Electrification 75,912
S# Description Ref: MRS-19 Length (ft) Width (ft) Depth (ft) No Quantity Unit Unit Rate Total Cost Remarks
1 Removing from walls: Cement or lime plaster NSI 41 2.5 1 102.50 Sft 5.5 563.8
Cement plaster 1:4 upto 20' height 1/2" Repairing in room where
2 11-09-b 41 2.5 1 102.50 Sft 27.63 2832.1
required
3 Dismantling 2nd class tile roofing 04-22-b
Rooms 25 16 2 800 sft
verandah 8.25 25.75 1 212.4375 sft
Total Quantity 1012.4375 sft 9.44 9557.41
Second class tile roofing consisting of 4" earth
4 and 1" mud plaster with gobri leeping etc 09-02
4 PCC 1:2:4 on top of stone masonry 06-05-f 68.00 1.50 0.25 1.00
Pacca brick work in ground and floor in
5 Cement, sand mortar 1:4 07-05-a-03 68.00 0.75 8.00 1.00
333760.76
7.581882
Rehabilitation of GGPS Shamkhai Low
BOQ: Existing latrine ren
Total
4 Distempering new surface:three coat 11-21-a-03
Long Wall (intrernal ) 4
Short Wall (internal) 4
Roof 4 4
Total
Deduction
Doors 2.5 0
Ventilators 1.5 0
Total Deduction
Total
Grand Total
bilitation of GGPS Shamkhai Lower Kurrram
BOQ: Existing latrine renovation
Estimated Estimated Cost
Depth (ft) No Unit Unit Rate
Quantity (PKR)
4 2 32 sft
5 4 80 sft
5 4 80 sft
5 1 150 sft
342 Sft 194.9 66655.80
1 195 Sft
195 Sft 200.04 39007.80
9 2 292.5 Sft
9 2 216 Sft
508.5 Sft
Sft
7 1 17.5 Sft
1.5 2 4.5 Sft
Total 22 Sft
487 Sft 28.45 13840.93
3 4 48 Sft
3 4 48 Sft
2 32 Sft
128 Sft
Sft
7 2 35 Sft
1.5 2 5 Sft
Total 40 Sft
89 Sft 8.77 776.15
Grand Total 120280.67
Remarks
Rehabilitation of GGPS Shamkhai Lower Kurrram
BOQ: Quarter Main Building Work (Rehab w
8 192.00 Sft
4 168.00 Sft
2 56.00 Sft
6 120.00 Sft
2 56.00
592.00 Sft 20.27 12,000
2 374 sft
2 242 sft
2 242 sft
2 220 sft
1 187.00 Sft
1 110.00 Sft
1 170 sft
1 60 sft
1 51 sft
2 140 sft
2 120 sft
1 42 sft
4 240 sft
4 120 sft
2 36 sft
1 152.5
2506.5 sft
8 192 sft
2 72 sft
2 56 sft
6 110.4
430.4 sft
2076.1 sft 4.36 9051.796
1 701.25 sft
701.25 sft
1 28 sft
2 72 sft
100 sft
601.25 sft 28.45 17105.5625
60,891
Rehabilitation of GGPS Shamkhai Lower Kurrram
BOQ of Electrifcation
Sub Head Description Ref: MRS Length No of Qty Unit MRS Rate Total Cost
No. Code 19 (Ft) Units
Wiring of light/fan/call-bell point in 3/0.029 PVC
1 insulated bare cable in PVC pipe recessed 15-50 11 11 Each 1098.65 12085.2
Supply and Erection best quality AC ceiling fan
2 complete with GI rod, canopy, blades & regulator : 15-68-c 2 2 Each 4428.7 8857.4
56" sweep
Supply and erection energy sever 24 watts
3 including all necessory fittings as per direction of NSI 9 9 Each 250 2250
engineer
Supply and erection girder clamp hook, 5/8" dia for
4 hanging ceiling fans 15-25 2 2 Each 322.24 644.48
Supply and Erection MS sheet box of 16 SWG,
5 4"deep with 3/16" thick Bakelite sheet top etc. 15-09-f 1 1 Each 463.58 463.58
complete : 12"x14"
Supplying and erection single phase imported auto
6 circuit breaker 6 AMP 15-71-a 2 2 Each 635.96 1271.92
Supplying and erection single phase imported auto
7 circuit breaker 30 AMP 15-71-d 2 2 Each 929.96 1859.92
TOTAL COST OF ELECTRIFICATION 27432.43
Remarks
Quarter
asia, breeze, Climax, Millat, National and pak
fan are the approved makes (one fan in each
room)
3 NSI Gravel Filling 4" Thick (Open Gravel Filling 4" Thick (Open Area)
Area)
Plain Cement Concrete
4 06-05-h including placing, PCC (1:3:6) 4" thick
compacting, finishing &
Curing (Ratio 1:3:6)
10.00 11-09-b Cement Plaster 1:4 upto 20' 0.5" Thick Plaster (1:4) under Ceramic Tiles Net Area of Tile Work
height 1/2" thick
0.5" Thick Plaster (1:4) back side of wall Back Side
Providing and laying cut,
joint, test, disinfect PVC
11.00 24-18-a-02 pipeline BSS Class 'B' working 4" UPVC Pipe for drainage Class B
pressure: 4" i/d (Polyfit or
equivalent)
44,904.85
52.5
41.66667 2520
Rehabilitation of GGPS Shamkhai Lower Kurrram
Bill of Quantities of Flag Post
S# Description Ref: MRS 19 Estimated Unit Unit Rate Estimated
Length Width Depth/ Height
Quantity Cost (PKR)
Remarks
Excavation in foundation of
1 building, bridges etc complete : in 03-25-d 4.00 3.00 0.75 9.00 Cft 9.3 83.6
shingle/gravel
Plain Cement Concrete including
placing, compacting, finishing &
2 curing (Ratio 1:4:8) 06-05-i 4.00 3.00 0.75 9.00 Cft 180.1 1620.5
S# Description Ref: MRS - 19 Length (ft) Width (ft) Depth (ft) No Estimated Unit Unit Rate Estimated Cost Remarks
Quantity (PKR)
Total 24510.50