RHEOFACE® 474

Solvent free surface deactivator for negative application for the manufacturing of exposed
aggregate concrete. Combination with an anti bonding agent to reduce cleaning times of the
moulds.

Description easy to apply, economical in use and very reliable


RHEOFACE® 474 is an aqueous dispersion of even under difficult application conditions. It dries
high-grade active components free of organic quickly, is resistant against humidity and abrasion
solvents. After application it forms a soft but stable and can be applied on all types of clean moulds.
film on the formwork. After demoulding the film
The high grade of effect of RHEOFACE® 474
remains on the concrete surface or on the
allows a wash-out time of 24 to 72 hours and can
formwork where it can be removed easily. The
therefore be used in a week-long production. The
forms remain clean and nearly dust free.
immediate wash-out after the stripping of the
A range of seven fine graded types marked by forms guarantees uniform and perfect edges.
colour codes are available:
• For excellent surface finish
• Green: aggregate size: 3 – 5/8 mm, • Solvent free and environmental friendly
exposure depth: 1,5 mm • Speeds up the production process by
• Yellow: aggregate size: 5 - 8 mm, shortening the cleaning times of the forms
exposure depth: 2,0 mm • Reliable function under difficult application
• Pink: aggregate size: 5 – 8/12 mm,
conditions
exposure depth: 2,5 mm
• Easy and economical application
• Grey: aggregate size: 8 - 16 mm,
exposure depth: 3,0 mm
Technical data
Colour: depending on the depth of exposure.
Fields of Application
RHEOFACE® 474 may be applied for architectural Packaging
concrete where excellent surface finishes and high RHEOFACE® 474 is packed in cans of 20 kg.
reproducibility are required. It may be used
preferably for mould surface (negative) application. Application Procedure
The application on concrete surface (positive) is The choice of the right type of RHEOFACE® 474
possible, too. Due to its excellent bond, should be made by pilot trials in the production.
RHEOFACE® 474 is ideal for all types of concrete RHEOFACE® 474 has to be mixed well with a
surfaces, guaranteeing perfectly washed surfaces, paddle before use.
especially for all horizontal and vertical, smooth,
structured or bevelled form work such as For negative applications RHEOFACE® 474 has to
polymers, wood or steel. be applied preferably with a foam roller or a
spraying unit economically but evenly onto the
Features and Benefits mould. The drying time depends on the thickness
RHEOFACE® 474 gives an improved exposed of the film and the ambient temperature and
surface of concrete. Due to its low viscosity it is
RHEOFACE® 474
humidity. As example the drying time at 20 °C and Storage
60 % rel. humidity was determined as: Protect from freezing and pollution. Storage
Spraying application 10-15 min temperatures should not exceed 40°C. If stored in
Foam roller 15-20 min original sealed containers at 20°C RHEOFACE®
474 is durable for 6 months.
For positive application, a spraying unit is to be
used. The concrete surfaces, which will be Handling and transportation
sprayed, should be free of bubbles. Covering of No special requirements need to be observed
the sprayed areas is not required, but could be of during use of RHEOFACE® 474. Do not eat, drink
advantage. or smoke during the application. Protection gloves
and glasses are recommended.
The hardening process of the concrete should RHEOFACE® 474 is not subject of any special
start earliest 60 minutes after pouring. Heating of regulations for transportation and shipping.
the form earliest 1 hour after consolidation. All For details please observe the Material Safety Data
data of the pilot trial should be transmitted exactly Sheet.
to the manufacturing process.
Note
Vibration respectively consolidation times as short Field service, where provided, does not constitute
as possible, but as long as necessary. Ideal supervisory responsibility. For additional
vibration times have to be determined during trials, information contact your local BASF
however begin of the vibration should take place representative.
not later than 45 minutes after the application of BASF reserves the right to have the true cause of
the concrete. any difficulty determined by accepted test
methods.
The wash-out normally takes place after 24 hours.
The concrete elements should at least stay in the Quality and care
forms for 8 hours. The wash-out can be done All products originating from BASF’s Dubai, UAE
most efficiently by high pressured water. facility are manufactured under a management
system independently certified to conform to the
Consumption requirements of the quality, environmental and
1 kg for approx. 10 - 15 m² depending on the type occupational health & safety standards ISO 9001,
of formwork and its absorption. Corresponds 60 ISO 14001 and OHSAS 18001.
to 100 grams/m².
03/2009 BASF_CC-UAE

Whilst any information contained herein is true, accurate and represents our best knowledge and experience, no warranty is given or implied with
any recommendations made by us, our representatives or distributors, as the conditions of use and the competence of any labour involved in the
application are beyond our control.

As all BASF technical datasheets are updated on a regular basis it is the user's responsibility to obtain the most recent issue.

BASF Construction Chemicals UAE LLC


P.O. Box 37127, Dubai, UAE
Tel: +971 4 8090800 Fax: +971 4 8851002
Certificate No. Certificate No. Certificate No.
www.basf-cc.ae e-mail: marketingcc.mideast@basf.com 963680 945787 772556

You might also like