7 ~ P12
2.40 m
Inspected by : Prepared by :
CTI Engineering Co., Ltd. Kubota Construction Co., Ltd.
in consortium with Nippon Koei Co., Ltd.

Name : Name :

Signature : Signature :
+-100 mm
+-100 mm
+-100 mm
+-100 mm