GOVERNMENT OF INDIA
DANAPUR DIVISION
TENDER DOCUMENT
2013-14
OPEN TENDER
(Not Transferable)
Important information:
M/s ………………………………………….
………………………………………….
………………………………………….
Hkkjr la?k ds jk"Vªifr ds fy, ,oa mudh vksj ls eaMy jsy izca/kd ¼flxuy ,oa nwj lapkj½ iwoZ e/; jsyos] nkukiqj eaMy] fuEufyf[kr dk;Z gsrq
fu/kkZfjr izi= esa eqgjcan fufonk,a vkeaf=r djrs gS%a &
Øze dk;Z dk uke fufonk dkxt fufonk dkxt fufonk [kqyus dk;Z iwjk
la dh fcdzh dh tek djus dh dh frfFk ,oa djus vof/k
lekfIr dh frfFk vafre frfFk ,oa le;
,oa le; le;
1- [kqyh fufonk Lka[;k- Lka[;k-Mh-,u-vkj-@,l-,.M Vh-@ Vsfy-
@2013@3 18-09-2013 19-09-2013 19-09-2013 एक माह
dk;Z dk uke & पूव मय रे लवेs केsa दानापुर मंडल म ःथापत dks 18 cts rd dks 12 cts rd dks 12-30 cts
दरू संचार उपकरणो के पी ड मस का स ( वेब#फल मेक) के
मर&मत हे तु काय A
UkksV &
1- dk;Z dk vuqekfur ykxr :-595041@&
595041@&
2- is’kxh jde &: :-11900@&
1900@& ek=] foRr lykgdkj ,oa eq[; ys[kk vf/kdkjh @ iwoZ e/; jsy @ gkftiqj ds Ik{k esa A
3- fufonk [kqyus dh frfFk ls izLrko ,oa is’kxh jde dh cS/krk 180 fnuksa dh gksuh pkfg;s A
egRoiw
egRoi.w kZ %&
1 vfxze /ku vfxze /ku vuqekfur fufonk ewY; dk 2 izfr’kr gksxk tSlk fd fufonk lwpuk esa n’kkZ;k x;k
gS A vfxze /ku 10 @& #0 ds fudVre iw.kZ #i esa gksuk pkfg, A
2 izfrHkwfr jde tc rd fd fo’ks"k 'krZ] ;fn dksbZ gks] esa vU;Fkk fofufnZ"V u gks] izfrHkwfr jde lafonk ewY;
dk 5% ¼izfr’kr½ gksuk pkfg, A
3 dk;Z fu"iknu tekur lQy fufonkdkj dks dk;Z djus dh dk;Z fu"iknu tekur nsuk gksxk] tks fd lafonk ewY;
¼ ijQkjesal xkjaVh ½ ¼ ih0 th0 ½ dk 5 izfr’kr ds cjkcj gksuk pkfg, A
4-2 fucaf/kr Mkd }kjk fufonk nLrkost eaxkus ds fy, :-500@& ¼:-ikWp lkS½ ek= vfrfjDr ns; dh /kujk’kh ¼xSj okilh½ dk fMek.M MªkQ~V ,Q-,-,.M
lh-,-vks-@iwoZ e/; jsy@gkthiqj ds i{k esa iVuk esa ns; gksxhA
4-3 fufonk nLrkost www.ecr.indianrailways.gov.in ;k www.tenders.gov.in ij miyC/k gsAa
5 dk;Z dkdk laf{kIr fooj.k & पूव मय रे लवेs केsa दानापुर मंडल म ःथापत दरू संचार उपकरणो के पी ड मस का स ( वेब#फल मेक) के मर&मत हे तु
काय A
6- fufonk izLrqr djus dk rjhdkA
6-1 fufonkdkj dks izLrko ds lkFk visf{kr is’kxh jde vo’; tek djuh pkfg;s ugha rks mldh fufonk ljljh rkSj ij vLohdkj dj nh tk;xh A
6-2 fufonkdkjksa ls vuqjks?k gS fd os dsoy jsyos ds ewy q fufonk QkeZ@ nLrkost ;k osclkbV ls MkÅuyksM fd;k x;k ewy q fufonk QkeZ@nLrkost gh tek
djsa A
6-3 fufonkdkj] tks fufonk izi= @ nLrkost ] osolkbV www.ecr.indianrailways.gov.in ;k www.tenders.gov.in ls MkÅuyksM djrs
2000 ()पये दो हज़ार ½ ek= /kujk’kh ¼ xSj okilh jde½ dk fMek.M MªkQV ,Q-
gSa ] dks :-2000@&( ,Q- ,- ,.M lh-
lh- ,- vks- @iwoZ e/; jsy @ gkthiqj ds i{k
esa ] fufonk dkxtkr ds ewY; ds #i esa fufonk ds lkFk vyx ls nsuk gksxk A
6-4 fdlh dkj.k fufonk ugha feyus ij ;k nsj ls feyus ij fufonkdkj ftEesokj gksx a As
6-5 jsyos dks ;g vf?kdkj gksxk dh og fdlh Hkh fufonk dks fcuk dkj.k crk, Lohdkj djs ;k jn~n djsA
Divisional Railway Manager (Signal & Telecom), East Central Railway, Danapur division, for and on behalf on
President of India invites sealed tenders in the prescribed form for the following work :-
Closing date Last date & Date & time of Completion
Sl.N Name of Work. of Sale of time for opening of the period
o. Tender receipt of the tender.
document tender
document
1. Open Tender No. DNR/S&T/Tele/2013/2.
Name of Work :- Repairing of PD MUX 18.09.2013 19.09.2013 19.09.2013 One
Cards(Webfil make) of Telecommunication at 18.00 Hrs. 12.00 Hrs. 12.30 Hrs. Calender
equipments of Danapur division of E.C.Rly. Month
NOTE:-
1. Cost of the work Rs.595041/=.
2. Earnest money: Rs.11900/= In favour of F.A. & C.A.O./E.C.R./Hajipur.
3. Validity of offer and earnest money should be 180 days from the date of opening of tender.
Important:
1. Earnest Money. The earnest money shall be 2% of the estimated tender value as indicated in the tender notice. The
earnest money should be rounded off to the nearest Rs.10/-
2. Security Deposit. Unless otherwise specified in the special condition, if any, the security deposit should be 5% of the
contract value.
3. Performance The successful bidders should give a performance Guarantee amounting to 5% of the contract
Guarantee (P.G.) value.
4. Availability of Tender Document.
4.1 Non transferable tender documents may be purchased from the date of publicity of this notice and onward from the office of
Chief Signal and Telecommunication Engineer / East Central Railway / Hajipur or Sr. Divl. Signal & Telecom. Engineer. East
Central Railway. Danapur on submission of receipt for payment of non-refundable amount of Rs.2000/- (Rupees Two
Thousand only ) to the Booking Supervisor, East Central Railway , Hajipur or Sr. Divisional Cashier East Central Railway,
Danapur.
4.2 An additional amount of Rs.500/= (Rupees Five hundred only non refundable amount) per set of tender form will be charged in the
form of Demand Draft in favour of F.A. & C.A.O/E.C. Railway/Hajipur payable at Patna, if the tender document are being
demanded by Registered Post.
4.3 The Tender document is also available on the Indian Railways website www.tenders.gov.in or www.ecr.indianrailways.gov.in.
5. Brief Scope of Work :- Repairing of PD MUX Cards(Webfil make) of Telecommunication equipments of
Danapur division of E.C.Rly.
6. Mode of Submission of Tender :-
6.1 The tenderer must submit requisite earnest money with the offer, without which tender shall summarily be rejected.
6.2 Tenderers are requested to submit original Railways tender form/document or tender form /document downloaded from website.
6.3 The tenderers who download the tender document from Indian Railway website www.tenders.gov.in or
www.ecr.indianrailways.gov.in, have to submit a separate Demand Draft of Rs.2000/- (Rupees Two Thousand only , non-
refundable amount) along with the offer in favour of F.A & C.A.O./ E.C.R./Hajipur as the cost of tender document .
6.4 Non-receipt or delayed receipts of tenders due to any account shall be at tenderers risk.
6.5 Railway reserves the right to accept or rejected any tender without assigning any reason.
ASTE/W/ECR/DNR
For & on behalf of President of India.
ANNEXURE-I
EAST CENTRAL RAILWAY
TENDER FORMS (FIRST SHEET)
Tender No.DNR/S&T/Tele/2013/3
To
The President of India
Acting through the Divisional Railway manager,
East Central Railway, Danapur.
1. I/We____________________________have read the various conditions to tender attached hereto and agree to
abide by the said condition. I/We also agree to keep this tender open for acceptance for a period of 180 days from
the date fixed for opening the same and in default thereof I/We will be liable for forfeiture of my/our “ Earnest money”.
I/We offer to do the work for East Central Railway, at the rates quoted in the attached schedule and hereby bind
myself/ourselves to complete the work in all respects in One Clender Month from the date of issue of letter of
acceptance of the tender.
2. I/We also hereby agree to abide by the General Condition of Contract corrected unto printed/advance correction slip
No. Nil of 2008 and to carry out the work according to the Special Condition of contract and specifications of materials
and works as laid down by Railway in the annexed Special Conditions / Specifications for the present contract.
3. A sum of Rs.11900/- (Rupees Eleven Thousand Nine Hundred only) is herewith forwarded as Earnest
Money. The full value Earnest money shall stand forfeited without prejudice to any other right or remedies in case my
/ our tender is accepted and if: -
a). I/We do not execute the contract documents within seven days after receipt of notice issued by the Railways that
such documents are ready and
b). I/We do not commence the work within ten days after receipt of orders to that
effect.
4. Until a formal agreement is prepared and executed, acceptance of the tender shall constitute binding contract between
us subject to modification as may be mutually agreed to between us and indicated in the letter of acceptance of
my/our offer for this work.
Signature of Tenderer(s)
Date
Address of the Tenderer(s)
ANNEXURE-II
TENDER FORM (SECOND SHEET)
unsuccessful Tenderer(s) within a reasonable time but the Railway shall not be responsible to any loss or depreciation
that may happen to the security for the due performance of the stipulation to keep the offer open for the period
specified in the tender documents or to the Earnest money while in their possession nor be liable to pay interest
thereon.
7. SECURITY DEPOSIT:
7.1 The Earnest Money deposited by the contractor with his tender will be retained by Railway as part of security for due
and faithful fulfillment of the contract by the contractor. The balance to make up the security deposit, the rates for
which are given below, may be deposited by the contractor in cash or may be recovered by percentage deduction from
the contractor’s “On account” bills. Provided also that in case of defaulting contractor the railway may retain any
amount due payment to the contractor on the pending “On account bills” so that the amounts so retained may not
exceed 10% of the total value of contract. unless otherwise specified in the special condition, if any, the security
Deposit/rate of recovery/mode of recovery shall be as under. :
a. Security Deposit for each work should be 5% of the contract value.
b. The rate of recovery should be at the rate of 10% of the bill amount till the full security deposit is recovered.
c. Security deposit will be recovered only from the running bills of the contract and no other mode of collecting SD, such
as SD in the form of instruments like BG, FD etc., shall be accepted towards Security Deposit.
Security Deposit shall be released only after the expiry of the maintenance/warantee period and after passing the final
bill based on “No Claim certificate”. The Competent Authority shall normally be the authority who is competent to sign
the contract. If this Competent Authority is of the rank lower than JA Grade, then a JA Grade Officer (Concerned with
the work) should issue the certificate. The certificate, inter alia, should mention that the work has been completed in all
respects and that all the contractual obligation have been fulfilled by the contractors and that there is no due from the
contractors to Railways against the contract concern. Before releasing the SD, an unconditional and unequivocal no-
claim certificate from the contractor concern should be obtained.
No interest will be payable upon the Earnest Money and Security Deposit of amounts payable to the Contractor under
the Contract.
7.2 PERFORMANCE GUARANTEE (PG): The procedure for obtaining Performance Guarantee is outlined below :-
(Rly. Boards Letter No.2007/CE.1/CT/18 dt.31.12.2010).
a. The successful bidder shall have to submit a Performance Guarantee (PG) to 5% of the contract value in any of the
following forms :- (i) a deposit of Cash (ii) Irrevocable Bank Guarantee (iii) Government Securities including State
Loan Bonds at 5 percent below the market value (iv) Deposit Receipts, Pay Orders, Demand Drafts and Guarantee
Bonds. These forms of Performance Guarantee could be either of the State Bank of India or of any of the
Nationalized Banks (v) Guarantee Bonds executed or Deposits Receipts tendered by all Scheduled Banks (vi) A
Deposit in the Post Office Saving Bank (vii) A Deposit in the National Savings Certificates (viii) Twelve years National
Defence Cetificates (ix) Ten years Defence Deposits (x) National Defence Bonds and (x) Unit Trust Certificates at 5
percent below market value or at the face value whichever is less Also FDR in favour of FA & CAO/E.C.Rly/Hajipur,
(free from any encumbrance) may be accepted.
NOTE : The instruments as listed above will also be acceptable for Guarantees in case of Mobilization advance.
b. The Performance Guarantee shall be submitted by successful bidder after the letter of acceptance has been issued,
but before signing of the agreement. The Performance Guarantee (PG) should be submitted within 30 (Thirty) days
from the date of issue of LOA. Extension of time for submission of PG beyond 30 (Thirty) days and up to 60 (Sixty)
days from the date of issue of LOA may be given by the Competent Authority. However, a penal interest of 15% per
anum shall be charged for delay beyond 30 (Thirty) days i.e. from 31st day after the date of issue of LOA. In case the
contractor fails to submit the requisite PG even after 60 days from date of issue of LOA, the contract shall be
terminated duly forfeiting EMD and other dues, if any payable against that contract. The failed contractor shall be
debarred from participating in re-tender for the work
The guarantee shall be initially valid up to the stipulated date of completion plus 60 days beyond that. In case , the
time for completion of work gets extended, the contractor shall get the validity of Performance Guarantee extended to
cover such extended time for completion of work plus 60days.
c. The value of PG to be submitted by the contractor will not change for variation upto 25% (either increase or
decrease). For variation beyond 25% of the original contract value an additional PG amounting to 5% (five percent) for
the excess value over the original contract value shall be deposited by the contractor.
d. The Performance Guarantee(PG) shall be released after the physical completion of the work based on the
“Completion Certificate” issued by the competent authority stating that contractor has completed the work in all
respects satisfactorily. The security deposite, however, shall be released only after the expiry of the
maintenance/warantee period and after passing the final bill based on “NO Claim Certificate”.
e. Wherever the contracts are rescinded, the security deposit should be forfeited and Performance Guarantee shall be
encashed and the balance work should be got done independently without risk and cost of the failed contract. The
failed contractor shall be debarred from participating in the tender for executing the balance work. If the failed
contractor is a JV or a partnership firm, then every member / partner of such a firm shall be debarred from
participating in the tender for the balance work either in his / her individual capacity or as a partner of any other JV/
partnership firm.
f. The Engineer shall not make a claim under the performance Guarantee except for amounts to which the President of
India is entitled under the contract (not withstanding and/or without prejudice to nay other provisions in the contract
agreement) in the event of:-
i. Failure by the contractor to extend the validity of Performance Guarantee as described herein above, in which
event the Engineer may claim the full amount of Performance Guarantee.
ii. Failure of concractor to pay President of India any amount due, either as agrees by the contractor or
determined under any of the Clauses/Conditions of the agreement, within 30 days of the service of notice to
this office effect by Engineer.
iii. The contract being determined or rescinded under provision of the GCC the Performance Guarantee shall be
forfeited in full and shall be absolutely at the disposal of the President of India.
8. Rights of the Railway to deal with tender: The authority for the acceptance of the Tender will rest with the Railway.
It shall not be obligatory on the said authority to accept the lowest tender or any other tender and no Tenderer(s) shall
demand any explanation for the cause of rejection of his/their tender nor the Railway undertake to assign reasons for
declining to consider or reject any particular tender or Tenderer(s).
9. If the tender (s) deliberately gives/give wrong information in his/their tender or Creates/create circumstances for the
acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
10. If the Tenderer(s) expires after the submission of his/their tender or after the acceptance of his/their tender, the
railway shall deem such tender cancelled. If a partner of a firm expires after the submission of the tender or after the
acceptance of their tender, the Railway shall deem such tender as cancelled unless firm retains its character.
11. Tender must be enclosed in a sealed cover subscribed tender No.DNR/S&T/Tele/2013/3 and deposited in the box
allotted for the purpose in the office of Chief Signal and Telecommunication Engineer / East Central Railway /
Hajipur or Sr.Divisional Signal & Telecommunication Engineer/East Central Railway/ Danapur. This special
box will be sealed at 12.00 Hrs on 19.09.2013. The tender will be opened at 12.30 Hrs. on 19.09.2013. The
tender paper will not be sold after 18.00 Hrs. on 18.09.2013.
12. Non-compliance with any of the conditions set forth there in above is liable to result in the tender being rejected.
13. Execution of contract documents: The successful Tenderer(s) shall be required to execute an agreement with the
president of India acting through the Sr. Divisional Signal & Telecommunication Engineer, East Central Railway,
Danapur for carrying out the work according to general condition of contract, special conditions/specifications
annexed to the tender and specification for work and materials as laid down in Works Hand Book of East Central
Railway as amended / corrected up to correction slip mentioning tender form (First Sheet).
14. Partnership deed, power of attorney etc: The tenderer (s) shall clearly specify whether the tender is submitted on
his own or on behalf of partnership concern. If the tender is submitted on behalf of partnership concern, he should
submit the certified copy of partnership deed along with the tender and authorization to sign the tender documents on
behalf of partnership firm. If these documents are not enclosed along with the tender documents the tender will be
treated as having been submitted by individual signing the tender documents. The Railway will not be bound by any
power of attorney granted by the tenderer (s) or by changes in composition of the firm made subsequent to the
execution of the contract. It may, However, recognize such power of attorney and change after obtaining proper legal
advise, the cost of which will be chargeable to the contractor.
15. The tenderer whether sole proprietor, a limited company or a partnership firm if they want to act through agent or
individual partner(s) should submit along with the tender or at a later stage, a power of attorney duly stamped and
authenticated by notary public or by magistrate in favour of the specific person whether he / they be partner of the firm
or any other person specifically authorizing him / them to submit the tender, sign the agreement, receive money,
witness measurement, sign measurement book, compromise, settle, relinquish any claim(s) preferred by the firm and
ANNEXURE-III
Technical specification
Network interface module card (NIM)
(i) ITU-T: recommendation- G-703, G-704, G-711, G-732, G-823.
(ii) Bit rate – 2048 K bit/S +/- 50 PPM.
Tributary Interface module (TRIB) card.
(i) 2MB port – 2Nos.
(ii) ITU-T recommendation - G-703, G-823,
(iii) Coad – H DB3
PSU card:-
(i) Input voltage – -48 v DC.
(ii) Protection :-
(a) Input – surge over voltage, under voltage.
(b) Output – over voltage, over load & short circuit.
E & M card; - 2/4 wire E &M card
(i) ITU-T recommendations ; G-712
(ii) Number of channel – 4 per card
(iii) Relative level – 4 wire Interface
(a) Input – 3.5 dd
(b) Output – 3.5dd
(c) Nominal impedance – 600 ohms.
Voice Interface (Subscriber interface card)
Repairing of above cards should be by the OEM/Authorised repairing dealer. If the cards become
defective within one year, all the cost of further repairing will be recovered by company or contractor.
Any ambiguity or clarification or other desired details if required, may be collected from Sr.DSTE
Danapur’s office.
ANNEXURE- IV
SPECIAL CONDITIONS OF CONTRACT
SCOPE OF WORK:
the other in respect of such non performance, and the obligation under the contract shall be resumed as soon as
practicable after such event has come to an end or ceased to exist. Provided further that if the performance in whole
or part of any obligations under this contract is prevented or delayed by reason of any such event beyond a period as
mutually agreed to by the railway and contractor after any event or 60 days in the absence of such an agreement
whichever is more, either party may at its option terminate the contract, provided also that if the contract is so
terminated under this clause the railway may at the time of such termination, take over from the contractor at prices
as provided for in the contract, all works executed or, works under execution.
7.0 AGREEMENT:
7.1 The successful tenderer shall have to perform agreements having been called upon by notice to do so be bound to
execute an agreement based on accepted rates and conditions, in such form as the railway may prescribe and lodge
the same with the railway together with the condition of contract, specification and schedule of price referred to
therein duly completed.
8.0 PROGRAMME OF WORK:
a. The Contractor shall be held responsible for the execution of the works according to the time schedule given above
for the execution of the work in full compliance of the specifications and the various clause of the supplement
technical specification, instructions and Drawings failure to comply with any of these will be dealt with as per provision
laid down in general condition of contract and instructions for tenders of the Engineering Department of Eastern
Railway.
b. The contractor is liable to carry out the extra work up to 25% of quantity for item under the same terms and conditions
of the agreement.
c. The contractor shall have necessary resources to execute the work, so that the work is to be completed within the
specified period mentioned in the agreement.
d. Programme of execution of work at site shall be intimated to the Railway before commencement and completion.
9.0 INSPECTION:
i. The Engineer or his representative may inspect and test the various portions of the work at all stages and shall have
full power to reject all or any portion of the work that may consider to be defective or inferior in quality or material,
workmanship or design in comparison to what is called for in the specifications. In the event of rejection of any work
already executed which is not in accordance with the specification as in this tender paper and / or as determined by
the Engineer of which the contractor have been apprised, the contractor shall carry out alternation, replacement to
such work to the satisfaction of the Engineer for which no additional expenses will be borne by the Railway.
ii. The contractor shall carry out such tests at his own expenses as are necessary in the opinion of the Engineer to
determine that the contract is being completed with and that the contractor is entitled for payment in respect thereof.
iii. Even if the Engineers representative remained associated / supervised in course of the progress of the works at
various stages, a joint inspection, for each items of works, by Engineers representative and contractors representative
will be carried out to check that the work has been done as per specification and measurement taken and one register
for that must be maintained.
iv. All the inspections will be carried out by the inspecting Authority at the original manufacturer’s premises only who are
supplying these items, but not any other places in case of important and large value items. The cost of stay of the
Railway inspecting official shall be borne by the Railway.
10.0 STORAGE OF MATERIALS:
Storage of materials, tools and machinery used by the contractors shall be done in orderly manner and anything used
by the contractor for the execution of work should in no way cause a danger or hindrance to the working of the railway
or to the movement of its staff or passengers.
11.0 CONTRACTOR’S RESPONSIBILITY
11.1 All costs, damages or expenses which railway may have paid , for which, under the contract, the contractor is liable
may be deducted by the railway from any money due or becoming due by him to the contractor under the contract or
may be recovered by action of law or otherwise from the contractor. The Railway reserves the right and is at liberty to
retain security deposit/Performance Guarantee, any payment due to the contractors under the contract and the
money retained under clause 16.1 (Revised) of the general condition of contract for execution of works and to set off
against such deposit, payments, and money retained all claims whether arising our of this contract or out of any other
transaction or claim whatever against the contractor.
11.2 The contractor shall have to obtain the necessary license before commencing the work, if required under the provision
of contract labour (regulation and abolition) Act 1970.
Annexure –Z
SCHEDULE OF WORK
Name of work :- Repairing of PD MUX Cards(Webfil make) of
Telecommunication
equipments of Danapur division of E.C.Rly.
TENDER No. DNR/S&T/Tele/2013/3
SL Description of works Qty Unit Rate in figure Rate in Words
No. (Per unit) (Per unit)
Note: 1. In case of any discrepancy between the rate quoted in word & figure, the rate quoted in figure shall be
considered for tender evaluation & the decision of Railways in this regard shall be final & binding on the
tenderer.
2. In case the tenderer intends to offer any rebate then the same is to be mentioned under earmarked
space in annexure-Z of this tender document. Cognizance of rebate mentioned elsewhere shall not be
taken & the tenders shall be evaluated accordingly.
ANNEXURE-Z(1)
East Central Railway
(S&T Department)
I/We offer general rebate of _________% (in figures) ____________%(In Words) as lump sump rebate on items of all
schedules.
NOTES: -
(1) If any tenderer wishes to give any rebate on the rates quoted by him, the same may be filled by him in this
schedule.
(2) It is to be noted that such rebate if offered, shall apply on the rates quoted for all the items in all the other
schedules of the tender documents. Such rebate shall be totally unconditional.
(3) In case a tenderer does not wish to give any rebate, he should write ‘NIL’ in this schedule. In case nothing has
been filled in by the tenderer in this schedule, it will be treated as ‘Nil’ and shall be so recorded in the blanks
above at the time of opening of the tender by the officials opening the tenders.
(4) If any tenderer gives any type of conditional rebate, such rebate shall not be considered for evaluation of the
tenderer.
Signature of Tenderer(s)
Date……………………..