Client:
E E
Project Manager:
Designer:
8500 H7
4250
8500 H8 H9 H10
HA 8500 H11 H12
AB CA 8500
4250 42 H13
503250
HB 8500
9000
D DA FA D
AC CB DB FB HC
FC
16
+4
5850
50
AD CC E1 HD
DC E2
EBEA FD
8800
PARTIAL PLAN-4 HE
PARTIAL PLAN-5 E3 PARTIAL PLAN-3 PLAN NORTH
Gewan Island
AE CD E4 PARTIAL PLAN-2
DD HF
5150
QIB
E5
FE
LA
AF CE E6 HG PARTIAL PLAN-1
DE E7 NOTE:
AG CF
12550
DF EC E8 HH
CG E9 FF 1- THIS DRAWING SHOULD BE READ IN CONJUCTION WITH
B9 DG GENERAL NOTES AND GENERAL DETAILS DRAWINGS
B8 E10
AH B6 B7 ED
B5 CH FG E11 HJ 2- FINAL EXTENT AND DIMENSIONS OF PADS SHALL BE
5900
EF
DH 3- ALL PITS FINAL LOCATION, EXTENT AND DIMENSIONS
CK FH J13
AK J9 J10 J11J12 SHALL BE VERIFIED BY THE SUPPLIER, MANUFACTURER
EG G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 G12 G13 J8 AND WITH MEP DRAWINGS.
BA
0
8200
HL
BB 4- FOR MECHANICAL SERVICES ROUTING WITHIN THE
CL FJ J7 BALANCING LAYER EXISTING BELOW SLAB ON GRADE
AL
J4 J5 J6 REFER TO MECHANICAL DRAWINGS AND
EH J3
4150 7000
BC P10 J1 J2 SPECIFICATIONS.
AM P7 P8 P9 CM
8800
KA
PH MJ LA
PARTIAL PLAN-13
PARTIAL PLAN-12
LB KB
KC
LC
PARTIAL PLAN-11 Project Number Q18020-0100D
KD
LD
KE
LE ISSUED FOR TENDER
B B
KF APRIL 2019
LF KG
LG
Issue:
Sheet Title
A
H
COMMON BASEMENT
QIBL
A
OVERALL PLAN
Zone Key Plan: BASEMENT FLOOR OVERALL PLAN
IN
IN
T
OU
OUT
Sheet No.
BBB-SC-1058
IN
T
OU
OUT
IN
IN
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER
CONCRETE PAD
Client:
HATCH T.O.C. LEVEL
-1.40
-0.90
E E
Project Manager:
Designer:
A11 C2 C3 C4 C5 C6 C7 C8 C9 C10
C1
MATCH LINE
MATCH LINE
8500 8500 8500 8500 8500 8500 8500 8500 8500 8500
REFER TO SHEET NO.
SC-1061
REFER TO
B2 REFER TO
NOTE 2 SC-3003
NOTE 2 B2
SC-3003
TRENCH 300D
BW-2 BW-2
480
D D
BW-2
16
+4
50
1185 SC-3005 F1
655 1060
2155
F1
2300
C101 855
1485
C101 C101 C101 C101
1865
SC-3002
SC-3002
F1 C101
105
CA SC-3002
PLAN NORTH
Gewan Island
3080 2500 745 2500 940 5175
140
C102 C101 PIT
QIB
1200X1200X1600D
C101
LA
C101 PIT
C101 PIT C101
1500X1500X1600D 1300X1200X1600D NOTE:
IN BOTH DIRECTIONS
-1.70
TOC Project Name:
F3
SC-3002
PIT
1430 1700X1500X1600D C3109
C101
225
CD
C101
C3107 C3102 C3101 C3101 C3101 C107
C3103
C103
TRENCH 300D Project Number Q18020-0100D
5150
PIT
1400X1200X1600D
C107
C101 C4401
1615 475
C3108
540 1040 5320
1225
CF
C103 C101 C101 C101 C101 C101 C101 C101 C103 C101 C101 C102 C101
MATCH LINE
REFER TO SHEET NO.
5000
Issue:
Sheet Title
A
H
COMMON BASEMENT
QIBL
A 1 : 100 PARTIAL PLANS
Zone Key Plan: BASEMENT FLOOR ARRANGEMENT
& REINFORCEMENT
IN
IN
PARTIAL PLAN-4
T
OU
OUT
Sheet No.
BBB-SC-1062
IN
T
OU
OUT
IN
IN
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER
Client:
E E
Project Manager:
Designer:
8500 H7
4250
8500 H8 H9 H10
HA 8500 H11 H12
AB CA 8500
4250 42 H13
503250
PARTIAL PLAN-5 HB 8500
9000
D PARTIAL PLAN-4 DA D
FA HC
AC CB DB
FC
16
+4
5850
50
FB
AD CC E1 HD
DC E2
EBEA FD
8800
HE
E3 PARTIAL PLAN-3 PLAN NORTH
Gewan Island
AE CD E4
DD HF
5150
QIB
E5
FE
LA
AF CE E6 HG PARTIAL PLAN-1
AG CF
DE E7 PARTIAL PLAN-2
12550
DF EC E8 HH
CG E9 FF
B9 DG
B8 E10
AH B6 B7 ED
B5 CH FG E11 HJ
5900
B3 B4 E12
B2 CJ EE
AJ B1 E13 HK
5900
EF
DH
CK FH J13
AK J9 J10 J11J12
BA EG G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 G12 G13 J8
PARTIAL PLAN-7
0
8200
5150 400
HL
BB CL J7
AL PARTIAL PLAN-6 FJ J5 J6
EH J3 J4
4150 7000
BC P10 J1 J2
AM P7 P8 P9 CM
8800
P5 P6 JA
P4 EJ GA
P2 P3
BD AN P1 CN
EK
0 5850
1995 8850
N1 N2 JB
BE GB C
4850 400
KA
PH MJ LA
PARTIAL PLAN-13
PARTIAL PLAN-12
LB KB
KC
LC
PARTIAL PLAN-11 Project Number Q18020-0100D
KD
LD
KE
LE ISSUED FOR TENDER
B B
KF APRIL 2019
LF KG
LG
Issue:
Sheet Title
A
H
COMMON BASEMENT
QIBL
A
OVERALL PLAN
Zone Key Plan: GROUND FLOOR OVERALL PLAN
IN
IN
T
OU
OUT
Sheet No.
BBB-SC-1074
IN
T
OU
OUT
IN
IN
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER
Client:
E E
Project Manager:
Designer:
MATCH LINE
A11 C1 C2 C3 C4 C5 C6 C7 C8 C9 C10
SC-1079
SC-1083
B2
SC-3003
B2
D SC-3003 D
BW-2 BW-2
BW-2
16
+4
50
B20
B25
DP1 DP1 DP1 DP1 DP1 DP1
PLAN NORTH
DP1 Gewan Island
CA DP1 DP1 DP1 C102
C101 C101 C101 C101 C101 30mm
C101 C101
QIB
B94
B94
EXP.J.
LA
15 NOTES:
SC-3006 C101 C101 C101 C101
1- THIS DRAWING SHOULD BE READ IN CONJUCTION WITH
SLAB THICK. GENERAL NOTES AND GENERAL DETAILS DRAWINGS.
450mm
2- ALL DROP PANELS ARE CONCENTRIC WITH THEIR
B80
RELATIVE COLUMNS UNLESS OTHERWISE SHOWN
B74
IN DRAWINGS.
B33
9000
+4.00
TOC 3-THE QUAY WALL ADJACENT TO THE BASEMENT WALLS
IS CAPABLE OF WITHSTANDING A LATERAL PRESSURE
4 OF 5.0 KN/M² ALONG ITS FULL HEIGHT. CONTRACTOR OF
3
SC-3005
1750 1750 PLOT BBB SHALL ENSURE THAT THE LATERAL
500 SC-3005
B84 4750 C104 PRESSURE EXERTED ON THE QUAY WALL DUE TO
2450
4 CONSTRUCTION OF THE BASEMENT STRUCTURE WILL
SC-3005 DP4 275 DP2 DP2 NOT EXCEED THE FORMER DESIGNATED PRESSURE
B3101 B3103 B3104
00
2150
00 DP1
30mm 30mm TEMPORARY BRACING SYSTEM FOR THE QUAY WALL TO
1220
800 575
2100 EXP.J. MITIGATE SUCH EXCEEDANCE. CONTRACTOR SHALL
45.
845
EXP.J.
800
1220
C3101 DP4 B3114 B3115 SUBMIT CALCULATIONS OF THE LATERAL PRESSURES
C3103
0°
CB
425
85 C3108 350
3100
3100
1000
85
1550
0 3475 MEP OPENING C107 C101
C108 C103 C101
2100
C3108 THE ENGINEER’S REVIEW AND APPROVAL.
2380
1000
C
B4E
B3107
B39
B53
450mm
B2C
1700
1755 B32A B32B B32C PLANTERS AND UPSTANDS ON THE GROUND FLOOR
5850
DP4
LEVEL.
B64
B11
C +4.00
150
3490
TOC
1050 1000
B32A
LOCATED ABOVE GROUND FLOOR SLAB SHALL BE
30mm CORE-3A2 C4401
B135 EXP.J. C101 B80 CORE-3A1 INSTALLED AND SECURED PRIOR TO CASTING THE
375 975 STAIR-3A2 GROUND FLOOR CONCRETE SLAB. FOR EXACT
600
2785
SLAB THICK. BASEMENT OR UP TO GROUND FLOOR
C101 C101 C101 C4419 LEVEL
450mm 3 3450 500
SC-3005
500
B91
B3106
B3109
450mm
8800
0° +5.20
45.
0
85
B58
B40
00
2905
3
2085
2750
2750
00
SC-3005
18
DP2
30mm
1205
C3109
EXP.J.
B135 85
CD 0
DP2
C101 C101 C3103 C3101 30mm
45. C3107 C3102 C3101 C3101
0° C107 EXP.J.
Project Number Q18020-0100D
B2C
B3108
5150
3
B2C
B3105
B2C
B2C
B2C
B4406
5425
B61
B63
B64
B76
B C3108 B
CE APRIL 2019
1150
1315
1150
B80
30mm
125 1950 +4.35 C4401
30mm
4000
18 C101 C101 C101 C101 C101 C101 C103 C101 C101 C102
1870
45.
00
0°
3045
EXP.J. 85 DP1
3045
45.
MATCH LINE 0
00
18
4915 2765
85
B53
4915 1735 0 C101
00
00
00
B66
00
450mm Issue:
18
B94
18
18
18
2330
1360
B163
1425
+4.35
45.
45.
45.
B65
B68
0°
85 85 85
0°
45.
0°
0 0 TOC
CG DRAWN BY: M.W./N.O.
Sheet Title
A
H
COMMON BASEMENT
QIBL
GROUND FLOOR ARRANGEMENT-PARTIAL PLAN-4 (1OF2)
A
PARTIAL PLANS
1 : 100
Zone Key Plan: GROUND FLOOR ARRANGEMENT
PARTIAL PLAN-4
IN
IN
1OF2
T
OU
OUT
Sheet No.
BBB-SC-1081
IN
T
OU
OUT
IN
IN
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER
Client:
E E
A11 C1 C2 C3 C4 C5 C6 C7 C8 C9 C10
Project Manager:
MATCH LINE
REFER TO SHEET NO.
MATCH LINE
REFER TO SHEET NO.
8500 8500 8500 8500 8500 8500 8500 8500 8500 8500
Designer:
SC-1080
SC-1084
4720
1125
PD 2
CA
2515
2485
2485
2485
2485
2485
D D
1880 3045 1385 785 2185
2270
4125
4830
16
+4
50
22.5°
2400
9000
600
PLAN NORTH
Gewan Island
PLANTER 1960X1860 PLANTER 685 7075 PLANTER
QIB
STEEL SHADING 1960X1960 1960X1960
PD
LA
UPSTANDS 3760 3875 14685 2
4250 NOTES:
SE1 SE1 SE1
4085
1290 SE1 3025
475 3970 6385
235
SE1
235
4570 GENERAL NOTES AND GENERAL DETAILS DRAWINGS.
1365
4220
150
235
2- FOR GENERAL UPSTANDS DETAILS, PLANTER UPSTANDS
320
150
650
DETAILS, WATER FEATURES UPSTANDS DETAILS, STEEL
CB SHADING UPSTANDS DETAILS, PEDESTALS PD1,
1160
845
70
4530
PEDESTALS PD2, AND DIFFUSER PADS DETAILS REFER TO
1470
235
PD1 475 3450 250
38 3- FOR PLANTER SETTING OUT, DIMENSIONS AND EXCAT
SC-3007 PLANTER
PLANTER 3905X1960 LOCATION REFER TO LS DRAWINGS SET.
1500X1500
5850
680
1290
235 COMMENCEMENT. IN CASE OF ANY DISCREPANCY
CONTRACTOR SHALL NOTIFY THE ENGINEER.
285 1420
5- ALL SLAB EDGES / UPSTANDS LOCATIONS, EXTENDS AND
CC
470
1230
1500
ANY CONSTRUCTION WORK COMMENCEMENT. IN CASE OF
2735
5810 38 ANY DISCREPANCY CONTRACTOR SHALL NOTIFY THE
C
SC-3007 4570 ENGINEER.
C
125 1040 4050 1040 150 1950
5995
150
PLANTER
150
2015
53
3285
8800
235
1560X1500 150
1815
1500X1500
SC-3007 150
2900
150
3505
700
150
235
875
PD1 53
SC-3007
53 UPSTANDS AND PLANTERS
3200
SC-3007
2650
150
150 VERTICAL ELEMENTS
330
CD
700
5810
2380
38 Project Name:
150 4570
SC-3007 235
525 930
930 2350
DIFFUSER PAD
5150
1375
4150X2400 PLANTER 1290 38
1500X1500 235 SC-3007
53 PLANTER
2050
2560
2560
SC-3007 1500X1500
1950
500
35 200
150
CE
150 865
235
1015
235
950
950
150
150
235
235
235
150
150
150
150
335 2015 1660 615 7650 660 1840 620 5450 730 1700 375 4035
125 225 8025 Project Number Q18020-0100D
4000
575
820
820
92
320
0°
2770
2155
° 805 PD 2
2685
585
590
PD1
200
PD1 PD1
CG
Issue:
A
H
COMMON BASEMENT
QIBL
A
PARTIAL PLANS
Zone Key Plan: GROUND FLOOR ARRANGEMENT
PARTIAL PLAN-4
IN
IN
2OF2
T
OU
OUT
Sheet No.
BBB-SC-1082
IN
T
OU
OUT
IN
IN
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER
THICK.
SLAB
THICK.
CONSTRUCTION JOINT
SLAB
CONSTRUCTION JOINT
150
150
GROUND FLOOR SLAB
GROUND FLOOR SLAB
E E
ɸ 25 @ 150
Project Manager:
QUAY WALL SURFACE SHALL BE MADE SMOOTH BY TOLERANCE GAP TO PROVIDE SMOOTH
PATCHING WHEREVER NECESSARY, SEALING AND ɸ 20 @ 150 GROUND FLOOR
SURFACE FOR WATERPROOFING SLAB
CHAMFERING OF JOINTS BY CEMENTITIOUS GROUT TO
MEMBRANE APPLICATION ɸ 16 @ 150
RECEIVE WATER PROOFING MEMBRANE ACCORDING
TO THE MANUFACTURER RECOMMENDATIONS AND TO
THE ENGINEER APPROVAL
30mm
BASEMENT WALL (BW1) EXP.J.
GROUND FLOOR
WATERPROOFING SLAB
MEMBRANE AS PER ST.SPECS WATERPROOFING
MEMBRANE AS PER ST.SPECS
ɸ 16 @ 150 ɸ 20
@1
L= 5 50 (A General Key Plan:
000 DD.)
C A
1000
LOC EN TER T EACH
ɸ 32 @ 150 ATIO E
N DW FAC
.
SLAB ON GRADE ITH E
EXP
. J.
SLAB ON GRADE
20 mm I.J -1.70
20 mm I.J -1.70 BASEMENT WALL
150
QUAY WALL
150
3000
D CONSTRUCTION JOINT D
16
+4
50
ɸ 25 @ 150 -2.70
ɸ 20 @ 300 (BALANCING LAYER)
1450
150
1450
3500 CONSTRUCTION JOINT PLAN NORTH
AND WATER STOP Gewan Island
-3.30 RAFT
QIB
1500 REINF. -3.30
1100
RAFT
LA
REINF.
150
NOTE:
1100
RAFT FOUNDATION BE TACKED OR SPLICED TO THE ENGINEER APPROVAL.
REINFORCEMENT IN BASEMENT WALLS AT
1100
CONTRACTOR TO PROVIDE CONNECTION DETAIL
RAFT FOUNDATION BETWEEN DIFFERENT WATERPROOFING MEMBRANES
GROUND FLOOR EXPANSION JOINTS LOCATIONS TO ENSURE BASEMENT WATER TIGHTNESS TO THE
ENGINEER’S APPROVAL.
SCALE: N.T.S
1 3- THE QUAY WALL ADJACENT TO THE BASEMENT WALLS
1.5 IS CAPABLE OF WITHSTANDING A LATERAL PRESSURE
OF 5.0 KN/M² ALONG ITS FULL HEIGHT. CONTRACTOR
WATERPROOFING OF PLOT BBB SHALL ENSURE THAT THE LATERAL
BED ROCK PRESSURE EXERTED ON THE QUAY WALL DUE TO
MEMBRANE AS PER ST.SPECS WATERPROOFING
100mm BLINDING CONSTRUCTION OF THE BASEMENT STRUCTURE WILL
MEMBRANE AS PER ST.SPECS NOT EXCEED THE FORMER DESIGNATED PRESSURE
VALUE, OTHERWISE CONTRACTOR SHOULD DESIGN A
TEMPORARY BRACING SYSTEM FOR THE QUAY WALL
PLAIN CONCRETE 100mm BLINDING TO MITIGATE SUCH EXCEEDANCE. CONTRACTOR
SECTION B2 - B2 SHALL SUBMIT CALCULATIONS OF THE LATERAL
SCALE: 1 : 25 PRESSURES RESULTING FROM THE BASEMENT WALL
CASTING BASED ON HIS SELECTED POURING
SECTION B1 - B1 C METHODOLOGY TO THE ENGINEER’S REVIEW AND
SCALE: 1 : 25 APPROVAL.
THICK.
SLAB
CONSTRUCTION JOINT ALL COLUMNS LOCATED WITHIN WATER TANKS.
AND WATER STOP
THICK.
SLAB
WATERPROOFING
150
CONSTRUCTION JOINT
MEMBRANE AS PER AR.SPECS
AND WATER STOP
GROUND FLOOR SLAB Project Name:
150
3000
SLAB ON GRADE
SLAB ON GRADE
20 mm I.J 2 ɸ 25 @ 150
-1.70
CRYSTALLINE WATERPROOFING -1.70
20 mm I.J
150
QUAY WALL
150
QUAY WALL 00 TD 04/04/2019 Approved Issue A.M.
-1.70 TANK FLOOR ɸ 20 @ 150 Rev. Phase Date Description Appr.
CONSTRUCTION JOINT SLAB
AND WATER STOP CONSTRUCTION JOINT Issue:
850
3000
850
-2.70 (BALANCING LAYER)
400
ɸ 25 @ 150 ɸ 20 @ 300
1450
ɸ 25 @ 150 ɸ 20 @ 300
(BALANCING LAYER)
1450
DRAWN BY: M.W./N.O.
150
3500 ɸ 16 @ 150 DESIGNED BY: M.SH.
3500 CHECKED BY: T.KH.
-3.30 RAFT
1500 REINF. -3.30 APPROVED BY: M.M.
1100
RAFT
1200
1100
Sheet Title
ɸ 32 @ 150
-3.80
-3.30
MIXED USE - BASEMENT
RAFT -3.80
REINF.
150
1100
RAFT FOUNDATION
1100
RAFT FOUNDATION COMMON BASEMENT
CONSTRUCTION JOINT
A AND WATER STOP DETAILS
1
1100
THICK.
THICK.
SLAB
SLAB
THICK.
SLAB
150
150
WATERPROOFING
E
GROUND FLOOR SLAB GROUND FLOOR SLAB MEMBRANE AS PER AR.SPECS
E
150
GROUND FLOOR SLAB
WATER TANK WATER TANK WATER TANK CONSTRUCTION JOINT WATER TANK
TANK WALL (TW1)
ɸ 25 @ 150
AND WATER STOP Designer:
ɸ 16 @ 150 ɸ 25 @ 150
ɸ 16 @ 150 ɸ 16 @ 150
ɸ 16 @ 150 ɸ 25 @ 150
ɸ 16 @ 150
150
150
150
150
D D
150
3000
3000
3000
3000
400
400
400
400
16
+4
50
ɸ 16 @ 150 ɸ 16 @ 150 ɸ 16 @ 150 ɸ 16 @ 150
1450
(BALANCING LAYER) (BALANCING LAYER) (BALANCING LAYER) (BALANCING LAYER)
1450
PLAN NORTH
(BALANCING LAYER) (BALANCING LAYER) Gewan Island
1200
1200
1200
1200
QIB
LA
-3.30 -3.30 -3.30 -3.30 RAFT REINF. -3.30 -3.30
RAFT REINF. RAFT REINF. NOTE:
1100
1100
1100
1100
OF 5.0 KN/M² ALONG ITS FULL HEIGHT. CONTRACTOR
1100
1100
RAFT FOUNDATION RAFT FOUNDATION RAFT FOUNDATION OF PLOT BBB SHALL ENSURE THAT THE LATERAL
PRESSURE EXERTED ON THE QUAY WALL DUE TO
CONSTRUCTION OF THE BASEMENT STRUCTURE WILL
NOT EXCEED THE FORMER DESIGNATED PRESSURE
VALUE, OTHERWISE CONTRACTOR SHOULD DESIGN A
TEMPORARY BRACING SYSTEM FOR THE QUAY WALL
TO MITIGATE SUCH EXCEEDANCE. CONTRACTOR
SHALL SUBMIT CALCULATIONS OF THE LATERAL
WATERPROOFING WATERPROOFING WATERPROOFING PRESSURES RESULTING FROM THE BASEMENT WALL
100mm BLINDING CASTING BASED ON HIS SELECTED POURING
MEMBRANE AS PER ST.SPECS 100mm BLINDING MEMBRANE AS PER ST.SPECS MEMBRANE AS PER ST.SPECS 100mm BLINDING
METHODOLOGY TO THE ENGINEER’S REVIEW AND
APPROVAL.
THICK.
IN BASEMENTS= WALLS UNLESS AT LOCATION SHOWN
WALL
PLAN
PLAN ON DRAWINGS.
THICK.
SLAB
ɸ 20 ɑ 150 (ADD.)
2000
WATERPROOFING
MEMBRANE AS PER AR.SPECS
WATERPROOFING
2000
MEMBRANE AS PER AR.SPECS GROUND FLOOR SLAB REFER TO SLAB REINF.
CRYSTALLINE WATERPROOFING PLAN Project Name:
REFER TO SLAB REINF. ɸ 20 ɑ 150 (ADD.)
2000
PLAN
THICK.
SLAB
150
150
THICK.
WALL
CONSTRUCTION JOINT
AND WATER STOP CRYSTALLINE WATERPROOFING
TANK FLOOR TANK FLOOR
SLAB SLAB
ɸ 32 @ 150 SLAB ON GRADE CONSTRUCTION JOINT TANK FLOOR
ɸ 20 ɑ 150 (ADD.)
ɸ 20 @ 150 -1.70 ɸ 20 @ 150
AND WATER STOP
2000 2000
SLAB
150
ɸ 32 @ 150
-1.70 20 mm I.J -1.70 ɸ 20 @ 150
3000
400
3000
ɸ 20 ɑ 150 (ADD.)
400
Issue:
ɸ 16 @ 150 ɸ 16 @ 150 ɸ 20 ɑ 150 (ADD.)
2000
ɸ 16 @ 150 FILE NAME: Q18020-0100D-PK3-BBB-TD-SC-3004-00
(BALANCING LAYER) (BALANCING LAYER) DRAWN BY: M.W./N.O.
1200
1200
1200
CHECKED BY: T.KH.
-3.30 -3.30 RAFT REINF. APPROVED BY: M.M.
1100
NO
RAFT FOUNDATION RT
A
WALL. REINF. H
COMMON BASEMENT
QIBL
1100
1100
A
RAFT FOUNDATION DETAILS
WALL
Zone Key Plan: BASEMENT WALLS AND TANK
THICK. WALLS R.C. DETAILS-2
WATERPROOFING
IN
IN
OUT
SCALE: 1 : 25
SECTION T5 - T5
T
OU
OUT
SCALE: 1 : 25
WALL AND WATER TANK WALLS PACKAGE BUILDING DESIGN TRADE SERIAL
SCALE:1/25 IN
IN