You are on page 1of 28

Sulzer Saudi Pump Company

Dammam-Khobar highway - NSH Business Tower 9th floor


P.O. Box 3726, Al Khobar 31952, Saudi Arabia
Tel: +966 13 86 47 171 / Fax: +966 13 89 86 554

SULZER SAUDI PUMP COMPANY (SSPC)

CUSTOMER EPPM SA

PROPOSAL TECHNO-COMMERCIAL PROPOSAL (BUDGET)

PROJECT UPGRADE ETHANE FACILITY AT JU’AYMAH NGL PLANT

SSPC REFERENCE SAU.2153-RUH.15.0013-F0 / Rev. 00 / 17-JUN-2020

RFQ NUMBER APK 10-20

Sulzer Saudi Pump Company, PO Box 51737, 2nd Industrial City, Riyadh – 11553, Saudi Arabia I Tel: +966 11 2652123 I Fax: +966 11 2651071

SULZER CONFIDENTIAL
Project: BI-10-01868-UPGRADE ETHANE FACILITY AT JU’AYMAH NGL PLANT
Customer’s Reference: UPGRADE ETHANE FACILITY AT JU’AYMAH NGL PLANT
SULZER-Reference: SAU.2153­RUH.15.0013­F0
Revision: 0

Commercial Section
June 17, 2020

M/S EPPM SA

Kind Attention : AHMED TOUMI

Project : UPGRADE ETHANE FACILITY AT JU’AYMAH NGL PLANT

SSPC Reference : SAU.2153-RUH.15.0013-F0 / Rev. 00

RFQ Number : APK 10-20

Dear,

SULZER Saudi Pump Company would like to thank M/S EPPM SA for the invitation to bid on the referenced enquiry. We hope
that you will find our offer complete and in line with applicable specifications and Project Standards.

Please note that SULZER has a full-fledged manufacturing facility in Second Industrial City, Riyadh to better serve
Saudi Arabian customers with the highest Sulzer standards from a local manufacturing and Service facility. The facility
has its focus mainly for the Oil and Gas, Power, Water & Desalination segments.

Sulzer Saudi Pump Co. factory ARAMCO vendor # is 10013834 and the Plant ID # is 30000934.

We once again thank you for the opportunity and considering SULZER SAUDI PUMP CO. on this project.

We trust we have interpreted your requirements to your satisfaction, however, please feel free to contact us in case you have any
questions and/or clarifications on any aspect of our offer.

Sincerely yours,

Tolis Pitsalidis Abdullah Almaskeen

Head of Sales & Tendering, Oil & Gas Sales & Tendering, Oil & Gas

Sulzer Saudi Pump Co. Sulzer Saudi Pump Co.

Mobile #: +966 50 77 44 588 Email: abdullah.almaskeen@sulzer.com

Email: tolis.pitsalidis@sulzer.com

SAU.2153 – UPGRADE ETHANE FACILITY AT JU’AYMAH NGL PLANT Page [1]

SULZER CONFIDENTIAL
KINGDOM OF SAUDI ARABIA Sulzer Pumps

SULZER PUMPS GENERAL TERMS AND CONDITIONS OF SUPPLY


These Terms and Conditions can be found on the Internet under www.sulzer.com.
1. Definitions 1.17 "Purchaser" means the Party defined as the Purchaser in the
Purchase Order, or, if such definition is missing, the Party issu-
1.1 "Applicable Export Laws" means any export control regulations ing the Purchase Order.
and/or laws in force at the time of export in the Supplier’s coun-
try of export and/or, in the case of re-export, in force at the time 1.18 "Quotation" means Supplier’s written proposal for the delivery of
of re-export in the country of origin of the particular re-exported the Scope of Supply.
Export Item.
1.19 "Receiving Party" means the Party receiving Confidential
1.2 "Change" means a change in the design, drawings, specifica- Information of the other Party
tions, shipping instructions, shipment schedules, or any other
1.20 "Sanctions" means any trade or economic sanctions (e.g.
documents forming part of the Contract, including any addi-
embargoes, etc.) in force at the time of export in the Supplier's
tions, substitutions, or omissions to the Scope of Supply.
country of export and/or, in the case of re-export, in force at the
1.3 "Change Order" means the documents issued by authorized time of re-export in the country of origin of the particular re-
representatives of Purchaser and Supplier in common agree- exported Item.
ment after a Change has been requested by Purchaser or
Supplier, and which documents rule the modification of the 1.21 "Scope of Supply" means the Goods and/or Services to be
Contract with respect to the Contract Price, specifications, delivered or performed under the Contract.
shipment schedule, warranty, delivery time, etc. 1.22 "Services" means site services such as erection and commis-
sioning, repairs and maintenance work.
1.4 "Confidential Information" means proprietary or confidential
data including pricing, terms, documents, specifications, plans 1.23 "Supplier" means the Sulzer Pumps company which accepted
or drawings that are not generally known to the public. the Purchase Order.
1.5 "Contract" means the Terms and Conditions contained herein, 1.24 "Terms and Conditions" means these Sulzer Pumps General
together with (i) such additional terms as are stated within Terms and Conditions of Supply.
Supplier's written Quotation, (ii) such specifications, drawings
or other documents as are incorporated by reference within 1.25 "Warranty Period" means the time period stipulated in Clause
Supplier's Quotation, (iii) any documents related to a Change 9.2 hereof.
Order and (iv) the Purchase Order to the extent approved in 2. General
writing by Supplier.
2.1 The Contract supersedes all previous negotiations, representa-
1.6 "Contract Price" means the total sum indicated in the Purchase tions and/or contractual commitments between the Parties.
Order or as modified in accordance with these Terms and Supplier hereby gives notice of its objection to and rejection of
Conditions. For Services carried out on a time basis, the Con- any different or additional terms, and Purchaser agrees that the
tract Price shall be determined in accordance with the hourly terms contained in the Contract shall apply and govern to the
rates specified in the Purchase Order. exclusion of all others.
1.7 "Day(s)" means calendar day(s) unless the term "working An offer by Supplier in its Quotation that does not stipulate an
day(s)" is used. expiration date shall not be binding unless otherwise stated in
1.8 "Delivery Date" means the date or dates agreed between the the Quotation. In this case, the Contract shall be deemed to
Parties with regard to the performance of the Scope of Supply have been entered into upon written acknowledgment of the
in the Contract or as modified in accordance with these Terms Purchase Order by an authorized representative of Supplier,
and Conditions. which may not be modified except in a Change Order.

1.9 "Disclosing Party" means the Party disclosing Confidential 2.2 In case of an inconsistency between the said documents within
Information to the other Party. the Contract, the following order of priority shall apply:

1.10 "Effective Date" means the date when the Purchase Order has a. Documents related to Change Orders mutually agreed upon by
been accepted by the Supplier in writing, or, in case the Con- both Parties, latest date priority, and to be clearly indentified as
tract documents are signed by both Parties, the date of the lat- "Change Order" to the Contract
est signing. b. Purchase Order (version confirmed by Supplier in writing as
1.11 "End-User" means the ultimate user and/or the ultimate owner defined in Clause 1.16) and all documents incorporated therein
of the Scope of Supply. by reference

1.12 "Export Item" means any goods or services, including but not c. Supplier’s Quotation and all documents incorporated therein by
limited to, commodities, software, Services or technology pro- reference
vided by Supplier that is required to be exported or re-exported d. These Terms and Conditions including Attachment 1 hereto. If
under the Contract. Services are required to be performed by Supplier, Attachment
1.13 "Incoterms" means the version in force on the Effective Date of 1 shall be construed as a part of the Contract if attached
the document published under the name "Incoterms" by the In- hereto.
ternational Chamber of Commerce. e. Purchaser's specifications
1.14 "Liquidated Damages" means an expressly stated amount in the f. Purchaser's terms and conditions.
Contract to be paid by Supplier as compensation for estimated
damage that Purchaser may incur in the event of breach of 2.3 The Incoterms version current at the Effective Date of the
Contract such as failure to meet delivery dates or performance Contract shall apply. If no specific Incoterms’ concept has been
guarantees. Such expressly stated amount is agreed by the stated in the Contract or subsequently agreed by both Parties,
Parties to be a pre-estimate of such damages and is not to be delivery will be made (i) ex works (Supplier’s or Supplier’s sub-
considered a penalty. supplier’s works) for domestic deliveries (delivery within the
country in which the Scope of Supply is performed), or (ii) it will
1.15 "Party" or "Parties" means Purchaser or Supplier or Purchaser be made FCA (free carrier, Supplier’s or sub-supplier’s works)
and Supplier. for international transactions. Irrespective of the delivery term,
1.16 "Purchase Order" means the order documents issued by Pur- for purpose of determining compliance with the Delivery Date,
chaser for the order of the Scope of Supply in the version con- the delivery shall be deemed to have been made on the date
firmed by Supplier in writing. the Supplier notifies the Purchaser that the Scope of Supply is
ready for shipment.

SSPC STANDARD TC SEPT 2017


3. Delivery other customers and comparable work shall apply. The Con-
tract Price and any part thereof are exclusive of sales, excise
3.1 Supplier shall make commercially reasonable efforts to deliver
duties, VAT, sales taxes or similar taxes and duties.
the Scope of Supply on the Delivery Date.
6.2 All payments shall be made net, without any deductions, within
3.2 In no event shall any period of time specified to calculate the
thirty (30) Days after date of invoice. Payment terms shall be as
Delivery Date commence earlier than the latest of the below
specified in the Purchase Order or any respective Change
dates:
Order, or, if not included therein, as specified in the Quotation.
a. Effective Date, or If neither the Purchase Order nor any respective Change Or-
der, nor the Quotation mentions the payment terms, Supplier
b. Date which is five (5) Days after receipt of Letter of Credit or shall be entitled to issue the invoices as follows: For one third
advance payment from Purchaser, if such Letter of Credit or (1/3) of the Contract Price within five (5) Days after Effective
advance payment is required in the Contract, or Date, for one third (1/3) after expiration of half of the delivery
c. Date of receipt of approval of engineering submittals by Sup- time, and for one third (1/3) within forty-five (45) Days prior to
plier. delivery. Payments for prices calculated on a time basis shall
be invoiced on a bi-weekly basis or after completion of the
3.3 The Delivery Date shall be amended if any delay is due to Scope of Supply, whichever occurs first
one or more of the following: (i) Force Majeure, (ii) Changes,
(iii) Purchaser's failure to fulfill any obligation under the 6.3 If the Purchaser does not comply with the agreed dates of
Contract, (iv) delay caused by End-User or any party payment, Purchaser shall be liable, without reminder, for inter-
engaged by Purchaser, (v) delay in obtaining export license est with effect from the agreed date on which payment was
or (vi) Purchaser’s delay in delivery of any documentation or due, at a rate depending on the normal interest conditions at
approvals to Supplier. the Purchaser’s domicile, but not less than five percentage
points (5%) above the three months' LIBOR (London Interbank
3.4 In any event Supplier shall have no responsibility for any delay Offered Rate) applicable at the due date of the delayed pay-
caused by a sub-supplier where such sub-supplier has been ment.
designated by Purchaser or End-User.
6.4 In case of late payment, Supplier may, after having notified the
3.5 Except in the case of Force Majeure, Purchaser shall reimburse Purchaser in writing, suspend its performance of the Scope of
Supplier for costs of extra transportation, storage and/or Supply until the open and due invoices have been paid.
administration fees incurred as a result of any delay resulting
from reasons not attributable to Supplier. 6.5 If Purchaser and Supplier agreed on issuing a Letter of Credit by
Purchaser in favor of Supplier, such Letter of Credit shall be
3.6 In the event Supplier fails to meet the Delivery Date for more irrevocable, extendable and confirmed by a bank nominated by
than two (2) calendar weeks (grace period) due to reasons for the Supplier; if no nomination is provided, then by a first class
which Supplier or its sub-suppliers are directly responsible, and bank in the Supplier's country of domicile. Payments under such
provided that the Purchase Order expressly provides Liqui- Letter of Credit shall be made on sight against presentation by
dated Damages for such failure, Purchaser shall be entitled to Supplier of invoice together with bill of lading, airway bill or
require Supplier to pay Liquidated Damages at the rate stated warehouse receipt, as applicable, or whatever documents as
in the Purchase Order. have been agreed upon between the Parties.
4. Force Majeure 6.6 If the cost to the Supplier of performing its obligations under the
4.1 Supplier shall not be liable for any non-performance, loss, Contract shall be increased after the date of Quotation by
damage, or delay due to war, riots, fire, flood, strikes or labor reason of the making of any amendment of any law, order,
difficulty, governmental acts such as, but not limited, to trade regulation or by-law having the force of law, the amount of such
restrictions including embargoes, acts of God, acts of the Pur- increase shall be added to the Contract Price.
chaser, its customer or the End-User, delays in transportation, 6.7 Both Parties shall be entitled to set-off due amounts in accor-
inability to obtain necessary labor or materials from usual dance with the applicable law, provided however, that the party
sources, or other causes beyond the reasonable control of effecting a set-off shall provide prior written notification detailing
Supplier. In the event of delay in performance due to any such the reason for the set-off to the other Party.
cause, the Delivery Date or time for completion of the Services
will be extended to reflect the length of time lost by reason of 7. Inspection, Acceptance
such delay. Payment obligations shall not be affected by force 7.1 The Scope of Supply shall be subject to Purchaser's final
majeure events. If the grounds for force majeure continue for
inspection upon receipt at the delivery site. Claims for damage,
more than six (6) months, either Supplier or Purchaser may shortage, errors in shipping or rejection of the Scope of Supply,
terminate the Contract upon seven (7) Days written notice to or portion thereof, must be made by Purchaser in writing within
the other Party. fourteen (14) Days following the date of receipt at the delivery
4.2 Supplier shall be entitled to be compensated for the extra costs site, or such other time period as agreed in the Purchase Order
caused by the interruption, or, in case of termination, for the or provided by applicable law, or such claims are waived and
work done prior to termination, and the expenses for non- the Scope of Supply is deemed to be irrevocably accepted by
cancelable procurements. Purchaser shall be entitled to receive Purchaser. Purchaser's sole remedy for such claims is repair or
the work for which it has paid. replacement of the Scope of Supply by Supplier. After the
expiration of the aforesaid fourteen (14) Day period, all claims
5. Transfer of Title and Risk for defects shall be remedied in accordance with Clause 9,
5.1 Unless otherwise required by the applicable compulsory law, Warranty herein.
title to the Scope of Supply shall be transferred to Purchaser 7.2 Services shall be accepted or rejected upon completion of such
after Supplier has received payment in full of the Contract Services.
Price.
7.3 Unless otherwise agreed in the Purchase Order, costs related
5.2 Risk of loss or damage to the Scope of Supply shall pass to to inspections or tests of the goods shall be borne by the Pur-
Purchaser from the Supplier upon delivery according to appli- chaser.
cable Incoterms.
8. Changes
6. Price and Payment
8.1 Purchaser and Supplier may request, in writing, Changes as
6.1 Supplier is entitled to receive payment of the Contract Price on defined in Clause 1.3 hereof. As promptly as practicable after
the dates determined in the Purchase Order or a respective receipt of a request for a Change by Supplier, Supplier will ad-
Change Order, if any. For work carried out on a time basis, the vise Purchaser what amendments to the Contract, if any, may
prices shall be determined in accordance with the hourly rates be necessitated by such requested Changes.
specified in the Purchase Order. If no agreement on hourly
rates has been made, the hourly rates applied by Supplier for

SSPC Sales T&C__English_September 2017 Page 2 of 6


8.2 The Parties shall agree on a fair and equitable adjustment of immediately take all appropriate steps to mitigate damages and
such amendments to the Contract at their earliest convenience. notify Supplier as stated herein.
In case such agreement should not be possible within fifteen
(15) Days after a Change has been requested by one of the 9.6 Correction of nonconformities in the manner and for the period
Parties, Supplier shall be entitled to continue with the delivery of time provided within this Clause 9 shall constitute fulfillment
of the Scope of Supply without the requested Change. of all liabilities of Supplier to Purchaser (which liabilities shall be
subject to the limitations of liability contained elsewhere in the
9. Warranty Contract, including without limitation, Clause 11), whether
based on contract, negligence or otherwise, with respect to
9.1 Supplier warrants that:
Scope of Supply or any Services performed. Supplier makes no
a. the Scope of Supply will be of the kind and quality as described other warranty, guarantee or representation in respect of the
in the Contract, and Scope of Supply including any Services performed other than
as specified in this Clause 9. ALL OTHER WARRANTIES,
b. will be free of defects in workmanship and material, and CONDITIONS AND REPRESENTATIONS, EXPRESSED OR
c. to the extent required for the functioning of the Scope of Sup- IMPLIED BY STATUTE, COMMON LAW OR OTHERWISE, IN
ply, will be free of defects in design, provided however that RELATION TO THE SUPPLY OF THE SCOPE OF SUPPLY,
Supplier shall not be responsible for the design of the Scope (INCLUDING BUT NOT LIMITED TO THE IMPLIED
of Supply (including but not limited to the selection of the WARRANTIES OF MERCHANTABILITY AND FITNESS FOR
materials) to the extent that the design and/or the selection of A PARTICULAR PURPOSE) ARE EXCLUDED TO THE
the materials has been undertaken or provided by Purchaser, EXTENT PERMITTED BY LAW.
End-User, or a third party not being a sub-supplier appointed 10. Performance Guarantee
by Supplier.
10.1 Unless certain requirements have explicitly been specified and
9.2 Except in cases where the Scope of Supply is limited to Ser-
accepted by Supplier in a written Contract document, Supplier
vices only, the Warranty Period shall end on the earliest of the shall not provide performance guarantees.
below dates:
10.2 If a performance guarantee has been agreed upon, it shall be
a. after twelve (12) months from the initial operation of the Scope fulfilled if the agreed requirements have been reached in a per-
of Supply, or formance test executed in the Supplier’s or its sub-supplier’s
b. after eighteen (18) months from delivery of the Scope of Sup- factory. Performance site tests shall be excluded.
ply, or, 11. Limitation of Liability
c. in the event that delivery is delayed or impeded for reasons
11.1 NOTWITHSTANDING ANYTHING TO THE CONTRARY IN THE
beyond Supplier’s control, after eighteen (18) months from the
CONTRACT, INCLUDING ALL DOCUMENTS MAKING PART
date of Supplier's notification that the Scope of Supply is ready THEREOF, AND TO THE MAXIMUM EXTENT PERMITTED
for dispatch. BY LAW, IN NO EVENT SHALL SUPPLIER BE LIABLE TO
Where the Scope of Supply is limited to Services only, the THE PURCHASER, BY WAY OF INDEMNITY, OR BY
Warranty Period shall commence on completion of such Ser- REASON OF ANY BREACH OF CONTRACT OR OF
vices and shall terminate on the end of the sixth (6) month STATUTORY DUTY OR BY REASON OF TORT (INCLUDING
thereafter. BUT NOT LIMITED TO NEGLIGENCE) FOR ANY LOSS OF
PROFIT, LOSS OF CONTRACTS OR EARNINGS, DELAY
9.3 If, during the W arranty Period, the Scope of Supply fails to DAMAGES, INTERRUPTION OR LOSS OF PRODUCTION,
meet the requirements set out in this Clause 9.1, then Pur- LOSS OF USE, LOSS OF OPPORTUNITY OR BUSINESS,
chaser shall give written notification to Supplier stating the rea- INDIRECT, PUNITIVE, SPECIAL, INCIDENTAL OR CONSE-
sons therefor. Within seven (7) Days (or such longer period QUENTIAL DAMAGES WHATSOEVER THAT MAY BE SUF-
that is reasonable under the circumstances) of receipt of Pur- FERED BY PURCHASER. PURCHASER FURTHER AGREES
chaser’s notification, Supplier shall commence the repair, TO DEFEND, INDEMNIFY AND HOLD HARMLESS
modification or replacement of the defective part. Purchaser SUPPLIER FROM ANY CLAIM MADE BY END-USER OR
shall make the Scope of Supply, or the defective part thereof, PURCHASER’S CUSTOMERS FOR SUCH LOSSES. THE
available for correction. Supplier shall be liable for Supplier’s REMEDIES OF PURCHASER SET FORTH HEREIN ARE
own costs incurred as a result of such action only. In no event EXCLUSIVE, AND SUPPLIER'S LIABILITY WITH RESPECT
shall Supplier be responsible for the cost of providing access TO ANY CONTRACT, INDEMNITY, TORT (INCLUDING
to the Scope of Supply, or costs of disassembly, removal or NEGLIGENCE), UNDER ANY WARRANTY, STRICT LIABIL-
reinstallation of any items. ITY OR OTHERWISE SHALL NOT EXCEED HUNDRED
9.4 In the event that Supplier undertakes any repair or replacement PERCENT (100%) OF THE CONTRACT PRICE, UNLESS
of any part of the Scope of Supply in accordance with its CLAIMS ARISE FROM GROSS NEGLIGENCE OR WILLFUL
obligations under Clause 9.3 then the Warranty Period of such MISCONDUCT OF THE SUPPLIER OR FROM SUPPLIER'S
repaired or replaced part shall commence on the date of com - LEGAL LIABILITY FOR PERSONAL INJURIES.
pletion thereof and shall continue for a period of six (6) months As used herein "gross negligence" shall mean reckless disre-
or until the end of the Warranty Period established in Clause gard of, or wanton indifference to, harmful and avoidable con-
9.2, whichever is the later. In any event such extended war- sequences and "willful misconduct" shall mean conduct that is
ranty period shall not exceed six (6) months after the end of the committed with an intentional disregard for the safety of others
Warranty Period. and/or the safety of another's property. "Gross negligence"
9.5 The warranties contained herein shall not apply and shall and/or "willful misconduct" shall not include any act or omission
terminate immediately if the faults or defects referred to herein or any error of judgment or mistake made in good faith.
cannot be proved to be a result of Supplier’s failure under this 12. Intellectual Property
Clause 9. Such exclusions from warranty shall include (but not
be limited to) the incorrect use, faulty installation, start-up or 12.1 Purchaser confirms that Purchaser is fully authorized to use or
failure to observe operating instructions, failure to carry out grant permission to use the technical documentation provided
proper maintenance, modifications or repairs by Purchaser, to Supplier for the performance of the Scope of Supply by
End-User or third parties other than Supplier, normal wear and Supplier or its sub-suppliers, respectively. In case Purchaser
tear, incorrect or negligent handling, erosion or corrosion, un- would not be authorized to order said performance from Sup-
suitable service products or replacement materials, unsuitable plier without violation of intellectual property rights of third par-
foundations, conditions more severe than or different from ties, Purchaser shall inform Supplier without any delay. In this
those specified or deficiencies resulting from other reasons be- case, Supplier shall stop the work until the approvals needed
yond Supplier's control. Warranties shall also terminate imme- for the performance have been obtained. Supplier shall not use
diately if Purchaser or End-User, in case of a defect, does not technical documentation received from Purchaser for any pur-
pose other than to fulfill the Contract.

SSPC Sales T&C__English_September 2017 Page 3 of 6


12.2 Any know-how, inventions, patents, copyrights or the like the value said partial Scope of Supply has for the Purchaser
belonging to or provided by Supplier and used for or developed shall be taken into consideration on a fair and true basis. In
in the course of the fulfillment of the Contract by Supplier shall case Purchaser does not accept any part of the Scope of Sup-
remain Supplier’s property, and no ownership shall be trans- ply, Purchaser shall, at Supplier's costs, return any tangible and
ferred to Purchaser, Purchaser’s customer or End-User with intangible goods already delivered to Supplier, and Supplier
respect to such know-how, inventions, patents and copyrights, shall reimburse the purchase price received. Supplier shall not
independent of the hardware on which such know-how, inven- owe any further payments.
tions, patents or copyrights is made available (machinery, paper,
electronic medium, etc.). However, End-User shall be granted a 13.3 Supplier shall have the right to terminate the Contract (or any
limited right to use such know-how, invention, patents, copyright portion thereof) for cause in the event that Purchaser:
or the like for the operation, maintenance and repair of the a. becomes insolvent, makes an assignment for the benefit of its
Scope of Supply on a non-exclusive basis, which right shall not creditors, has a receiver or trustee appointed for the benefit of
include the use of the said intellectual property for the its creditors, or files for protection from creditors under any
reproduction of the Scope of Supply or parts thereof. bankruptcy or insolvency laws; or
12.3 Supplier shall make its best endeavors to ensure that the b. fails to comply with any material terms of the Contract, includ-
Scope of Supply and any part thereof, in the particular form ing but not limited to, failure to make any payment when due or
designed and sold by Supplier, shall not infringe any intellec- to fulfill any payment conditions.
tual property rights of third parties. In the event of any in -
fringement of intellectual property rights relating to the said 13.4 If Supplier terminates the Contract, or any portions thereof
Scope of Supply, Supplier may, in its sole discretion, procure under Clause 13.3 hereof, Supplier shall be paid for all Scope
the right to use the Scope of Supply without impairing its suit- of Supply completed or partially completed prior to the date of
ability, or modify or replace it so that it is rendered non- termination, plus extra costs and other damages incurred by
infringing. The obligations of Supplier set forth herein are the termination, including but not limited to cancellation costs
contingent upon (i) Supplier receiving prompt written notice under subcontracts and/or expenses for non-cancelable pro-
from Purchaser of such infringement; (ii) Supplier receiving curement.
assistance from Purchaser in the defense and (iii) the right of 14. Termination for Convenience
Supplier to settle or defend.
14.1 Purchaser shall have the right to terminate the Contract upon
12.4 The obligation of Supplier stipulated in Clause 12.3 shall not apply fifteen (15) Days’ prior written notice to Supplier, and Supplier
to (i) the Scope of Supply or part thereof which has been shall stop its performance upon the receipt of such notice ex-
manufactured according to Purchaser’s design, (ii) services cept as otherwise agreed with Purchaser. If Purchaser termi-
performed using Purchaser’s documentation, (iii) the use of the nates the Contract for convenience, it shall pay Supplier:
Scope of Supply or any part thereof in conjunction with any
other product in a combination not furnished by Supplier as part a. the agreed unit price for Scope of Supply completed and deliv-
of the Scope of Supply or (iv) products fabricated by using the ered, plus
Scope of Supply. As to any such equipment, service, product, b. additional material and labor costs incurred, and for engineer-
part or use in such combination, Supplier assumes no liability ing services supplied by Supplier with respect to the canceled
whatsoever for infringement of intellectual property rights of items, which shall be charged to Purchaser at Supplier's rates
third parties, and Purchaser shall indemnify Supplier against in effect at the time of cancellation, but which shall not exceed
any respective infringement claims. Supplier shall co-operate the Contract Price for such items, plus
with Purchaser in the same manner as required by Supplier
under 12.3 (i) to (iii) herein above. c. six percent (6%) of the costs and expenses referred to in (b)
above in lieu of profit, plus
12.5 Supplier’s copyrighted material shall not be copied by Purchaser
except for archiving purposes or to replace a defective copy. d. such other costs and expenses, including cancellation charges
Purchaser’s copyrighted material shall not be copied by under subcontracts, storage costs, etc., as Supplier may incur
Supplier except for archiving purposes or to replace a in connection with such cancellation or termination; or
defective copy. e. in the event a cancellation schedule is included as part of the
13. Termination for Cause Contract, the amount specified on such cancellation schedule.
13.1 Purchaser shall have the right to terminate the Contract (or any 15. Suspension
portion thereof) for cause in the event that Supplier: 15.1 If Purchaser decides to suspend the Contract, Supplier shall be
a. becomes insolvent, makes an assignment for the benefit of its entitled to be compensated for any proven costs caused by the
creditors, has a receiver or trustee appointed for the benefit of suspension. If the suspension lasts for more than two (2)
its creditors, or files for protection from creditors under any months, the Contract shall be deemed to be terminated for
bankruptcy or insolvency laws; or convenience in accordance with Clause 14.
b. substantially breaches and fails to comply with or perform its 15.2 In case of suspension according to Clause 15.1 or Clause 6.4,
material obligations hereunder (but only with respect to a mate- Supplier shall resume work upon written instruction from Pur-
rial obligation for which the Contract does not provide exclusive chaser, receipt of payments due and owing by Purchaser under
remedies), provided that Purchaser shall first have provided the Contract, and written agreement between the Parties of
Supplier with written notice of the nature of such breach and of Changes as may be requested, as soon as the required work-
Purchaser’s intention to terminate the Contract as a result of shop capacity is available.
such breach, and Supplier shall have failed, within three weeks 16. Confidentiality
after receipt of such notice (or such extended period as is con-
sidered reasonable and agreed by the Parties), to either (i) 16.1 In connection with the Contract, Supplier and Purchaser (as to
commence to cure such breach and diligently thereafter to pur- information disclosed, the Disclosing Party) may each provide
sue such cure, or (ii) provide reasonable evidence that no such the other Party (as to information received, the Receiving Party)
breach has occurred. with Confidential Information. Confidential Information shall not
include information which (i) is or becomes generally available
13.2 If Purchaser terminates the Contract under Clause 13.1 hereof, or to the public other than as a result of disclosure by the
any portion thereof, as provided in this Clause 13, Purchaser Receiving Party, its representatives or its affiliates, or (ii) is or
shall pay to Supplier that portion of the Contract price allocable becomes available to the Receiving Party or its representatives
to the Scope of Supply completed and accepted by Purchaser. If or affiliates on a non-confidential basis from a source other than
the Parties cannot agree on the value for such portion of Scope the Disclosing Party when such source is not, to the best of the
of Supply so terminated, a neutral expert to be determined by Receiving Party’s knowledge, subject to a confidentiality
both Parties shall fix the price, and this price shall be accepted obligation to the Disclosing Party, or (iii) has been or is
by both Parties. For the determination of the price, Supplier's subsequently independently developed by the Receiving Party,
cost related to the partial Scope of Supply and its representatives or affiliates, without reference to the Confi-

SSPC Sales T&C__English_September 2017 Page 4 of 6


dential Information, or (iv) is required to be disclosed by order and/or maintain under this Contract, provided that such policies
of a competent court or government agency. shall not be primary with respect to Purchaser's, its customer's
or End User's insurance policies and shall not grant waiver of
16.2 The Receiving Party agrees, except as otherwise required by law,
subrogation to Purchaser, its customer or End User or name
(i) to use the Confidential Information only in connection with
such parties as additional insured or co-insured party.
the performance of the Contract or installation, operation,
maintenance and use of the Scope of Supply sold hereunder, 19. Applicable Law / Dispute Resolution
and (ii) to take reasonable measures to prevent disclosure of 19.1 Applicable Law
the Confidential Information, except to its employees for the
purpose of performance of the Contract, or installation, opera- THE CONTRACT IS CONSTRUED AND SHALL BE INTER-
tion, maintenance or use of the Scope of Supply sold here- PRETED IN ACCORDANCE WITH THE LAWS OF THE
under. Further, if disclosure of Confidential Information to a KINGDOM OF SAUDI ARABIA. THE CONFLICT OF LAW
third party is required, the Receiving Party agrees to use its RULES SHALL BE EXCLUDED.
best efforts to require proprietary or confidential treatment of
the information by such third party. 19.2 Arbitration

17. Export Control In case of a dispute, the Parties shall make their best
endeavors to solve such dispute amicably. If this should
17.1 Supplier shall export and/or re-export any Export Item in ac- not be possible, any dispute arising out of the formation,
cordance with all Applicable Export Laws. performance, interpretation, nullification, termination or
17.2 Purchaser expressly acknowledges and agrees that it will invalidation of this contract or arising there from or related
NOT: thereto in any manner whatsoever, shall be finally settled
by arbitration in accordance with the provisions set forth
a. divert, use, export or re-export any Export Items contrary to any
under the Rules of Commercial Conciliation and
Applicable Export Laws; and/or
Arbitration (“the Rules”) of the Riyadh Chamber of
b. export, re-export, or provide any Export Items to any entity or Commerce & Industry, by three arbitrators appointed in
person within any country that is subject to any Sanctions; compliance with the Rules. The place of arbitration shall
and/or be Riyadh, K.S.A. The language to be used in the
c. export, re-export, or provide any Export Item to entities and arbitration proceedings shall be English.
persons that are ineligible under Applicable Export Laws. 20. Miscellaneous
17.3 Export License 20.1 Assignment
If an export license is required, upon receipt of the Purchase Any attempt by a Party to assign, transfer, or delegate any of
Order, Supplier shall prepare an application on Purchaser’s the rights, duties or obligations herein to a third party without
behalf and submit it to the appropriate authorities. As to any prior written consent of the other Party shall render such at-
export license, Purchaser shall advise Supplier of the validity, tempted assignment or transfer null and void. Supplier’s affili -
number, date of issue and expiration date. Supplier’s perform - ated companies shall not be considered third parties.
ance hereunder shall be subject to Supplier’s prior receipt of However, such restriction shall not apply in instances where
evidence satisfactory to Supplier that an appropriate export li- Supplier, in the course of its usual business practices, requires
cense has been granted. Purchaser assumes all responsibility part of its work to be undertaken or supplied by sub-
for reimbursing Supplier for all expenses incurred by Supplier contractors or sub-suppliers.
with respect to any export license.
20.2 W aiver of Rights
18. Indemnity / Insurance
Supplier’s or Purchaser’s failure to exercise any of its rights
18.1 Indemnity shall not constitute or be deemed a waiver or a forfeiture of
Both Parties shall indemnify and hold harmless the other Party such rights.
of damage to third party tangible property, or for bodily injury 20.3 Severability
(including death), or both, arising out of the performance of the
Contract to the extent that such damage or injury is attributable If a provision of the Contract is determined to be void or unen-
to the negligence or willful misconduct of the indemnifying Party. forceable, this finding shall not render other provision void or
Any claim of contribution or indemnity between Supplier and unenforceable, and Supplier and Purchaser shall make their
Purchaser shall be resolved on the basis of each Party's best endeavors to replace such provision by a valid one cover-
percentage of negligence, after resolution of the third party claim ing the original commercial intention as far as legally possible.
on which such liability is based. 21. Taxes, Duties and Fees:
18 .2 Insuran ce The Contract Price and any part thereof are exclusive of custom
18.2.1 Supplier shall effect and/or maintain the following insurance: duties or similar taxes and duties, value added tax or any other
taxes arising or payable under this Contract. Value added tax
a. General and products liability insurance covering its legal shall be stated in the invoice and the format of such invoice
liability for bodily injury and damage to third party physical must be in compliance with the applicable law.
property (including Purchaser’s property other than the Scope
of Supply) arising out of performance of this Contract. The limit Should the Supplier suffer delay and/ or incur additional costs
of insurance shall be one million Euros (€ 1,000,000.00) per or any adverse effect as a result of a change in tax law in the
occurrence and two million Euros (€ 2,000,000.00) in the ag- country of the Supplier, the parties shall meet and agree an
gregate. appropriate adjustment to the Contract Price provided that the
Supplier must deliver a notice of the occurrence of that change
b. Transport insurance in accordance with any agreed trade term, of law to the Purchaser and the impact of that change of law.
which shall be construed in accordance with the Incoterms.
Purchaser shall defend, indemnify, and hold the Supplier
c. For all its employees engaged in performing this Contract harmless from any liability, claim, cost or demand resulting from
occupational accident and disease insurance (i.e. workers the Purchaser’s failure to make any payment, filings, reporting,
compensation or similar social insurance) in accordance with comply with any procedural requirement or any obligations with
the law which may apply to those employees. respect to any value added tax, corporate income tax, sales
d. Automobile liability insurance in accordance with local laws or tax, customs duties and the like incurred with respect to the
custom to the extent that Supplier’s employees use owned, Scope of Supply or the Contract. This indemnity shall include
non-owned or rented automobiles whilst performing Services at all related penalties and interest imposed in addition to the
value added tax, corporate income tax, sales tax, customs
Purchaser’s site.
duties and the like due as a result of the failure of the
18.2.2 Whenever required by Purchaser and procurable from the
Purchaser to comply with the reporting, filing, payment, or
respective insurance carrier/broker, Supplier shall furnish
procedural requirements
confirmation of any insurance which Supplier is required to effect

Page 5 of 6
SSPC Sales T&C__English_September 2017
ATTACHMENT 1 to SULZER PUMPS GENERAL TERMS AND CONDITIONS OF SUPPLY
Additional Terms and Conditions for Contracts including Services

A1 Parties’ Representatives A3.2 The Purchaser shall be responsible for any loss or damage to
tools, plant, equipment, materials and consumable stored or
A1.1 Purchaser and Supplier shall each appoint a person to act as its
placed upon the Site and shall procure and maintain suitable
representative for the purposes of the Services and shall each
insurance policy to cover all risks.
notify the other in writing of such appointment prior to Supplier's
personnel arrival at site. ("Site" means the place where the A3.3 Purchaser also undertakes to maintain the site and facilities, upon
Services have to be performed.) Such person shall have full which Supplier’s personnel may be required to enter, in a safe
authority to act on behalf of the Purchaser or the Supplier condition, and to comply with all applicable laws, statutes and
respectively for the purposes of the Services. regulations governing workplace health and safety, and to give
Supplier’s personnel all instructions necessary. Supplier shall
A1.2 For the purposes of this Contract, Supplier's representative and
make sure that its personnel will follow all instructions
other personnel shall be deemed to be agents of Supplier and reasonably made by Purchaser.
nothing herein shall establish the relationship of master and
servant as between the Purchaser and the Supplier's rep- A3.4 Purchaser's failure to comply with the obligations stated in
resentative and other personnel. Clauses A3.1, A3.2, and A3.3 above shall entitle Supplier to
either stop rendering its services, and/or postpone the delivery
A2 Labor Provided by Purchaser
and/or ask for additional charges for the lost time of its service
A2.1 Where required by the Contract or where subsequently agreed personnel.
between the Parties, Purchaser shall provide, at its own ex- A4 Working Hours
pense, skilled and unskilled labor sufficient in quantity and suf-
ficiently competent to undertake the relevant identified work. A4.1 The applicable working hours shall b e as stated in the Con-
Such labor shall include at least one foreman who is fluent in tract.
the English language.
A4.2 After a period of not more than sixty (60) Days, or such other
A2.2 Purchaser shall procure and maintain suitable Workman's and period as stated in the Contract, of attendance by any of the
Employer's Liability Insurance as required by the applicable law Supplier's personnel at Site and in addition at the Christ-
for any labor provided by him under the Contract. mas/New Year period, the Supplier's personnel are entitled to
a return visit to their country of residence. The cost of the
A2.3 The skilled and unskilled labor provided by the Purchaser or End-
journey from and to Site shall be paid by the Purchaser to the
User shall remain the servants and under the control of the
Supplier.
Purchaser or End-User, as the case may be, but shall work to
the orders and instructions of the Supplier’s representative. The A5 Time Sheets
Supplier shall not be liable for any act, omission or negligence
A5.1 At the end of each week the Supplier's personnel shall submit
of such labor, except to the extent that such act or omission is
time sheets to the Purchaser's representative, showing all
as a result of the proven negligence of the Sup-plier’s
hours worked, to whom they are chargeable and any other
representative (subject always to the limitations contained in
items that are reimbursable by the Purchaser. The Purchasers
Clause 11 of the Terms and Conditions).
representative shall sign such time sheets and return them to
A3 Facilities Provided by Purchaser Supplier's personnel within forty eight (48) hours of receipt.
Should the Purchaser's representative disagree with the con-
A3.1 The Purchaser shall provide the following facilities at his own tent of the time sheets, he shall discuss such disagreement
expense. with Supplier's representative within such forty eight (48) hour
A3.1.1 Adequately furnished and equipped living accommodation to period.
European standards for use by the Supplier's personnel A6 Accidents, Sickness and Medical Facilities
throughout their period at Site together with subsistence and
other reasonable expenses of the Supplier's personnel. A6.1 In cases of sickness or accidents to any of Supplier's personnel,
Purchaser shall provide, at his own cost, suitable qualified
A3.1.2 Transportation for the Supplier's personnel between Site and
medical and dental care including medicines. Any treatment
place of arrival and departure and for transportation between
requiring hospitalization shall be given in a private ward.
accommodation and Site.
A7 Areas of High Risk
A3.1.3 Any special clothing for the Supplier's personnel that may be
required for the applicable Site conditions. A7.1 In the event that, due to the location of the Site, the Supplier is
unable to obtain insurance cover in respect of Employers Li-
A3.1.4 Except as otherwise stated in the Contract, all tools and
ability, Personal Accident and/or travel under the Supplier’s
equipment required to perform the Services, including but not
present policy for the Supplier's personnel, the Purchaser shall
limited to, hand-tools, any special tools, heavy tools, lifting
pay any additional required premiums that the Supplier may in-
equipment, craneage, scaffolding, lighting and welding sets. All
cur to provide such special insurances. However, should it not
such tools and equipment shall be maintained in a safe and
be possible for the Supplier to obtain such suitable insurance
suitable condition by the Purchaser and, where applicable, be
cover or existing cover is withdrawn during the course of the
fully tested.
Services, the Supplier is hereby relieved of its obligations under
A3.1.5 All Site security, protection and watching together with imple- the Contract. In this event Supplier shall not be in breach of any
menting the correct operating and maintenance of all safety obligations hereunder and Purchaser shall have no right of
systems, procedures and equipment. claim against Supplier either under the Contract or against any
bank guarantee or surety given by Supplier.
A3.1.6 All suitable consumables required for the Services, including but
not limited to, heating, gas, fuel, compressed air, electricity,
lubrication materials and other sundry items.
A3.1.7 Suitable lockable storage, security and protection for all mate-
rials and equipment.
A3.1.8 Arrangement for the provision of letters of invitation to enable
Supplier to arrange necessary visas.
A3.1.9 Permits, including work permits, licenses and approvals.

SSPC Sales T&C__English_September 2017 Page 6 of 6


nd
P.O. Box 51737, 2 Industrial City,
SAUDI PUMP FACTORY Riyadh 11553, Kingdom of Saudi Arabia.
ISO 9001 : 2000 COMPANY Tel : + 966 (0)1 265 2123.
Fax : + 966 (0)1 265 1071.
E-mail : mail@saudi-pump.com

CANCELLATION CHARGES

Cancellation After Buyer’s order has been accepted by the Company, it may not be
cancelled without the Company’s consent. Any cancellation after acceptance is subject to a
cancellation charge determined by reference to the attached graph.

The attached graph shall be applied only to services provided by and goods manufactured
or modified by the Company. All other goods or services provided in a final condition
(Buyout items such as drivers, systems instruments, couplings, seals, etc.) shall be billable
to the Buyer at the Buyout supplier’s charges to the Company plus 20% Administration and
Handling Charges.

In the event of cancellation, this pre-determined formula shall prevail and shall not be
subject to audit.
Project: BI­10­01868­UPGRADE ETHANE FACILITY AT JU’AYMAH NGL PLANT
Customer’s Reference: UPGRADE ETHANE FACILITY AT JU’AYMAH NGL PLANT
SULZER­Reference: SAU.2153­RUH.15.0013­F0
Revision: 0

Technical Section
CUSTOMER : SINOPEC Engineering Group Saudi Co., Ltd.(SEG)
PROJECT : UPGRADE ETHANE FACILITY AT JU’AYMAH NGL PLANT
RFQ REFERENCE : 01868-RFQ-B04-REV.00
END USER : SAUDI ARABIAN OIL COMPANY
DATE : 16/June/2020
SSPC REFERENCE : SAU.2153-RUH.15.0013-F0
REVISION : 00

UNPRICED PROFORMA INVOICE

MOTOR PUMP
PUMP NUMBER OF MATERIALS (ARAMCO MOTOR LOS DELIVERY TIME DDP SITE
# ITEM # QTY SERVICE MODEL / SIZE Standard PUMP RPM POWER FLANGE FLUSH PLANS UNIT PRICE TOTAL PRICE
TYPE STAGES CODE) HP REQUIRED in KSA
SUPPLY RATING

PRODUCED WATER Please refer to


1 R83-G-1041 A/B/C/E/F 5 CP 4x6x9 BB5 11 API 610 HSZ 900 3560 3/60/4160 1500# NO 53B Included Included
DISPOSAL PUMP Terms & Conditions

5 Grand total price DDP to site in KSA Included

TERMS AND CONDITIONS


1 All prices are BUDGET in US Dollars and nett to your Company, based DDP to site KSA.
2 Our prices above include Commissioning and start-up spares for the pumps (one set of gaskets / O rings per pump).
3 Suitable packing for inland KSA transportation is included.
4 Our offer is valid until 30 August 2020 unless previously withdrawn by ourselves in writing.
5 Prices are based on full award to SSPC (i.e. all 5 units shown). We reserve the right to alter any or all our prices in case of any partial order award.
6 Scope of supply for each item as explicitly listed in our technical proposal. Items not explicitly shown or listed in our offer are not included. Couplings, el.motors will be exclusively SSPC choice, from the ARAMCO RVL.
7 Delivery time will be 70-77 w.weeks DDP site in KSA, after receipt of an acceptable P.O. NMR601 submittals within 12-14 weeks after receipt of an acceptable P.O. and 2 weeks are considered for approvals. Any delay on approvals will be added to the delivery time.
8 Payment terms : To be agreed
9 In case of an order and subsequent order cancellation due to any reason, the enclosed Order Cancellation charges will apply.
10 Standard SSPC warranty is 12 months from pumps' start up or 18 months from shipment ex-works, whichever comes earlier. Extended warranty terms are possible but at an extra price and special conditions (can be communicated upon request).
11 VAT (not included in the a.m. prices) is to be considered also per the latest KSA authorities mandate.
12 Prices have been quoted based on 5% import duties to KSA, any adjustment from KSA authorities after the date of this offer will necessitate a price amendment from our side based on the finally mandated import duties.
13 Should the execution of the order/project be unavoidably delayed by Covid-19 driven developments, the delivery date shall be adjusted by a corresponding period by the delivering party. The Parties shall keep each other informed with the intention of minimizing
the impact of any such delay.

SULZER CONFIDENTIAL
#
GENERAL SCOPE OF SUPPLY:

The scope of supply offered is described and limited as here below listed. Any other component or service not
specifically listed is understood as excluded.

▪ Standards to the pumps are as and where applicable (API 610 11th & 31-SAMSS-004 2018).
▪ Pumps as per requested material of construction or in accordance to performa Invoice.
▪ Electrical Motors generally in line with ARAMCO specifications. All motors are DOL starting and will
be exclusively SSPC Choice from ARAMCO RVL.
▪ Common baseplate for pump, motor and any instrumentation as and where applicable. Baseplates
are for grouted installation.
▪ Mechanical Seals & Seal Systems as per API 682 & 31-SAMSS-012 from ARAMCO approved
Vendor of Sulzer choice. ATU is included as per MR.
▪ Flexible disc-pack spacer type coupling & non-sparking coupling guard (aluminium). Coupling will be
exclusively SSPC Choice from ARAMCO RVL.
▪ Pump Instrumentation as applicable per section 7.4 of 31-SAMSS-004.
▪ Local Control Stations.
▪ Sun-Shades will be provided for Seal System and instrumentations as and where applicable.
▪ Certified Material Test Reports for pumps & seals will be offered as per applicable forms 175.
▪ Hydrostatic Test of pumps’ pressure casing - 30 as applicable in form – 175.
▪ Performance Test as applicable in form – 175. All performance tests with shop motors at rated
speed as required.
▪ NPSH Test as and if required per form – 175.
▪ Mechanical Run Test as and where applicable in form – 175. All mechanical run tests will be
performed with shop motors
▪ All interconnecting piping within the skid battery limit.
▪ Vent & Drain connection as applicable will be provided & terminated up to skid edge with valve. All
auxiliary piping within the pump unit mounting plate battery limits will be in the materials per AD-
036821 and relevant inspection form 175.
▪ constant level oiler, level sight glass and a drainable sight glass.
▪ Junction boxes for instruments as applicable.
▪ Painting as per Sulzer standard in compliance to Aramco painting specs. Noting that all stainless
steel, auxiliary piping, valves, manifold valves & instrumentation within our battery limits will not be
painted.
▪ Spare parts for commissioning and start up: one set of pump gaskets and ‘O’ rings per pump.
Included in base scope. Also, one set of cartridge withdrawal equipment as special tool.
▪ 3.1 / 2.2 Certificates for all wetted / pressure parts will be provided as and where applicable.
▪ Dynamic Balancing of impellers will be provided as per Form 175
▪ Documentation in accordance with Sulzer standard & Aramco requirements. VDDR, NMR601, 602 &
603 as applicable to our scope of supply.
▪ Final inspection in our Riyadh / KSA factory.
▪ Suitable packing for inland truck transportation to the job site.
▪ Transportation by truck and delivery DDP job site in Saudi Arabia.

Sulzer Saudi Pump Company, PO Box 51737, 2nd Industrial City, Riyadh – 11553, Saudi Arabia I Tel: +966 11 2652123 I Fax: +966 11 2651071

SULZER CONFIDENTIAL
TECHNICALS NOTES:

➢ Our scope is limited to pumps, Motors, Seals & seal systems, instrumentation as applicable,
interconnecting piping within the pump skid only.
➢ Except for pumps, all other rotating machinery within our scope will be supplied with the respective
manufacturers’ standard bearing isolators.
➢ Lube Oil System is not required for pump as per API 610.
➢ Only one 53B system will be used during functional test as specified in 175.
➢ Number of witnessed and non-witnessed (certified) tests for the pumps and the motors included is
in strict accordance with the relevant Saudi Aramco Standards.
➢ All submitted drawings are preliminary general arrangement drawings for your reference.
➢ Noise levels will be recorded during the performance or mechanical run test but they will be
provided for information only. Noise levels cannot be guaranteed or meet the specified noise level
values because of continuous and uncontrolled workshop background noise encountered in the
test lab/workshop.

ITEMS NOT INCLUDED IN SCOPE:

o Third party certification


o Other Instrumentation for pumps, motors (like wireless machine monitoring triaxial transducer) are not
offered.
o Special tools except cartridge withdrawal.
o Starters.
o Strainers.
o Lifting beams.
o First fill of lubricants. We will provide you the list of ISO VG grade lubricants list after order placement.
o Foundations, foundation bolts, levelling shims and grout.
o Interconnecting piping / valves / fittings outside pump battery limit.
o Counter flanges, as the offered pump are with standard flanges sizes.
o No power cables for motors have been considered.
o Personnel protection (thermal or any other type) insulation has not been considered as we consider
this to be in Contractor scope.
o Noise attenuation devices (noise blankets etc.) for any pump or motor.
o Any Lifting Devices, lifting beams, chains, shackles etc.
o 3D Model Review meetings of the Package.
o Analysis like lateral / torsional analysis are not included in scope.
o Machinery Protection Systems have not been considered in our scope of supply. Only Pump & motor
instrumentation as per SAMSS / Project requirements have been considered.
o Complete unit test (string test) for any of the pumps.
o Any capital spare parts & 2 Years Spare Parts are excluded. These can be quoted once all the pump
sizes and materials are frozen after the completion of the technical alignment of the project.
o Seaworthy packing
o Foundations, foundation bolts, levelling shims and grout.
o No Gearboxes have been considered.
o Any instrumentation and related instruments’ wiring/cabling outside pump unit skid.

Sulzer Saudi Pump Company, PO Box 51737, 2nd Industrial City, Riyadh – 11553, Saudi Arabia I Tel: +966 11 2652123 I Fax: +966 11 2651071

SULZER CONFIDENTIAL
4x6x9EW CP 11 stage
SNC LAVALIN - Saudi Arabia TAG: R83-G-1041 A/B/C
Produced Water 3560 rpm Design point:
1085.0 kg/m3 11 flow Q = 410.0 USGPM
140.0 °F 17.0 head H = 4219 ft
power P = 725.8 BHP
Dynamic Viscosity:0.922
1.0 centiPoise
mm2/s TPC_4x6x9EW
efficiency = 65.4 %

6000

D2 = 270.0 mm Allowable operating region


5500 Prefered operating region

5000 D2 trim = 255.3 mm

4500
Head [ft]

4000

3500
D2 min = 216.0 mm

3000

2500

MCSF
2000

1000
Power [BHP]

800

600

400

200

70

60 30

50 25
Efficiency [%]

NPSH [ft]

40 20

30 15

20 10

NPSH 3%
10 5

0 0
0 50 100 150 200 250 300 350 400 450 500 550 600 650
© SULZER Ltd 2020

Flow [USGPM]
4 Sulzer Reference ID

MJ 29/01/2020 RUH.15.0013 AEAR-14343


4-504.512.324
CP CROSS CARTRIDGE DESIGN SECTION PARTS LIST RUH 15.0013
11.02.2020 rev4
Aramco HSZ Materials - SUME Coated
TEMPERATURE RANGE -29°C < T < 315°C

REFERENCE
COMPONENT GENERIC MATERIAL NOTE SPECIFICATION
NUMBER
Super Duplex ASTM A995 Gr.6A
100.100 Casing 1
Super Duplex ASTM A890 Gr.6A
110.100 Inner Casing 1
Super Duplex ASTM A182 F53
161.100 Casing End Cover NDE
Super Duplex ASTM A995 Gr.6A
161.200 Casing End Cover DE 1
Super Duplex ASTM A276 UNS S32760
210.263 Pump Shaft

230.241 Impeller 1st Stage


Super Duplex ASTM A890 Gr.5A
230.242 Impeller Series Stages
Stationary Wear Ring
502.203
(1st Stage Eye) Super Duplex Hard Faced UNS S32760 Hard Faced
Stationary Wear Ring SUME®PUMP SA HVOF
502.206
(Series Stage Eye)
Impeller Wear Ring
503.222
(1st Stage Eye)
Impeller Wear Ring Super Duplex Hard Faced UNS S32760 Hard Faced
503.225
(Series Stage Eye) SUME®PUMP SA HVOF
Impeller Wear Ring
503.226
(Hub)
522.233 Throttle sleeve
Super Duplex Hard Faced UNS S32760 Hard Faced
SUME®PUMP SA HVOF
533.232 Centre sleeve
Super Duplex Hard Faced UNS S32760 Hard Faced
541.209 Interstage Bush
SUME®PUMP SA HVOF
542.215 Throttle Bush
Super Duplex Hard Faced UNS S32760 Hard Faced
SUME®PUMP SA HVOF
546.210 Centre Bush
Bearing Housing Carbon Steel ASTM A216 Gr.WCB
D.E & N.D.E
O Ring
Case Gasket
Case Studs Not Required
Case Nuts
Gland Studs Super Duplex ASTM A276 UNS S32760
Gland Nuts ASTM A276 UNS S32760

NOTES:-

1) ASTM A890 Gr.5A may be substituted due to foundry preference at Sulzer option
2)

Equivalent wrought or cast material specifications may be substituted as listed in API 610 Table H.2 at Sulzer option

UNCONTROLLED COPY - VALID AT DATE OF PRINTING ONLY 7 January 2020


SULZER CONFIDENTIAL
#
2020.06.07.Juaiymah Terminal revamp Upgrade_SZ29281-8.xlsx last change: 6/17/2020

Offer responsible Mohamed, Marwa Technical notes:


OEM name Sulzer Saudi Pump Company (former SPF), Saudi Arabia General: API 682 6.1.2.14: Vapour margin not less 0,35 MPa (3.5 bar) (50psi) (API 682 4th Edition) or a minimum ratio of 1.3 (API 682 3rd Edition) between the absolute pressure in seal chamber and absolute vapor pressure of the pumped fluid at pumping temp. is required.
Contact Abdullah Almaskeen The (attached) EagleBurgmann Hydrogen Sulfide (H2S) Health & Safety Instruction with the corresponding threshold values is part of this offer/contract. This is also available in the Download Center for Safety Data Sheets under www.eagleburgmann.com
Customer reference number SAU.2153-RUH.15.0013-F0 1: EB is offering as per PDS & RFQ
Quote date 07 June 2020 2: Inboard Seal wetted parts made of Super Duplex as per SZ confirmation and request.
EB quotation number 00029281-8 3: MAWP & Seal chamber presure missing from RFQ
Project name Saudi Aramco - Juaiymah Terminal revamp / Upgrade 4: No paintngg for Sealant system or Nuts and Bolts.
Project no. IP-EOG-SA-1710-11132-00 5: As per ARAMCO SAES-A-206, Seal & Sealant systems are Exempted from the PMI test.
Offer name Saudi Aramco - Juaiymah Terminal revamp / Upgrade 6: Due to the fact that the pressurized steel parts of the seal are made of bar stock material, there is no necessity to perform any hydrostatic tests for the seals
End user location JUAYMAH 7: Refilling time 28 days is confirmed.
End user country Saudi Arabia 8: Supply and installation of the LCS and JB shall be in SSPC facility in Riyadh after delivery of the ATU under EB supervision and warranty. The supply and installation activities would add 1 week over the ATU delivery to customer from SSPC facility.
End user name Saudi Aramco, Saudi Arabia
EPC name SNC Lavalin, United Arab Emirates
API 682 Engineered Seal
Offer validity 31 August 2020

Pump data Service conditions EagleBurgmann mechanical seal and supply system

Supply system secondary supply plan


Drive end (DE) / Non-drive end (NDE)

Supply system tertiary supply plan


Viscosity @ pumping temperature

Supply system primary flush plan


Pump manufacturer model

Corrosive / erosive agents

Seal chamber pressure

API 682 configuration


Discharge pressure
API 610 pump type

API 682 seal code


Suction pressure
Pump shaft diam.
Quantity / pumps

Vapour pressure
Chloride content

Mechanical seal
Specific gravity

Technical notes
Shaft material
Pump service

Material code
Temperature
Bearing size

H2S content

API Plan
pH value
Medium

MAWP
MAWT
Speed

Solids
Item

rated min rated max min rated max min rated max min rated max min rated max min rated max min rated max
in rpm ppm ppm ppm °F °C psi (a) 0 cP psi (a) psi (a) psi (a) psi (g)
0 0.0 0 0 0 0.0 0.00 0.00 0.00 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

R83-G-0001 PRODUCED AQ2KM5G4-


A/B/C 3 WATER BB5 2.6 0 0 3560 Water 411.0 TDS 249200 200.00 110941.00 6.30 0.0 160.0 180.0 0.0 0.00 2.90 7.51 0.000 1.085 0.000 0.000 1.000 0.000 0.00 18.12 40.46 0.00 1987.00 2024.46 0.00 18.12 40.46 2999.00 SHFV-D/..-E682 AQ2VM5G 3CW-FF C2A3ES53B 53B Plan 53B Forced draft Air cooler 1500#
3 0 Seal design(s) 0 Supply system design(s)
Additional equipment Description Quantity Tech. notes
Instrumentation data sheet 0 0
1 0
Sunshades 0 6 0
TIT (loose supply without piping extention) 0 6 0
N2 charging kit 0 1 0
Portable refilling unit 0 1 0
ATU as per MR Including LCS, JB & installation as per attached1Documents 0
Extra PIT (loose supply) 0 6 0

page 1 of 1
Customer  
    
Project Name     !" #
Reference No.  $%$&'()*+,
Date Issued  &+&+-+.-$/

Technical Specification
for
Induction Motor

0 &+&+-+.-$/ 
0 1 2--2" "-3- 0-#-2"
Rev. Date Issued Contents Prepared By Checked By Approved By

Hyundai Electric Co., Ltd.


AC INDUCTION MOTOR DATA SHEET
Model No.or RFQ No. 1912687-03 Item No. A01 Rev.No [ 0 ]
 
    Project No.

Project Name Quantity 3 sets

GENERAL SPECIFICATION PERFORMANCE DATA


Frame Size 450 Rated Output 900 HP
Type HNE6 454 Number of Poles 2
Enclosure(Proctection) TEFC ( IP55 ) Rotor Type Squirrel Cage
Method of Cooling IC411 Starting Method* D.O.L
Rated Frequncy 60 Hz Rated Voltage 4160 V
Number of Phases  Full Load 110.2A
Current
Thermal Class F Locked-Rotor** 550 %
Temp. Rise at full load (by resistance method ) Efficiency
at 1.0 S.F 70 deg.C 50% Load -%
Motor Location Outdoor 75% Load -%
Altitude Less than 1000 meter 100% Load 95 %
Relative Humidity Less than 100 % Power Factor(p.u)
Ambient Temp. 50 deg.c (Max.) 50% Load -
Duty Type S1 75% Load -
Service Factor 1.0 100% Load 0.89
Mounting B3 Speed at Full Load 3560 r.p.m
Type Sleeve-Self Torque
Bearing DE/N-DE Sleeve / Sleeve Full Load 183.7 kg·m
Lubricant Oil Bath-Self Locked-rotor** 65 %
External Thrust Refer to Remark #1 Breakdown** 220 %
Coupling Method Direct Moment of Inertia (J)
Shaft Extension Single Load - kg.m2
Main Steel Motor - kg.m2
Terminal Aux. Yes Sound Pressure Level(No-load & mean value at 1m from motor)
Box
Location Refer to Outline Drawing 82 dB(A) No-Load
Application R83-G-0001 A/B/C Vibration 2.3mm/s(rms) - Limit of bearing housing
vibration
Area classification Classs 1, Div. 2, Group A, T3 Permissible number of Cold 3 times
Type of Ex-Protection Non-Spark consecutive starts Hot 2 times
Applicable Standard IEC,NEMA,API 541, Paint Munsell No. 
ACCESSORIES SUBMITTAL DRAWING
(1) Winding Temp Detector(Pt 100 Ohm/Single) : 6EA / Motor Outline Dimension Drawing \ Motor Weight (Approx.)
(2) Bearing Temp Detector(Pt 100 Ohm/Dual) : 2EA / Motor B3 1912687-03-A01 5120 kg
(3) Space Heater : 1ST / Motor REMARK #1
(4) Trio Oiler : 2EA / Motor
External Thrust (Nor) N/A
External Thrust (Max) N/A
External Thrust (Up) N/A

SPARE PARTS REMARK #2

 

 

2020.05.14      - ! 

Note : Others not mentioned in this data sheet shall be in accordance with maker standard.
Above technical data are only design values and shall be guaranteed with tolerance of applicable standard.
Inspection and performance test shall be guranteed with tolerance of applicable standard.

HHI W230-131-1 * In case of Inverter or V.V.V.F Motor:Performance data is based on sine wave test. A4(210mm X 297mm)
Three Phase Induction Motor Hyundai Electric
Technical Clarification Sheet (Reference No. : Ref. No.1912687-03)

      
Revision 0 Dated in May.14.2020
Spec. No.
Item
and PROJECT Specification Requirement Proposed Exception & Deviation of HHI Dev./Clai. Purchaser's Judgement
No.
Para. No.
    ! "
"#"  !  $
 %  !&& '() ) %*+,-+- .
1
/)0
  "! 0*) 3
4 
 51 33 6
"= 99 45 6 58 > ?=5
8 

5478 9 00:; 9 <= < 
8 <' >8
!1
2 
4>() 3 5 4>9 =5 49  51=38 3 494
4>
<' ?=48
>8 9 =/ <
4>
2
>548 0:; (4> 9 
 
4>()
4> 3=84>( 3555 4> =<34>(.5 >8 (  6@)
  !  . A+%%0:-0
3 .B.C"  D 
""E&& '() ) %*+,-20 . /)
"= 99 45 6 58 > FC!G> 1>=5
!1
F 9 , 00) !G> 1>=5   0A:: 3 494
4>
5<8 45 +2::< E 9
15 
5)
4

!
4>355 5
3 9
=6
4 3 45 >

H:)  "!    =6 


!1
F 9 , <<34 63 9
15 
5 54> 
15 3 494
4>
!
4>355 !
3
5

5   > 35= 
5)
 "! !+:: !45
">3G =@) 6@5 >8 9 5
>5 '433 6
!1
F 9 ,  8' C3' G5 ?=48 9 5/ 3 494
4>
<<348 !!+02
4 3)
6
54/  E
>5
>
43 3/3 45 >
> 55 G 9
=64
4> !G5
 F*) B 4>(
!1
+ 9 , 9 8 3=64
4> 
5) 145 45 >
3 494
4>
>5
>
%/3 !4(1
8 "435 ?=48
7
>5488)
 >5488
145 ?=4 >
45
<<34 63 >3G 9 51 9
)  (>
4  
4 3
?=48 > 3G545I !1< >5<
4>I >8
!1
H 9 , 5
I 4?=48 >
 >
5
>8  8>55 3 494
4>
5
5
5/
4>
8
5
 >
> 55 G 54> 
1  >
'388 < 
5 > 51 9
)
?=48 > 3G545I !1< >5<
4>I >8
!1
H 9 , 3 5 5
1 <
4> 3 <4  9
145
5
) 3 494
4>
5
5 ! 38 D4>84>( >9 >  5

  !" "


10   !&& '() )
%::- . /)0
Page: 1 of 1
H), 4/5 H)0:)0 1 >
49=( 3 <= <
84/5 51 33 6 5478 4> 8 >  '4
1
1
"= 99 45 6 58 > ?=5
8 

933'4>(
63 4> 884
4>

5
4>(
!1
F2 9 +* 
4>() 3 5 4>9 =5 49  51=38 3 494
4>

3 > 5 >
4>8 4> +0%!!!%::-
11
>548 0:; (4> 9 
 
4>()
4/ <3
 
4>(  &*H  4>4 =
 >
( 9 = < 
8 '  00:
2)F 3
4 3 
5 2)F)00  3 >
3
 3 >
3  >3 45 =
9 5 < 9
!1
FA 9 +* 5

4> 9  1 
 51 33 6 5=<<348 6G 3 494
4>
5=<<3G)
12
/>8)
<<END>>

Page: 2 of 2
CP Horizontal Radially Split Multistage
Barrel Pump
Main Applications

The CP is a BB5 multistage barrel pump suitable for high pressure, high
speed and high temperature services requiring reliability and long service
life. It is mainly used in the following applications:
• Water injection
• Offshore crude oil shipping
• High pressure pipeline Features and Benefits
• Boiler feed
• High pressure safety injection
• Refinery charge
• Ethylene shipping 1• Opposed impellers
• Balance axial loads with no lube system
needed on smaller pumps

2• Axially split inner case


• Rotor balance is not disturbed when
installing pump

3• Dual volute inner case


• Balances radial loads for longer life
7
4• Twistlock barrel construction
3 • Reduces maintenance time on lower
8 temperature services
4
5• Cartridge design with SuperboltsTM on
1 larger pumps
• Speeds repair with standard tools
2 6• Bearings
• Bearing options to suit specific applications:
ball/ball, sleeve/ball, or sleeve/pivot shoe

7• Barrel
• Forged pressure boundary components
providing secure containment
6
5 8• Optional double suction first stage
• Reduces Net Positive Suction Head
Required (NPSHR)
CP Horizontal Radially Split Multistage Barrel Pump

Oil and gas Hydrocarbon Power Pulp and General Chemical Water and
processing generation paper industry processing wastewater

Operating data

50 Hz 60 Hz
80 to 250 mm Pump sizes 3 to 10 in

up to 1,000 m3/h Capacities up to 4,400 USgpm

up to 7,000 m Heads up to 23,000 ft

up to 425 bar Pressures up to 6,250 psi

-50 to 425°C Temperatures 46 to 800°F

Performance ranges

Head H (m) Head H (ft)


3,000
50 Hz 10,000 60 Hz
2,000 8,000

6,000

1,000
4,000

3,000
600

2,000

300 1,500

200
1,000
150
20 40 60 100 200 400 600 1,000 60 100 200 400 600 1,000 2,000 4,000
3
Capacity Q (m /h) Capacity Q (USgpm)

Materials

Material classes Material

API 610 S-6, S-8, C-6, A-8, D-1, D-2


We Do What We Say

Customer partnership
• We are a reliable partner
• We provide a high level of service
• We make our customers more
competitive

Committed people
• We drive accountability
• We are open and transparent
• We are team players

Operational excellence
• We focus on results
• We take initiative and work within
established processes
• We act safely

A Global Specialist at Your Doorstep

Sulzer serves clients worldwide through a network of over 150 production and service sites and has a
strong footprint in emerging markets.

Sulzer headquarters,
Winterthur, Switzerland
www.sulzer.com

E00609 en (5) 9.2015 (500), Copyright © SULZER Ltd. 2015


This brochure is a general presentation. It does not provide any warranty or guarantee of any kind. Please, contact us for a description of the warranties and guarantees offered with
our products. Directions for use and safety will be given separately. All information herein is subject to change without notice.

You might also like