Professional Documents
Culture Documents
Remarks
CHWP-1303A, CHWP-1303B
Chilled Water Generation Unit
Twin Screw Compressor, Semi-Hermatically sealed
2
Utility Block
Uncontrolled
100
7
7
3 kg/cm²
Condenser & Evaporator 14 bar
ASME Section VIII DVI
CS
R-134a
Safe
DRYCOOL
12
7
32
37
60
0.0002/0.0004
0.0002/0.0004
1
0.5
100% Water
1
1
1.42
1000
7-Aug
0.504
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
Yes
Bitzer/JE Hall
Twin Screw
1
VFD
IE3
F
IP-65
Remarks
Chiller
Removable, Flooded
83.6m²
360
19.05
Expanded/Welded
SA213TP304. 16 BWG
MS Rolled Plate
Refrigerent
Chilled Water
*
Nitrile Rubber (K=0.25)
Project
Process Data Sheet Location
YChem Consulting Pvt. Ltd. Document No.
Chilled Water Unit System Date
Client: Ami Organics Limited Unit - II Rev
Equipment Tag: CHWP-1303A, CHWP-1303B
118 Electric Motor
119 Description UOM For Primary Pump For Secondary Pump
120 Type CHWP-1303A, CHWP-1303B
121 Electric Supply Chilled Water Generation Unit
122 Motor Rating kw Twin Screw Compressor, Semi- *
123 Speed RPM Hermatically
* sealed *
124 Insulation Class Utility Block F
125 Motor Efficiency Class % Uncontrolled IE3
126 Motor Protection Class IP65 IP65
127
128 Pump Details:- In Client Scope
129 Description UOM Cooling Water Supply Primary Chilled Water Supply
130 Type Centrifugal, Close Impeller Centrifugal, Close Impeller
131 Make Grudfos, ITT, KSB, Flow Serve
132 Quantity Nos. 2 4
133 Flow Rate m3/hr 60 803
134 Head m 15 25
135 NPSHA m 8 8
136 NPSHR * *
137 MOC of Wetted Parts CS CS
138 Mechanical Seal SS-304 SS-304
139
140 Packaged Cooling Tower
141 Type
142 Capacity TR
143 MOC
144
145 Instrumentation and Control
146 Description Field Display Panel Display Recording Type
147 Pressure Sensing Instruments
148 Suction Pressure Yes Yes Yes Pressure Transmetter (0-10V)
149 Discharge Pressure Yes Yes Yes Pressure Transmetter (0-10V)
150 Chilled Water In Press. to Evaporator Yes Yes Yes Pressure Transmetter (0-10V)
151 Chilled Water Out Press. to Evaporator Yes Yes Yes Pressure Transmetter (0-10V)
152 Cooling Water Inlet Press. to Evaporator Yes Yes Yes Pressure Transmetter (0-10V)
153 Cooling Water Outlet Press. to Evaporator Yes Yes Yes Pressure Transmetter (0-10V)
154 Oil Pressure Yes Yes Yes Pressure Transmetter (0-10V)
155 Differential Oil Pressure Yes Yes Yes Pressure Transmetter (0-10V)
156
157 Temperature Sensing Instruments
158 Chilled Water In Temp. to Evaporator Yes Yes Yes Temp. Transmetter (4-20mA)
159 Chilled Water out Temp. to Evaporator Yes Yes Yes Temp. Transmetter (4-20mA)
160 Cooling Water Supply Temperature Yes Yes Yes Temp. Transmetter (4-20mA)
161 Cooling Water Return Temperature Yes Yes Yes Temp. Transmetter (4-20mA)
162 Suction Line Refrigerant Temperature Yes Yes Yes Temp. Transmetter (4-20mA)
163 Liquid Line Refrigerant Temperature Yes Yes Yes Temp. Transmetter (4-20mA)
164 Discharge Line Refrigerant Temperature Yes Yes Yes Temp. Transmetter (4-20mA)
165 Plant Chilled Water Supply Temperature Yes Yes Yes Temp. Transmetter (4-20mA)
166 Plant Chilled Water Return Temperature Yes Yes Yes Temp. Transmetter (4-20mA)
167 Motor Winding Temperature Yes Yes Yes Temp. Transmetter (4-20mA)
168
169 Flow Rate Measurements
170 Chilled Water Suppy to the Machine Yes Yes Yes Flow Transmetter (4-20mA)
171
172 Machine Status Display
173 Description On Off
174 Compressor Yes Yes
175 Primary Pump Yes Yes
176 Secondary Pump Yes Yes
roject Utility
ocation Ankleshwar
Document No. CHWP-1303A- 0.00
Date 17-11-2022
ev 0.00
ump Remarks
* 7.5 Kw
* 1450 RPM
F F
IE3 IE3
IP65 IP65
Make
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
Honeywell
E&H
Off Remarks
Yes Yes
Yes Yes
Yes Yes
Project
Process Data Sheet Location
YChem Consulting Pvt. Ltd. Document No.
Chilled Water Unit System Date
Client: Ami Organics Limited Unit - II Rev
Equipment Tag: CHWP-1303A, CHWP-1303B
177 Water Flow Yes Yes
178 Chilled Water Flow Yes Yes
179 CHWP-1303A, CHWP-1303B
180 Power Meters
181 Description Twin Screw Quntity
182 Compressor Power Consumption Compressor,
kw 1
Semi-
183 Primary Pump Power Consumption Utility Block
Hermatically NA
184 Secondary Pump Power Consumption sealed
Uncontrolled NA
185 Coolers Water Pump Power Consumption kw NA
186
187 Identification Plate details :
188 Equipment ID: CHWP-1303A, CHWP-1303B
189 Capacity: 100 TR
190 Client: Ami Organics Limited Unit - II
191 Designed By: YChem Consulting Pvt. Ltd. , Mumbai
192 MFG By: DRYCOOL Systems India (P) Ltd
193 Date: 3/7/2023
194
195 General Notes
196 1 * indicates that the information shall be provided by the Vendor.
197 2 Equipment shall be Aesthetic, Elegant Look and Compact Design.
198 3 Equipment shall be Algae/ Corrosion/ Deposit free.
199 4 Uniform Distribution of Water Over entire Fill Area.
200 5 Equipment to be provided with and STD frame size.
201 6 Equipment shall have proper Lifting Lugs.
202 7 Name plate shall be designed as given in the side bar and base frame.
203 8 Nozzles shall be provided with blind flange.
204 9 Equipment shall be Low Noise, Low Vibration, Less and Easy Maintenance.
205
206 10 Electrical Panel and Instrumentation
207 ● Consists of Isolating M.C.B, M.C.B's for motor. Remote FLP panel Temperature display.
208 ● Contactors and Overload relays, Indicating Lamps, Timer with pulsating arrangement for dust catcher.
209
210 11 Control Panel
211 ● Microprocesses based smart control panel, IP65, shall be provided having the following capabilities.
212 ● Data Logging with HMI
213 ● PLC of appropriate input and output
214 ● Data Storage
215 ● Trending
216 ● Efficiency Calculation, Energy Management.
217
218 12 Safety and Interlocks and Alarms
219 ● High Condenser Pressure Alarm
220 ● Low Condenser Pressure Alarm
221 ● Low Evaporator Pressure
222 ● Low Oil Pressure Deferential Alarm
223 ● Antifreeze Trip
224 ● Compressor Motor Overload on Current
225 ● Compressor Motor Underload on Current
226 ● No Flow
227 ● High Oil Temperature
228 ● Mechanical High Pressure/High Discharge Gas Temp and Trip
229 ● Low Oil Level
230 ● Pro Active Unload for High Current
231 ● Pro Active Unload for High Discharge Pressure
232 ● Pro Active Unload for Low Suction Pressure
233 ● Pro Active Unload for High Discharge Temperature
234 ● Pro Active Unload for High Oil Temperature
235 ● Over Voltage/Under Voltage/Single Phasing/Reverse Phasing/Voltage Unbalance
Utility
Ankleshwar
CHWP-1303A- 0.00
17-11-2022
0.00
Yes
Yes
Remarks
Yes
NA
NA
NA
bai
Project
Process Data Sheet Location
YChem Consulting Pvt. Ltd. Document No.
Chilled Water Unit System Date
Client: Ami Organics Limited Unit - II Rev
Equipment Tag: CHWP-1303A, CHWP-1303B
236 ● Motor Winding Overheat
237 ● Low Condenser Water Flow
238 ● Low Chilled Water Flow
239
240 13 Other Requirements
241 ● Control panel shall have lockout facility on alarms to avoid unauthorized Operator Control.
242 ● PGD0 display with blacklight.
243 ● The control panel shall have capability to change and display in different unit systems.
244 ● Battery backup shall be provided to retain memory and clock incase of power failures.
245 ● Automatic startup on resumption of power after power failures.
246 ● Alarm History: should have capability to log last 500 alarms.
247 ● PC-interfacing facilty shall be provided on the control panel.
248 ● Password protection shall be provided with three levels of password users.
249 ● In case of multiple chillers, the sequencing facility shall be provided to control outlet temperature supplied to the plant.
250
251 14 Test Certificate
252 ● Performance\ Trial
253 ● MOC Test Report
254 ● Warranty
255
256 15 Inspection Terms
257 ● Inspection terms shall be agreed during the time of finalization of the order by the client.
258
259 16 Drawings
260 ● Vendor to submit three sets of fabrication drawings for approval.
261 ● Three sets of drawings shall be submitted in A1 Size paper sheet.
262 ● Three sets of approved drawing shall also be submitted before commencing fabrication.
263 ● Three sets of as built drawing shall be required.
264 ● Copy of the Inspection report and In-house quality report shall be required.
265
266 17 Documentation
267 ● Vendor to provide the FAT and IQ documentation before dispatch of the equipment.
268 ● All M.S parts and rotating parts will be covered with SS-304 sheet. Inside polishing to 220 Grits and outside polishing to 180 Grits.
269
270 18 Finishing
271 ● All MS parts shall be sand blasted followed by two coats of PU primer and two coats of PU paints (Gray Color).
272 ● External and internal surfaces shall be free from welding flux.
273
274 19 Packing
275 ● The Equipment shall be properly packed as not to damage during transit,Loading and Unloading.
276
277
278
279
280
281 Revision History
282 Rev Date Change Summary Issued For
283 0 17-11-2022 Specifications Prepared Comments
284
285
286
287
288
289
290
291
292
293
294
Utility
Ankleshwar
CHWP-1303A- 0.00
17-11-2022
0.00
rits.
Issued For
Comments
Project
Process Data Sheet Location
YChem Consulting Pvt. Ltd. Document No.
Chilled Water Unit System Date
Client: Ami Organics Limited Unit - II Rev
Equipment Tag: CHWP-1303A, CHWP-1303B
Rev 0 Rev 1 Rev 2
Prepared By/Date Simran Ramteke
Rev 2