You are on page 1of 2

National Institutional Ranking Framework

Ministry of Human Resource Development


Government of India
Submitted Institute Data for NIRF'2019'
Institute Name: Indian Institute of Science Education & Research Pune [IR-O-U-0305]

Sanctioned (Approved) Intake


Academic Year 2017-18 2016-17 2015-16 2014-15 2013-14 2012-13

UG [5 Years Program(s)] 225 200 200 200 200 -

Total Actual Student Strength (Program(s) Offered by Your Institution)


(All programs No. of Male No. of Female Total Students Within State Outside State Outside Economically Socially No. of students No. of students No. of students No. of students
of all years) Students Students (Including male (Including male Country Backward Challenged receiving full receiving full receiving full who are not
& female) & female) (Including male (Including male (SC+ST+OBC tuition fee tuition fee tuition fee receiving full
& female) & female) Including male reimbursement reimbursement reimbursement tuition fee
& female) from the State from Institution from the Private reimbursement
and Central Funds Bodies
Government

UG [5 Years 598 254 852 233 619 0 26 422 172 0 41 235


Program(s)]

Placement & Higher Studies

UG [5 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students Academic Year No. of students No. of students Median salary of No. of students
students intake in the students admitted in admitted through graduating in placed placed selected for Higher
year the year Lateral entry minimum stipulated graduates(Amount in Studies
time Rs.)

2011-12 100 82 2012-13 0 2015-16 64 0 0(Zero) 42

2012-13 120 113 2013-14 0 2016-17 96 0 0(Zero) 50

2013-14 200 143 2014-15 0 2017-18 115 0 0(Zero) 42

Ph.D Student Details


Ph.D (Student pursuing doctoral program till 2017-18; Students admitted in the academic year 2018-19 should not be entered here.)

Total Students

Full Time 548

Part Time 0

No. of Ph.D students graduated (including Integrated Ph.D)

2017-18 2016-17 2015-16

Full Time 41 42 33

Part Time 0 0 0

Financial Resources: Utilised Amount for the Capital expenditure for previous 3 years
Academic Year 2017-18 2016-17 2015-16

Utilised Amount Utilised Amount Utilised Amount

Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)

Library 46128345 (Four Crore Sixty One Lakh Twenty Eight Thousand 3956283 (Thirty Nine Lakh Fifty Six Thousand Two Hundred 3146070 (Thirty One Lakh Forty Six Thousand Seventy)
Three Hundred Forty Five) Eighty Three)

New Equipment for Laboratories 215585140 (Twenty One Crore Fifty Five Lakh Eighty Five 71187321 (Seven Crore Eleven Lakh Eighty Seven Thousand 94762209 (Nine Crore Forty Seven Lakh Sixty Two Thousand
Thousand One Hundred Forty) Three Hundred Twenty One) Two Hundred Nine)

Engineering Workshops 0 (Zero) 0 (Zero) 0 (Zero)

Other expenditure on creation of Capital Assets (excluding 15307100 (One Crore Fifty Three Lakh Seven Thousand One 55195475 (Five Crore Fifty One Lakh Ninety Five Thousand 10285050 (One Crore Two Lakh Eighty Five Thousand Fifty)
expenditure on Land and Building) Hundred) Four Hundred Seventy Five)

Financial Resources: Utilised Amount for the Operational expenditure for previous 3 years
Academic Year 2017-18 2016-17 2015-16

Utilised Amount Utilised Amount Utilised Amount

Annual Operational Expenditure

Salaries (Teaching and Non Teaching staff) 521166788 (Fifty Two Crore Eleven Lakh Sixty Six Thousand 216501340 (Twenty One Crore Sixty Five Lakh One Thousand 182895332 (Eighteen Crore Twenty Eight Lakh Ninety Five
Seven Hundred Eighty Eight) Three Hundred Forty) Thousand Three Hundred Thirty Two)

Maintenance of Academic Infrastructure or consumables, 477443472 (Forty Seven Crore Seventy Four Lakh Forty Three 102939314 (Ten Crore Twenty Nine Lakh Thirty Nine 133152772 (Thirteen Crore Thirty One Lakh Fifty Two
other running expenditures etc.(excluding maintenance of Thousand Four Hundred Seventy Two) Thousand Three Hundred Fourteen) Thousand Seven Hundred Seventy Two)
hostels and allied services)

Seminars/Conferences/Workshops 1088661 (Ten Lakh Eighty Eight Thousand Six Hundred Sixty 3164842 (Thirty One Lakh Sixty Four Thousand Eight Hundred 3092609 (Thirty Lakh Ninety Two Thousand Six Hundred Nine)
One) Forty Two)

PCS Facilities: Facilities of physically challenged students


1. Do your institution buildings have Lifts/Ramps? Yes, more than 80% of the buildings

2. Do your institution have provision for walking aids, includingwheelchairs and transportation from one building to another for Yes
handicapped students?

3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings

You might also like