SOBOH ENGINEERING CONSULTING OFFICE

WATER CALCULATION SHEET

PROJECT NAME: Mr. AL-RAYYAN BUILDING


FLOOR : BASEMENT
PREPARED BY : ENG. SANA' ABU-ELZAIT

CRITICAL PATH CALCULATIONS

LINE SYMBOL HEAD (m) LENGTH (m) FRICTION LOSS (Pa/m)

A-E 8.1 43 1847.93023255814

A-F 8.1 42.5 1869.67058823529

CRITICAL PATH IS: A-E


FRICTION LOSS= 1847.9302326 Pa/m
PRESSURE DROP= 79461 Pa
SOBOH ENGINEERING CONSULTING OFFICE
WATER CALCULATION SHEET

PROJECT NAME: Mr. AL-RAYYAN BUILDING


FLOOR : GROUND "APPARTMENT(1)"
PREPARED BY : ENG. SANA' ABU-ELZAIT

CRITICAL PATH CALCULATIONS

LINE SYMBOL HEAD (m) LENGTH (m) FRICTION LOSS (Pa/m)

A-D 5.1 39 1282.84615384615

A-E 5.1 38.5 1299.50649350649

CRITICAL PATH IS: A-D


FRICTION LOSS= 1282.8461538 Pa/m
PRESSURE DROP= 50031 Pa
SOBOH ENGINEERING CONSULTING OFFICE
WATER CALCULATION SHEET

PROJECT NAME: Mr. AL-RAYYAN BUILDING


FLOOR : GROUND "APPARTMENT (2)"
PREPARED BY : ENG. SANA' ABU-ELZAIT

CRITICAL PATH CALCULATIONS

LINE SYMBOL HEAD (m) LENGTH (m) FRICTION LOSS (Pa/m)

A-D 5.1 43 1163.51162790698

A-E 5.1 42.5 1177.2

CRITICAL PATH IS: A-E


FRICTION LOSS= 1163.5116279 Pa/m
PRESSURE DROP= 50031 Pa
SOBOH ENGINEERING CONSULTING OFFICE
WATER CALCULATION SHEET

PROJECT NAME: Mr. AL-RAYYAN BUILDING


FLOOR : 1st FLOOR "APPARTMENT (1)"
PREPARED BY : ENG. SANA' ABU-ELZAIT

CRITICAL PATH CALCULATIONS

LINE SYMBOL HEAD (m) LENGTH (m) FRICTION LOSS (Pa/m)

A-D 2.1 43 479.093023255814

A-E 2.1 42.5 484.729411764706

CRITICAL PATH IS: A-E


FRICTION LOSS= 479.09302326 Pa/m
PRESSURE DROP= 20601 Pa
SOBOH ENGINEERING CONSULTING OFFICE
WATER CALCULATION SHEET

PROJECT NAME: Mr. AL-RAYYAN BUILDING


FLOOR : 1st FLOOR "APPARTMENT(2)"
PREPARED BY : ENG. SANA' ABU-ELZAIT

CRITICAL PATH CALCULATIONS

LINE SYMBOL HEAD (m) LENGTH (m) FRICTION LOSS (Pa/m)

A-D 2.1 43 479.093023255814

A-E 2.1 42.5 484.729411764706

CRITICAL PATH IS: A-E


FRICTION LOSS= 479.09302326 Pa/m
PRESSURE DROP= 20601 Pa