You are on page 1of 2

Procument selection

Analyze the Selection of procument method depending on different project variables of the
project
There are 3 types of procument routes in construction industry.
1. Traditional
2. Design and build
3. Turnkey
Risk distribution

Whilst investigating the most appropriate Procurement Strategy for the projects the Client must
consult with the PM and Design Team. They will have invaluable input and expertise to make in
making the final decision.
Different project variable
In the early stages of the project, the Client should be developing the Procurement Strategy for
the project in consultation with the PM and the Design Team. This decision requires to be made
in consideration of the objectives of the project. When the selecting a procument route there
some facts to consider. As following:
 Project Size
 Client Type
 Time
 Cost
 Quality
 Accountability
 Certain of Project Objectives
 Market Conditions
 Risk.
 Asset ownership.
 Financing

In this project (Mohammad Farhan’s house) the client has selected traditional procument route to
complete the project. In this method client has to appoint a design team and initiates with
construction process.
The design is completed fully before the tender process commences. It affords the Client a great
deal of control over the quality, specification and cost, however the timescale is lengthened to
achieve the completion of the design, and the Client maintains the risk in terms of the
Consultants Design and any unforeseen items e.g. ground conditions, as well as failing to benefit
from the contractors’ input on build ability by appointing the Contractor once the design is
completed.
As the contractor has no responsibility for the design, the Client is responsible for any mistakes
or omissions in the design. Although, some risk is shared with the contractor the majority of risk
is taken on by Client and the success of Design Team and the contractor.

You might also like