You are on page 1of 1

Power and Gas Division

Project: Bandar Dayyer Client-Project-No.:


Client: Siraf D-R / Siemens No.: 1ARFY2M
Service: ASU for Methanol Plant Date: 22.11.2016
Item: MAC Rev.: 0
Section Main Air Compressor Datasheet

TECHNICAL DATA COMPRESSOR

Compressor model STC-GV(125-3)


No. of stages 3
Process name Process 1 / 1

Operating
Gas point Normal
handled Air / Water
Gas constant J/kgK 295,4
Mol. weight kg/kmol 28,15
Delivered volume flow
(1.013 bar & 0°C dry) Nm 3 /h 193.000
Weight flow (wet) kg/h 261.762
Cooling water inlet temp. °C 38,0
Approach temp. °C 5,0
Re-cooling temp. °C 43,0

Inlet Conditions at battery


limit:
Pressure at flange bar a 0,97
Temperature °C 48,0
Relative humidity % 65,0
Isentropic exponent - 1,4
Actual inlet volume m³/h 253.212

Discharge Conditions at
battery limits:
Pressure bar a 6,20
Temperature °C 87,9

Performance:

Expected Power at coupling kW 16142

Guaranteed Power at
coupling with 1,5% tolerance kW 16169
acc VDI 2045
Power Guarantee - Yes
Flow Guarantee Yes
Driver rating kW see driver datasheet
Bull gear speed rpm 1.500

Cooling water temp. Rise °C 10,0


Cooling water requirement:
- gas cooler(s) m³/h 1.714
- oil cooler m³/h 95
Fouling factor water side m²K/W 0.00020
NOTE1: Operating range may be limited to protect compressor against excessive load, e.g. deviating suction conditions, PSV settings, max. allowable gear load,
etc.
NOTE2: Only operating points specified on customer datasheets have been considered for compressor design.
NOTE3: PSV - required at 7,13 bar

based on 16-siraf-phm//2.01, dated 21.11.2016, 10:31:30, by kisch00j