May 2012 Monthly Report
May 2012 Monthly Report
5. FREQUENCY PROFILE
¾ During the month of May 2012, the overall system was running normal to the
large extent except few events / incidents. The maximum of all India peak
demand met was 119089 MW (on 30-05-12) which is 8% more as compared
to last year May month demand (110231MW) and 2.7% more as compared to
April 2012 demand (115880 MW).
¾ For 87.82% of time, the NEW grid frequency was in the IEGC band (49.5 –
50.2) against 93.68% of the time in the last month (April 2012). For SR Grid,
the frequency remained within the IEGC band for 94.01% against 91.28% of
the time in the last month (April 2012).
¾ There was around 13% decrement in average all India Hydro generation
compared to last year & 17% increment compared to last month.
¾ Regarding wind generation, there was around 128% increment in average all
India wind generation compared to last month. May 2012 average wind
generation was 87 MUs/day against 38 MUs/day in April 2012.
ALL INDIA REGIONWISE INSTALLED CAPACITY (MW) AS ON
31-05-2012
Source-CEA
PEAK DEMAND MET AT NATIONAL LEVEL
NR - Max: 34984 MW Min: 26715 MW Avg : 32568 WR - Max: 37255 MW Min: 34081 MW Avg : 36030
SR - Max: 31714 MW Min: 27474 MW Avg : 29682 ER - Max: 14874 MW Min: 11486 MW Avg : 13677
120
100
PEAK DMD (MW) -->
80
ALL INDIA - Max: 119089 MW Min: 105417 MW Avg : NER - Max: 1680 MW Min: 1315 MW Avg : 1523
60
40
20
0
1-May-12
2-May-12
3-May-12
4-May-12
5-May-12
6-May-12
7-May-12
8-May-12
9-May-12
10-May-12
11-May-12
12-May-12
13-May-12
14-May-12
15-May-12
16-May-12
17-May-12
18-May-12
19-May-12
20-May-12
21-May-12
22-May-12
23-May-12
24-May-12
25-May-12
26-May-12
27-May-12
28-May-12
29-May-12
30-May-12
31-May-12
DATE --> NR WR SR ER NER INDIA
ALL INDIA LOAD DURATION CURVE FOR MAY' 2012
Thousands
116
112
DEMAND (MW) --->
108
104
100
96
92
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%
% OF TIME --->
ENERGY MET AT NATIONAL LEVEL
2500
2000
ENERGY (MU) -->
1500 NR - Max: 849 MU Min: 688 MU Avg : 780 MU WR - Max: 852 MU Min: 789 MU Avg : 830 MU
SR - Max: 720 MU Min: 615 MU Avg : 677 MU ER - Max: 720 MU Min: 615 MU Avg : 677 MU
ALL INDIA - Max: 2761 MU Min: 2423 MU Avg : 2610 NER - Max: 30 MU Min: 21 MU Avg : 26 MU
1000
500
0
1-May-12
2-May-12
3-May-12
4-May-12
5-May-12
6-May-12
7-May-12
8-May-12
9-May-12
10-May-12
11-May-12
12-May-12
13-May-12
14-May-12
15-May-12
16-May-12
17-May-12
18-May-12
19-May-12
20-May-12
21-May-12
22-May-12
23-May-12
24-May-12
25-May-12
26-May-12
27-May-12
28-May-12
29-May-12
30-May-12
31-May-12
DATE --> NR WR SR ER NER INDIA
FREQUENCY PROFILE FOR THE MONTH OF MAY 2012
SR GRID
FREQUENCY Max. Min. Avg.
< 48.5 48.5 - 49.5 < 49.5 49.5 - 50.2 >50.2
PROFILE Freq Freq Freq
Apr-12 0.00 7.79 7.79 91.28 0.93 50.66 48.66 49.69
% TIME
May-12 0.00 5.61 5.61 94.01 0.38 50.63 48.81 49.7
NEW GRID
FREQUENCY Max. Min. Avg.
< 48.5 48.5 - 49.5 < 49.5 49.5 - 50.2 >50.2
PROFILE Freq Freq Freq
Apr-12 0.00 2.38 2.38 93.68 3.94 50.66 49.08 49.9
% TIME
May-12 0.00 10.82 10.82 87.82 1.36 50.75 48.82 49.8
50.6
FREQUENCY DURATION CURVES FOR MAY' 2012
1.2
50.4 1
0.8
50.2
0.6
50
0.2
49.8 0
-0.2
49.6
-0.4
-0.6
49.4
-0.8
49.2 -1
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%
% OF TIME --->
NEW SR DIFF_FREQ
HYDRO GENERATION AT NATIONAL LEVEL
MONTH:- MAY 2012
All figures in MU
Date NR WR SR ER NER TOTAL
5/1/2012 147 27 44 23 5 246
5/2/2012 145 44 51 27 5 271
5/3/2012 141 41 53 18 6 259
5/4/2012 141 36 55 18 5 255
5/5/2012 146 38 51 26 6 266
5/6/2012 154 35 47 22 6 264
5/7/2012 161 41 77 23 5 307
5/8/2012 173 48 78 23 5 326
5/9/2012 185 50 60 30 6 331
5/10/2012 187 40 64 27 5 323
5/11/2012 197 41 62 25 4 328
5/12/2012 190 38 47 25 5 304
5/13/2012 192 41 46 26 4 310
5/14/2012 191 59 54 31 6 342
5/15/2012 193 68 51 32 7 351
5/16/2012 189 57 54 34 8 341
5/17/2012 195 50 59 28 5 336
5/18/2012 202 45 71 25 6 347
5/19/2012 208 53 63 26 5 354
5/20/2012 200 48 52 28 6 334
5/21/2012 195 62 66 27 6 355
5/22/2012 194 63 76 27 6 365
5/23/2012 183 58 76 32 6 355
5/24/2012 189 44 69 20 8 330
5/25/2012 222 38 73 27 8 367
5/26/2012 238 45 87 25 5 400
5/27/2012 223 45 71 25 5 369
5/28/2012 231 46 86 25 5 391
5/29/2012 244 49 81 26 5 404
5/30/2012 256 47 72 28 7 409
5/31/2012 261 37 74 30 7 409
TOTAL 5969 1430 1969 807 175 10350
MAXIMUM 261 68 87 34 8 409
MINIMUM 141 27 44 18 4 246
AVERAGE 193 46 64 26 6 334
HYDRO ENERGY DURING THE MONTH OF MAY' 2012
450
NR - Max: 261 MU Min: 141 MU Avg : 193 MU
SR - Max: 87 MU Min: 44 MU Avg : 63 MU
400 ALL INDIA - Max: 409 MU Min: 246 MU Avg : 334 MU
350
300
HYDRO ENERGY (MU) -->
250
200
50
0
1-May-12
2-May-12
3-May-12
4-May-12
5-May-12
6-May-12
7-May-12
8-May-12
9-May-12
10-May-12
11-May-12
12-May-12
13-May-12
14-May-12
15-May-12
16-May-12
17-May-12
18-May-12
19-May-12
20-May-12
21-May-12
22-May-12
23-May-12
24-May-12
25-May-12
26-May-12
27-May-12
28-May-12
29-May-12
30-May-12
31-May-12
DATE --> NR WR SR ER NER INDIA
WIND GENERATION AT NATIONAL LEVEL
MONTH:- MAY 2012
All figures in MU
Date NR WR SR ER NER TOTAL
5/1/2012 6 26 46 … … 78
5/2/2012 3 21 52 … … 76
5/3/2012 4 30 55 … … 89
5/4/2012 2 38 74 … … 114
5/5/2012 5 35 79 … … 119
5/6/2012 12 30 52 … … 94
5/7/2012 10 24 17 … … 51
5/8/2012 8 16 25 … … 49
5/9/2012 10 18 27 … … 55
5/10/2012 10 31 25 … … 66
5/11/2012 12 24 24 … … 60
5/12/2012 14 39 53 … … 106
5/13/2012 9 34 28 … … 71
5/14/2012 8 28 33 … … 69
5/15/2012 13 31 47 … … 90
5/16/2012 21 40 50 … … 111
5/17/2012 17 36 55 … … 108
5/18/2012 9 32 40 … … 80
5/19/2012 9 32 65 … … 105
5/20/2012 15 33 54 … … 101
5/21/2012 11 39 65 … … 115
5/22/2012 4 40 55 … … 99
5/23/2012 3 42 73 … … 118
5/24/2012 14 49 93 … … 156
5/25/2012 26 53 95 … … 175
5/26/2012 10 50 89 … … 149
5/27/2012 6 45 93 … … 144
5/28/2012 10 45 90 … … 145
5/29/2012 12 41 82 … … 135
5/30/2012 20 51 103 … … 174
5/31/2012 24 57 96 … … 177
TOTAL 334 1109 1833 … … 3277
MAXIMUM 26 57 103 … … 175
MINIMUM 2 16 17 … … 49
AVERAGE 11 36 59 … … 103
ACTUAL POWER SUPPLY POSITION - MAY 2012
NFF/Railway 70 70 0 2 2 0
GOA(SR) 54 48 -6 2 2 0
WBSEB 32 30 -2 1 1 0
Arunachal Pradesh 30 40 9 1 1 0
Manipur 38 36 -2 1 1 0
NER MeSEB 65 60 -6 2 2 0
Mizoram 26 27 1 1 1 0
Nagaland 28 35 7 1 1 0
Tripura 29 24 -5 1 1 0
Inter-Regional Exchanges (2012-2013)
All figs. in MUs
ALL FIGURES ARE IN MUs
Total FINANCIAL
Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 YEAR2012-13 (Till
May'12)
No. of Energy
Description Name of RLDC
Transactions Approved(MU)
NR 350 1077
WR 126 1158
MAY'12 SR 73 346
ER 152 791
NER 23 107
TOTAL 724 3479
Sale Purchase