Department - Engineering Section – Electrical

Transformer Maintenance Report

Due date of maintenance - Date of maintenance -


Tag - Location - Period - Months
Make - Rating - KVA Volt Ratio
Sr No. - P Current Amp S Current Amp

Sr No Description Comment / Remark


1 Oil Level
2 Oil Leakage
3 Valve Tightening
4 Explosion Vent
5 Breather
6 Breather Oil
7 Bochholz Relay
8 Connection
(a) Marshalling Box Sealing
(b) HT Terminals
(c) LT Terminals
9 Insulator (a) HT
(b) LT
10 Check for Temperature setting
(a) Winding Temperature
(b) Oil Temperature
11 OLTC Operation
12 Cooling Fan Operation (a) Auto
(b) Manual
13 Earth Connection
14 Transformer Cleaning
15 NGR & its cubical visual inspection
16 Oil Testing
(a) Colour of oil
(b) BDV of top oil sample
(c) BDV of bottom oil sample
(d) BDV of OLTC oil
17 IR Value of Winding (a) HT to Earth
(b) LT to Earth
(c) HT to LT
18 Breaker trip by 86 Relay

Maint. Engineer Sign _______________ Name ___________________________