SOBEH ENGINEERING CONSULTING OFFICE

PROJECT NAME: Mr. AL-RAYYAN BUILDING


PREPARED BY : ENG. SANA' ABU-ELZAIT
BASEMENT FLOOR (CABINET No. 1)
high pressure drop= 5800

OUTER
RADIATOR HEATING INNER PIPE FLOW
FLOW PIPE SIZE LENGTH FRICTION LOSS (Pa/m) %
No. CAP. (W) SIZE (mm) (L/h)
(L/H) (mm)

1.1 700 60.2 16 12 7 828.571428571429 350.3229 0.171841

1.2 700 60.2 16 12 5 1160 420.2006 0.143265

2.1 1000 86 16 12 9 644.444444444444 305.8239 0.281208

2.2 1000 86 16 12 3 1933.33333333333 553.8279 0.155283

3.1 2300 197.8 16 12 12 483.333333333333 261.7803 0.755595

4.1 2700 232.2 16 12 5 1160 420.2006 0.552593

4.2 2700 232.2 16 12 8 725 325.9279 0.712428

5.1 3200 275.2 16 12 12 483.333333333333 261.7803 1.051263

5.2 3200 60.2 16 12 18 322.222222222222 210.258 0.286315

5.3 3200 275.2 16 12 2.5 2320 611.189 0.45027

5.4 3200 275.2 16 12 20 290.000 198.6181 1.385574


101.5 ###
NOTES

5800

5800

5800

5800

5800

5800

5800

5800

5800

5800

5800