You are on page 1of 101

gabion at slab culvert and pipe culvert LHS baki

breast wall at slab culvert baki


9229 ko catchpit baki x
9229 ko wing wall baki x
9229 ko head wall baki xai
8226 ko cascade baki and wing wall
kunauto towards beg khola cutting
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Road
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)

Project: Road Improvements Works of Beni-Ghasa Section


(Ch. 4+000-23+000) Beni Jomsom Korolla Road

Interim Payment Certificate No.

Laborotary Reports

Volume -1

Submitted by: Sharma/United JV, Kathmandu


Contract No.: 337145/NS/BJK/073/74-001
Name of Road: Kaligandaki Corrider (Beni-Jomsom- Korola Road)

March, 2020
AGF No. 171
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)

Project: Road Improvements Works of Beni-Ghasa Section


(Ch. 4+000-23+000) Beni Jomsom Koralla Road

Interim Payment Certificate No.

Submitted by: Sharma/United JV, Kathmandu

Contract No.: 337145/NS/BJK/073/74-001

Name of Road: Kaligandaki Corrider (Beni-Jomsom- Korola Road)

Feb, 2020
AGF No. 171

Sharma/United J/V
Kathmandu
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom

Project: Road Improvements Works of Beni-Ghasa Section (Ch. 4+000-23+000), Beni


Jomsom Koralla Road

Description of works : Earthwork, Structures and Pavement works

Name of Road: Kaligandaki Corrider (Beni-Jomsom- Korola Road)

Sub-Contractor :Omkareshwor Construction PVT. LTD

Contract No.: 337145/NS/BJK/073/74-001

Bill Amount (Ex-VAT):

Original Contract Price: NRs. 606,093,969.17 (Including VAT and PS)

Date of Agreement : '2074/02/08

Work Order Date : '2074/02/08

Work Commencement Date : '2074/02/14

Due date of completion :

Work Completed Date : 'Running

Measurement Date : '2076/12/06

Interim Payment Certificate No.


5/101
Sharma/United J/V
Kathmandu

Summary of Payment Sheet

Project: Road Improvements Works of Beni-Ghasa Section (Ch. 4+000-23+000), Beni Jomsom Koralla Road
Sub-Contractor :Omkareshwor Construction PVT. LTD

S. No. Description Cumulative (NRs.) Previous (NRs.) Current (NRs.) Remarks

A 1,441,035.74 - 1,441,035.74
Bill Amount (Work Done Value)
B Bill Amount without PS 1,441,035.74 - 1,441,035.74
Cost Price Adjustment as per
C 195,980.86 - 195,980.86
Sub Clause No. 45.1 of CoC
Total Amount including CPA
C' 1,637,016.60 - 1,637,016.60
(B+C)
D VAT 13% of C' 212,812.16 - 212,812.16
E Total Bill Amount (A+C+D) 1,849,828.76 - 1,849,828.76
F Retention Amount Repayment
G Compensation for events if any
Sub Total Payment to the
H 1,849,828.76 - 1,849,828.76
Contractor (E+F+G)
Deductions
I Retention Amount @ 5% of C' - - -
Mobilization Advance
J Repayment as stated by Sub - - -
Clause 48.3 of CoC.
K TDS @ 1.5% of C' - - -
Contractor's Development Fund
L - - -
@ 0.10% of A

M 50% of VAT 106,406.08 - 106,406.08

Sub Total Deductible Amount


N 106,406.08 - 106,406.08
(Sum of I to L)
Net Payable to the Contractor
O 1,743,422.68 - 1,743,422.68
including VAT (H-M)
United Outstanding
P 61,019.79 61,019.79
Expenses(3.5%)
Net Payable to the Contractor
Q including VAT (O-P) 1,682,402.89 1,682,402.89
Net Payment to the Contractor in Words:
One million Six hundred Eighty Two thousand four hundred two rupees and paisa eighty nine only.

Department of Road Representatives


Contractor:
Checked By: Verified By: Approved By:

Authorized Representative Engineer Site Engineer Project Manager


6/101

Sharma/United J/V
Kathmandu

Price Adjusment Factor Calculation


Late date of bid Subimission : 2073/11/17 28-Feb-17

Base Date : 2073/10/16 29-Jan-17

Invoice Month Base Value Current Value


Interim
Payment Equipmen Equipmen Pn=A+b*
S.N. Non - Labour Materials Non - Labour Materials Remarks
Certificate t Usage t Usage Ln/Lo+c*
Date Date adjustable (b)= (c)=0.35, Date adjustable (b)= (c) ,0=.35,
No. (d)= 0.25, (d)=0.25,E Mn/Mo+d
(A), 0.15 0.25, Lo Mo (A), 0.15 0.25,Ln Mn
Eo n *En/Eo

1 01 19-Jun-20 2076-03-05 29-Jan-17 404.80 89.80 99.90 20-May-20 500.00 104.74 107.39 1.136 Provisional Index
of oct/nov 2019

Submitted by: Checked by: Approved by:


7/101

Sharma/United J/V
Kathmandu

Price Adjusment Calculation

Interim
Price
Payment Mobilization Deduction Net Amount after Total Adjusted Amount to be
S.N Invoice Month Total Bill Amount Adjustme
Certificate Deduction for PS Mobilizaton Price Paid, NRs
nt Factor
No.

1 19-Jun-20 1,441,035.74 - 1,441,035.74 1.136 1,637,016.60 195,980.86


Total upto date 1,441,035.74 - 1,441,035.74 1,637,016.60 195,980.86
Paid amount upto previous IPC -
Amount claimed for this IPC 195,980.86

Submitted by: Checked by: Approved by:


Government of Nepal Page 8 of 101
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Bill of Contract
Project: Road Improvements Works of Beni-Ghasa Section (Ch. 4+000-23+000), Beni Jomsom Koralla Road Date of Agreement : '2074/02/08
Name of Road: Kaligandaki Corrider (Beni-Jomsom- Korola Road) Work Commencement Date : '2074/02/14 -
Contractor : Sharma/United J/V, Kathmandu Extention Time: Previous bill No:
Contract No.: 337145/NS/BJK/073/74-001 Due date of completion : 2076/08/15 Vouchar No:
Act Completion Date : Payment date:

Spec. Bill of Quantities With VO-1 Cumulative Bill Previous Bill Current Bill Remaining
S.N. Clause Item Description Unit Remarks
Ref. Quantity Rate Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount
Part 1: GENERAL

Providing,furnishing and
1.01 maintanence of material testing
laboratory at the specified location
101.00
1.01 a) a) providing laboratory space LS 1.00 200,000.00 200,000.00 0.50 100,000.00 0.50 100,000.00 0.00 - 0.50 100,000.00
b) providing and furnishing
1.01 b)
laboratory equipment,furniture etc
LS 1.00 200,000.00 200,000.00 0.50 100,000.00 0.50 100,000.00 0.00 - 0.50 100,000.00
1.02 Maintenance of Road
a) Maintenance of Road during
1.02a)
construction period
Km-month 613.50 2,000.00 1,227,000.00 4.00 8,000.00 0.00 - 4.00 8,000.00 609.50 1,219,000.00
107.00
b) Maintenance of Road during
1.02 b)
defect liabiality period
Km-month 245.40 1,500.00 368,100.00 0.00 - 0.00 - 0.00 - 245.40 368,100.00

Provision and install project


1.03 108.00
singnboards
no. 2.00 50,000.00 100,000.00 0.00 - 0.00 - 0.00 - 2.00 100,000.00

Insurance for contractors work, plant


materials and manpower,third party
1.04
including staff of the employer and
LS 1.00 7,000,000.00 7,000,000.00 0.00 - 0.00 - 0.00 - 1.00 7,000,000.00
engineer.
1.05 111.00 Provding video cassettes set 2.00 50,000.00 100,000.00 0.00 - 0.00 - 0.00 - 2.00 100,000.00
Part 2 : SITE CLEARANCE

Clearing and grubbing of forest


including uprooting carrying and
2.01 201.00
disposing of vegetation, grass, bush
m2 41800.00 15.00 627,000.00 25,100.00 376,500.00 0.00 - 25100.00 376,500.00 16700.00 250,500.00
saping and trees with necessary works

Clearing landslides, debris from


causeway, culverts and side drains
2.02 905 haulage for disposal within 1 km m3 50750.00 95.00 4,821,250.00 17,360.00 1,649,200.00 0.00 - 17360.00 1,649,200.00 33390.00 3,172,050.00
during monsoon and as per
requirements
Part 3 : EARTHWORK
905
Roadway excavation including
haulage and disposal at appropriate
3.01
location, all complete as per
specification

a) Common material (Hard


3.01 a)
soil/Gravel/BMS)
m3 186072.64 70.00 13,025,084.80 59,635.62 4,174,493.14 0.00 - 59635.62 4,174,493.14 126437.02 8,850,591.66

3.01 b) b) Hard rock excavation using breaker m3 182372.10 350.00 63,830,235.00 84,834.14 29,691,947.76 0.00 - 84834.14 29,691,947.76 97537.96 34,138,287.24

905 Earthwork excavation for road side


drain and structure including haulage
3.02 and disposal at appropriate m3 42290.00 100.00 4,229,000.00 5,793.60 579,360.00 0.00 - 5793.60 579,360.00 36496.40 3,649,640.00
location,all complete as per
specification.
909
Formation of embankment including
compaction in layers not exceeding
3.03 150mm. Compacted depth, watering m3 45454.00 200.00 9,090,800.00 58,788.81 11,757,761.60 0.00 - 58788.81 11,757,761.60 (13334.81) (2,666,961.60)
and haulage 10. etc all complete as
per specification.

908 Back filling with suitable materials in


layers in structures including
3.04
compaction and watering all
m3 29522.00 130.00 3,837,860.00 1,408.10 183,053.00 0.00 - 1408.10 183,053.00 28113.90 3,654,807.00
complete.
Part 4 : RETAINING AND BREAST WALL
Bill of Quantities With VO-1 Cumulative Bill Previous Bill Current Bill Remaining Page 9 of 101
Spec.
S.N. Clause Item Description Unit Remarks
Ref. Quantity Rate Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount

Supply and assemble of machin made


mechanically salvaged gabion and
mattresses from double twisted heavy
coated GI wire of hexagonal mesh
4.01 2401 size 100mm * 120mm with mesh size m3 24250.00 -
3mm, salvaged wire 3.9mm, lacing
wire 2.4mm and stone filling in
gabions including transport and fixing
of gabions in position all complete.

125%of BOQ Quantity m3 22618.75 5,500.00 124,403,125.00 1,195.75 6,576,625.00 0.00 - 1195.75 6,576,625.00 21423.00 117,826,500.00
Above 125% of BOQ Quantity m3 1631.25 4,200.00 6,851,250.00 0.00 - 0.00 - - 1631.25 6,851,250.00
2607, Providing and laying random rubble
2602, masonry in MM 5 in C/M including
4.02 2603, 2510 pointing and 100mm dia PVC pipe m3 11813.33 10,000.00 118,133,300.00 0.00 - 0.00 - 0.00 - 11813.33 118,133,300.00
for weep hole

Providing preparing and installing


formwork including necessary
4.03 1804/1805
supports and removing after
m2 901.00 850.00 765,850.00 69.79 59,321.50 0.00 - 69.79 59,321.50 831.21 706,528.50
completion of works all complete.

Providing and placing cement


concrete for foundation and footing
4.04 2000
etc including compection, curing and
testing.
4.04 a) 0 a) M 15/40 m3 118.00 12,000.00 1,416,000.00 #REF! #REF! 0.00 - #REF! #REF! #REF! #REF!
4.04 b) 0 b) M20/20 m3 268.00 15,000.00 4,020,000.00 12.65 189,690.00 0.00 - 12.65 189,690.00 255.35 3,830,310.00
2000 Providing and laying reinforcement
4.05 including cutting, bending, mt 18.27 120,000.00 2,192,400.00 0.00 - 0.00 - 0.00 - 18.27 2,192,400.00
binding,fixing in position etc
2403 Providing and laying dry stone soling
4.06
in foundation
m3 400.00 4,000.00 1,600,000.00 0.00 - 0.00 - 0.00 - 400.00 1,600,000.00
2404 Providing , laying and fixing geo-
4.07
textile (filter fabric)
m2 14561.80 250.00 3,640,450.00 0.00 - 0.00 - 0.00 - 14561.80 3,640,450.00

Providing and placing plum concrete


2406 (2), with 60% M15/40 concrete and 40%
4.08a
(4) boulders/stones as per specification
m3 2319.00
using concrete mixer and vibrator

125%of BOQ Quantity m3 836.25 12,000.00 10,035,000.00 161.60 1,939,200.00 0.00 - 161.60 1,939,200.00 674.65 8,095,800.00
Above 125% of BOQ Quantity m3 1482.75 8,695.65 12,893,478.26 0.00 - 0.00 - - 1482.75 12,893,478.26
Part 5 : CROSS DRAINAGE , SIDE DRAINAGE AND
MISCELLANEOUS WORKS
2401

Providing and assembling of machine


made Heavy Zinc Coated gabion crate
(Mesh wire 3mm, selvage Wire
3.9mm, binding wire 2.4mm and
mesh size 100*120mm, hexagonal),
placing in poisition including
stretching,forming compartments,
5.01
tying with bracing wires and tie
m3 4465.00 10,500.00 46,882,500.00 0.00 - 0.00 - 0.00 - 4465.00 46,882,500.00
wires; tying down the lid complete
and providing and filling stone /
boulders in gabion boxes/matresses
etc. including dressing,binding,
bonding and all transportation as per
specification all complete.

2607, Providing and laying random rubble


2602, masonry in MM 7.5 in C/M including
5.02 2603, 2510 pointing and 100mm dia PVC pipe m3 10501.00 10,000.00 105,010,000.00 0.00 - 0.00 - 0.00 - 10501.00 105,010,000.00
for weep hole.
2000
Providing and placing M15/40
cement concrete for foundation and
5.03
footing etc including compection,
m3 684.00 12,000.00 8,208,000.00 0.00 - 0.00 - 0.00 - 684.00 8,208,000.00
curing and testing all complete.

2000
Providing and placing machine mixed
cement concrete for superstructure,
deckslab etc including compaction,
5.04 curing and testing
Bill of Quantities With VO-1 Cumulative Bill Previous Bill Current Bill Remaining Page 10 of 101
Spec.
S.N. Clause Item Description Unit Remarks
5.04 Quantity Rate Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount
Ref.
a) M20/20 m3 1319.00 15,000.00 19,785,000.00 0.00 - 0.00 - 0.00 - 1319.00 19,785,000.00
b) M25/20 m3 719.16 17,000.00 12,225,720.00 0.00 - 0.00 - 0.00 - 719.16 12,225,720.00
2000
Providing and placing machine mixed
cement concrete M25/20 for precast
5.05
slab/cast in situ including compaction,
m3 87.00 20,000.00 1,740,000.00 0.00 - 0.00 - 0.00 - 87.00 1,740,000.00
curing, testing all complete.

2000 Providing and laying reinforcement


including cutting, bending,
5.06
binding,fixing in position etc,all
mt 94.11 120,000.00 11,293,200.00 0.00 - 0.00 - 0.00 - 94.11 11,293,200.00
complete
1804/1805 Providing and installing formwork
including necessary support and
5.07 removing after comletion for m2 5803.00 850.00 4,932,550.00 0.00 - 0.00 - 0.00 - 5803.00 4,932,550.00
foundation,footing and slabs precast
elements
701
Providing and laying RCC pipes
(class NP3) diameter 900mm
(internal) with or without collars,
5.08
jointed with stiff mixture of cement
lin.m 488.00 20,000.00 9,760,000.00 0.00 - 0.00 - 0.00 - 488.00 9,760,000.00
motar in the proportion of 1:2
(cement :sand), all complete

2404 Providing and laying HDPE pipe of


160mm dia (pressure 4kg/cm2) for
drianage outlet, sub soil drain ,
5.09
irrigation crossing etc including
lin.m 350.00 2,000.00 700,000.00 0.00 - 0.00 - 0.00 - 350.00 700,000.00
performation and joining, all
complete
5.1 3100 Back filling with graded materials m3 63.00 2,000.00 126,000.00 108.50 217,000.00 0.00 - 108.50 217,000.00 (45.50) (91,000.00)
2404 Providing laying and fixing geo
5.11
textile (filter fabric)
m2 2855.00 250.00 713,750.00 0.00 - 0.00 - 0.00 - 2855.00 713,750.00
2403 Providing and laying dry stone soling
5.12
in foundation
m3 2548.00 4,000.00 10,192,000.00 0.00 - 0.00 - 0.00 - 2548.00 10,192,000.00
1500
supplying and applying Enamel paint
5.13 two coats including one coat priming m2 397.00 800.00 317,600.00 0.00 - 0.00 - 0.00 - 397.00 317,600.00
as per specifiction all complete

2406(2),(4)
Providing and placing plum concrete
with 60% M15/40 concrete and 40%
5.14
boulders/stones as per specification
m3 209.00 11,000.00 2,299,000.00 0.00 - 0.00 - 0.00 - 209.00 2,299,000.00
using concrete mixture and vibrators.

3100
Supply and fixing in position 50mm
5.15 dia GI pipi (medium class) railing as rm 905.00 4,000.00 3,620,000.00 0.00 - 0.00 - 0.00 - 905.00 3,620,000.00
per drawing and engineer's instruction

Part 6 : PAVEMENT WORK


1003 Preperation of subgrade by filling or
cutting in all types of materials
6.01
including compaction and watering
m2 181756.13 10.00 1,817,561.30 0.00 - 0.00 - 0.00 - 181756.13 1,817,561.30
all complete
1201
Providing , laying, spreading,
6.02 watering, levelling, and compaction m3 38793.97 1,500.00 58,190,955.00 0.00 - 0.00 - 0.00 - 38793.97 58,190,955.00
of natural gravel subbase all complete

1202
Providing, laying, spreading,
6.03 watering, levelling and compaction of m3 23203.05 2,000.00 46,406,100.00 0.00 - 0.00 - 0.00 - 23203.05 46,406,100.00
crushers run base course, all complete

1301/1302
Providing and spreading bituminous
prime coat MC30/MC70 including
6.04
cleaning the road surface using wire
lit. 154993.08 110.00 17,049,238.80 0.00 - 0.00 - 0.00 - 154993.08 17,049,238.80
brushes broom etc, all complete

1301/1303 Providing and applying bitumen


6.05 binder for surface dressing, all lit. 338208.54 110.00 37,202,939.40 0.00 - 0.00 - 0.00 - 338208.54 37,202,939.40
complete
1301/1303 Prividing and applying bitumen
6.06 cutter (kerosene) for bitumen of lit. 14092.32 105.00 1,479,693.60 0.00 - 0.00 - 0.00 - 14092.32 1,479,693.60
surface dressing ,all complete
1301/1303 Providing and applying chipping for
6.07 surface dressing (class C), all
complete
Bill of Quantities With VO-1 Cumulative Bill Previous Bill Current Bill Remaining Page 11 of 101
Spec.
S.N. Clause Item Description Unit Remarks
Ref. Quantity Rate Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount
6.07 a) a) 20mm nominal size t 3100.80 2,400.00 7,441,920.00 0.00 - 0.00 - 0.00 - 3100.80 7,441,920.00
6.07 b) b) 10mm nominal size t 1470.00 2,400.00 3,528,000.00 0.00 - 0.00 - 0.00 - 1470.00 3,528,000.00
1301(7) Providing and applying anti
6.08
strippling agent all complete
Kg 1761.54 1,000.00 1,761,540.00 0.00 - 0.00 - 0.00 - 1761.54 1,761,540.00
2403 Providing and laying dry stone soling
6.09
in foundation,all complete
m3 350.00 4,000.00 1,400,000.00 0.00 - 0.00 - 0.00 - 350.00 1,400,000.00
2000 Providing and placing machine
mixed cement concrete M25/20 for
6.10
compaction, curing, testing all
m3 875.00 17,000.00 14,875,000.00 0.00 - 0.00 - 0.00 - 875.00 14,875,000.00
complete.
1804/1805
Providing preparing and installing
formwork including necessary
6.11
supports and removing after
m2 850.00 850.00 722,500.00 0.00 - 0.00 - 0.00 - 850.00 722,500.00
completion of works all complete.

2000
Providing and laying reinforcement
6.12 including cutting, bending, binding, mt 49.22 120,000.00 5,906,400.00 0.00 - 0.00 - 0.00 - 49.22 5,906,400.00
fixinf in position etc, all complete

Part 07 : ROAD FURNITURE AND TRAFFIC SAFETY


MEASURES
supplying and erecting traffic sign in
7.01 1501 place incbolt etc as per the
drawing,all complete
7.01 a) 0 a) single post no. 120.00 15,000.00 1,800,000.00 0.00 - 0.00 - 0.00 - 120.00 1,800,000.00
7.01 b) 0 b) two or more post no. 7.00 15,000.00 105,000.00 0.00 - 0.00 - 0.00 - 7.00 105,000.00
Supplying and placing stone marker
(RCC kilometer post) including
7.02 1503 excavation, back fill, painting and
writing etc all complete as per
Drawings.

a) standard kilometer marker stone


7.02 a)
stone (placed at each km distance).
no. 16.00 15,000.00 240,000.00 0.00 - 0.00 - 0.00 - 16.00 240,000.00

b) 5th kilometer marker stone (placed


7.02 b)
at each 5 km distance)
no. 4.00 15,000.00 60,000.00 0.00 - 0.00 - 0.00 - 4.00 60,000.00

Supplying and fixing in plane R.C.C.


delineator post with reflecting
7.03 1504 elements including excavation, back no. 643.00 2,000.00 1,286,000.00 0.00 - 0.00 - 0.00 - 643.00 1,286,000.00
filling, painting and erection etc all
complete as per drawings.

Provide and erecting "W" metal beam


crash barrier comprising of 3mm
thick corrugated sheet metal rail,
70cm above road/group level,fixed on
ISMC series channel vertical post,
150*75*5mm spaced 2m c/c 1.8m
high,1.1m below road/ground level ,
all steel plates and fitment to be
7.04 1502
galvanised by hot deep process, all
m 4850.00 3,500.00 16,975,000.00 0.00 - 0.00 - 0.00 - 4850.00 16,975,000.00
fitting to confrim to is 1367 and is
1364, metal beam rail to be fixed on
the vertical post with a spacer of
channel 150*75*5mm ,330mm long,
including excavation in hard rock and
concreting with M20 concrete, all
complete

BS 3262
Supplying and applying
thermoplastic road marking paint
7.05
including cleaning,
m2 4645.60 1,400.00 6,503,840.00 0.00 - 0.00 - 0.00 - 4645.60 6,503,840.00
watering,brooming etc all complete

Part 08 : DAY WORKS


8.01 labour
8.01 a) a) Foreman / supervisor md 90.00 1,500.00 135,000.00 0.00 - 0.00 - 0.00 - 90.00 135,000.00
b) Skilled labour (mason carpenter,
8.01 b)
mechanics etc)
md 200.00 1,500.00 300,000.00 0.00 - 0.00 - 0.00 - 200.00 300,000.00
c) General labour (Unskilled, helpers,
8.01 c)
assistant operators etc.)
md 400.00 1,000.00 400,000.00 0.00 - 0.00 - 0.00 - 400.00 400,000.00
Bill of Quantities With VO-1 Cumulative Bill Previous Bill Current Bill Remaining Page 12 of 101
Spec.
S.N. Clause Item Description Unit Remarks
Ref. Quantity Rate Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount
8.02 Materials
8.02 a) a) cement t 5.00 18,000.00 90,000.00 0.00 - 0.00 - 0.00 - 5.00 90,000.00
8.02 b) b) Sand m3 6.00 2,500.00 15,000.00 0.00 - 0.00 - 0.00 - 6.00 15,000.00
8.02 c) c) Aggregate m3 8.00 3,000.00 24,000.00 0.00 - 0.00 - 0.00 - 8.00 24,000.00
8.02 d) d) Disel lit. 250.00 80.00 20,000.00 0.00 - 0.00 - 0.00 - 250.00 20,000.00
8.02 e) e) Petrol lit. 150.00 101.00 15,150.00 0.00 - 0.00 - 0.00 - 150.00 15,150.00
8.03 Equipment
a) Concrete mixture (0.40 m3
8.03 a)
capacity)
hr 100.00 400.00 40,000.00 0.00 - 0.00 - 0.00 - 100.00 40,000.00
8.03 b) b) Concrete vibrator hr 100.00 200.00 20,000.00 0.00 - 0.00 - 0.00 - 100.00 20,000.00

8.03 c) c) Tipper truck (8-10 ton capacity) hr 150.00 800.00 120,000.00 160.00 128,000.00 0.00 - 160.00 128,000.00 (10.00) (8,000.00)

8.03 d) d) Loader (1-1.5 m3 bucket capacity) hr 200.00 1,500.00 300,000.00 160.00 240,000.00 0.00 - 160.00 240,000.00 40.00 60,000.00
8.03 e) c) Excavator (200hp) hr 400.00 2,000.00 800,000.00 160.00 320,000.00 0.00 - 160.00 320,000.00 240.00 480,000.00
Part 09: PROVISIONAL SUMS

Provisional Sum for compliance of


social measures and the
Environmental Mitigation and
monitoring as indicated in EPM
9.01
(eg.air, noise, and water quality
PS 1.00 950,000.00 950,000.00 0.00 - 0.00 - 0.00 - 1.00 950,000.00
monitoring etc and other relevant
unforeseen work items as necessitated
and directed by the engineer

Relocation of utilities including


necessary materials and works in
BOQ items and other relvant
9.02 unforseen work items as necessitated PS 1.00 2,800,000.00 2,800,000.00 0.00 - 0.00 - 0.00 - 1.00 2,800,000.00
and directed by the engineer

Bio engineering works for slope


9.03 protection as necessitated and directed PS 1.00 850,000.00 850,000.00 0.00 - 0.00 - 0.00 - 1.00 850,000.00
by the engineer
Total PS Amount (Without discount) 4,600,000.00 - - - 4,600,000.00
Total Amount including PS (Without discount) 864,043,341.16 #REF! 200,000.00 #REF! #REF! A
Total Amount excluding PS (Without discount) 859,443,341.16 #REF! 200,000.00 #REF! #REF! B
Discount @ 31% on B 266,427,435.76 #REF! 62,000.00 #REF! #REF! C
Total Amount after discount including PS 597,615,905.40 #REF! 138,000.00 #REF! #REF! D
Total Amount after discount excluding PS 593,015,905.40 #REF! 138,000.00 #REF! #REF! E

Submitted by: Checked by: Recommended by: Approved by:


13/101

Sharma/United J/V
Kathmandu

Project: Road Improvements Works of Beni-Ghasa Section (Ch. 4+000-23+000), Beni Jomsom Koralla Road
Name of Road: Kaligandaki Corrider (Beni-Jomsom- Korola Road)
Sub-Contractor :Omkareshwor Construction PVT. LTD
Contract No.: 337145/NS/BJK/073/74-001
Claim Quantity

Spec. Total Quantity Office Claim Quantity United Claim Quantity


S.N. Clause Item Description Unit Remarks
Ref. Quantity Rate Amount Quantity Rate Amount Quantity Rate Amount
Part 4 : RETAINING AND BREAST WALL
Supply and assemble of machin made mechanically salvaged
gabion and mattresses from double twisted heavy coated GI
wire of hexagonal mesh size 100mm * 120mm with mesh size
4.01 2401
3mm, salvaged wire 3.9mm, lacing wire 2.4mm and stone
filling in gabions including transport and fixing of gabions in
position all complete.
m3 207.75 5,500.00 1,142,625.00 207.75 5,500.00 1,142,625.00 -
m3 1,195.75 4,200.00 5,022,150.00 1,195.75 4,200.00 5,022,150.00 1195.75 1300.00 1,554,475.00
2406 (2), Providing and placing plum concrete with 60% M15/40
4.08 (4) concrete and 40% boulders/stones as per specification using
concrete mixer and vibrator
m3 - 12,000.00 - - 12,000.00 - -
m3 161.60 8,695.65 1,405,217.39 161.60 8,695.65 1,405,217.39 161.60 3304.35 533,982.60

Total Sum of PS 7,569,992.39 7,569,992.39 2,088,457.60


Total Amount including PS (Without discount) 7,569,992.39 7,569,992.39 2,088,457.60 A
Total Amount excluding PS (Without discount) 7,569,992.39 7,569,992.39 2,088,457.60 B
Discount @ 31% on B 2,346,697.64 2,346,697.64 647,421.86 C
Total Amount after discount including PS 5,223,294.75 5,223,294.75 1,441,035.74 D
Total Amount after discount excluding PS 5,223,294.75 5,223,294.75 1,441,035.74 E

Submitted by: Checked by: Approved by:


Measurement Details
AGF No. 17115/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Project: Road Improvements Works of Beni-Ghasa Section (Ch. 4+000-23+000), Beni Jomsom Koralla Road Date of Agreement : '2074/02/08
Contract No.: 337145/NS/BJK/073/74-001 Work Commencement Date : '2074/02/14
Name of Road: Kaligandaki Corrider (Beni-Jomsom- Korola Road) Due date of completion :
Sub-Contractor :Omkareshwor Construction PVT. LTD Act Completion Date :
Bill No :

Quantity Collection Sheet


Item No. BOQ after
Cumulative Bill Previous Bill Current Bill Remaining
Item Description Unit VO-1
Quantity Quantity Quantity Quantity Quantity
Part 1: GENERAL
Providing,furnishing and maintanence of material testing laboratory at the specified
1.01
location
a) providing laboratory space LS 1.00 0.00 0.00 0.00 1.00
b) providing and furnishing laboratory equipment,furniture etc LS 1.00 0.00 0.00 0.00 1.00
1.02 Maintenance of Road
a) Maintenance of Road during construction period Km-month 613.50 4.00 0.00 4.00 609.50
b) Maintenance of Road during defect liabiality period Km-month 245.40 0.00 0.00 0.00 245.40
1.03 Provision and install project singnboards no. 2.00 0.00 0.00 0.00 2.00
Insurance for contractors work, plant materials and manpower,third party including staff
1.04 LS 1.00 0.00 0.00 0.00 1.00
of the employer and engineer.
1.05 Providing video cassettes set 2.00 0.00 0.00 0.00 2.00
Part 2 : SITE CLEARANCE 0.00
Clearing and grubbing of forest including uprooting carrying and disposing of vegetation,
2.01 m2 41800.00 25100.00 0.00 25100.00 16700.00
grass, bush saping and trees with necessary works
Clearing landslides, debris from causeway, culverts and side drains haulage for disposal
2.02 m3 50750.00 17360.00 0.00 17360.00 33390.00
within 1 km during monsoon and as per requirements
Part 3 : EARTHWORK 0.00
Roadway excavation including haulage and disposal at appropriate location, all complete
3.01 0.00
as per specification
a) Common material (Hard soil/Gravel/BMS) m3 186072.64 59635.62 0.00 59635.62 126437.02
b) Hard rock excavation using breaker m3 182372.10 84834.14 0.00 84834.14 97537.96
Earthwork excavation for road side drain and structure including haulage and disposal at
3.02 m3 42290.00 5793.60 0.00 5793.60 36496.40
approprate location,all complete as per spicification.
Formation of embankment including compaction in layers not exceeding 150mm.
3.03 m3 45454.00 58788.81 0.00 58788.81 -13334.81
Compacted depth, watering and haulage 10. etc all complete as per specification.
Back filling with suitable materials in layers in structures including compaction and
3.04 m3 29522.00 1408.10 0.00 1408.10 28113.90
watering all complete.
Part 4 : RETAINING AND BREAST WALL 0.00

Supply and assemble of machin made mechanically salvaged gabion and mattresses from
double twisted heavy coated GI wire of hexagonal mesh size 100mm * 120mm with mesh
4.01 m3 24250.00 1195.75 0.00 1195.75 23054.25
size 3mm, salvaged wire 3.9mm, lacing wire 2.4mm and stone filling in gabions including
transport and fixing of gabions in position all complete.
Providing and laying random rubble masonry in MM 5 in C/M including pointing and
4.02 m3 11813.33 0.00 0.00 0.00 11813.33
100mm dia PVC pipe for weep hole
Providing preparing and installing formwork including necessary supports and removing
4.03 m2 901.00 69.79 0.00 69.79 831.21
after completion of works all complete.
Providing and placing cement concrete for foundation and footing etc including
4.04
compection, curing and testing.
a) M 15/40 m3 118.00 12.65 0.00 12.65 105.35
b) M20/20 m3 268.00 12.65 0.00 255.35
Providing and laying reinforcement including cutting, bending, binding,fixing in position
4.05 mt 18.27 0.00 0.00 0.00 -23.09
etc
4.06 Providing and laying dry stone soling in foundation m3 400.00 0.00 0.00 0.00 -58.57
4.07 Providing , laying and fixing geo-textile (filter fabric) m2 14561.80 0.00 0.00 0.00 14561.80
Providing and placing plum concrete with 60% M15/40 concrete and 40%
4.08 m3 2319.00 161.60 0.00 161.60 2157.40
boulders/stones as per specification using concrete mixer and vibrator
Part 5 : CROSS DRAINAGE , SIDE DRAINAGE AND MISCELLANEOUS WORKS 0.00
Providing and assembling of machine made Heavy Zinc Coated gabion crate (Mesh wire
3mm, selvage Wire 3.9mm, binding wire 2.4mm and mesh size 100*120mm, hexagonal),
placing in poisition including stretching,forming compartments, tying with bracing wires
5.01 m3 4465.00 0.00 0.00 0.00 4465.00
and tie wires; tying down the lid complete and providing and filling stone / boulders in
gabion boxes/matresses etc. including dressing,binding, bonding and all transportation as
per specification all complete.
Providing and laying random rubble masonry in MM 7.5 in C/M including pointing and
5.02 m3 10501.00 0.00 0.00 0.00 10501.00
100mm dia PVC pipe for weep hole.
Providing and placing M15/40 cement concrete for foundation and footing etc including
5.03 m3 684.00 0.00 0.00 0.00 684.00
compection, curing and testing all complete.
Providing and placing machine mixed cement concrete for superstructure, deckslab etc
5.04 0.00
including compaction, curing and testing
a) M20/20 m3 1319.00 0.00 0.00 0.00 1319.00
b) M25/20 m3 719.16 0.00 0.00 0.00 719.16
Providing and placing machine mixed cement concrete M25/20 for precast slab/cast in
5.05 m3 87.00 0.00 0.00 0.00 87.00
situ including compaction, curing, testing all complete.
Providing and laying reinforcement including cutting, bending, binding,fixing in position
5.06 mt 94.11 0.00 0.00 0.00 94.11
etc,all complete
Providing and installing formwork including necessary support and removing after
5.07 m2 5803.00 0.00 0.00 0.00 5803.00
comletion for foundation,footing and slabs precast elements
Providing and laying RCC pipes (class NP3) diameter 900mm (internal) with or without
5.08 collars, jointed with stiff mixture of cement motar in the proportion of 1:2 (cement :sand), lin.m 488.00 0.00 0.00 0.00 488.00
all complete
Providing and laying HDPE pipe of 160mm dia (pressure 4kg/cm2) for drianage outlet,
5.09 lin.m 350.00 0.00 0.00 0.00 350.00
sub soil drain , irrigation crossing etc including performation and joining, all complete
AGF No. 17116/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Project: Road Improvements Works of Beni-Ghasa Section (Ch. 4+000-23+000), Beni Jomsom Koralla Road Date of Agreement : '2074/02/08
Contract No.: 337145/NS/BJK/073/74-001 Work Commencement Date : '2074/02/14
Name of Road: Kaligandaki Corrider (Beni-Jomsom- Korola Road) Due date of completion :
Sub-Contractor :Omkareshwor Construction PVT. LTD Act Completion Date :
Bill No :

Quantity Collection Sheet


Item No. BOQ after
Cumulative Bill Previous Bill Current Bill Remaining
Item Description Unit VO-1
Quantity Quantity Quantity Quantity Quantity
5.10 Back filling with graded materials m3 63.00 108.50 0.00 108.50 -45.50
5.11 Providing laying and fixing geo textile (filter fabric) m2 2855.00 0.00 0.00 0.00 2855.00
5.12 Providing and laying dry stone soling in foundation m3 2548.00 0.00 0.00 0.00 2548.00
supplying and applying Enamel paint two coats including one coat priming as per
5.13 m2 397.00 0.00 0.00 0.00 397.00
specifiction all complete
Providing and placing plum concrete with 60% M15/40 concrete and 40%
5.14 m3 209.00 0.00 0.00 0.00 209.00
boulders/stones as per specification using concrete mixture and vibrators.
Supply and fixing in position 50mm dia GI pipe (medium class) railing as per drawing
5.15 rm 905.00 0.00 0.00 0.00 905.00
and engineer's instruction
Part 6 : PAVEMENT WORK
Preperation of subgrade by filling or cutting in all types of materials including
6.01 m2 181756.13 0.00 0.00 0.00 181756.13
compaction and watering all complete
Providing , laying, spreading, watering, levelling, and compaction of natural gravel
6.02 m3 38793.97 0.00 0.00 0.00 38793.97
subbase all complete
Providing, laying, spreading, watering, levelling and compaction of crushers run base
6.03 m3 23203.05 0.00 0.00 0.00 23203.05
course, all complete
Providing and spreading bituminous prime coat MC30/MC70 including cleaning the road
6.04 lit. 154993.08 0.00 0.00 0.00 154993.08
surface using wire brushes broom etc, all complete
6.05 Providing and applying bitumen binder for surface dressing, all complete lit. 338208.54 0.00 0.00 0.00 338208.54
Prividing and applying bitumen cutter (kerosene) for bitumen of surface dressing ,all
6.06 lit. 14092.32 0.00 0.00 0.00 14092.32
complete
6.07 Providing and applying chipping for surface dressing (class C), all complete 0.00 0.00
a) 20mm nominal size t 3100.80 0.00 0.00 0.00 3100.80
b) 10mm nominal size t 1470.00 0.00 0.00 0.00 1470.00
6.08 Providing and applying anti strippling agent all complete kg 1761.54 0.00 0.00 0.00 1761.54
6.09 Providing and laying dry stone soling in foundation,all complete m3 350.00 0.00 0.00 0.00 350.00
Providing and placing machine mixed cement concrete M25/20 for compaction, curing,
6.10 m3 875.00 0.00 0.00 0.00 875.00
testing all complete.
Providing preparing and installing formwork including necessary supports and removing
6.11 m2 850.00 0.00 0.00 0.00 850.00
after completion of works all complete.
Providing and laying reinforcement including cutting, bending, binding, fixinf in position
6.12 mt 49.22 0.00 0.00 0.00 49.22
etc, all complete
Part 07 : ROAD FURNITURE AND TRAFFIC SAFETY MEASURES 0.00

7.01 supplying and erecting traffic sign in place incbolt etc as per the drawing,all complete 0.00

a) single post no. 120.00 0.00 0.00 0.00 120.00


b) two or more post no. 7.00 0.00 0.00 0.00 7.00
Supplying and placing stone marker (RCC kilometer post) including excavation, back fill,
7.02 0.00
painting and writing etc all complete as per Drawings.
a) standard kilometer marker stone stone (placed at each km distance). no. 16.00 0.00 0.00 0.00 16.00
b) 5th kilometer marker stone (placed at each 5 km distance) no. 4.00 0.00 0.00 0.00 4.00

Supplying and fixing in plane R.C.C. delineator post with reflecting elements including
7.03 no. 643.00 0.00 0.00 0.00 643.00
excavation, back filling, painting and erection etc all complete as per drawings.

Provide and erecting "W" metal beam crash barrier comprising of 3mm thick corrugated
sheet metal rail, 70cm above road/group level,fixed on ISMC series channel vertical post,
150*75*5mm spaced 2m c/c 1.8m high,1.1m below road/ground level , all steel plates
7.04 and fitment to be galvanised by hot deep process, all fitting to confrim to is 1367 and is m 4850.00 0.00 0.00 0.00 4850.00
1364, metal beam rail to be fixed on the vertical post with a spacer of channel
150*75*5mm ,330mm long, including excavation in hard rock and concreting with M20
concrete, all complete
Supplying and applying thermoplastic road marking paint including cleaning,
7.05 m2 4645.60 0.00 0.00 0.00 4645.60
watering,brooming etc all complete
Part 08 : DAY WORKS
8.01 Labor
a) Foreman / Supervisor md 90.00 0.00 0.00 0.00 90.00
b) Skilled labour (mason carpenter, mechanics etc) md 200.00 0.00 0.00 0.00 200.00
c) General labour (Unskilled, helpers, assistant operators etc.) md 400.00 0.00 0.00 0.00 400.00
8.02 Materials 0.00
a) Cement t 5.00 0.00 0.00 0.00 5.00
b) Sand m3 6.00 0.00 0.00 0.00 6.00
c) Aggregate m3 8.00 0.00 0.00 0.00 8.00
d) Diesel lit. 250.00 0.00 0.00 0.00 250.00
e) Petrol lit. 150.00 0.00 0.00 0.00 150.00
8.03 Equipment
a) Concrete mixture (0.40 m3 capacity) hr 100.00 0.00 0.00 0.00 100.00
b) Concrete vibrator hr 100.00 0.00 0.00 0.00 100.00
c) Tipper truck (8-10 ton capacity) hr 150.00 160.00 0.00 160.00 -10.00
d) Loader (1-1.5 m3 bucket capacity) hr 200.00 160.00 0.00 160.00 40.00
e) Excavator (200hp) hr 400.00 160.00 0.00 160.00 240.00
Part 09: PROVISIONAL SUMS
AGF No. 17117/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Project: Road Improvements Works of Beni-Ghasa Section (Ch. 4+000-23+000), Beni Jomsom Koralla Road Date of Agreement : '2074/02/08
Contract No.: 337145/NS/BJK/073/74-001 Work Commencement Date : '2074/02/14
Name of Road: Kaligandaki Corrider (Beni-Jomsom- Korola Road) Due date of completion :
Sub-Contractor :Omkareshwor Construction PVT. LTD Act Completion Date :
Bill No :

Quantity Collection Sheet


Item No. BOQ after
Cumulative Bill Previous Bill Current Bill Remaining
Item Description Unit VO-1
Quantity Quantity Quantity Quantity Quantity

Provisional Sum for compliance of social measures and the Environmental Mitigation
9.01 and monitoring as indicated in EPM (eg.air, noise, and water quality monitoring etc and PS 1.00 0.00 0.00 0.00 1.00
other relevant unforeseen work items as necessitated and directed by the engineer

Relocation of utilities including necessary materials and works in BOQ items and other
9.02 PS 1.00 0.00 0.00 0.00 1.00
relvant unforseen work items as necessitated and directed by the engineer

9.03 Bio engineering works for slope protection as necessitated and directed by the engineer PS 1.00 0.00 0.00 0.00 1.00

Submitted by: Checked by: Approved by:


Sub-Contractor :Omkareshwor Construction PVT. LTD
Government of Nepal 18/101
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet

Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 1.02 a) Unit : Km-Month
Maintenance of Road
a) Maintenance of Road during construction period
SN Description No. Length Month Quantity Remarks

1 From Mangshir 15
to falgun 15, 2076 1 19 3 57
Quantity Claim 57
Quantity Taken 53
Withheld 4

Submitted by: Checked by: Approved by:


Government of Nepal 101/101
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet

Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 1.03 Unit : No.
Provision and install project singnboards
SN Description No. Length Breadth Height Quantity Remarks
1 Installation of Board 0.00 0
Total upto date 0
Quantity Claim 0

Submitted by: Checked by: Approved by:


101/101
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet

Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 1.04 Unit : LS
Insurance for contractors work, plant materials and manpower,third party including staff of the employer and engineer.
SN Description No. Length Breadth Height Quantity Remarks
1 Taking 5% of total work 1.00 0.00
Quantity Claim 0.00

Submitted by: Checked by: Approved by:


Page 21 of 101
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BOQ Item No. 2.01 Unit : m2
Clearing and grubbing of forest including uprooting carrying and disposing of vegetation, grass, bush saping and trees with
necessary works
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
1 6+500.00 6+510.00 1 10 5 50
2 6+510.00 6+520.00 1 10 5 50
3 6+520.00 6+530.00 1 10 5 50
4 6+530.00 6+540.00 1 10 5 50
5 6+540.00 6+550.00 1 10 5 50
6 6+550.00 6+560.00 1 10 5 50
7 6+560.00 6+570.00 1 10 5 50
8 6+570.00 6+580.00 1 10 5 50
9 6+580.00 6+590.00 1 10 5 50
10 6+590.00 6+600.00 1 10 5 50
11 6+600.00 6+610.00 1 10 5 50
12 6+610.00 6+620.00 1 10 5 50
13 6+620.00 6+630.00 1 10 5 50
14 6+630.00 6+640.00 1 10 5 50
15 6+640.00 6+650.00 1 10 5 50
16 6+650.00 6+660.00 1 10 5 50
17 6+660.00 6+670.00 1 10 5 50
18 6+670.00 6+680.00 1 10 5 50
19 6+680.00 6+690.00 1 10 5 50
20 6+690.00 6+700.00 1 10 5 50
21 6+700.00 6+710.00 1 10 5 50
22 6+710.00 6+720.00 1 10 5 50
23 6+720.00 6+730.00 1 10 5 50
24 6+730.00 6+740.00 1 10 5 50
25 6+740.00 6+750.00 1 10 5 50
26 6+750.00 6+760.00 1 10 5 50
27 6+760.00 6+770.00 1 10 5 50
28 6+770.00 6+780.00 1 10 5 50
29 6+780.00 6+790.00 1 10 5 50
30 6+790.00 6+800.00 1 10 5 50
31 6+800.00 6+810.00 1 10 5 50
32 6+810.00 6+820.00 1 10 5 50
33 6+820.00 6+830.00 1 10 5 50
34 6+830.00 6+840.00 1 10 5 50
35 6+840.00 6+850.00 1 10 5 50
36 6+850.00 6+860.00 1 10 5 50
37 6+860.00 6+870.00 1 10 5 50
38 6+870.00 6+880.00 1 10 5 50

Submitted by: Checked by: Approved by:


Page 22 of 101
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
39 6+880.00 6+890.00 1 10 5 50
40 6+890.00 6+900.00 1 10 5 50
41 6+900.00 6+910.00 1 10 5 50
42 6+910.00 6+920.00 1 10 5 50
43 6+920.00 6+930.00 1 10 5 50
44 6+930.00 6+940.00 1 10 5 50
45 6+940.00 6+950.00 1 10 5 50
46 6+950.00 6+960.00 1 10 5 50
47 6+960.00 6+970.00 1 10 5 50
48 6+970.00 6+980.00 1 10 5 50
49 6+980.00 6+990.00 1 10 5 50
50 6+990.00 7+000.00 1 10 5 50
51 7+000.00 7+010.00 1 10 5 50
52 7+010.00 7+020.00 1 10 5 50
53 7+020.00 7+030.00 1 10 5 50
54 7+030.00 7+040.00 1 10 5 50
55 7+040.00 7+050.00 1 10 5 50
56 7+050.00 7+060.00 1 10 5 50
57 7+060.00 7+070.00 1 10 5 50
58 7+070.00 7+080.00 1 10 5 50
59 7+080.00 7+090.00 1 10 5 50
60 7+090.00 7+100.00 1 10 5 50
61 7+100.00 7+110.00 1 10 5 50
62 7+110.00 7+120.00 1 10 5 50
63 7+120.00 7+130.00 1 10 5 50
64 7+130.00 7+140.00 1 10 5 50
65 7+140.00 7+150.00 1 10 5 50
66 7+150.00 7+160.00 1 10 5 50
67 7+160.00 7+170.00 1 10 5 50
68 7+170.00 7+180.00 1 10 5 50
69 7+180.00 7+190.00 1 10 5 50
70 7+190.00 7+200.00 1 10 5 50
71 7+200.00 7+210.00 1 10 5 50
72 7+210.00 7+220.00 1 10 5 50
73 7+220.00 7+230.00 1 10 5 50
74 7+230.00 7+240.00 1 10 5 50
75 7+240.00 7+250.00 1 10 5 50
76 7+250.00 7+260.00 1 10 5 50
77 7+260.00 7+270.00 1 10 5 50
78 7+270.00 7+280.00 1 10 5 50
79 7+280.00 7+290.00 1 10 5 50
80 7+290.00 7+300.00 1 10 5 50
81 7+300.00 7+310.00 1 10 5 50
82 7+310.00 7+320.00 1 10 5 50
83 7+320.00 7+330.00 1 10 5 50
84 7+330.00 7+340.00 1 10 5 50
85 7+340.00 7+350.00 1 10 5 50
86 7+350.00 7+360.00 1 10 5 50
87 7+360.00 7+370.00 1 10 5 50
88 7+370.00 7+380.00 1 10 5 50

Submitted by: Checked by: Approved by:


Page 23 of 101
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
89 7+380.00 7+390.00 1 10 5 50
90 7+390.00 7+400.00 1 10 5 50
91 7+400.00 7+410.00 1 10 5 50
92 7+410.00 7+420.00 1 10 5 50
93 7+420.00 7+430.00 1 10 5 50
94 7+430.00 7+440.00 1 10 5 50
95 7+440.00 7+450.00 1 10 5 50
96 7+450.00 7+460.00 1 10 5 50
97 7+460.00 7+470.00 1 10 5 50
98 7+470.00 7+480.00 1 10 5 50
99 7+480.00 7+490.00 1 10 5 50
100 7+490.00 7+500.00 1 10 5 50
101 7+500.00 7+510.00 1 10 5 50
102 7+510.00 7+520.00 1 10 5 50
103 7+520.00 7+530.00 1 10 5 50
104 7+530.00 7+540.00 1 10 5 50
105 7+540.00 7+550.00 1 10 5 50
106 7+550.00 7+560.00 1 10 5 50
107 7+560.00 7+570.00 1 10 5 50
108 7+570.00 7+580.00 1 10 5 50
109 7+580.00 7+590.00 1 10 5 50
110 7+590.00 7+600.00 1 10 5 50
111 7+600.00 7+610.00 1 10 5 50
112 7+610.00 7+620.00 1 10 5 50
113 7+620.00 7+630.00 1 10 5 50
114 7+630.00 7+640.00 1 10 5 50
115 7+640.00 7+650.00 1 10 5 50
116 7+650.00 7+660.00 1 10 5 50
117 7+660.00 7+670.00 1 10 5 50
118 7+670.00 7+680.00 1 10 5 50
119 7+680.00 7+690.00 1 10 5 50
120 7+690.00 7+700.00 1 10 5 50
121 7+700.00 7+710.00 1 10 5 50
122 7+710.00 7+720.00 1 10 5 50
123 7+720.00 7+730.00 1 10 5 50
124 7+730.00 7+740.00 1 10 5 50
125 7+740.00 7+750.00 1 10 5 50
126 7+750.00 7+760.00 1 10 5 50
127 7+760.00 7+770.00 1 10 5 50
128 7+770.00 7+780.00 1 10 5 50
129 7+780.00 7+790.00 1 10 5 50
130 7+790.00 7+800.00 1 10 5 50
131 7+800.00 7+810.00 1 10 5 50
132 7+810.00 7+820.00 1 10 5 50
133 7+820.00 7+830.00 1 10 5 50
134 7+830.00 7+840.00 1 10 5 50
135 7+840.00 7+850.00 1 10 5 50
136 7+850.00 7+860.00 1 10 5 50
137 7+860.00 7+870.00 1 10 5 50
138 7+870.00 7+880.00 1 10 5 50

Submitted by: Checked by: Approved by:


Page 24 of 101
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
139 7+880.00 7+890.00 1 10 5 50
140 7+890.00 7+900.00 1 10 5 50
141 7+900.00 7+910.00 1 10 5 50
142 7+910.00 7+920.00 1 10 5 50
143 7+920.00 7+930.00 1 10 5 50
144 7+930.00 7+940.00 1 10 5 50
145 7+940.00 7+950.00 1 10 5 50
146 7+950.00 7+960.00 1 10 5 50
147 7+960.00 7+970.00 1 10 5 50
148 7+970.00 7+980.00 1 10 5 50
149 7+980.00 7+990.00 1 10 5 50
150 7+990.00 8+000.00 1 10 5 50
151 8+000.00 8+010.00 1 10 5 50
152 8+010.00 8+020.00 1 10 5 50
153 8+020.00 8+030.00 1 10 5 50
154 8+030.00 8+040.00 1 10 5 50
155 8+040.00 8+050.00 1 10 5 50
156 8+050.00 8+060.00 1 10 5 50
157 8+060.00 8+070.00 1 10 5 50
158 8+070.00 8+080.00 1 10 5 50
159 8+080.00 8+090.00 1 10 5 50
160 8+090.00 8+100.00 1 10 5 50
161 8+100.00 8+110.00 1 10 5 50
162 8+110.00 8+120.00 1 10 5 50
163 8+120.00 8+130.00 1 10 5 50
164 8+130.00 8+140.00 1 10 5 50
165 8+140.00 8+150.00 1 10 5 50
166 8+150.00 8+160.00 1 10 5 50
167 8+160.00 8+170.00 1 10 5 50
168 8+170.00 8+180.00 1 10 5 50
169 8+180.00 8+190.00 1 10 5 50
170 8+190.00 8+200.00 1 10 5 50
171 8+200.00 8+210.00 1 10 5 50
172 8+210.00 8+220.00 1 10 5 50
173 8+220.00 8+230.00 1 10 5 50
174 8+230.00 8+240.00 1 10 5 50
175 8+240.00 8+250.00 1 10 5 50
176 8+250.00 8+260.00 1 10 5 50
177 8+260.00 8+270.00 1 10 5 50
178 8+270.00 8+280.00 1 10 5 50
179 8+280.00 8+290.00 1 10 5 50
180 8+290.00 8+300.00 1 10 5 50
181 8+300.00 8+310.00 1 10 5 50
182 8+310.00 8+320.00 1 10 5 50
183 8+320.00 8+330.00 1 10 5 50
184 8+330.00 8+340.00 1 10 5 50
185 8+340.00 8+350.00 1 10 5 50
186 8+350.00 8+360.00 1 10 5 50
187 8+360.00 8+370.00 1 10 5 50
188 8+370.00 8+380.00 1 10 5 50

Submitted by: Checked by: Approved by:


Page 25 of 101
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
189 8+380.00 8+390.00 1 10 5 50
190 8+390.00 8+400.00 1 10 5 50
191 8+400.00 8+410.00 1 10 5 50
192 8+410.00 8+420.00 1 10 5 50
193 8+420.00 8+430.00 1 10 5 50
194 8+430.00 8+440.00 1 10 5 50
195 8+440.00 8+450.00 1 10 5 50
196 8+450.00 8+460.00 1 10 5 50
197 8+460.00 8+470.00 1 10 5 50
198 8+470.00 8+480.00 1 10 5 50
199 8+480.00 8+490.00 1 10 5 50
200 8+490.00 8+500.00 1 10 5 50
201 8+500.00 8+510.00 1 10 5 50
202 8+510.00 8+520.00 1 10 5 50
203 8+520.00 8+530.00 1 10 5 50
204 8+530.00 8+540.00 1 10 5 50
205 8+540.00 8+550.00 1 10 5 50
206 8+550.00 8+560.00 1 10 5 50
207 8+560.00 8+570.00 1 10 5 50
208 8+570.00 8+580.00 1 10 5 50
209 8+580.00 8+590.00 1 10 5 50
210 8+590.00 8+600.00 1 10 5 50
211 8+600.00 8+610.00 1 10 5 50
212 8+610.00 8+620.00 1 10 5 50
213 8+620.00 8+630.00 1 10 5 50
214 8+630.00 8+640.00 1 10 5 50
215 8+640.00 8+650.00 1 10 5 50
216 8+650.00 8+660.00 1 10 5 50
217 8+660.00 8+670.00 1 10 5 50
218 8+670.00 8+680.00 1 10 5 50
219 8+680.00 8+690.00 1 10 5 50
220 8+690.00 8+700.00 1 10 5 50
221 8+700.00 8+710.00 1 10 5 50
222 8+710.00 8+720.00 1 10 5 50
223 8+720.00 8+730.00 1 10 5 50
224 8+730.00 8+740.00 1 10 5 50
225 8+740.00 8+750.00 1 10 5 50
226 8+750.00 8+760.00 1 10 5 50
227 8+760.00 8+770.00 1 10 5 50
228 8+770.00 8+780.00 1 10 5 50
229 8+780.00 8+790.00 1 10 5 50
230 8+790.00 8+800.00 1 10 5 50
231 8+800.00 8+810.00 1 10 5 50
232 8+810.00 8+820.00 1 10 5 50
233 8+820.00 8+830.00 1 10 5 50
234 8+830.00 8+840.00 1 10 5 50
235 8+840.00 8+850.00 1 10 5 50
236 8+850.00 8+860.00 1 10 5 50
237 8+860.00 8+870.00 1 10 5 50
238 8+870.00 8+880.00 1 10 5 50

Submitted by: Checked by: Approved by:


Page 26 of 101
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
239 8+880.00 8+890.00 1 10 5 50
240 8+890.00 8+900.00 1 10 5 50
241 8+900.00 8+910.00 1 10 5 50
242 8+910.00 8+920.00 1 10 5 50
243 8+920.00 8+930.00 1 10 5 50
244 8+930.00 8+940.00 1 10 5 50
245 8+940.00 8+950.00 1 10 5 50
246 8+950.00 8+960.00 1 10 5 50
247 8+960.00 8+970.00 1 10 5 50
248 8+970.00 8+980.00 1 10 5 50
249 8+980.00 8+990.00 1 10 5 50
250 8+990.00 9+000.00 1 10 5 50
251 9+000.00 9+010.00 1 10 5 50
252 9+010.00 9+020.00 1 10 5 50
253 9+020.00 9+030.00 1 10 5 50
254 9+030.00 9+040.00 1 10 5 50
255 9+040.00 9+050.00 1 10 5 50
256 9+050.00 9+060.00 1 10 5 50
257 9+060.00 9+070.00 1 10 5 50
258 9+070.00 9+080.00 1 10 5 50
259 9+080.00 9+090.00 1 10 5 50
260 9+090.00 9+100.00 1 10 5 50
261 9+100.00 9+110.00 1 10 5 50
262 9+110.00 9+120.00 1 10 5 50
263 9+120.00 9+130.00 1 10 5 50
264 9+130.00 9+140.00 1 10 5 50
265 9+140.00 9+150.00 1 10 5 50
266 9+150.00 9+160.00 1 10 5 50
267 9+160.00 9+170.00 1 10 5 50
268 9+170.00 9+180.00 1 10 5 50
269 9+180.00 9+190.00 1 10 5 50
270 9+190.00 9+200.00 1 10 5 50
271 9+200.00 9+210.00 1 10 5 50
272 9+210.00 9+220.00 1 10 5 50
273 9+220.00 9+230.00 1 10 5 50
274 9+230.00 9+240.00 1 10 5 50
275 9+240.00 9+250.00 1 10 5 50
276 9+250.00 9+260.00 1 10 5 50
277 9+260.00 9+270.00 1 10 5 50
278 9+270.00 9+280.00 1 10 5 50
279 9+280.00 9+290.00 1 10 5 50
280 9+290.00 9+300.00 1 10 5 50
281 9+300.00 9+310.00 1 10 5 50
282 9+310.00 9+320.00 1 10 5 50
283 9+320.00 9+330.00 1 10 5 50
284 9+330.00 9+340.00 1 10 5 50
285 9+340.00 9+350.00 1 10 5 50
286 9+350.00 9+360.00 1 10 5 50
287 9+360.00 9+370.00 1 10 5 50
288 9+370.00 9+380.00 1 10 5 50

Submitted by: Checked by: Approved by:


Page 27 of 101
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
289 9+380.00 9+390.00 1 10 5 50
290 9+390.00 9+400.00 1 10 5 50
291 9+400.00 9+410.00 1 10 5 50
292 9+410.00 9+420.00 1 10 5 50
293 9+420.00 9+430.00 1 10 5 50
294 9+430.00 9+440.00 1 10 5 50
295 9+440.00 9+450.00 1 10 5 50
296 9+450.00 9+460.00 1 10 5 50
297 9+460.00 9+470.00 1 10 5 50
298 9+470.00 9+480.00 1 10 5 50
299 9+480.00 9+490.00 1 10 5 50
300 9+490.00 9+500.00 1 10 5 50
301 9+500.00 9+510.00 1 10 5 50
302 9+510.00 9+520.00 1 10 5 50
303 9+520.00 9+530.00 1 10 5 50
304 9+530.00 9+540.00 1 10 5 50
305 9+540.00 9+550.00 1 10 5 50
306 9+550.00 9+560.00 1 10 5 50
307 9+560.00 9+570.00 1 10 5 50
308 9+570.00 9+580.00 1 10 5 50
309 9+580.00 9+590.00 1 10 5 50
310 9+590.00 9+600.00 1 10 5 50
311 9+600.00 9+610.00 1 10 5 50
312 9+610.00 9+620.00 1 10 5 50
313 9+620.00 9+630.00 1 10 5 50
314 9+630.00 9+640.00 1 10 5 50
315 9+640.00 9+650.00 1 10 5 50
316 9+650.00 9+660.00 1 10 5 50
317 9+660.00 9+670.00 1 10 5 50
318 9+670.00 9+680.00 1 10 5 50
319 9+680.00 9+690.00 1 10 5 50
320 9+690.00 9+700.00 1 10 5 50
321 9+700.00 9+710.00 1 10 5 50
322 9+710.00 9+720.00 1 10 5 50
323 9+720.00 9+730.00 1 10 5 50
324 9+730.00 9+740.00 1 10 5 50
325 9+740.00 9+750.00 1 10 5 50
326 9+750.00 9+760.00 1 10 5 50
327 9+760.00 9+770.00 1 10 5 50
328 9+770.00 9+780.00 1 10 5 50
329 9+780.00 9+790.00 1 10 5 50
330 9+790.00 9+800.00 1 10 5 50
331 9+800.00 9+810.00 1 10 5 50
332 9+810.00 9+820.00 1 10 5 50
333 9+820.00 9+830.00 1 10 5 50
334 9+830.00 9+840.00 1 10 5 50
335 9+840.00 9+850.00 1 10 5 50
336 9+850.00 9+860.00 1 10 5 50
337 9+860.00 9+870.00 1 10 5 50
338 9+870.00 9+880.00 1 10 5 50

Submitted by: Checked by: Approved by:


Page 28 of 101
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
339 9+880.00 9+890.00 1 10 5 50
340 9+890.00 9+900.00 1 10 5 50
341 9+900.00 9+910.00 1 10 5 50
342 9+910.00 9+920.00 1 10 5 50
343 9+920.00 9+930.00 1 10 5 50
344 9+930.00 9+940.00 1 10 5 50
345 9+940.00 9+950.00 1 10 5 50
346 9+950.00 9+960.00 1 10 5 50
347 9+960.00 9+970.00 1 10 5 50
348 9+970.00 9+980.00 1 10 5 50
349 9+980.00 9+990.00 1 10 5 50
350 9+990.00 10+000.00 1 10 5 50
351 10+000.00 10+010.00 1 10 5 50
352 10+010.00 10+020.00 1 10 5 50
353 10+020.00 10+030.00 1 10 5 50
354 10+030.00 10+040.00 1 10 5 50
355 10+040.00 10+050.00 1 10 5 50
356 10+050.00 10+060.00 1 10 5 50
357 10+060.00 10+070.00 1 10 5 50
358 10+070.00 10+080.00 1 10 5 50
359 10+080.00 10+090.00 1 10 5 50
360 10+090.00 10+100.00 1 10 5 50
361 10+100.00 10+110.00 1 10 5 50
362 10+110.00 10+120.00 1 10 5 50
363 10+120.00 10+130.00 1 10 5 50
364 10+130.00 10+140.00 1 10 5 50
365 10+140.00 10+150.00 1 10 5 50
366 10+150.00 10+160.00 1 10 5 50
367 10+160.00 10+170.00 1 10 5 50
368 10+170.00 10+180.00 1 10 5 50
369 10+180.00 10+190.00 1 10 5 50
370 10+190.00 10+200.00 1 10 5 50
371 10+200.00 10+210.00 1 10 5 50
372 10+210.00 10+220.00 1 10 5 50
373 10+220.00 10+230.00 1 10 5 50
374 10+230.00 10+240.00 1 10 5 50
375 10+240.00 10+250.00 1 10 5 50
376 10+250.00 10+260.00 1 10 5 50
377 10+260.00 10+270.00 1 10 5 50
378 10+270.00 10+280.00 1 10 5 50
379 10+280.00 10+290.00 1 10 5 50
380 10+290.00 10+300.00 1 10 5 50
381 10+300.00 10+310.00 1 10 5 50
382 10+310.00 10+320.00 1 10 5 50
383 10+320.00 10+330.00 1 10 5 50
384 10+330.00 10+340.00 1 10 5 50
385 10+340.00 10+350.00 1 10 5 50
386 10+350.00 10+360.00 1 10 5 50
387 10+360.00 10+370.00 1 10 5 50
388 10+370.00 10+380.00 1 10 5 50

Submitted by: Checked by: Approved by:


Page 29 of 101
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
389 10+380.00 10+390.00 1 10 5 50
390 10+390.00 10+400.00 1 10 5 50
391 10+400.00 10+410.00 1 10 5 50
392 10+410.00 10+420.00 1 10 5 50
393 10+420.00 10+430.00 1 10 5 50
394 10+430.00 10+440.00 1 10 5 50
395 10+440.00 10+450.00 1 10 5 50
396 10+450.00 10+460.00 1 10 5 50
397 10+460.00 10+470.00 1 10 5 50
398 10+470.00 10+480.00 1 10 5 50
399 10+480.00 10+490.00 1 10 5 50
400 10+490.00 10+500.00 1 10 5 50
401 10+500.00 10+510.00 1 10 5 50
402 10+510.00 10+520.00 1 10 5 50
403 10+520.00 10+530.00 1 10 5 50
404 10+530.00 10+540.00 1 10 5 50
405 10+540.00 10+550.00 1 10 5 50
406 10+550.00 10+560.00 1 10 5 50
407 10+560.00 10+570.00 1 10 5 50
408 10+570.00 10+580.00 1 10 5 50
409 10+580.00 10+590.00 1 10 5 50
410 10+590.00 10+600.00 1 10 5 50
411 10+600.00 10+610.00 1 10 5 50
412 10+610.00 10+620.00 1 10 5 50
413 10+620.00 10+630.00 1 10 5 50
414 10+630.00 10+640.00 1 10 5 50
415 10+640.00 10+650.00 1 10 5 50
416 10+650.00 10+660.00 1 10 5 50
417 10+660.00 10+670.00 1 10 5 50
418 10+670.00 10+680.00 1 10 5 50
419 10+680.00 10+690.00 1 10 5 50
420 10+690.00 10+700.00 1 10 5 50
421 10+700.00 10+710.00 1 10 5 50
422 10+710.00 10+720.00 1 10 5 50
423 10+720.00 10+730.00 1 10 5 50
424 10+730.00 10+740.00 1 10 5 50
425 10+740.00 10+750.00 1 10 5 50
426 10+750.00 10+760.00 1 10 5 50
427 10+760.00 10+770.00 1 10 5 50
428 10+770.00 10+780.00 1 10 5 50
429 10+780.00 10+790.00 1 10 5 50
430 10+790.00 10+800.00 1 10 5 50
431 10+800.00 10+810.00 1 10 5 50
432 10+810.00 10+820.00 1 10 5 50
433 10+820.00 10+830.00 1 10 5 50
434 10+830.00 10+840.00 1 10 5 50
435 10+840.00 10+850.00 1 10 5 50
436 10+850.00 10+860.00 1 10 5 50
437 10+860.00 10+870.00 1 10 5 50
438 10+870.00 10+880.00 1 10 5 50

Submitted by: Checked by: Approved by:


Page 30 of 101
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
439 10+880.00 10+890.00 1 10 5 50
440 10+890.00 10+900.00 1 10 5 50
441 10+900.00 10+910.00 1 10 5 50
442 10+910.00 10+920.00 1 10 5 50
443 10+920.00 10+930.00 1 10 5 50
444 10+930.00 10+940.00 1 10 5 50
445 10+940.00 10+950.00 1 10 5 50
446 10+950.00 10+960.00 1 10 5 50
447 10+960.00 10+970.00 1 10 5 50
448 10+970.00 10+980.00 1 10 5 50
449 10+980.00 10+990.00 1 10 5 50
450 10+990.00 11+000.00 1 10 5 50
451 11+000.00 11+010.00 1 10 5 50
452 11+010.00 11+020.00 1 10 5 50
453 11+020.00 11+030.00 1 10 5 50
454 11+030.00 11+040.00 1 10 5 50
455 11+040.00 11+050.00 1 10 5 50
456 11+050.00 11+060.00 1 10 5 50
457 11+060.00 11+070.00 1 10 5 50
458 11+070.00 11+080.00 1 10 5 50
459 11+080.00 11+090.00 1 10 5 50
460 11+090.00 11+100.00 1 10 5 50
461 11+100.00 11+110.00 1 10 5 50
462 11+110.00 11+120.00 1 10 5 50
463 11+120.00 11+130.00 1 10 5 50
464 11+130.00 11+140.00 1 10 5 50
465 11+140.00 11+150.00 1 10 5 50
466 11+150.00 11+160.00 1 10 5 50
467 11+160.00 11+170.00 1 10 5 50
468 11+170.00 11+180.00 1 10 5 50
469 11+180.00 11+190.00 1 10 5 50
470 11+190.00 11+200.00 1 10 5 50
471 11+200.00 11+210.00 1 10 5 50
472 11+210.00 11+220.00 1 10 5 50
473 11+220.00 11+230.00 1 10 5 50
474 11+230.00 11+240.00 1 10 5 50
475 11+240.00 11+250.00 1 10 5 50
476 11+250.00 11+260.00 1 10 5 50
477 11+260.00 11+270.00 1 10 5 50
478 11+270.00 11+280.00 1 10 5 50
479 11+280.00 11+290.00 1 10 5 50
480 11+290.00 11+300.00 1 10 5 50
481 11+300.00 11+310.00 1 10 5 50
482 11+310.00 11+320.00 1 10 5 50
483 11+320.00 11+330.00 1 10 5 50
484 11+330.00 11+340.00 1 10 5 50
485 11+340.00 11+350.00 1 10 5 50
486 11+350.00 11+360.00 1 10 5 50
487 11+360.00 11+370.00 1 10 5 50
488 11+370.00 11+380.00 1 10 5 50

Submitted by: Checked by: Approved by:


Page 31 of 101
Description
S.No. No. Length Breadth Height Quantity Remarks
From To
489 11+380.00 11+390.00 1 10 5 50
490 11+390.00 11+400.00 1 10 5 50
491 11+400.00 11+410.00 1 10 5 50
492 11+410.00 11+420.00 1 10 5 50
493 11+420.00 11+430.00 1 10 5 50
494 11+430.00 11+440.00 1 10 5 50
495 11+440.00 11+450.00 1 10 5 50
496 11+450.00 11+460.00 1 10 5 50
497 11+460.00 11+470.00 1 10 5 50
498 11+470.00 11+480.00 1 10 5 50
499 11+480.00 11+490.00 1 10 5 50
500 11+490.00 11+500.00 1 10 5 50
501 11+500.00 11+510.00 1 10 5 50
502 11+510.00 11+520.00 1 10 5 50
Total Quantity 25100.00
Quantity Claim 25100.00

Submitted by: Checked by: Approved by:


32/101
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 2.02 Unit : m3
Clearing landslides, debris from causeway, culverts and side drains haulage for disposal within 1 km during monsoon and as per
requirements
SN Chainage No. Length Area Height Quantity Remarks
1 8+560.00 8+600.00 1 40 280 1 280 Debris Removal On 2076-08-15
2 8+600.00 8+640.00 1 40 240 1.5 360 Debris Removal On 2076-08-17
3 8+660.00 8+710.00 1 50 250 1.3 325 Debris Removal On 2076-08-18
4 8+720.00 8+770.00 1 50 275 1.5 412.5 Debris Removal On 2076-08-19
5 8+800.00 8+890.00 1 90 585 1.2 702 Debris Removal On 2076-08-21
6 8+950.00 9+030.00 1 80 560 1 560 Debris Removal On 2076-08-24
7 9+050.00 9+100.00 1 50 375 1.2 450 Debris Removal On 2076-08-25
8 9+150.00 9+230.00 1 80 500 1.4 700 Debris Removal On 2076-08-26
9 9+250.00 9+360.00 1 110 797.5 1.6 1276 Debris Removal On 2076-08-29
10 9+400.00 9+490.00 1 90 540 1.5 810 Debris Removal On 2076-09-05
11 9+510.00 9+600.00 1 90 495 1.3 643.5 Debris Removal On 2076-09-07
12 9+610.00 9+670.00 1 60 360 1.2 432 Debris Removal On 2076-09-09
13 9+670.00 9+740.00 1 70 280 1.7 476 Debris Removal On 2076-09-11
14 9+750.00 9+990.00 1 240 1680 1.6 2688 Debris Removal On 2076-09-14
15 ### ### 1 70 490 1.4 686 Debris Removal On 2076-09-15
16 ### ### 1 80 560 1.45 812 Debris Removal On 2076-09-16
17 ### ### 1 90 630 1.5 945 Debris Removal On 2076-09-18
18 6+700.00 6+780.00 1 80 560 2 1120 Debris Removal On 2076-09-20
19 6+780.00 6+890.00 1 110 770 2.3 1771 Debris Removal On 2076-09-21
20 6+890.00 7+020.00 1 130 910 2.1 1911 Debris Removal On 2076-09-23
Total Quantity 17360.00
Quantity Claim 17360.00

Submitted by: Checked by: Approved by:


33/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Contractor : Sharma/United J/V, Kathmandu Interim Payment Certificate No. 9
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.01 a), 3.01 b) & 3.03 Unit : m3
Roadway excavation including haulage and disposal at appropriate location, all complete as per specification
a) Common material (Hard soil/Gravel/BMS)
b) Hard rock excavation using breaker
Formation of embankment including compaction in layers not exceeding 150mm. Compacted depth, watering and haulage 10. etc all complete as per specification.
Road Area (m2) Road Volume (m3) Classified Volume (m3)
Cut Vol.

Common
S.N. Chainage M. Dist. Fill Vol. (BoQ material (Hard Hard Rock Remarks
Road Cut Road Fill Mean cut Mean Fill Cut Vol. Soil / excavation using
Item No. 3.03)
Gravel/BMS) breaker (BoQ
(BoQ Item No. Item No. 3.01 (b)
3.01 (a)

1 6+700.00 47.341 27.561


2 6+710.00 53.237 52.067 50.289 39.814 10.000 502.888 398.140 502.888
3 6+720.00 27.732 27.489 40.484 39.778 10.000 404.841 397.777 404.841
4 6+730.00 27.527 27.082 27.629 27.286 10.000 276.294 272.855 276.294
5 6+740.00 32.691 0.000 30.109 13.541 10.000 301.092 135.412 301.092
6 6+750.00 80.712 69.049 56.702 34.524 10.000 567.018 345.243 567.018
7 6+760.00 102.494 0.000 91.603 34.524 10.000 916.030 345.243 916.030
8 6+770.00 72.472 0.000 87.483 0.000 10.000 874.828 0.000 874.828
9 6+780.00 82.739 0.000 77.606 0.000 10.000 776.057 0.000 776.057
10 6+790.00 81.901 0.000 82.320 0.000 10.000 823.201 0.000 823.201
11 6+800.00 67.381 0.000 74.641 0.000 10.000 746.407 0.000 746.407
12 6+810.00 58.296 0.000 62.838 0.000 10.000 628.384 0.000 628.384
13 6+820.00 51.847 0.000 55.072 0.000 10.000 550.716 0.000 550.716
14 6+830.00 80.712 59.630 66.280 29.815 10.000 662.797 298.148 662.797
15 6+840.00 48.351 37.377 64.532 48.503 10.000 645.315 485.034 645.315
16 6+850.00 52.980 11.936 50.665 24.657 10.000 506.654 246.566 506.654
17 6+860.00 32.743 32.356 42.862 22.146 10.000 428.616 221.458 428.616
18 6+870.00 30.021 30.944 31.382 31.650 10.000 313.820 316.496 313.820
19 6+880.00 21.395 28.389 25.708 29.666 10.000 257.080 296.664 257.080
20 6+890.00 28.160 28.066 24.777 28.228 10.000 247.773 282.276 247.773
21 6+900.00 10.920 81.387 19.540 54.727 10.000 195.398 547.265 195.398
22 6+910.00 5.616 23.378 8.268 52.383 10.000 82.678 523.826 82.678
23 6+920.00 7.571 58.088 6.593 40.733 10.000 65.932 407.332 65.932
24 6+930.00 7.691 32.195 7.631 45.141 10.000 76.309 451.414 76.309
25 6+940.00 25.700 29.269 16.695 30.732 10.000 166.954 307.318 166.954
26 6+950.00 16.200 9.047 20.950 19.158 10.000 209.499 191.583 209.499
27 6+960.00 10.795 6.906 13.497 7.977 10.000 134.973 79.768 134.973
28 6+970.00 4.759 13.411 7.777 10.159 10.000 77.770 101.585 77.770
29 6+980.00 2.762 15.700 3.761 14.555 10.000 37.608 145.555 37.608
30 6+990.00 4.805 10.767 3.783 13.234 10.000 37.835 132.335 37.835
31 7+000.00 1.630 10.306 3.217 10.537 10.000 32.174 105.365 32.174
32 7+010.00 5.510 11.355 3.570 10.831 10.000 35.698 108.306 35.698
33 7+020.00 13.418 19.480 9.464 15.418 10.000 94.640 154.177 94.640
34 7+030.00 6.312 18.255 9.865 18.868 10.000 98.651 188.677 98.651
35 7+040.00 3.692 21.161 5.002 19.708 10.000 50.019 197.081 50.019
36 7+050.00 0.844 20.838 2.268 21.000 10.000 22.681 209.997 22.681
37 7+060.00 0.000 36.830 0.422 28.834 10.000 4.221 288.343 4.221
38 7+070.00 0.000 33.857 0.000 35.344 10.000 0.000 353.439 0.000
39 7+080.00 0.000 30.139 0.000 31.998 10.000 0.000 319.980 0.000
40 7+090.00 0.000 31.295 0.000 30.717 10.000 0.000 307.165 0.000
41 7+100.00 0.000 18.812 0.000 25.053 10.000 0.000 250.532 0.000
42 7+110.00 3.680 19.945 1.840 19.379 10.000 18.401 193.786 18.401
43 7+120.00 20.372 22.050 12.026 20.998 10.000 120.260 209.977 120.260
44 7+130.00 14.181 2.900 17.277 12.475 10.000 172.765 124.748 172.765
45 7+140.00 13.171 0.000 13.676 1.450 10.000 136.763 14.498 136.763
46 7+150.00 20.338 0.000 16.755 0.000 10.000 167.546 0.000 167.546
47 7+160.00 31.160 0.000 25.749 0.000 10.000 257.488 0.000 257.488
48 7+170.00 35.022 0.000 33.091 0.000 10.000 330.906 0.000 330.906
49 7+180.00 34.394 0.000 34.708 0.000 10.000 347.078 0.000 347.078
50 7+190.00 36.922 0.000 35.658 0.000 10.000 356.579 0.000 356.579
51 7+200.00 36.065 0.000 36.493 0.000 10.000 364.935 0.000 364.935
52 7+210.00 40.614 0.000 38.339 0.000 10.000 383.393 0.000 383.393
53 7+220.00 50.871 0.000 45.742 0.000 10.000 457.421 0.000 457.421
54 7+230.00 44.870 0.000 47.870 0.000 10.000 478.704 0.000 478.704
55 7+240.00 18.323 0.000 31.596 0.000 10.000 315.963 0.000 315.963

Submitted by: Checked by: Approved by:


34/101

Contractor : Sharma/United J/V, Kathmandu Interim Payment Certificate No. 9


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.01 a), 3.01 b) & 3.03 Unit : m3
Roadway excavation including haulage and disposal at appropriate location, all complete as per specification
a) Common material (Hard soil/Gravel/BMS)
b) Hard rock excavation using breaker
Formation of embankment including compaction in layers not exceeding 150mm. Compacted depth, watering and haulage 10. etc all complete as per specification.
Road Area (m2) Road Volume (m3) Classified Volume (m3)
Cut Vol.

Common
S.N. Chainage M. Dist. Fill Vol. (BoQ material (Hard Hard Rock Remarks
Road Cut Road Fill Mean cut Mean Fill Cut Vol. Soil / excavation using
Item No. 3.03)
Gravel/BMS) breaker (BoQ
(BoQ Item No. Item No. 3.01 (b)
3.01 (a)

56 7+250.00 15.328 22.372 16.825 11.186 10.000 168.255 111.858 168.255


57 7+260.00 5.683 34.879 10.506 28.626 10.000 105.058 286.255 105.058
58 7+270.00 0.662 53.258 3.173 44.069 10.000 31.728 440.687 31.728
59 7+280.00 8.050 26.390 4.356 39.824 10.000 43.561 398.242 43.561
60 7+290.00 2.946 30.615 5.498 28.502 10.000 54.980 285.025 54.980
61 7+300.00 0.000 63.661 1.473 47.138 10.000 14.731 471.377 14.731
62 7+310.00 1.237 95.546 0.619 79.603 10.000 6.185 796.034 6.185
63 7+320.00 0.000 85.166 0.619 90.356 10.000 6.185 903.557 6.185
64 7+330.00 0.000 83.173 0.000 84.169 10.000 0.000 841.693 0.000
65 7+340.00 0.000 71.701 0.000 77.437 10.000 0.000 774.368 0.000
66 7+350.00 0.000 59.312 0.000 65.507 10.000 0.000 655.065 0.000
67 7+360.00 0.000 77.689 0.000 68.501 10.000 0.000 685.009 0.000
68 7+370.00 0.000 41.780 0.000 59.735 10.000 0.000 597.348 0.000
69 7+380.00 0.000 41.230 0.000 41.505 10.000 0.000 415.049 0.000
70 7+390.00 0.000 23.455 0.000 32.342 10.000 0.000 323.421 0.000
71 7+400.00 0.000 17.989 0.000 20.722 10.000 0.000 207.217 0.000
72 7+410.00 0.000 17.258 0.000 17.623 10.000 0.000 176.234 0.000
73 7+420.00 0.419 19.018 0.210 18.138 10.000 2.096 181.379 2.096
74 7+430.00 1.393 19.404 0.906 19.211 10.000 9.062 192.109 9.062
75 7+440.00 0.541 32.557 0.967 25.980 10.000 9.670 259.803 9.670
76 7+450.00 5.069 26.816 2.805 29.687 10.000 0.000 296.865 0.000
77 7+460.00 9.538 39.014 7.303 32.915 10.000 0.000 329.150 0.000
78 7+470.00 16.068 17.499 12.803 28.257 10.000 0.000 282.565 0.000
79 7+480.00 4.769 17.412 10.418 17.456 10.000 0.000 174.558 0.000
80 7+490.00 4.293 19.745 4.531 18.579 10.000 0.000 185.787 0.000
81 7+500.00 0.619 18.698 2.456 19.222 10.000 0.000 192.216 0.000
82 7+510.00 2.327 19.880 1.473 19.289 10.000 0.000 192.892 0.000
83 7+520.00 11.795 5.146 7.061 12.513 10.000 0.000 125.130 0.000
84 7+530.00 21.887 0.000 16.841 2.573 10.000 0.000 25.729 0.000
85 7+540.00 41.198 4.512 31.542 2.256 10.000 0.000 22.561 0.000
86 7+550.00 34.186 0.867 37.692 2.690 10.000 0.000 26.896 0.000
87 7+560.00 17.262 0.000 25.724 0.434 10.000 0.000 4.335 0.000
88 7+570.00 12.154 0.000 14.708 0.000 10.000 0.000 0.000 0.000
89 7+580.00 18.228 0.000 15.191 0.000 10.000 0.000 0.000 0.000
90 7+590.00 14.547 2.869 16.387 1.434 10.000 0.000 14.344 0.000
91 7+600.00 18.399 0.632 16.473 1.750 10.000 0.000 17.504 0.000
92 7+610.00 25.372 0.000 21.886 0.316 10.000 0.000 3.161 0.000
93 7+620.00 20.670 15.453 23.021 7.727 10.000 0.000 77.267 0.000
94 7+630.00 19.738 5.686 20.204 10.570 10.000 202.038 105.696 202.038
95 7+640.00 12.382 8.637 16.060 7.161 10.000 160.598 71.615 160.598
96 7+650.00 6.155 12.483 9.268 10.560 10.000 92.683 105.599 92.683
97 7+660.00 1.494 17.425 3.824 14.954 10.000 38.242 149.536 38.242
98 7+670.00 1.470 13.379 1.482 15.402 10.000 14.818 154.017 14.818
99 7+680.00 5.318 7.200 3.394 10.290 10.000 33.939 102.895 33.939
100 7+690.00 1.796 12.950 3.557 10.075 10.000 35.569 100.753 35.569
101 7+700.00 0.000 22.752 0.898 17.851 10.000 8.979 178.509 8.979
102 7+710.00 0.232 18.960 0.116 20.856 10.000 1.162 208.556 1.162
103 7+720.00 0.000 18.951 0.116 18.955 10.000 1.162 189.553 1.162
104 7+730.00 1.632 18.073 0.816 18.512 10.000 8.159 185.118 8.159
105 7+740.00 6.541 14.276 4.087 16.174 10.000 40.865 161.742 40.865
106 7+750.00 11.788 4.145 9.165 9.211 10.000 91.648 92.105 91.648
107 7+760.00 13.368 20.431 12.578 12.288 10.000 125.780 122.882 125.780
108 7+770.00 8.513 18.904 10.940 19.667 10.000 109.402 196.674 109.402
109 7+780.00 5.952 28.550 7.232 23.727 10.000 72.324 237.267 72.324
110 7+790.00 6.736 28.309 6.344 28.429 10.000 63.441 284.291 63.441
111 7+800.00 0.495 26.075 3.616 27.192 10.000 36.157 271.920 36.157
112 7+810.00 0.131 16.118 0.313 21.097 10.000 3.129 210.966 3.129
113 7+820.00 0.009 18.070 0.070 17.094 10.000 0.698 170.938 0.698
114 7+830.00 5.575 6.246 2.792 12.158 10.000 27.918 121.577 27.918
115 7+840.00 2.377 8.633 3.976 7.439 10.000 39.758 74.394 39.758
116 7+850.00 1.248 4.529 1.813 6.581 10.000 18.126 65.809 18.126

Submitted by: Checked by: Approved by:


35/101

Contractor : Sharma/United J/V, Kathmandu Interim Payment Certificate No. 9


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.01 a), 3.01 b) & 3.03 Unit : m3
Roadway excavation including haulage and disposal at appropriate location, all complete as per specification
a) Common material (Hard soil/Gravel/BMS)
b) Hard rock excavation using breaker
Formation of embankment including compaction in layers not exceeding 150mm. Compacted depth, watering and haulage 10. etc all complete as per specification.
Road Area (m2) Road Volume (m3) Classified Volume (m3)
Cut Vol.

Common
S.N. Chainage M. Dist. Fill Vol. (BoQ material (Hard Hard Rock Remarks
Road Cut Road Fill Mean cut Mean Fill Cut Vol. Soil / excavation using
Item No. 3.03)
Gravel/BMS) breaker (BoQ
(BoQ Item No. Item No. 3.01 (b)
3.01 (a)

117 7+860.00 0.177 2.903 0.713 3.716 10.000 7.126 37.161 7.126
118 7+870.00 0.000 9.225 0.088 6.064 10.000 0.885 60.640 0.885
119 7+880.00 3.857 2.310 1.929 5.767 10.000 19.285 57.672 19.285
120 7+890.00 11.942 0.000 7.900 1.155 10.000 78.996 11.549 78.996
121 7+900.00 22.562 0.000 17.252 0.000 10.000 172.518 0.000 172.518
122 7+910.00 33.659 0.000 28.110 0.000 10.000 281.102 0.000 281.102
123 7+920.00 29.525 0.000 31.592 0.000 10.000 315.921 0.000 315.921
124 7+930.00 31.711 0.000 30.618 0.000 10.000 306.181 0.000 306.181
125 7+940.00 95.699 0.000 63.705 0.000 10.000 637.049 0.000 637.049
126 7+950.00 76.999 0.000 86.349 0.000 10.000 863.492 0.000 863.492
127 7+960.00 186.840 0.000 131.920 0.000 10.000 1319.196 0.000 1319.196
128 7+970.00 56.310 0.000 121.575 0.000 10.000 1215.748 0.000 1215.748
129 7+980.00 112.028 3.675 84.169 1.837 10.000 841.691 18.374 841.691
130 7+990.00 64.294 0.000 88.161 1.837 10.000 881.612 18.374 881.612
131 8+000.00 186.840 0.000 125.567 0.000 10.000 1255.669 0.000 1255.669
132 8+010.00 44.668 0.000 115.754 0.000 10.000 1157.539 0.000 1157.539
133 8+020.00 65.856 0.000 55.262 0.000 10.000 552.621 0.000 552.621
134 8+030.00 87.470 0.000 76.663 0.000 10.000 766.631 0.000 766.631
135 8+040.00 87.960 0.000 87.715 0.000 10.000 877.152 0.000 877.152
136 8+050.00 133.858 21.579 110.909 10.790 10.000 1109.094 107.895 1109.094
137 8+060.00 74.038 16.545 103.948 19.062 10.000 1039.484 190.619 1039.484
138 8+070.00 37.760 7.083 55.899 11.814 10.000 558.992 118.140 558.992
139 8+080.00 16.867 10.739 27.314 8.911 10.000 273.137 89.109 273.137
140 8+090.00 17.337 20.446 17.102 15.592 10.000 171.023 155.922 171.023
141 8+100.00 0.000 41.606 8.669 31.026 10.000 86.687 310.260 86.687
142 8+110.00 13.120 50.648 6.560 46.127 10.000 65.600 461.269 65.600
143 8+120.00 17.140 66.553 15.130 58.600 10.000 151.300 586.001 151.300
144 8+130.00 10.140 70.307 13.640 68.430 10.000 136.400 684.297 136.400
145 8+140.00 9.631 76.199 9.886 73.253 10.000 98.855 732.529 98.855
146 8+150.00 10.245 95.426 9.938 85.813 10.000 99.380 858.127 99.380
147 8+160.00 8.785 101.067 9.515 98.246 10.000 95.150 982.465 95.150
148 8+170.00 9.765 91.100 9.275 96.084 10.000 92.750 960.835 92.750
149 8+180.00 10.167 94.883 9.966 92.992 10.000 99.660 929.917 99.660
150 8+190.00 11.165 67.576 10.666 81.229 10.000 106.660 812.293 106.660
151 8+200.00 12.341 56.243 11.753 61.909 10.000 117.530 619.094 117.530
152 8+210.00 22.162 42.058 17.251 49.151 10.000 172.515 491.505 172.515
153 8+220.00 80.890 17.227 51.526 29.643 10.000 515.258 296.426 515.258
154 8+230.00 9.480 8.586 45.185 12.907 10.000 451.847 129.067 451.847
155 8+240.00 2.303 5.151 5.891 6.868 10.000 58.911 68.685 58.911
156 8+250.00 20.199 0.000 11.251 2.575 10.000 112.507 25.754 112.507
157 8+260.00 29.998 0.000 25.099 0.000 10.000 250.985 0.000 250.985
158 8+270.00 32.094 0.000 31.046 0.000 10.000 310.459 0.000 310.459
159 8+280.00 31.349 0.000 31.721 0.000 10.000 317.212 0.000 317.212
160 8+290.00 41.920 0.000 36.634 0.000 10.000 366.343 0.000 366.343
161 8+300.00 86.566 0.000 64.243 0.000 10.000 642.429 0.000 642.429
162 8+310.00 120.959 0.000 103.763 0.000 10.000 1037.627 0.000 1037.627
163 8+320.00 116.934 0.000 118.947 0.000 10.000 1189.467 0.000 1189.467
164 8+330.00 114.484 0.000 115.709 0.000 10.000 1157.092 0.000 1157.092
165 8+340.00 62.680 0.000 88.582 0.000 10.000 885.822 0.000 885.822
166 8+350.00 47.754 0.000 55.217 0.000 10.000 552.171 0.000 552.171
167 8+360.00 56.195 0.000 51.974 0.000 10.000 519.744 0.000 519.744
168 8+370.00 64.522 0.000 60.358 0.000 10.000 603.582 0.000 603.582
169 8+380.00 75.987 0.000 70.254 0.000 10.000 702.542 0.000 702.542
170 8+390.00 84.914 0.000 80.450 0.000 10.000 804.504 0.000 804.504
171 8+400.00 55.375 0.000 70.144 0.000 10.000 701.445 0.000 701.445
172 8+410.00 76.046 0.000 65.710 0.000 10.000 657.102 0.000 657.102
173 8+420.00 62.212 4.410 69.129 2.205 10.000 691.285 22.049 691.285
174 8+430.00 2.279 18.183 32.245 11.296 10.000 322.455 112.963 322.455
175 8+440.00 8.648 43.472 5.464 30.828 10.000 54.637 308.276 54.637
176 8+450.00 4.500 12.485 6.574 27.979 10.000 65.738 279.789 65.738
177 8+460.00 3.160 10.003 3.830 11.244 10.000 38.301 112.440 38.301

Submitted by: Checked by: Approved by:


36/101

Contractor : Sharma/United J/V, Kathmandu Interim Payment Certificate No. 9


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.01 a), 3.01 b) & 3.03 Unit : m3
Roadway excavation including haulage and disposal at appropriate location, all complete as per specification
a) Common material (Hard soil/Gravel/BMS)
b) Hard rock excavation using breaker
Formation of embankment including compaction in layers not exceeding 150mm. Compacted depth, watering and haulage 10. etc all complete as per specification.
Road Area (m2) Road Volume (m3) Classified Volume (m3)
Cut Vol.

Common
S.N. Chainage M. Dist. Fill Vol. (BoQ material (Hard Hard Rock Remarks
Road Cut Road Fill Mean cut Mean Fill Cut Vol. Soil / excavation using
Item No. 3.03)
Gravel/BMS) breaker (BoQ
(BoQ Item No. Item No. 3.01 (b)
3.01 (a)

178 8+470.00 15.018 2.855 9.089 6.429 10.000 90.893 64.289 90.893
179 8+480.00 20.404 0.000 17.711 1.428 10.000 177.109 14.275 177.109
180 8+490.00 7.655 6.191 14.029 3.095 10.000 140.293 30.953 140.293
181 8+500.00 2.847 5.573 5.251 5.882 10.000 52.509 58.817 52.509
182 8+510.00 0.000 16.242 1.423 10.907 10.000 14.234 109.072 14.234
183 8+520.00 1.298 8.851 0.649 12.546 10.000 6.488 125.462 6.488
184 8+530.00 8.707 3.512 5.002 6.182 10.000 50.024 61.815 50.024
185 8+540.00 15.893 4.023 12.300 3.767 10.000 123.000 37.675 123.000
186 8+550.00 16.120 4.943 16.006 4.483 10.000 160.064 44.827 160.064
187 8+560.00 13.297 8.628 14.708 6.786 10.000 147.085 67.855 147.085
188 8+570.00 0.626 24.238 6.961 16.433 10.000 69.613 164.332 69.613
189 8+580.00 0.000 31.827 0.313 28.033 10.000 3.129 280.327 3.129
190 8+590.00 0.000 40.899 0.000 36.363 10.000 0.000 363.631 0.000
191 8+600.00 0.000 37.819 0.000 39.359 10.000 0.000 393.587 0.000
192 8+610.00 0.000 43.008 0.000 40.413 10.000 0.000 404.134 0.000
193 8+620.00 0.000 33.183 0.000 38.096 10.000 0.000 380.957 0.000
194 8+630.00 0.000 36.178 0.000 34.681 10.000 0.000 346.808 0.000
195 8+640.00 0.000 41.026 0.000 38.602 10.000 0.000 386.021 0.000
196 8+650.00 0.000 37.347 0.000 39.186 10.000 0.000 391.863 0.000
197 8+660.00 0.000 31.662 0.000 34.504 10.000 0.000 345.044 0.000
198 8+670.00 0.000 27.061 0.000 29.362 10.000 0.000 293.615 0.000
199 8+680.00 0.000 34.649 0.000 30.855 10.000 0.000 308.551 0.000
200 8+690.00 0.000 29.107 0.000 31.878 10.000 0.000 318.783 0.000
201 8+700.00 0.000 18.234 0.000 23.671 10.000 0.000 236.706 0.000
202 8+710.00 0.000 15.482 0.000 16.858 10.000 0.000 168.578 0.000
203 8+720.00 0.000 9.439 0.000 12.460 10.000 0.000 124.602 0.000
204 8+730.00 4.227 3.388 2.113 6.413 10.000 21.135 64.133 21.135
205 8+740.00 13.771 5.046 8.999 4.217 10.000 89.991 42.168 89.991
206 8+750.00 47.600 0.000 30.685 2.523 10.000 306.854 25.229 306.854
207 8+760.00 41.895 0.000 44.747 0.000 10.000 447.471 0.000 447.471
208 8+770.00 57.619 0.000 49.757 0.000 10.000 497.566 0.000 497.566
209 8+780.00 56.830 0.000 57.224 0.000 10.000 572.244 0.000 572.244
210 8+790.00 51.337 0.000 54.084 0.000 10.000 540.836 0.000 540.836
211 8+800.00 37.452 0.000 44.395 0.000 10.000 443.947 0.000 443.947
212 8+810.00 25.664 0.000 31.558 0.000 10.000 315.581 0.000 315.581
213 8+820.00 29.177 0.000 27.420 0.000 10.000 274.203 0.000 274.203
214 8+830.00 27.376 0.000 28.276 0.000 10.000 282.764 0.000 282.764
215 8+840.00 25.322 0.000 26.349 0.000 10.000 263.490 0.000 263.490
216 8+850.00 30.106 0.000 27.714 0.000 10.000 277.137 0.000 277.137
217 8+860.00 44.221 0.000 37.163 0.000 10.000 371.634 0.000 371.634
218 8+870.00 61.756 0.000 52.989 0.000 10.000 529.885 0.000 529.885
219 8+880.00 90.000 0.000 75.878 0.000 10.000 758.779 0.000 758.779
220 8+890.00 134.476 0.000 112.238 0.000 10.000 1122.381 0.000 1122.381
221 8+900.00 155.761 0.000 145.118 0.000 10.000 1451.185 0.000 1451.185
222 8+910.00 167.851 0.000 161.806 0.000 10.000 1618.058 0.000 1618.058
223 8+920.00 166.322 0.000 167.086 0.000 10.000 1670.863 0.000 1670.863
224 8+930.00 144.743 0.000 155.533 0.000 10.000 1555.325 0.000 1555.325
225 8+940.00 156.334 0.000 150.539 0.000 10.000 1505.388 0.000 1505.388
226 8+950.00 137.133 0.000 146.734 0.000 10.000 1467.335 0.000 1467.335
227 8+960.00 93.607 0.000 115.370 0.000 10.000 1153.697 0.000 1153.697
228 8+970.00 65.601 0.000 79.604 0.000 10.000 796.038 0.000 796.038
229 8+980.00 37.765 23.904 51.683 11.952 10.000 516.831 119.518 516.831
230 8+990.00 31.568 44.216 34.666 34.060 10.000 346.664 340.596 346.664
231 9+000.00 25.709 26.378 28.638 35.297 10.000 286.381 352.970 286.381
232 9+010.00 20.248 37.912 22.979 32.145 10.000 229.786 321.451 229.786
233 9+020.00 14.195 30.210 17.222 34.061 10.000 172.216 340.610 172.216
234 9+030.00 3.475 14.712 8.835 22.461 10.000 88.347 224.612 88.347
235 9+040.00 11.804 25.711 7.639 20.212 10.000 76.392 202.115 76.392
236 9+050.00 47.789 48.185 29.796 36.948 10.000 297.965 369.480 297.965
237 9+060.00 39.333 44.945 43.561 46.565 10.000 435.612 465.653 435.612
238 9+070.00 13.150 49.731 26.242 47.338 10.000 262.416 473.383 262.416

Submitted by: Checked by: Approved by:


37/101

Contractor : Sharma/United J/V, Kathmandu Interim Payment Certificate No. 9


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.01 a), 3.01 b) & 3.03 Unit : m3
Roadway excavation including haulage and disposal at appropriate location, all complete as per specification
a) Common material (Hard soil/Gravel/BMS)
b) Hard rock excavation using breaker
Formation of embankment including compaction in layers not exceeding 150mm. Compacted depth, watering and haulage 10. etc all complete as per specification.
Road Area (m2) Road Volume (m3) Classified Volume (m3)
Cut Vol.

Common
S.N. Chainage M. Dist. Fill Vol. (BoQ material (Hard Hard Rock Remarks
Road Cut Road Fill Mean cut Mean Fill Cut Vol. Soil / excavation using
Item No. 3.03)
Gravel/BMS) breaker (BoQ
(BoQ Item No. Item No. 3.01 (b)
3.01 (a)

239 9+080.00 9.747 41.239 11.449 45.485 10.000 114.485 454.851 114.485
240 9+090.00 10.328 24.954 10.037 33.096 10.000 100.373 330.961 100.373
241 9+100.00 1.516 41.037 5.922 32.995 10.000 59.217 329.951 59.217
242 9+110.00 2.275 48.707 1.896 44.872 10.000 18.956 448.717 18.956
243 9+120.00 3.286 44.442 2.780 46.574 10.000 27.805 465.742 27.805
244 9+130.00 0.886 30.810 2.086 37.626 10.000 20.859 376.257 20.859
245 9+140.00 2.044 19.749 1.465 25.279 10.000 14.654 252.793 14.654
246 9+150.00 9.158 26.360 5.601 23.055 10.000 56.011 230.545 56.011
247 9+160.00 12.606 24.451 10.882 25.406 10.000 108.818 254.056 108.818
248 9+170.00 10.249 14.896 11.427 19.674 10.000 114.275 196.737 114.275
249 9+180.00 11.762 7.764 11.006 11.330 10.000 110.055 113.300 110.055
250 9+190.00 20.550 0.000 16.156 3.882 10.000 161.561 38.819 161.561
251 9+200.00 25.402 0.000 22.976 0.000 10.000 229.762 0.000 229.762
252 9+210.00 24.632 0.000 25.017 0.000 10.000 250.168 0.000 250.168
253 9+220.00 11.717 11.025 18.174 5.513 10.000 181.743 55.127 181.743
254 9+230.00 12.551 19.068 12.134 15.047 10.000 121.340 150.466 121.340
255 9+240.00 20.884 24.543 16.717 21.805 10.000 167.174 218.053 167.174
256 9+250.00 25.571 22.120 23.227 23.331 10.000 232.275 233.313 232.275
257 9+260.00 34.606 19.911 30.089 21.015 10.000 300.887 210.154 300.887
258 9+270.00 55.841 0.000 45.224 9.955 10.000 452.236 99.555 452.236
259 9+280.00 113.506 0.000 84.673 0.000 10.000 846.732 0.000 846.732
260 9+290.00 96.057 0.000 104.781 0.000 10.000 1047.815 0.000 1047.815
261 9+300.00 88.002 0.000 92.030 0.000 10.000 920.296 0.000 460.148 460.148
262 9+310.00 82.210 0.000 85.106 0.000 10.000 851.059 0.000 851.059
263 9+320.00 76.783 0.000 79.496 0.000 10.000 794.964 0.000 794.964
264 9+330.00 74.342 0.000 75.562 0.000 10.000 755.624 0.000 377.812 377.812
265 9+340.00 80.712 0.000 77.527 0.000 10.000 775.271 0.000 775.271
266 9+350.00 72.600 0.000 76.656 0.000 10.000 766.562 0.000 383.281 383.281
267 9+360.00 32.325 0.000 52.462 0.000 10.000 524.625 0.000 524.625
268 9+370.00 42.125 0.000 37.225 0.000 10.000 372.247 0.000 372.247
269 9+380.00 21.567 0.000 31.846 0.000 10.000 318.458 0.000 318.458
270 9+390.00 15.880 0.000 18.723 0.000 10.000 187.233 0.000 187.233
271 9+400.00 17.453 0.000 16.666 0.000 10.000 166.664 0.000 166.664
272 9+410.00 19.135 0.000 18.294 0.000 10.000 182.939 0.000 182.939
273 9+420.00 10.346 0.000 14.740 0.000 10.000 147.401 0.000 147.401
274 9+430.00 22.456 0.000 16.401 0.000 10.000 164.009 0.000 164.009
275 9+440.00 26.785 0.000 24.621 0.000 10.000 246.208 0.000 246.208
276 9+450.00 24.240 0.000 25.513 0.000 10.000 255.126 0.000 255.126
277 9+460.00 30.672 0.000 27.456 0.000 10.000 274.561 0.000 274.561
278 9+470.00 40.576 0.000 35.624 0.000 10.000 356.243 0.000 356.243
279 9+480.00 18.912 0.000 29.744 0.000 10.000 297.443 0.000 297.443
280 9+490.00 25.437 0.000 22.175 0.000 10.000 221.745 0.000 221.745
281 9+500.00 29.133 0.000 27.285 0.000 10.000 272.846 0.000 272.846
282 9+510.00 21.563 0.000 25.348 0.000 10.000 253.479 0.000 253.479
283 9+520.00 22.980 0.000 22.272 0.000 10.000 222.717 0.000 222.717
284 9+530.00 30.135 0.000 26.557 0.000 10.000 265.574 0.000 265.574
285 9+540.00 31.067 0.000 30.601 0.000 10.000 306.010 0.000 306.010
286 9+550.00 21.135 0.000 26.101 0.000 10.000 261.010 0.000 261.010
287 9+560.00 30.452 0.000 25.793 0.000 10.000 257.933 0.000 257.933
288 9+570.00 34.651 0.000 32.552 0.000 10.000 325.517 0.000 325.517
289 9+580.00 25.672 0.000 30.162 0.000 10.000 301.618 0.000 301.618
290 9+590.00 70.128 0.000 47.900 0.000 10.000 479.001 0.000 479.001
291 9+600.00 80.659 0.000 75.393 0.000 10.000 753.934 0.000 753.934
292 9+610.00 80.764 0.000 80.712 0.000 10.000 807.116 0.000 807.116
293 9+620.00 78.984 0.000 79.874 0.000 10.000 798.742 0.000 798.742
294 9+630.00 110.234 0.000 94.609 0.000 10.000 946.092 0.000 946.092
295 9+640.00 105.892 0.000 108.063 0.000 10.000 1080.631 0.000 1080.631
296 9+650.00 58.146 0.000 82.019 0.000 10.000 820.189 0.000 820.189
297 9+660.00 32.890 0.000 45.518 0.000 10.000 455.179 0.000 455.179
298 9+670.00 90.451 0.000 61.671 0.000 10.000 616.707 0.000 616.707
299 9+680.00 39.099 0.000 64.775 0.000 10.000 647.750 0.000 647.750

Submitted by: Checked by: Approved by:


38/101

Contractor : Sharma/United J/V, Kathmandu Interim Payment Certificate No. 9


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.01 a), 3.01 b) & 3.03 Unit : m3
Roadway excavation including haulage and disposal at appropriate location, all complete as per specification
a) Common material (Hard soil/Gravel/BMS)
b) Hard rock excavation using breaker
Formation of embankment including compaction in layers not exceeding 150mm. Compacted depth, watering and haulage 10. etc all complete as per specification.
Road Area (m2) Road Volume (m3) Classified Volume (m3)
Cut Vol.

Common
S.N. Chainage M. Dist. Fill Vol. (BoQ material (Hard Hard Rock Remarks
Road Cut Road Fill Mean cut Mean Fill Cut Vol. Soil / excavation using
Item No. 3.03)
Gravel/BMS) breaker (BoQ
(BoQ Item No. Item No. 3.01 (b)
3.01 (a)

300 9+690.00 41.902 0.000 40.500 0.000 10.000 405.004 0.000 405.004
301 9+700.00 85.097 0.000 63.500 0.000 10.000 634.997 0.000 634.997
302 9+710.00 50.159 0.000 67.628 0.000 10.000 676.281 0.000 676.281
303 9+720.00 49.157 0.000 49.658 0.000 10.000 496.580 0.000 496.580
304 9+730.00 29.098 0.000 39.128 0.000 10.000 391.276 0.000 391.276
305 9+740.00 33.578 0.000 31.338 0.000 10.000 313.381 0.000 313.381
306 9+750.00 45.981 0.000 39.780 0.000 10.000 397.796 0.000 397.796
307 9+760.00 40.145 0.000 43.063 0.000 10.000 430.632 0.000 430.632
308 9+770.00 81.145 0.000 60.645 0.000 10.000 606.452 0.000 606.452
309 9+780.00 77.134 0.000 79.140 0.000 10.000 791.397 0.000 791.397
310 9+790.00 27.091 0.000 52.113 0.000 10.000 521.126 0.000 521.126
311 9+800.00 35.008 0.000 31.050 0.000 10.000 310.496 0.000 310.496
312 9+810.00 30.201 0.000 32.605 0.000 10.000 326.046 0.000 326.046
313 9+820.00 30.145 0.000 30.173 0.000 10.000 301.731 0.000 301.731
314 9+830.00 28.912 0.000 29.529 0.000 10.000 295.287 0.000 295.287
315 9+840.00 49.082 0.000 38.997 0.000 10.000 389.972 0.000 389.972
316 9+850.00 24.071 0.000 36.577 0.000 10.000 365.767 0.000 365.767
317 9+860.00 41.551 0.000 32.811 0.000 10.000 328.111 0.000 328.111
318 9+870.00 16.718 0.000 29.134 0.000 10.000 291.345 0.000 291.345
319 9+880.00 40.154 0.000 28.436 0.000 10.000 284.361 0.000 284.361
320 9+890.00 31.151 0.000 35.653 0.000 10.000 356.525 0.000 356.525
321 9+900.00 30.457 0.000 30.804 0.000 10.000 308.038 0.000 308.038
322 9+910.00 33.456 0.000 31.956 0.000 10.000 319.564 0.000 319.564
323 9+920.00 18.192 0.000 25.824 0.000 10.000 258.242 0.000 258.242
324 9+930.00 24.901 0.000 21.547 0.000 10.000 215.468 0.000 215.468
325 9+940.00 30.145 0.000 27.523 0.000 10.000 275.232 0.000 275.232
326 9+950.00 35.175 0.000 32.660 0.000 10.000 326.601 0.000 326.601
327 9+960.00 41.980 0.000 38.578 0.000 10.000 385.776 0.000 385.776
328 9+970.00 55.190 0.000 48.585 0.000 10.000 485.851 0.000 485.851
329 9+980.00 58.095 0.000 56.643 0.000 10.000 566.426 0.000 566.426
330 9+990.00 36.147 0.000 47.121 0.000 10.000 471.210 0.000 471.210
331 ### 16.102 0.000 26.125 0.000 10.000 261.245 0.000 261.245
332 ### 35.189 0.000 25.646 0.000 10.000 256.456 0.000 256.456
333 ### 6.145 0.000 20.667 0.000 10.000 206.671 0.000 206.671
334 ### 10.200 0.000 8.173 0.000 10.000 81.726 0.000 81.726
335 ### 15.892 0.000 13.046 0.000 10.000 130.460 0.000 130.460
336 ### 25.189 0.000 20.541 0.000 10.000 205.406 0.000 102.703 102.703
337 ### 33.456 0.000 29.323 0.000 10.000 293.227 0.000 293.227
338 ### 40.189 0.000 36.823 0.000 10.000 368.227 0.000 368.227
339 ### 29.761 0.000 34.975 0.000 10.000 349.753 0.000 349.753
340 ### 31.157 0.000 30.459 0.000 10.000 304.592 0.000 304.592
341 ### 25.871 0.000 28.514 0.000 10.000 285.141 0.000 285.141
342 ### 31.451 0.000 28.661 0.000 10.000 286.610 0.000 286.610
343 ### 31.415 0.000 31.433 0.000 10.000 314.330 0.000 314.330
344 ### 35.012 0.000 33.214 0.000 10.000 332.135 0.000 332.135
345 ### 34.168 0.000 34.590 0.000 10.000 345.899 0.000 345.899
346 ### 10.112 0.000 22.140 0.000 10.000 221.399 0.000 221.399
347 ### 8.990 0.000 9.551 0.000 10.000 95.511 0.000 95.511
348 ### 10.120 0.000 9.555 0.000 10.000 95.551 0.000 95.551
349 ### 11.091 0.000 10.606 0.000 10.000 106.056 0.000 106.056
350 ### 14.110 0.000 35.470 0.000 10.000 354.700 0.000 354.700
351 ### 12.151 0.000 13.130 0.000 10.000 131.304 0.000 65.652
352 ### 24.156 19.091 18.154 9.546 10.000 181.535 95.455 181.535
353 ### 16.190 14.091 20.173 16.591 10.000 201.730 165.910 201.730
354 ### 12.112 23.092 14.151 18.591 10.000 141.510 185.914 141.510
355 ### 14.150 18.091 13.131 20.591 10.000 131.310 205.914 131.310
356 ### 14.167 31.091 14.159 24.591 10.000 141.585 245.910 141.585
357 ### 12.123 20.091 13.145 25.591 10.000 131.450 255.910 131.450
358 ### 19.182 15.092 15.653 17.592 10.000 156.525 175.916 156.525
359 ### 14.120 12.092 16.651 13.592 10.000 166.510 135.921 166.510
360 ### 40.151 0.000 27.136 6.046 10.000 271.357 60.460 271.357

Submitted by: Checked by: Approved by:


39/101

Contractor : Sharma/United J/V, Kathmandu Interim Payment Certificate No. 9


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.01 a), 3.01 b) & 3.03 Unit : m3
Roadway excavation including haulage and disposal at appropriate location, all complete as per specification
a) Common material (Hard soil/Gravel/BMS)
b) Hard rock excavation using breaker
Formation of embankment including compaction in layers not exceeding 150mm. Compacted depth, watering and haulage 10. etc all complete as per specification.
Road Area (m2) Road Volume (m3) Classified Volume (m3)
Cut Vol.

Common
S.N. Chainage M. Dist. Fill Vol. (BoQ material (Hard Hard Rock Remarks
Road Cut Road Fill Mean cut Mean Fill Cut Vol. Soil / excavation using
Item No. 3.03)
Gravel/BMS) breaker (BoQ
(BoQ Item No. Item No. 3.01 (b)
3.01 (a)

361 ### 16.876 0.000 28.514 0.000 10.000 285.137 0.000 285.137
362 ### 8.232 0.000 12.554 0.000 10.000 125.541 0.000 125.541
363 ### 10.234 0.000 9.233 0.000 10.000 92.331 0.000 92.331
364 ### 75.718 0.000 42.976 0.000 10.000 429.761 0.000 429.761
365 ### 61.126 0.000 68.422 0.000 10.000 684.220 0.000 684.220
366 ### 55.132 0.000 58.129 0.000 10.000 581.290 0.000 581.290
367 ### 87.146 0.000 71.139 0.000 10.000 711.389 0.000 711.389
368 ### 74.150 0.000 80.648 0.000 10.000 806.478 0.000 806.478
369 ### 61.178 0.000 67.664 0.000 10.000 676.642 0.000 676.642
370 ### 43.251 0.000 52.215 0.000 10.000 522.147 0.000 522.147
371 ### 31.165 0.000 37.208 0.000 10.000 372.080 0.000 372.080
372 ### 35.183 0.000 33.174 0.000 10.000 331.740 0.000 331.740
373 ### 32.109 0.000 33.646 0.000 10.000 336.460 0.000 336.460
374 ### 38.215 0.000 35.162 0.000 10.000 351.621 0.000 351.621
375 ### 32.082 0.000 35.149 0.000 10.000 351.486 0.000 351.486
376 ### 33.109 0.000 32.596 0.000 10.000 325.956 0.000 325.956
377 ### 9.083 0.000 21.096 0.000 10.000 210.962 0.000 210.962
378 ### 11.092 0.000 10.088 0.000 10.000 100.877 0.000 100.877
379 ### 13.092 0.000 12.092 0.000 10.000 120.921 0.000 120.921
380 ### 21.091 0.000 17.092 0.000 10.000 170.915 0.000 170.915
381 ### 25.091 0.000 23.091 0.000 10.000 230.910 0.000 230.910
382 ### 28.018 0.000 26.555 0.000 10.000 265.545 0.000 265.545
383 ### 31.091 0.000 29.555 0.000 10.000 295.545 0.000 295.545
384 ### 34.019 0.000 32.555 0.000 10.000 325.550 0.000 325.550
385 ### 11.091 0.000 22.555 0.000 10.000 225.550 0.000 225.550
386 ### 14.292 0.000 12.691 0.000 10.000 126.914 0.000 126.914
387 ### 11.091 0.000 12.691 0.000 10.000 126.914 0.000 126.914
388 ### 9.871 0.000 10.481 0.000 10.000 104.810 0.000 0.000
389 ### 63.219 0.000 36.545 0.000 10.000 365.450 0.000 365.450
390 ### 71.231 0.000 67.225 0.000 10.000 672.250 0.000 672.250
391 ### 180.230 0.000 125.731 0.000 10.000 1257.305 0.000 1257.305
392 ### 155.140 0.000 167.685 0.000 10.000 1676.850 0.000 1676.850
393 ### 185.781 0.000 170.461 0.000 10.000 1704.605 0.000 1704.605
394 ### 141.092 0.000 163.437 0.000 10.000 1634.366 0.000 1634.366
395 ### 71.209 0.000 106.151 0.000 10.000 1061.506 0.000 1061.506
396 ### 34.092 0.000 52.651 0.000 10.000 526.505 0.000 526.505
397 ### 29.192 0.000 31.642 0.000 10.000 316.420 0.000 316.420
398 ### 31.156 0.000 30.174 0.000 10.000 301.741 0.000 301.741
399 ### 16.192 0.000 23.674 0.000 10.000 236.741 0.000 236.741
400 ### 23.198 0.000 19.695 0.000 10.000 196.951 0.000 98.475
401 ### 10.245 0.000 16.722 0.000 10.000 167.216 0.000 83.608
402 ### 39.091 0.000 24.668 0.000 10.000 246.680 0.000 123.340
403 ### 18.092 0.000 28.592 0.000 10.000 285.916 0.000 142.958
404 ### 26.218 0.000 22.155 0.000 10.000 221.551 0.000 110.775
405 ### 24.192 0.000 25.205 0.000 10.000 252.050 0.000 126.025
406 ### 30.181 0.000 27.187 0.000 10.000 271.865 0.000 135.933
407 ### 27.192 0.000 28.687 0.000 10.000 286.865 0.000 143.433
408 ### 35.192 45.029 31.192 22.515 10.000 311.920 225.145 155.960
409 ### 25.152 30.201 30.172 37.615 10.000 301.721 376.150 150.860
410 ### 27.091 32.092 26.122 31.147 10.000 261.216 311.465 130.608
411 ### 30.130 28.092 28.611 30.092 10.000 286.105 300.920 286.105
412 ### 33.901 65.982 32.016 47.037 10.000 320.155 470.370 320.155
413 ### 50.220 0.000 42.061 32.991 10.000 420.605 329.910 420.605
414 ### 45.091 0.000 47.656 0.000 10.000 476.555 0.000 476.555
415 ### 41.092 0.000 43.092 0.000 10.000 430.916 0.000 430.916
416 ### 29.098 0.000 35.095 0.000 10.000 350.951 0.000 350.951
417 ### 30.181 0.000 29.640 0.000 10.000 296.396 0.000 296.396
418 ### 40.182 0.000 35.182 0.000 10.000 351.815 0.000 351.815
419 ### 45.298 0.000 42.740 0.000 10.000 427.401 0.000 427.401
420 ### 50.821 0.000 48.060 0.000 10.000 480.596 0.000 480.596
421 ### 49.082 21.092 49.952 10.546 10.000 499.516 105.460 499.516

Submitted by: Checked by: Approved by:


40/101

Contractor : Sharma/United J/V, Kathmandu Interim Payment Certificate No. 9


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.01 a), 3.01 b) & 3.03 Unit : m3
Roadway excavation including haulage and disposal at appropriate location, all complete as per specification
a) Common material (Hard soil/Gravel/BMS)
b) Hard rock excavation using breaker
Formation of embankment including compaction in layers not exceeding 150mm. Compacted depth, watering and haulage 10. etc all complete as per specification.
Road Area (m2) Road Volume (m3) Classified Volume (m3)
Cut Vol.

Common
S.N. Chainage M. Dist. Fill Vol. (BoQ material (Hard Hard Rock Remarks
Road Cut Road Fill Mean cut Mean Fill Cut Vol. Soil / excavation using
Item No. 3.03)
Gravel/BMS) breaker (BoQ
(BoQ Item No. Item No. 3.01 (b)
3.01 (a)

422 ### 30.157 9.829 39.620 15.461 10.000 396.197 154.607 396.197
423 ### 65.109 20.221 47.633 15.025 10.000 476.332 150.252 476.332
424 ### 42.152 10.091 53.631 15.156 10.000 536.306 151.560 536.306
425 ### 75.091 11.091 58.622 10.591 10.000 586.216 105.910 586.216
426 ### 55.252 23.091 65.172 17.091 10.000 651.716 170.910 651.716
427 ### 45.215 9.091 50.234 16.091 10.000 502.335 160.911 502.335
428 ### 0.000 11.202 22.608 10.147 10.000 226.075 101.466 226.075
429 ### 0.000 24.145 0.000 17.674 10.000 0.000 176.736 0.000
430 ### 0.000 22.091 0.000 23.118 10.000 0.000 231.180 0.000
431 ### 0.000 28.109 0.000 25.100 10.000 0.000 251.001 0.000
432 ### 0.000 21.221 0.000 24.665 10.000 0.000 246.651 0.000
433 ### 0.000 14.762 0.000 17.992 10.000 0.000 179.915 0.000 0.000
434 ### 0.000 21.123 0.000 17.943 10.000 0.000 179.425 0.000
435 ### 0.000 13.092 0.000 17.108 10.000 0.000 171.075 0.000
436 ### 0.000 10.219 0.000 11.656 10.000 0.000 116.555 0.000
437 ### 0.000 17.092 0.000 13.656 10.000 0.000 136.556 0.000
438 ### 0.000 17.093 0.000 17.093 10.000 0.000 170.927 0.000
439 ### 0.000 23.101 0.000 20.097 10.000 0.000 200.971 0.000
440 ### 0.000 20.150 0.000 21.626 10.000 0.000 216.255 0.000
441 ### 0.000 18.096 0.000 19.123 10.000 0.000 191.230 0.000
442 ### 0.000 13.091 0.000 15.594 10.000 0.000 155.935 0.000
443 ### 0.000 13.291 0.000 13.191 10.000 0.000 131.910 0.000
444 ### 0.000 21.142 0.000 17.217 10.000 0.000 172.165 0.000
445 ### 0.000 41.021 0.000 31.082 10.000 0.000 310.815 0.000
446 ### 25.209 21.191 12.605 31.106 10.000 126.047 311.060 126.047
447 ### 10.236 19.021 17.722 20.106 10.000 177.225 201.060 177.225
448 ### 18.210 14.021 14.223 16.521 10.000 142.226 165.210 142.226
449 ### 29.092 13.201 23.651 13.611 10.000 236.508 136.110 236.508
450 ### 31.291 15.231 30.192 14.216 10.000 301.916 142.160 301.916
451 ### 22.102 16.172 26.697 15.702 10.000 266.965 157.015 266.965
452 ### 31.020 14.121 26.561 15.147 10.000 265.610 151.465 265.610
453 ### 31.109 12.231 31.065 13.176 10.000 310.646 131.762 310.646
454 ### 31.011 12.141 31.060 12.186 10.000 310.601 121.862 310.601
455 ### 0.000 14.761 15.506 13.451 10.000 155.055 134.510 155.055
456 ### 0.000 15.713 0.000 15.237 10.000 0.000 152.370 0.000
457 ### 0.000 10.126 0.000 12.920 10.000 0.000 129.195 0.000
458 ### 0.000 14.141 0.000 12.134 10.000 0.000 121.335 0.000
459 ### 0.000 16.782 0.000 15.462 10.000 0.000 154.615 0.000
460 ### 13.252 14.971 6.626 15.877 10.000 66.260 158.765 66.260
461 ### 0.000 0.000 6.626 7.486 10.000 66.260 74.855 66.260
462 ### 0.000 0.000 0.000 0.000 10.000 0.000 0.000 0.000
463 ### 23.211 0.000 11.606 0.000 10.000 116.055 0.000 116.055
464 ### 14.260 0.000 18.736 0.000 10.000 187.355 0.000 187.355
465 ### 10.182 0.000 12.221 0.000 10.000 122.210 0.000 122.210
466 ### 15.102 0.000 12.642 0.000 10.000 126.420 0.000 126.420
467 ### 20.123 0.000 17.613 0.000 10.000 176.125 0.000 176.125
468 ### 0.000 0.000 10.062 0.000 10.000 100.615 0.000 100.615
469 ### 0.000 0.000 0.000 0.000 10.000 0.000 0.000 0.000
470 ### 0.000 0.000 0.000 0.000 10.000 0.000 0.000 0.000
471 ### 0.000 0.000 0.000 0.000 10.000 0.000 0.000 0.000
472 ### 0.000 0.000 0.000 0.000 10.000 0.000 0.000 0.000
473 ### 0.000 0.000 0.000 0.000 10.000 0.000 0.000 0.000
474 ### 0.000 0.000 0.000 0.000 10.000 0.000 0.000 0.000
475 ### 0.000 0.000 0.000 0.000 10.000 0.000 0.000 0.000
476 ### 25.192 0.000 12.596 0.000 10.000 125.960 0.000 125.960
477 ### 17.102 0.000 21.147 0.000 10.000 211.470 0.000 211.470
478 ### 19.102 0.000 18.102 0.000 10.000 181.021 0.000 181.021
479 ### 21.134 0.000 20.118 0.000 10.000 201.181 0.000 201.181
480 ### 0.000 0.000 10.567 0.000 10.000 105.671 0.000 105.671
481 ### 25.192 0.000 12.596 0.000 10.000 125.960 0.000 125.960
482 ### 17.102 0.000 21.147 0.000 10.000 211.470 0.000 211.470

Submitted by: Checked by: Approved by:


41/101

Contractor : Sharma/United J/V, Kathmandu Interim Payment Certificate No. 9


Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.01 a), 3.01 b) & 3.03 Unit : m3
Roadway excavation including haulage and disposal at appropriate location, all complete as per specification
a) Common material (Hard soil/Gravel/BMS)
b) Hard rock excavation using breaker
Formation of embankment including compaction in layers not exceeding 150mm. Compacted depth, watering and haulage 10. etc all complete as per specification.
Road Area (m2) Road Volume (m3) Classified Volume (m3)
Cut Vol.

Common
S.N. Chainage M. Dist. Fill Vol. (BoQ material (Hard Hard Rock Remarks
Road Cut Road Fill Mean cut Mean Fill Cut Vol. Soil / excavation using
Item No. 3.03)
Gravel/BMS) breaker (BoQ
(BoQ Item No. Item No. 3.01 (b)
3.01 (a)

483 ### 19.102 0.000 18.102 0.000 10.000 181.020 0.000 181.020
484 ### 0.000 0.000
485 ### 11.241 0.000 5.621 0.000 10.000 56.205 0.000 56.205
486 ### 23.190 0.000 17.216 0.000 10.000 172.155 0.000 172.155
487 ### 27.102 0.000 25.146 0.000 10.000 251.460 0.000 251.460
488 ### 25.918 0.000 26.510 0.000 10.000 265.102 0.000 265.102
489 ### 9.203 0.000 17.561 0.000 10.000 175.608 0.000 175.608
490 ### 19.083 0.000 14.143 0.000 10.000 141.432 0.000 141.432
Total quantity upto date 145208.588 58788.808 59635.616 84834.136
Quantity Claim 145208.588 58788.808 59635.616 84834.136

Submitted by: Checked by: Approved by:


42/101

Sharma/United J/V
Kathmandu
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.02 & 3.04 Unit : m3
Earthwork excavation for road side drain and structure including haulage and disposal at approprate
location,all complete as per spicification.
Back filling with suitable materials in layers in structures including compaction and watering all complete.
Structure Earthwork Area (m2) Structure Volume (m3)
S.N. Chainage
Structure Structure
Distance Cut Vol.
Fill Vol. (BoQ Remarks
Mean cut Mean Fill (BoQ Item
Cut Fill Item No. 3.04)
No. 3.02)
1 8+000 1.260 0.420
2 8+010 1.260 0.420 1.260 0.420 10.00 12.600 4.200
3 8+020 1.260 0.420 1.260 0.420 10.00 12.600 4.200
4 8+030 1.260 0.420 1.260 0.420 10.00 12.600 4.200
5 8+040 1.260 0.420 1.260 0.420 10.00 12.600 4.200
6 8+050 17.892 4.816 9.580 2.620 10.00 95.800 26.200
7 8+060 20.194 5.973 19.050 5.400 10.00 190.500 54.000
8 8+070 25.301 8.796 22.750 7.390 10.00 227.500 73.900
9 8+080 1.260 0.420 13.290 4.610 10.00 132.900 46.100
10 8+090 1.260 0.420 1.260 0.420 10.00 12.600 4.200
11 8+100 0.000 0.000 0.630 0.210 10.00 6.300 2.100
12 8+110 0.000 0.000 0.000 0.000 10.00 0.000 0.000
13 8+120 0.000 0.000 0.000 0.000 10.00 0.000 0.000
14 8+130 0.000 0.000 0.000 0.000 10.00 0.000 0.000
15 8+140 0.000 0.000 0.000 0.000 10.00 0.000 0.000
16 8+150 0.000 0.000 0.000 0.000 10.00 0.000 0.000
17 8+160 0.000 0.000 0.000 0.000 10.00 0.000 0.000
18 8+170 0.000 0.000 0.000 0.000 10.00 0.000 0.000
19 8+180 0.000 0.000 0.000 0.000 10.00 0.000 0.000
20 8+190 0.000 0.000 0.000 0.000 10.00 0.000 0.000
21 8+200 0.201 0.201 0.110 0.110 10.00 1.100 1.100
22 8+210 1.260 0.420 0.740 0.320 10.00 7.400 3.200
23 8+220 36.568 7.127 18.920 3.780 10.00 189.200 37.800
24 8+230 1.260 0.420 18.920 3.780 10.00 189.200 37.800
25 8+240 2.460 0.693 1.870 0.560 10.00 18.700 5.600
26 8+250 3.856 1.688 3.160 1.190 10.00 31.600 11.900
27 8+260 3.873 1.689 3.870 1.690 10.00 38.700 16.900
28 8+270 3.875 1.688 3.880 1.690 10.00 38.800 16.900
29 8+280 1.260 0.420 2.570 1.060 10.00 25.700 10.600
30 8+290 1.260 0.420 1.260 0.420 10.00 12.600 4.200
31 8+300 1.260 0.420 1.260 0.420 10.00 12.600 4.200
32 8+310 1.260 0.420 1.260 0.420 10.00 12.600 4.200
33 8+320 1.260 0.420 1.260 0.420 10.00 12.600 4.200
34 8+330 1.260 0.420 1.260 0.420 10.00 12.600 4.200
35 8+340 1.260 0.420 1.260 0.420 10.00 12.600 4.200
36 8+350 1.260 0.420 1.260 0.420 10.00 12.600 4.200
37 8+360 1.260 0.420 1.260 0.420 10.00 12.600 4.200
38 8+370 1.260 0.420 1.260 0.420 10.00 12.600 4.200
39 8+380 1.260 0.420 1.260 0.420 10.00 12.600 4.200
40 8+390 1.260 0.420 1.260 0.420 10.00 12.600 4.200
41 8+400 1.260 0.420 1.260 0.420 10.00 12.600 4.200
42 8+410 1.260 0.420 1.260 0.420 10.00 12.600 4.200

Submitted by: Checked by: Approved by:


43/101
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.02 & 3.04 Unit : m3
Earthwork excavation for road side drain and structure including haulage and disposal at approprate
location,all complete as per spicification.
Back filling with suitable materials in layers in structures including compaction and watering all complete.
Structure Earthwork Area (m2) Structure Volume (m3)
S.N. Chainage Structure Structure
Distance Cut Vol.
Fill Vol. (BoQ Remarks
Mean cut Mean Fill (BoQ Item
Cut Fill Item No. 3.04)
No. 3.02)
43 8+420 1.260 0.420 1.260 0.420 10.00 12.600 4.200
44 8+430 5.784 1.959 3.530 1.190 10.00 35.300 11.900
45 8+440 1.652 0.664 3.720 1.320 10.00 37.200 13.200
46 8+450 1.260 0.420 1.460 0.550 10.00 14.600 5.500
47 8+460 33.051 4.556 17.160 2.490 10.00 171.600 24.900
48 8+470 32.061 6.498 32.560 5.530 10.00 325.600 55.300
49 8+480 1.260 0.420 16.670 3.460 10.00 166.700 34.600
50 8+490 1.260 0.420 1.260 0.420 10.00 12.600 4.200
51 8+500 1.260 0.420 1.260 0.420 10.00 12.600 4.200
52 8+510 0.482 0.207 0.880 0.320 10.00 8.800 3.200
53 8+520 1.260 0.420 0.880 0.320 10.00 8.800 3.200
54 8+530 1.260 0.420 1.260 0.420 10.00 12.600 4.200
55 8+540 1.260 0.420 1.260 0.420 10.00 12.600 4.200
56 8+550 1.260 0.420 1.260 0.420 10.00 12.600 4.200
57 8+560 1.260 0.420 1.260 0.420 10.00 12.600 4.200
58 8+570 1.958 0.263 1.610 0.350 10.00 16.100 3.500
59 8+580 0.000 0.000 0.980 0.140 10.00 9.800 1.400
60 8+590 0.000 0.000 0.000 0.000 10.00 0.000 0.000
61 8+600 0.000 0.000 0.000 0.000 10.00 0.000 0.000
62 8+610 0.000 0.000 0.000 0.000 10.00 0.000 0.000
63 8+620 0.532 0.208 0.270 0.110 10.00 2.700 1.100
64 8+630 0.739 0.210 0.640 0.210 10.00 6.400 2.100
65 8+640 0.000 0.000 0.370 0.110 10.00 3.700 1.100
66 8+650 0.000 0.000 0.000 0.000 10.00 0.000 0.000
67 8+660 0.000 0.000 0.000 0.000 10.00 0.000 0.000
68 8+670 0.000 0.000 0.000 0.000 10.00 0.000 0.000
69 8+680 0.000 0.000 0.000 0.000 10.00 0.000 0.000
70 8+690 0.088 0.039 0.050 0.020 10.00 0.500 0.200
71 8+700 0.723 0.244 0.410 0.150 10.00 4.100 1.500
72 8+710 0.056 0.032 0.390 0.140 10.00 3.900 1.400
73 8+720 0.331 0.110 0.200 0.080 10.00 2.000 0.800
74 8+730 1.260 0.420 0.800 0.270 10.00 8.000 2.700
75 8+740 1.260 0.420 1.260 0.420 10.00 12.600 4.200
76 8+750 4.321 1.603 2.800 1.020 10.00 28.000 10.200
77 8+760 4.321 1.603 4.330 1.610 10.00 43.300 16.100
78 8+770 4.321 1.603 4.330 1.610 10.00 43.300 16.100
79 8+780 4.321 1.603 4.330 1.610 10.00 43.300 16.100
80 8+790 4.321 1.603 4.330 1.610 10.00 43.300 16.100
81 8+800 45.013 6.647 24.670 4.130 10.00 246.700 41.300
82 8+810 50.079 7.118 47.550 6.890 10.00 475.500 68.900
83 8+820 4.321 1.603 27.210 4.370 10.00 272.100 43.700
84 8+830 4.321 1.603 4.330 1.610 10.00 43.300 16.100
85 8+840 4.321 1.603 4.330 1.610 10.00 43.300 16.100
86 8+850 4.321 1.603 4.330 1.610 10.00 43.300 16.100
87 8+860 4.321 1.603 4.330 1.610 10.00 43.300 16.100
88 8+870 4.321 1.603 4.330 1.610 10.00 43.300 16.100
89 8+880 1.260 0.420 2.800 1.020 10.00 28.000 10.200
90 8+890 1.260 0.420 1.260 0.420 10.00 12.600 4.200

Submitted by: Checked by: Approved by:


44/101
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
BoQ Item No.:- 3.02 & 3.04 Unit : m3
Earthwork excavation for road side drain and structure including haulage and disposal at approprate
location,all complete as per spicification.
Back filling with suitable materials in layers in structures including compaction and watering all complete.
Structure Earthwork Area (m2) Structure Volume (m3)
S.N. Chainage Structure Structure
Distance Cut Vol.
Fill Vol. (BoQ Remarks
Mean cut Mean Fill (BoQ Item
Cut Fill Item No. 3.04)
No. 3.02)
91 8+900 1.260 0.420 1.260 0.420 10.00 12.600 4.200
92 8+910 1.260 0.420 1.260 0.420 10.00 12.600 4.200
93 8+920 1.260 0.420 1.260 0.420 10.00 12.600 4.200
94 8+930 1.260 0.420 1.260 0.420 10.00 12.600 4.200
95 8+940 1.260 0.420 1.260 0.420 10.00 12.600 4.200
96 8+950 1.260 0.420 1.260 0.420 10.00 12.600 4.200
97 8+960 1.260 0.420 1.260 0.420 10.00 12.600 4.200
98 8+970 1.260 0.420 1.260 0.420 10.00 12.600 4.200
99 8+980 1.260 0.420 1.260 0.420 10.00 12.600 4.200
100 8+990 1.260 0.420 1.260 0.420 10.00 12.600 4.200
101 9+000 1.260 0.420 1.260 0.420 10.00 12.600 4.200
102 9+010 1.260 0.420 1.260 0.420 10.00 12.600 4.200
103 9+020 1.260 0.420 1.260 0.420 10.00 12.600 4.200
104 9+030 1.260 0.420 1.260 0.420 10.00 12.600 4.200
105 9+040 1.260 0.420 1.260 0.420 10.00 12.600 4.200
106 9+050 1.260 0.420 1.260 0.420 10.00 12.600 4.200
107 9+060 1.260 0.420 1.260 0.420 10.00 12.600 4.200
108 9+070 1.260 0.420 1.260 0.420 10.00 12.600 4.200
109 9+080 1.260 0.420 1.260 0.420 10.00 12.600 4.200
110 9+090 1.260 0.420 1.260 0.420 10.00 12.600 4.200
111 9+100 1.260 0.420 1.260 0.420 10.00 12.600 4.200
112 9+110 1.260 0.420 1.260 0.420 10.00 12.600 4.200
113 9+120 1.260 0.420 1.260 0.420 10.00 12.600 4.200
114 9+130 1.260 0.420 1.260 0.420 10.00 12.600 4.200
115 9+140 1.260 0.420 1.260 0.420 10.00 12.600 4.200
116 9+150 1.260 0.420 1.260 0.420 10.00 12.600 4.200
117 9+160 1.260 0.420 1.260 0.420 10.00 12.600 4.200
118 9+170 1.260 0.420 1.260 0.420 10.00 12.600 4.200
119 9+180 1.260 0.420 1.260 0.420 10.00 12.600 4.200
120 9+190 1.260 0.420 1.260 0.420 10.00 12.600 4.200
121 9+200 1.260 0.420 1.260 0.420 10.00 12.600 4.200
122 9+210 1.260 0.420 1.260 0.420 10.00 12.600 4.200
123 9+220 52.398 6.499 26.830 3.460 10.00 268.300 34.600
124 9+230 42.671 5.317 47.540 5.910 10.00 475.400 59.100
125 9+240 10.417 2.725 26.550 4.030 10.00 265.500 40.300
126 9+250 10.801 2.961 10.610 2.850 10.00 106.100 28.500
127 9+260 10.801 2.961 10.810 2.970 10.00 108.100 29.700
128 9+270 3.524 1.354 7.170 2.160 10.00 71.700 21.600
129 9+280 3.524 1.354 3.530 1.360 10.00 35.300 13.600
130 9+290 3.524 1.354 3.530 1.360 10.00 35.300 13.600
131 9+300 3.384 1.354 3.460 1.360 10.00 34.600 13.600
132 9+310 3.384 1.354 3.390 1.360 10.00 33.900 13.600
133 9+320 3.384 1.354 3.390 1.360 10.00 33.900 13.600
134 9+330 3.524 1.354 3.460 1.360 10.00 34.600 13.600
135 9+340 3.524 1.354 3.530 1.360 10.00 35.300 13.600
136 9+350 3.524 1.354 3.530 1.360 10.00 35.300 13.600
137 9+360 1.770 0.680 10.00 17.700 6.800
Quantity Claim 5793.600 1408.100

Submitted by: Checked by: Approved by:


45/101

Sharma/United J/V
Kathmandu

Detailed Measurement Sheet

Sub-Contractor :Omkareshwor Construction PVT. LTD

Item No. 4.01 Unit : m3


Supply and assemble of machin made mechanically salvaged gabion and mattresses from double twisted heavy coated GI
wire of hexagonal mesh size 100mm * 120mm with mesh size 3mm, salvaged wire 3.9mm, lacing wire 2.4mm and stone
filling in gabions including transport and fixing of gabions in position all complete.
SN Chainage No. Length Breadth Height Quantity Remarks
From IPC-09
RHS
1 8+181.00 8+226.00
First Layer 21 2 1 1 42 Adding two
2 1.5 1 1 3 layers
Second Layer 45 1.5 1 1 67.5
2 8+470.00 8+505.50
Adding one
First Layer 17 2 1 1 34
layer
1 1.5 1 1 1.5
3 8+628.70 8+645.70
Third Layer 8 2 1 1 16
Second Layer 17 1.5 1 1 25.5
First Layer 17 2 1 1 34
4 8+649.70 8+664.70
Third Layer 6 2 1 1 12
2 1.5 1 1 3
Second Layer 15 1.5 1 1 22.5
First Layer 15 2 1 1 30
5 8+678.70 8+699.70 Adding one
Top Layer 21 1 1 1 21 layers
6 9+229.00 9+239.50
Third Layer 5 2 1 1 10
Second Layer 7 1.5 1 1 10.5
First Layer 9 2 1 1 18
2 1.5 1 1 3
7 10+100.00 10+112.00
Fourth Layer 4 3 1 1 12
Third Layer 8 1.5 1 1 12
Second Layer 12 2 1 1 24
First Layer 12 3 1 1 36
8 10+668.00 10+688.00
First Layer 6 3 1 1 18
1 2 1 1 2 Adding two
Second Layer 20 1.5 1 1 30 layers
LHS
9 8+203.00

Submitted by: Checked by: Approved by:


46/101

Sharma/United J/V
Kathmandu

Detailed Measurement Sheet

Sub-Contractor :Omkareshwor Construction PVT. LTD

Item No. 4.01 Unit : m3


Supply and assemble of machin made mechanically salvaged gabion and mattresses from double twisted heavy coated GI
wire of hexagonal mesh size 100mm * 120mm with mesh size 3mm, salvaged wire 3.9mm, lacing wire 2.4mm and stone
filling in gabions including transport and fixing of gabions in position all complete.
SN Chainage No. Length Breadth Height Quantity Remarks
For water
First Layer 6 1.5 1 1 9 Drop
10 9+229.00 9+269.00
Fourth Layer 24 1.5 1 1 36
2 2 1 1 4
Third Layer 40 1.5 1 1 60
Second Layer 40 2 1 1 80
First Layer 40 2.5 1 1 100
11 9+792.90 9+828.90
Fourth Layer 12 2 1 1 24
1 3 1 1 3
5 1.5 1 1 7.5
Third Layer 36 1.5 1 1 54
Second Layer 36 2 1 1 72
First Layer 36 2 1 1 72
12 9+828.90 9+838.90
Fourth Layer 7 1.5 1 1 10.5
Third Layer 10 1.5 1 1 15
Second Layer 10 2 1 1 20
First Layer 5 2 1 1 10
13 9+838.90 9+844.90
Fourth Layer 4 1.5 1 1 6
Third Layer 6 1.5 1 1 9
Second Layer
Plumb Done
First Layer
14 9+844.90 9+873.90
Fourth Layer 19 1.5 1 1 28.5
Third Layer 29 1.5 1 1 43.5
Second Layer 29 2 1 1 58
First Layer 29 2 1 1 58
15 9+873.90 9+882.90
Fourth Layer 6 1.5 1 1 9
Third Layer 9 1.5 1 1 13.5
Second Layer 9 2 1 1 18
First Layer 9 2 1 1 18
16 11+170.00 11+182.00
Fourth Layer 3 3 1 1 9
Third Layer 7 1.5 1 1 10.5
Submitted by: Checked by: Approved by:
47/101

Sharma/United J/V
Kathmandu

Detailed Measurement Sheet

Sub-Contractor :Omkareshwor Construction PVT. LTD

Item No. 4.01 Unit : m3


Supply and assemble of machin made mechanically salvaged gabion and mattresses from double twisted heavy coated GI
wire of hexagonal mesh size 100mm * 120mm with mesh size 3mm, salvaged wire 3.9mm, lacing wire 2.4mm and stone
filling in gabions including transport and fixing of gabions in position all complete.
SN Chainage No. Length Breadth Height Quantity Remarks
Second Layer 11 2 1 1 22
First Layer 12 3 1 1 36
Total Quantity 1403.50
Quantity Claim 1403.50

Submitted by: Checked by: Approved by:


48/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 4.02 Unit : m3
Providing and laying random rubble masonry in MM 5 in C/M including pointing and 100mm dia PVC pipe for weep hole
Chainage Breadth Height
SN No. Length Quantity Remarks
Start End Bottom Top Mean h1 h2 Mean
1 8+226.00 8+234.40 1 8.4 1.18 0.5 0.8375 2.2 2.5 2.35 16.53
2 8+234.40 8244.4 1 10 1.13 0.5 0.8125 2 2.5 2.25 18.28
3 8+244.40 8248.05 1 3.65 1.13 0.5 0.8125 2 2.5 2.25 6.67
4 Partition Wall 1 2.3 0.80 0.6 0.7 1 1 1 1.61 For Water Jump

5 At 8+783.90 Staircase
steps 5 1.2 0.32 0.32 0.32 0.25 0.25 0.25 0.48
6 8+783.90 8+793.90 1 10 0.9 0.4 0.65 2.5 2.5 2.5 16.25
7 8+793.90 8+803.90 1 10 0.9 0.4 0.65 2.5 2.5 2.5 16.25
8 8+803.90 8+813.90 1 10 0.9 0.4 0.65 2.5 2.5 2.5 16.25
9 8+813.90 8+821.50 1 7.6 0.9 0.4 0.65 2.5 2.5 2.5 12.35
10 8+821.50 8+824.80 1 3.3 0.7 0.4 0.55 1.3 1.1 1.2 2.18
11 8+824.80 8+834.80 1 10.00 0.9 0.4 0.65 2.5 2.5 2.5 16.25
12 8+834.80 8+844.80 1 10.00 0.9 0.4 0.65 1.1 2.5 1.8 11.7
13 8+844.80 8+854.80 1 10.00 0.7 0.4 0.55 2 2 2 11
14 8+854.80 8+864.80 1 10.00 0.7 0.4 0.55 2 2 2 11
15 8+864.80 8+867.70 1 2.9 0.9 0.4 0.65 2.5 2.5 2.5 4.71
16 8+867.70 8+870.70 1 3.00 0.9 0.4 0.65 1.1 2.5 1.8 3.51
17 9+292.80 9+300.00 1 6.20 0.7 0.4 0.55 2 2 2 6.82
18 9+300.00 9+310.00 1 10.00 0.7 0.4 0.55 2 2 2 11
19 9+310.00 9+320.00 1 10.00 0.7 0.4 0.55 2 2 2 11
20 9+320.00 9+330.00 1 10.00 0.7 0.4 0.55 2 2 2 11
21 9+330.00 9+340.00 1 10.00 0.7 0.4 0.55 2 2 2 11
22 9+340.00 9+350.00 1 10.00 0.7 0.4 0.55 2 2 2 11
23 9+350.00 9+360.00 1 10.00 0.7 0.4 0.55 2 2 2 11
24 9+360.00 9+370.00 1 10.00 0.7 0.4 0.55 2 2 2 11
25 9+370.00 9+380.00 1 10.00 0.7 0.4 0.55 2 2 2 11
26 9+380.00 9+390.00 1 10.00 0.7 0.4 0.55 2 2 2 11
27 9+390.00 9+400.00 1 10.00 0.7 0.4 0.55 2 2 2 11
26 9+517.00 9+527.00 1 10.00 0.88 0.4 0.64 2.5 2.5 2.5 16
27 9+527.00 9+537.00 1 10.00 0.88 0.4 0.64 2.5 2.5 2.5 16 LHS
28 9+537.00 9+547.00 1 10.00 0.88 0.4 0.64 2.5 2.5 2.5 16
29 9+547.00 9+557.40 1 10.40 0.88 0.4 0.64 2.5 2.5 2.5 16.64
30 9+557.40 9+565.80 1 8.40 0.88 0.4 0.64 2.5 1.5 2 10.75
31 9+680.88 9+686.00 1 5.12 0.96 0.4 0.68125 1.7 3.5 2.6 9.07
27 9+686.00 9+696.00 1 10.00 1.3 0.4 0.85 3.5 3.5 3.5 29.75
28 9+696.00 9+706.00 1 10.00 1.3 0.4 0.85 3.5 3.5 3.5 29.75
27 9+706.00 9+716.00 1 10.00 1.3 0.4 0.85 3.5 3.5 3.5 29.75
28 9+716.00 9+726.00 1 10.00 1.3 0.4 0.85 3.5 3.5 3.5 29.75
29 9+726.00 9+736.00 1 10.00 1.3 0.4 0.85 3.5 3.5 3.5 29.75
30 9+736.00 9+746.00 1 10.00 1.3 0.4 0.85 3.5 3.5 3.5 29.75
31 9+746.00 9+756.00 1 10.00 1.3 0.4 0.85 3.5 3.5 3.5 29.75
32 9+756.00 9+767.00 1 11.00 1.3 0.4 0.85 3.5 3.5 3.5 32.73
33 10+000.50 10+003.10 1 2.6 0.6 0.4 0.5 1.3 1.3 1.3 1.69
34 10+277.80 10+288.00 1 10.2 0.7 0.4 0.55 1.6 1.6 1.6 8.98

Submitted by: Checked by: Approved by:


49/101
LHS

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 4.02 Unit : m3
Providing and laying random rubble masonry in MM 5 in C/M including pointing and 100mm dia PVC pipe for weep hole
Chainage Breadth Height
SN No. Length Quantity Remarks
Start End Bottom Top Mean h1 h2 Mean
35 10+288.00 10+298.00 1 10 0.9 0.4 0.65 2.2 2.2 2.2 14.3
36 10+298.00 10+308.00 1 10 0.9 0.4 0.65 2.2 2.2 2.2 14.3
37 10+308.00 10+318.00 1 10 0.9 0.4 0.65 2.2 2.2 2.2 14.3
38 10+318.00 10+328.00 1 10 0.9 0.4 0.65 2.2 2.2 2.2 14.3
38 10+328.00 10+338.00 1 10 0.9 0.4 0.65 2.2 2.2 2.2 14.3
39 10+338.00 10+348.30 1 10.3 0.9 0.4 0.65 2.2 0.6 1.4 9.37
39 10+362.00 10+364.20 1 2.2 0.7 0.4 0.55 1.7 0.6 1.15 1.39
40 10+364.20 10+372.00 1 7.8 0.7 0.4 0.55 1.7 1.7 1.7 7.29
41 10+372.00 10+373.90 1 1.9 0.7 0.4 0.55 1.7 0.6 1.15 1.2

42 At 11+140 Staircase
steps 6 1.5 0.5 0.5 0.5 0.3 0.3 0.3 1.35
43 8+420.00 8+432.50 1 12.5 2.1 0.5 1.3 4.2 4.2 4.2 68.25
44 8+587.50 8+600.00 1 12.5 1.25 0.5 0.875 2.5 2.5 2.5 27.34
45 10+621.00 10+632.20 1 6 2.05 0.5 1.275 4.1 4.1 4.1 31.37
1 5.2 1.3 0.5 0.9 2.6 2.6 2.6 12.17
Quantity Claim 849.18

Submitted by: Checked by: Approved by:


50/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 4.03 Unit : m2
Providing preparing and installing formwork including necessary supports and removing after completion of works all
complete.
SN Chainage No. Length Breadth Height Quantity Remarks
BELOW RRM
1 8+234.40 8248.05 2 13.65 1.00 0.1 2.93
2 10+521.30 10+528.10 2 6.8 1.55 0.1 1.67
3 10+528.10 10+537.40 2 9.3 2.50 0.1 2.36
4 10+537.40 10+543.70 2 6.3 1.55 0.1 1.57
5 8+420.00 8+432.50 2 12.5 2.1 0.1 2.92
6 8+587.50 8+600.00 2 12.5 1.25 0.1 2.75 RHS
7 10+621.00 10+632.20 2 11.2 2.1 0.1 2.66
PLUMB
1 9+804.00 9+815.00 Below Gabion
Fourth Layer 1 11 1 0.875 10.5
2 9+815.00 9+821.00 Below Gabion
Third Layer 1 6 0.9 0.875 6.04
Fourth Layer 1 6 0.775 0.825 5.59
3 10+621.00 10+633.00 2 12 2 1.1 30.8 Below RRM
Total quantity 69.79
Quantity Claim 69.79
Withheld 69.79

Submitted by: Checked by: Approved by:


51/101
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 4.04 Unit : m3
Providing and placing cement concrete for foundation and footing etc including compection, curing and testing.
a) M 15/40
Chainage Breadth
SN No. Length Height Quantity Remarks
Start End b1 b2 Mean
BELOW RRM
1 8+234.40 8248.05 1 13.65 1.1 1.25 1.175 0.1 1.604
2 10+521.30 10+528.10 1 6.8 1.55 2.5 2.025 0.1 1.377
Jharna
3 10+528.10 10+537.40 1 9.3 2.5 2.5 2.5 0.1 2.325
Protection
4 10+537.40 10+543.70 1 6.3 1.55 2.5 2.025 0.1 1.276
5 8+420.00 8+432.50 1 12.5 2.1 2.1 2.1 0.1 2.625
6 8+587.50 8+600.00 1 12.5 1.25 1.25 1.25 0.1 1.563 RHS
7 10+621.00 10+632.20 1 11.2 2.05 1.3 1.675 0.1 1.876
Total Quantity 12.65

Submitted by: Checked by: Approved by:


Government of Nepal 52/101
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 4.06 Unit : m3
Providing and laying dry stone soling in foundation
Chainage Breadth
SN No Length Height Quantity Remarks
Start End b1 b2 Mean
BELOW RRM(LHS)
1 8+226.00 8+234.40 1 8.4 1.1 1.25 1.175 0.1 0.99
2 8+234.40 8248.05 1 13.65 1 1.25 1.125 0.1 1.54
3 Partition Wall 1 2.3 0.8 0.8 0.8 0.1 0.18 For Water Jump
4 8+783.90 8+821.50 1 37.6 0.9 0.9 0.9 0.1 3.38
5 8+821.50 8+824.80 1 3.3 0.7 0.7 0.7 0.1 0.23
6 8+824.80 8+869.30 1 44.5 0.9 0.9 0.9 0.1 4.01
7 8+869.30 8+872.30 1 3 0.9 0.9 0.9 0.1 0.27
8 9+300.00 9+330.00 1 30.00 0.7 0.7 0.7 0.1 2.1
9 9+330.00 9+360.00 1 30.00 0.7 0.7 0.7 0.1 2.1
10 9+360.00 9+400.00 1 40.00 0.7 0.7 0.7 0.1 2.8
11 9+517.00 9+547.00 1 30.00 0.88 0.88 0.88 0.1 2.64
12 9+547.00 9+557.40 1 10.40 0.88 0.88 0.88 0.1 0.92
13 9+557.40 9+565.80 1 8.40 0.88 0.88 0.88 0.1 0.74
14 9+680.88 9+686.00 1 5.12 0.963 0.963 0.96 0.1 0.49
15 9+686.00 9+767.00 1 81.00 1.3 1.3 1.3 0.1 10.53
16 10+000.50 10+003.10 1 2.6 0.7 0.7 0.7 0.1 0.18
17 10+277.80 10+288.00 1 10.2 0.7 0.7 0.7 0.1 0.71
18 10+288.00 10+344.60 1 56.6 0.9 0.9 0.9 0.1 5.09
19 10+344.60 10+348.30 1 3.7 0.9 0.9 0.9 0.1 0.33
20 10+362.00 10+364.20 1 2.2 0.7 0.7 0.7 0.1 0.15
21 10+364.20 10+372.00 1 7.8 0.7 0.7 0.7 0.1 0.55
22 10+372.00 10+373.90 1 1.9 0.7 0.7 0.7 0.1 0.13
23 10+521.30 10+528.10 1 6.8 2.5 2.5 2.5 0.1 1.7
Jharna
24 10+528.10 10+537.40 1 9.3 2.5 2.5 2.5 0.1 2.32
Protection
25 10+537.40 10+543.70 1 6.3 2.5 2.5 2.5 0.1 1.58
26 8+420.00 8+432.50 1 12.5 2.1 2.1 2.1 0.1 2.63
27 8+587.50 8+600.00 1 12.5 1.25 1.25 1.25 0.1 1.56 RHS
28 10+621.00 10+632.20 1 11.2 2.1 2.1 2.1 0.1 2.35
Plumb
1 9+804.00 9+815.00 Below Gabion
Fourth Layer 1 11 1 1 1 0.1 1.1
2 9+815.00 9+821.00 Below Gabion
Fourth Layer 1 6 0.75 0.8 0.775 0.1 0.47
3 10+621.00 10+633.00 2 12 1.9 2.1 2 0.1 4.8
Current Quantity Claim 58.57

Submitted by: Checked by: Approved by:


53/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 4.07 Unit : m2
Providing , laying and fixing geo-textile (filter fabric)
S.No. Chainage No. Length Breadth Height Quantity Remarks
Tieing in Pvc pipe on weep hole at stone masonry
1 8+050.00 8+065.00 60 0.3 0.3 5.4
1 8+226.00 8+234.40 8 0.3 0.3 0.72
2 8+234.40 8248.05 10 0.3 0.3 0.9
4 8+783.90 8+821.50 60 0.3 0.3 5.4
5 8+821.50 8+824.80 4 0.3 0.3 0.36
6 8+824.80 8+869.30 50 0.3 0.3 4.5
7 8+869.30 8+872.30 3 0.3 0.3 0.27
8 9+300.00 9+330.00 30 0.3 0.3 2.7
9 9+330.00 9+360.00 30 0.3 0.3 2.7
10 9+360.00 9+400.00 40 0.3 0.3 3.6
11 9+517.00 9+547.00 30 0.3 0.3 2.7
12 9+547.00 9+557.40 10 0.3 0.3 0.9
LHS
13 9+557.40 9+565.80 8 0.3 0.3 0.72
14 9+680.88 9+686.00 2 0.3 0.3 0.18
15 9+686.00 9+767.00 120 0.3 0.3 10.8
17 10+277.80 10+288.00 10 0.3 0.3 0.9
18 10+288.00 10+344.60 60 0.3 0.3 5.4
19 10+344.60 10+348.30 4 0.3 0.3 0.36
20 10+362.00 10+364.20 2 0.3 0.3 0.18
21 10+364.20 10+372.00 10 0.3 0.3 0.9
22 10+372.00 10+373.90 2 0.3 0.3 0.18
23 10+521.30 10+528.10 9 0.3 0.3 0.81
24 10+528.10 10+537.40 10 0.3 0.3 0.9
25 10+537.40 10+543.70 10 0.3 0.3 0.9
26 8+050.00 8+065.00 60 0.3 0.3 5.4
27 8+420.00 8+432.50 20 0.3 0.3 1.8
RHS
28 8+587.50 8+600.00 20 0.3 0.3 1.8
29 10+621.00 10+632.20 10 0.3 0.3 0.9
Laying at inner side of gabion walls
RHS
Adding two
1 8+181.00 8+226.00 1 45 2.2 99
layers
For water
8+203.00
2 1 9 1.1 Drop
Adding one
3 8+470.00 8+505.50 1 35.5 1.1 39.05
layer
4 8+628.70 8+645.70 1 17 3.2 54.4
5 8+649.70 8+664.70 1 15 3.2 48
Adding two
8+678.70 8+701.70 layers
6 1 23 2.1 48.3
7 9+767.00 9+804.00 1 37 4.2 155.4

Submitted by: Checked by: Approved by:


54/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 4.07 Unit : m2
Providing , laying and fixing geo-textile (filter fabric)
S.No. Chainage No. Length Breadth Height Quantity Remarks
8 9+804.00 9+815.00 1 11 4.2 46.2
9 9+815.00 9+821.00 1 6 4.2 25.2
10 9+821.00 9+850.00 1 29 4.2 121.8
11 9+229.00 9+239.50 1 10.5 3.2 33.6
12 10+100.00 10+112.00 1 12 4.2 50.4

10+668.00 10+688.00 Adding two


13 1 20 2.2 44 layers
LHS
14 9+229.00 9+269.00 1 40 4.2 168
15 11+170.00 11+182.00 1 12 4.2 50.4
Total Quantity 1046.03
Quantity Claim 496.05
Withheld 549.98

Submitted by: Checked by: Approved by:


55/101

Sharma/United J/V
Kathmandu

Detailed Measurement Sheet


Sub-Contractor :Omkareshwor Construction PVT. LTD

Item No. 4.08 Unit : m3


Providing and placing plum concrete with 60% M15/40 concrete and 40% boulders/stones as per specification using concrete mixer and
vibrator
Chainage Breadth Height
SN No Length Quantity Remarks
Start End b1 b2 Mean h1 h2 Mean
From IPC-09
1 9+804.00 9+815.00 Below Gabion
First Layer 1 11 1 1 1 0.75 1 0.875 9.63
2 9+815.00 9+821.00 Below Gabion
Second Layer 1 6 1 0.8 0.9 0.75 1 0.875 4.73
First Layer 1 6 0.75 0.8 0.775 0.75 0.9 0.825 3.84
3 10+621.00 10+633.00 1 6 1.9 2.1 2 1.1 1.1 1.1 13.2 Below RRM
From IPC-10
1 8+040.00 8+061.00 1 21.00 3.1 3.1 3.1 2 2 2 130.2 Below RRM (turning)
Total Quantity 161.60
Quantity Claim 161.60

Submitted by: Checked by: Approved by:


56/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.01 Unit : m3

Providing and assembling of machine made Heavy Zinc Coated gabion crate (Mesh wire 3mm, selvage Wire 3.9mm, binding
wire 2.4mm and mesh size 100*120mm, hexagonal), placing in poisition including stretching,forming compartments, tying
with bracing wires and tie wires; tying down the lid complete and providing and filling stone / boulders in gabion
boxes/matresses etc. including dressing,binding, bonding and all transportation as per specification all complete.

SN Chainage No. Length Breadth Height Quantity Remarks


Downstream
1 8+458.00 8+470.00 Cascade
Fourth Layer 1 3 1 1 3
2 2 1 1 4
2 1.5 1 1 3
2 1 1 1 2
Third Layer 4 2 1 1 8
3 1.5 1 1 4.5
Second Layer 8 3 1 1 24
1 2 1 1 2
2 1.5 1 1 3
First Layer 8 3 1 1 24
4 2 1 1 8
2 8+817.45 8+821.45 Cascade
Second Layer 2 2 1 1 4
First Layer 2 3 1 1 6
2 1.5 1 1 3
1 2 1 1 2
3 10+365.80 10+370.00 Cascade
Locking Gabion
Third Layer 2 2 1 1 4
Second Layer 4 1.5 1 1 6
First Layer 4 2 1 1 8

4 10+865.70 10+870.00 Cascade


Third Layer 2 3 1 1 6
Second Layer 2 3 1 1 6
3 2 1 1 6
2 1.5 1 1 3
First Layer 4 3 1 1 12
3 2 1 1 6
Upstream
5 9+223.20 9+229.00 Cascade
Fifth Layer 3 2 1 1 6
1 1.5 1 1 1.5
Fourth Layer 10 2 1 1 20
7 1.5 1 1 10.5
Third Layer 20 1.5 1 1 30
Second Layer 7 2 1 1 14
9 2 1 1 18

Submitted by: Checked by: Approved by:


57/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.01 Unit : m3

Providing and assembling of machine made Heavy Zinc Coated gabion crate (Mesh wire 3mm, selvage Wire 3.9mm, binding
wire 2.4mm and mesh size 100*120mm, hexagonal), placing in poisition including stretching,forming compartments, tying
with bracing wires and tie wires; tying down the lid complete and providing and filling stone / boulders in gabion
boxes/matresses etc. including dressing,binding, bonding and all transportation as per specification all complete.

SN Chainage No. Length Breadth Height Quantity Remarks


First Layer 15 2 1 1 30
5 1.5 1 1 7.5
6 10+365.80 10+370.00 Cascade
Third Layer 1 3 1 1 3
1 2 1 1 2
1 1.5 1 1 1.5
Second Layer 1 3 1 1 3
3 2 1 1 6
1 1.5 1 1 1.5
First Layer 2 3 1 1 6
1 2 1 1 2
2 1.5 1 1 3
Current Quantity Claim 323.00

Submitted by: Checked by: Approved by:


Page 58 of 101
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.02 Unit : m3
Providing and laying random rubble masonry in MM 7.5 in C/M including pointing and 100mm dia PVC pipe for weep hole.
Chainage Breadth Height
SN No. Length Quantity Remarks
Start End Bottom Top Mean h1 h2 Mean
1 8+217.50 8+226.00 Pipe culvert
wing wall 1 1.8 1.8 0.5 1.15 3.6 3.6 3.6 7.45
1 2.2 1.375 0.5 0.9375 2.75 2.75 2.75 5.67
LHS wall 1 7 2.5 0.5 1.5 5 5 5 52.5
1 1.9 0.9 0.5 0.7 1.8 1.8 1.8 2.39
Head Wall 1 8.9 0.5 0.5 0.5 0.5 0.5 0.5 2.23
RHS wall 1 11.6 1 0.5 0.75 1.75 1.75 1.75 15.23
Head Wall 1 11.6 0.5 0.5 0.5 0.5 0.5 0.5 2.9
Deduction for hume
pipe -1 O.Dia= 1.1 1.7 1.7 1.7 -1.61
2 8+248.05 8+258.05 1 10.00 0.5 0.375 0.4375 0.5 0.5 0.5 2.19 Drain wall
3 8+248.05 8+258.05 1 10.00 0.5 0.4 0.45 1.5 1.5 1.5 6.75 Drain wall
4 8+258.05 8+268.05 1 10.00 0.5 0.375 0.4375 0.5 0.5 0.5 2.19 Drain wall
5 8+258.05 8+268.05 1 10.00 0.5 0.4 0.45 1.5 1.5 1.5 6.75 Drain wall
6 8+268.05 8+278.05 1 10.00 0.5 0.375 0.4375 0.5 0.5 0.5 2.19 Drain wall
7 8+268.05 8+278.05 1 10.00 0.5 0.4 0.45 1.5 1.5 1.5 6.75 Drain wall
8 8+278.05 8+283.05 1 5.00 0.5 0.375 0.4375 0.5 0.5 0.5 1.09 Drain wall
9 8+278.05 8+283.05 1 5.00 0.5 0.4 0.45 1.5 1.5 1.5 3.38 Drain wall
10 8+465.60 8+470.00 Pipe culvert
wing wall 1 8.8 1.35 0.5 0.925 2.7 2.7 2.7 21.98
1 7.6 1.35 0.5 0.925 2.7 2.7 2.7 18.98
1 6 1.35 0.5 0.925 2.7 2.7 2.7 14.99
LHS wall 1 4.4 1.35 0.5 0.925 2.7 2.7 2.7 10.99
Head Wall 1 4.4 0.5 0.5 0.5 0.5 0.5 0.5 1.1
RHS wall 1 9 2.2 0.5 1.35 4.4 4.4 4.4 53.46
1 2.9 1 0.5 0.75 2 2 2 4.35
Head Wall 1 12 0.5 0.5 0.5 0.5 0.5 0.5 3
Cascade RHS 1 2 0.9 0.6 0.75 1 1 1 1.5
1 0.8 0.6 0.3 0.45 1 1 1 0.36
1 1 0.6 0 0.3 1 1 1 0.3
1 2 0.5 0.5 0.5 1 1 1 1
Deduction for hume
pipe -2 O.Dia= 1.1 1.2 1.5 1.35 -2.56
11 8+779.85 8+789.85 1 10 0.5 0.375 0.4375 0.5 0.5 0.5 2.19 Drain wall
12 8+789.85 8+799.85 1 10 0.5 0.375 0.4375 0.5 0.5 0.5 2.19 Drain wall
13 8+799.85 8+809.85 1 10 0.5 0.375 0.4375 0.5 0.5 0.5 2.19 Drain wall
14 8+809.85 8+817.45 1 7.6 0.5 0.375 0.4375 0.5 0.5 0.5 1.66 Drain wall
15 8+817.45 8+821.45 0 0 Pipe culvert
wing wall 1 4 1.65 0.5 1.075 3.3 3.3 3.3 14.19
1 1.8 1.65 0.5 1.075 3.3 3.3 3.3 6.39
1 1.8 1.65 0.5 1.075 2.9 2.9 2.9 5.61
LHS wall 1 4 1.7 0.5 1.1 3.3 3.4 3.35 14.74
Head Wall 1 4 0.5 0.5 0.5 0.5 0.5 0.5 1
RHS wall 1 6.95 2.5 0.5 1.5 5 5 5 52.13
Head Wall 1 6.95 0.5 0.5 0.5 0.5 0.5 0.5 1.74
Cascade RHS 2 1 0.8 0.5 0.65 1 1 1 1.3
Deduction for hume
pipe -2 O.Dia= 1.1 1.4 1.5 1.45 -2.75

16 8+821.45 8+831.45 1 10 0.5 0.375 0.4375 0.5 0.5 0.5 2.19 Drain wall
17 8+831.45 8+835.95 1 4.5 0.5 0.375 0.4375 0.5 0.5 0.5 0.98 Drain wall
18 8+835.95 8+845.95 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
19 8+845.95 8+855.95 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
20 8+855.95 8+865.95 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
21 8+865.95 8+875.95 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall

Submitted by: Checked by: Approved by:


Page 59 of 101
Chainage Breadth Height
SN No. Length Quantity Remarks
Start End Bottom Top Mean h1 h2 Mean
22 8+875.95 8+887.65 1 11.7 0.4 0.25 0.325 0.5 0.5 0.5 1.9 Drain wall
23 8+887.65 8+897.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
24 8+897.65 8+907.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
25 8+907.65 8+917.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
26 8+917.65 8+927.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
27 8+927.65 8+937.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
28 8+937.65 8+947.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
29 8+947.65 8+957.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
30 8+957.65 8+967.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
31 8+967.65 8+977.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
32 8+977.65 8+987.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
33 8+987.65 8+997.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
34 8+997.65 9+007.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
35 9+007.65 9+017.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
36 9+017.65 9+027.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
37 9+027.65 9+037.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
38 9+037.65 9+047.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
39 9+047.65 9+057.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
40 9+057.65 9+067.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
41 9+067.65 9+077.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
42 9+077.65 9+087.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
43 9+087.65 9+097.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
44 9+097.65 9+107.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
45 9+107.65 9+117.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
46 9+117.65 9+127.65 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
47 9+222.65 9+229.00 Pipe culvert
Wing Wall 1 4.1 1.35 0.5 0.925 2.6 2.7 2.65 10.05
1 3.9 1.35 0.5 0.925 2.45 2.45 2.45 8.84
LHS wall 1 6.35 1.35 0.5 0.925 2.5 2.5 2.5 14.68
Head Wall 1 6.35 0.5 0.5 0.5 0.5 0.5 0.5 1.59
RHS wall 1 12.4 0.7 0.5 0.6 0.6 0.6 0.6 4.46
Head Wall 1 5.8 0.5 0.5 0.5 0.5 0.5 0.5 1.45
Deduction for hume
pipe -1 O.Dia= 1.1 1.2 1 1.1 -1.04
48 9+706.90 9+716.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
49 9+716.90 9+726.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
50 9+726.90 9+736.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
51 9+736.90 9+746.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
52 9+746.90 9+756.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
53 9+756.90 9+766.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
54 9+766.90 9+776.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
55 9+776.90 9+786.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
56 9+786.90 9+793.02 1 6.12 0.4 0.25 0.325 0.5 0.5 0.5 0.99 Drain wall
57 9+793.02 9+803.02 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
58 9+793.02 9+803.02 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
59 9+803.02 9+813.02 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
60 9+803.02 9+813.02 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
61 9+813.02 9+823.02 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
62 9+813.02 9+823.02 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
63 9+823.02 9+833.02 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
64 9+823.02 9+833.02 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
65 9+833.02 9+843.02 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
66 9+833.02 9+843.02 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
67 9+843.02 9+853.02 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
68 9+843.02 9+853.02 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
69 9+853.02 9+863.02 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
70 9+853.02 9+863.02 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
71 9+863.02 9+873.02 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
72 9+863.02 9+873.02 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
73 9+873.02 9+881.02 1 8 0.4 0.25 0.325 0.5 0.5 0.5 1.3 Drain wall
74 9+873.02 9+881.02 1 8 0.2 0.2 0.2 0.6 0.6 0.6 0.96 Drain wall
75 9+887.90 9+897.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
76 9+897.90 9+907.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
77 9+907.90 9+917.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
78 9+917.90 9+927.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall

Submitted by: Checked by: Approved by:


Page 60 of 101
Chainage Breadth Height
SN No. Length Quantity Remarks
Start End Bottom Top Mean h1 h2 Mean
79 9+927.90 9+937.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
80 9+937.90 9+947.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
81 9+947.90 9+957.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
82 9+957.90 9+967.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
83 9+967.90 9+977.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
84 9+977.90 9+987.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
85 9+987.90 9+997.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
86 9+997.90 10+007.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
87 10+007.90 10+017.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
88 10+017.90 10+027.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
89 10+027.90 10+037.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
90 10+037.90 10+047.90 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
91 10+047.90 10+057.90 1 10 0.5 0.375 0.4375 0.5 0.5 0.5 2.19 Drain wall
92 10+057.90 10+067.90 1 10 0.5 0.375 0.4375 0.5 0.5 0.5 2.19 Drain wall
93 10+067.90 10+077.90 1 10 0.5 0.375 0.4375 0.5 0.5 0.5 2.19 Drain wall
94 10+077.90 10+080.20 1 2.3 0.5 0.375 0.4375 0.5 0.5 0.5 0.5 Drain wall
95 10+080.20 10+086.00 Pipe culvert
wing wall 1 3.1 0.5 0.5 0.5 1.8 1.8 1.8 2.79
1 3.8 0.5 0.5 0.5 1.8 1.8 1.8 3.42
LHS wall 1 5.8 0.5 0.5 0.5 2.6 2.6 2.6 7.54
Head Wall 1 5.8 0.5 0.5 0.5 0.5 0.5 0.5 1.45
RHS wall 1 13.5 0.5 0.5 0.5 4.1 4 4.05 27.34
1 7.2 0.5 0.5 0.5 1.4 1.4 1.4 5.04
Head Wall 1 13.5 0.5 0.5 0.5 0.5 0.5 0.5 3.38
Deduction for hume
pipe -2 O.Dia= 1.1 1.2 1.5 1.35 -2.56
96 10+086.00 10+096.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
97 10+096.00 10+106.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
98 10+106.00 10+116.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
99 10+116.00 10+126.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
100 10+126.00 10+136.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
101 10+136.00 10+146.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
102 10+146.00 10+156.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
103 10+156.00 10+166.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
104 10+166.00 10+176.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
105 10+176.00 10+186.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
106 10+186.00 10+196.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
107 10+196.00 10+206.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
108 10+206.00 10+216.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
109 10+216.00 10+226.00 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
110 10+226.00 10+236.50 1 10.5 0.4 0.25 0.325 0.5 0.5 0.5 1.71 Drain wall
111 10+236.50 10+246.50 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
112 10+236.50 10+246.50 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
113 10+246.50 10+256.50 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
114 10+246.50 10+256.50 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
115 10+256.50 10+266.50 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
116 10+256.50 10+266.50 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
117 10+266.50 10+276.50 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
118 10+266.50 10+276.50 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
119 10+276.50 10+277.80 1 1.3 0.4 0.25 0.325 0.5 0.5 0.5 0.21 Drain wall
120 10+276.50 10+277.80 1 1.3 0.2 0.2 0.2 0.6 0.6 0.6 0.16 Drain wall
121 10+277.80 10+287.80 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
122 10+287.80 10+297.80 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
123 10+297.80 10+307.80 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
124 10+307.80 10+317.80 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
125 10+317.80 10+327.80 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
126 10+327.80 10+337.80 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
127 10+337.80 10+348.30 1 10.5 0.4 0.25 0.325 0.5 0.5 0.5 1.71 Drain wall
128 10+348.30 10+358.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
129 10+348.30 10+358.30 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
130 10+358.30 10+362.00 1 3.7 0.4 0.25 0.325 0.5 0.5 0.5 0.6 Drain wall
131 10+358.30 10+362.00 1 3.7 0.2 0.2 0.2 0.6 0.6 0.6 0.44 Drain wall
130 10+362.00 10+373.90 1 11.9 0.4 0.25 0.325 0.5 0.5 0.5 1.93 Drain wall
131 10+373.90 10+385.80 1 11.9 0.4 0.25 0.325 0.5 0.5 0.5 1.93 Drain wall
132 10+373.90 10+385.80 1 11.9 0.2 0.2 0.2 0.6 0.6 0.6 1.43 Drain wall

Submitted by: Checked by: Approved by:


Page 61 of 101
Chainage Breadth Height
SN No. Length Quantity Remarks
Start End Bottom Top Mean h1 h2 Mean
133 10+385.80 10+390.00 0 0
wing wall 1 3.3 0.5 0.5 0.5 2.7 2.7 2.7 4.46
1 2.9 0.5 0.5 0.5 2.7 2.7 2.7 3.92
1 5.2 0.5 0.5 0.5 2.7 2.7 2.7 7.02
LHS wall 1 4.2 0.5 0.5 0.5 3.3 3.3 3.3 6.93
Head Wall 1 4.2 0.5 0.5 0.5 0.5 0.5 0.5 1.05
RHS Head Wall 1 10.85 0.5 0.5 0.5 0.5 0.5 0.5 2.71
Cascade LHS 1 1 0.5 0.5 0.5 1 1 1 0.5
Between
1 2 0.5 0.5 0.5 1 1 1 1 cascade
Cascade RHS 1 1 0.5 0.5 0.5 1 1 1 0.5
Between
1 2 0.5 0.5 0.5 1 1 1 1 cascade
Deduction for hume
pipe -1 O.Dia= 1.1 1.2 1 1.1 -1.04
134 10+390.00 10+400.40 1 10.4 0.4 0.25 0.325 0.5 0.5 0.5 1.69 Drain wall
135 10+390.00 10+400.40 1 10.4 0.2 0.2 0.2 0.6 0.6 0.6 1.25 Drain wall
136 10+400.40 10+410.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
137 10+400.40 10+410.40 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
138 10+410.40 10+420.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
139 10+410.40 10+420.40 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
138 10+420.40 10+425.40 1 5 0.4 0.25 0.325 0.5 0.5 0.5 0.81 Drain wall
139 10+420.40 10+425.40 1 5 0.2 0.2 0.2 0.6 0.6 0.6 0.6 Drain wall
140 10+425.40 10+435.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
141 10+435.40 10+445.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
142 10+445.40 10+455.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
143 10+455.40 10+465.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
144 10+465.40 10+475.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
145 10+475.40 10+485.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
146 10+485.40 10+495.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
147 10+495.40 10+505.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
148 10+505.40 10+515.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
149 10+515.40 10+525.40 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
150 10+525.40 10+531.70 1 6.3 0.4 0.25 0.325 0.5 0.5 0.5 1.02 Drain wall
151 10+531.70 10+538.50 1 6.8 1.55 0.5 1.025 0.5 5 2.75 19.17
Jharna
152 10+538.50 10+547.80 1 9.3 2.5 0.5 1.5 5 5 5 69.75
Protection
153 10+547.80 10+554.10 1 6.3 1.55 0.5 1.025 0.5 5 2.75 17.76
153 10+554.10 10+564.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
154 10+564.10 10+574.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
154 10+574.10 10+584.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
155 10+584.10 10+594.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
155 10+594.10 10+604.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
156 10+604.10 10+614.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
156 10+614.10 10+624.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
157 10+624.10 10+634.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
157 10+634.10 10+644.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
158 10+644.10 10+654.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
158 10+654.10 10+664.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
159 10+664.10 10+674.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
159 10+674.10 10+684.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
160 10+684.10 10+694.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
160 10+694.10 10+704.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
161 10+704.10 10+714.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
161 10+714.10 10+724.90 1 10.8 0.4 0.25 0.325 0.5 0.5 0.5 1.75 Drain wall
162 10+724.90 10+735.60 1 10.7 0.4 0.25 0.325 0.5 0.5 0.5 1.74 Drain wall
162 10+724.90 10+735.60 1 10.7 0.2 0.2 0.2 0.6 0.6 0.6 1.28 Drain wall
163 10+735.60 10+745.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
163 10+745.60 10+755.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
164 10+755.60 10+765.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
164 10+765.60 10+775.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
165 10+775.60 10+785.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
165 10+785.60 10+795.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
166 10+795.60 10+805.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
166 10+805.60 10+815.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
167 10+815.60 10+825.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall

Submitted by: Checked by: Approved by:


Page 62 of 101
Chainage Breadth Height
SN No. Length Quantity Remarks
Start End Bottom Top Mean h1 h2 Mean
167 10+825.60 10+835.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
168 10+835.60 10+845.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
168 10+845.60 10+856.30 1 10.7 0.4 0.25 0.325 0.5 0.5 0.5 1.74 Drain wall
169 10+856.30 10+860.60 Pipe culvert
wing wall 1 1.95 0.5 0.5 0.5 2.2 2.2 2.2 2.15
1 1.85 0.5 0.5 0.5 2.2 2.2 2.2 2.04
LHS wall 1 4.3 0.5 0.5 0.5 2.2 2.2 2.2 4.73
RHS wall 1 19.3 2 0.5 1.25 4 4 4 96.5
Deduction for hume pipe -2 O.Dia= 1.1 1.2 1.4 1.3 -2.47
170 10+860.60 10+870.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
171 10+870.60 10+880.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
172 10+880.60 10+890.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
173 10+880.60 10+890.60 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
174 10+890.60 10+898.70 1 8.1 0.4 0.25 0.325 0.5 0.5 0.5 1.32 Drain wall
175 10+890.60 10+898.70 1 8.1 0.2 0.2 0.2 0.6 0.6 0.6 0.97 Drain wall
176 10+898.70 10+908.70 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
177 10+908.70 10+918.70 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
178 10+918.70 10+928.70 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
179 10+928.70 10+938.70 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
180 10+938.70 10+948.70 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
181 10+948.70 10+958.70 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
182 10+958.70 10+968.70 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
183 10+968.70 10+978.70 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
184 10+978.70 10+988.70 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
185 10+988.70 10+992.10 1 3.4 0.4 0.25 0.325 0.5 0.5 0.5 0.55 Drain wall
186 10+992.10 11+002.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
187 10+992.10 11+002.10 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
188 11+002.10 11+012.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
189 11+002.10 11+012.10 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
190 11+012.10 11+022.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
191 11+012.10 11+022.10 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
192 11+022.10 11+032.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
193 11+022.10 11+032.10 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
194 11+032.10 11+042.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
195 11+032.10 11+042.10 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
196 11+042.10 11+052.10 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
197 11+042.10 11+052.10 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
198 11+052.10 11+055.60 1 3.5 0.4 0.25 0.325 0.5 0.5 0.5 0.57 Drain wall
199 11+052.10 11+055.60 1 3.5 0.2 0.2 0.2 0.6 0.6 0.6 0.42 Drain wall
200 11+055.60 11+065.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
201 11+065.60 11+075.60 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
202 11+075.60 11+080.30 1 4.7 0.4 0.25 0.325 0.5 0.5 0.5 0.76 Drain wall
201 11+080.30 11+090.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
202 11+080.30 11+090.30 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
203 11+090.30 11+100.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
204 11+090.30 11+100.30 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
203 11+100.30 11+110.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
204 11+100.30 11+110.30 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
205 11+110.30 11+120.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
206 11+110.30 11+120.30 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
205 11+120.30 11+130.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
206 11+120.30 11+130.30 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
207 11+130.30 11+140.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
208 11+130.30 11+140.30 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall
207 11+140.30 11+151.30 1 11 0.4 0.25 0.325 0.5 0.5 0.5 1.79 Drain wall
208 11+140.30 11+151.30 1 11 0.2 0.2 0.2 0.6 0.6 0.6 1.32 Drain wall
209 11+151.30 11+161.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
210 11+161.30 11+171.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
211 11+171.30 11+181.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
212 11+181.30 11+191.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
213 11+191.30 11+201.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
214 11+201.30 11+211.30 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
215 11+211.30 11+216.74 1 5.44 0.4 0.25 0.325 0.5 0.5 0.5 0.88 Drain wall
216 11+216.74 11+226.74 1 10 0.4 0.25 0.325 0.5 0.5 0.5 1.63 Drain wall
217 11+216.74 11+226.74 1 10 0.2 0.2 0.2 0.6 0.6 0.6 1.2 Drain wall

Submitted by: Checked by: Approved by:


Page 63 of 101
Chainage Breadth Height
SN No. Length Quantity Remarks
Start End Bottom Top Mean h1 h2 Mean
218 11+226.74 11+229.40 1 2.66 0.4 0.25 0.325 0.5 0.5 0.5 0.43 Drain wall
219 11+226.74 11+229.40 1 2.66 0.2 0.2 0.2 0.6 0.6 0.6 0.32 Drain wall
Total Quantity Claim 1013.59

Submitted by: Checked by: Approved by:


64/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.03 Unit : m3
Providing and placing M15/40 cement concrete for foundation and footing etc including compection, curing and testing all complete.
Chainage Breadth
SN No. Length Height Quantity Remarks
Start End b1 b2 Mean
1 Pipe Culvert at 8+226 4 2.5 1.4 1.4 1.4 0.1 1.4 for hume pipe bed
2 Pipe Culvert at 8+470 5 2.5 1.4 1.4 1.4 0.1 1.75 for hume pipe bed
3 Pipe Culvert at 8+817.45 5 2.5 1.4 1.4 1.4 0.1 1.75 for hume pipe bed
4 Pipe Culvert at 9+229 2 2.5 1.4 1.4 1.4 0.1 0.7 for hume pipe bed
5 Pipe Culvert at 10+086 5 2.5 1.4 1.4 1.4 0.1 1.75 for hume pipe bed
6 Pipe Culvert at 10+370 5 2.5 1.4 1.4 1.4 0.1 1.75 for hume pipe bed
7 Pipe Culvert at 10+840.60 5 2.5 1.4 1.4 1.4 0.1 1.75 for hume pipe bed
8 8+217.50 8+226.00 0
wing wall 1 1.8 1.8 1.8 1.8 0.1 0.33
1 2.2 1.375 1.375 1.375 0.1 0.31
LHS wall 1 7 2.5 2.5 2.5 0.1 1.75
1 1.9 0.9 0.9 0.9 0.1 0.18
9 8+465.60 8+470.00 0
wing wall 1 9.4 1.35 1.35 1.35 0.1 1.27
1 7.6 1.35 1.35 1.35 0.1 1.03
1 6 1.35 1.35 1.35 0.1 0.81
LHS wall 1 4.4 1.35 1.35 1.35 0.1 0.6
RHS wall 1 12 2.2 2.2 2.2 0.1 2.64
1 2.3 1.1 0.9 1 0.1 0.23
10 8+817.45 8+821.45 0
wing wall 1 4 1.65 1.65 1.65 0.1 0.66
1 1.9 1.65 1.65 1.65 0.1 0.32
1 2.3 1.65 1.65 1.65 0.1 0.38
LHS wall 1 4 1.3 1.3 1.3 0.1 0.52
RHS wall 1 6.95 2.5 2.5 2.5 0.1 1.74
11 9+222.65 9+229.00 0.1 0
Wing Wall 1 4.1 1.35 1.35 1.35 0.1 0.56
1 3.9 1.35 1.35 1.35 0.1 0.53
LHS wall 1 6.35 1.35 1.35 1.35 0.1 0.86
12 10+080.20 10+086.00 0.1 0
wing wall 1 3.3 1.35 1.35 1.35 0.1 0.45
1 2.9 1.35 1.35 1.35 0.1 0.4
1 5.2 1.35 1.35 1.35 0.1 0.71
LHS wall 1 4.2 1.65 1.65 1.65 0.1 0.7
RHS wall 1 10.85 2 2 2 0.1 2.17
13 10+385.80 10+390.00 0
wing wall 1 3.3 1.35 1.35 1.35 0.1 0.45
1 2.9 1.35 1.35 1.35 0.1 0.4
1 5.2 1.35 1.35 1.35 0.1 0.71
LHS wall 1 4.2 1.65 1.65 1.65 0.1 0.7
RHS wall 1 10.85 2 2 2 0.1 2.17

Prepared and submitted by: Checked by: Approved by:


65/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.03 Unit : m3
Providing and placing M15/40 cement concrete for foundation and footing etc including compection, curing and testing all complete.
Chainage Breadth
SN No. Length Height Quantity Remarks
Start End b1 b2 Mean
14 10+856.30 10+860.60 0.1 0
wing wall 1 1.95 1.1 1.1 1.1 0.1 0.22
1 1.85 1.1 1.1 1.1 0.1 0.21
LHS wall 1 4.3 1.1 1.1 1.1 0.1 0.48
RHS wall 1 19.3 2 2 2 0.1 3.86

Current Quantity Claim 39.20

Prepared and submitted by: Checked by: Approved by:


Page 66 of 101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.04 Unit : m3

Providing and placing machine mixed cement concrete for superstructure, deckslab etc including compaction, curing and testing

a) M20/20
Chainage Breadth Height
SN No. Length Quantity Remarks
Start End b1 b2 Mean h1 h2 Mean
1 8+217.50 8+226.00 Pipe culvert
Catchpit Bottom 1 5.5 2.2 1.8 2 0.1 0.1 0.1 1.1
upstream river training work 1 4.6 2.2 1.6 1.9 0.1 0.1 0.1 0.87
1 3.8 1.6 2.3 1.95 0.1 0.1 0.1 0.74
1 3 2.3 4.5 3.4 0.1 0.1 0.1 1.02
1 8.8 4.5 9 6.75 0.1 0.1 0.1 5.94
2 8+248.05 8+258.05 1 10.00 0.8 0.9 0.850 0.1 0.1 0.1 0.85
3 8+258.05 8+268.05 1 10.00 0.6 0.6 0.600 0.1 0.1 0.1 0.6
4 8+268.05 8+278.05 1 10.00 0.6 0.6 0.600 0.1 0.1 0.1 0.6
5 8+278.05 8+283.05 1 5.00 0.6 0.6 0.600 0.1 0.1 0.1 0.3
6 8+465.60 8+470.00 0 0 Pipe culvert
Catchpit Bottom 1 7.1 11.3 4.4 7.85 0.1 0.1 0.1 5.57
Fourth Layer 1 3 2 2 2 0.15 0.15 0.15 0.9
1 5 2 2 2 0.15 0.15 0.15 1.5
Third Layer 1 2 0.5 0.5 0.5 0.15 0.15 0.15 0.15
Second Layer 1 2 0.5 0.5 0.5 0.15 0.15 0.15 0.15
7 8+779.85 8+789.85 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
8 8+789.85 8+799.85 1 10 0.6 0.7 0.65 0.1 0.1 0.1 0.65
9 8+799.85 8+809.85 1 10 0.7 0.8 0.75 0.1 0.1 0.1 0.75
10 8+809.85 8+817.45 1 7.6 0.8 1.1 0.95 0.1 0.1 0.1 0.72
11 8+817.45 8+821.45 0 0 Pipe culvert
Catchpit Bottom 1 3 1.9 1.7 1.8 0.1 0.1 0.1 0.54
Second Layer 1 2.5 2 2 2 0.15 0.15 0.15 0.75
12 8+821.45 8+831.45 1 10 0.9 1.1 1 0.1 0.1 0.1 1
13 8+831.45 8+835.95 1 4.5 1.1 0.7 0.9 0.1 0.1 0.1 0.41
14 8+835.95 8+845.95 1 10 0.7 0.7 0.7 0.1 0.1 0.1 0.7
15 8+845.95 8+855.95 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
16 8+855.95 8+865.95 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
17 8+865.95 8+875.95 1 10 0.65 0.6 0.625 0.1 0.1 0.1 0.63
18 8+875.95 8+887.65 1 11.7 0.6 0.6 0.6 0.1 0.1 0.1 0.7
19 8+887.65 8+897.65 1 10 0.7 0.8 0.75 0.1 0.1 0.1 0.75
20 8+897.65 8+907.65 1 10 1.1 1.5 1.3 0.1 0.1 0.1 1.3
21 8+907.65 8+917.65 1 10 0.9 0.8 0.85 0.1 0.1 0.1 0.85
22 8+917.65 8+927.65 1 10 0.8 0.9 0.85 0.1 0.1 0.1 0.85
23 8+927.65 8+937.65 1 10 0.9 1.1 1 0.1 0.1 0.1 1
24 8+937.65 8+947.65 1 10 1.2 1 1.1 0.1 0.1 0.1 1.1
25 8+947.65 8+957.65 1 10 1.5 0.8 1.15 0.1 0.1 0.1 1.15
26 8+957.65 8+967.65 1 10 0.9 1.1 1 0.1 0.1 0.1 1
27 8+967.65 8+977.65 1 10 0.9 0.8 0.85 0.1 0.1 0.1 0.85
28 8+977.65 8+987.65 1 10 1 1.1 1.05 0.1 0.1 0.1 1.05

Approved By:
Submitted By: Checked By:
Page 67 of 101

Chainage Breadth Height


SN No. Length Quantity Remarks
Start End b1 b2 Mean h1 h2 Mean
29 8+987.65 8+997.65 1 10 0.9 0.8 0.85 0.1 0.1 0.1 0.85
30 8+997.65 9+007.65 1 10 1.1 1 1.05 0.1 0.1 0.1 1.05
31 9+007.65 9+017.65 1 10 0.9 1 0.95 0.1 0.1 0.1 0.95
32 9+017.65 9+027.65 1 10 1 0.7 0.85 0.1 0.1 0.1 0.85
33 9+027.65 9+037.65 1 10 0.8 0.9 0.85 0.1 0.1 0.1 0.85
34 9+037.65 9+047.65 1 10 0.7 1 0.85 0.1 0.1 0.1 0.85
35 9+047.65 9+057.65 1 10 1.1 1.2 1.15 0.1 0.1 0.1 1.15
36 9+057.65 9+067.65 1 10 0.9 1.3 1.1 0.1 0.1 0.1 1.1
37 9+067.65 9+077.65 1 10 1.1 1.4 1.25 0.1 0.1 0.1 1.25
38 9+077.65 9+087.65 1 10 0.9 1 0.95 0.1 0.1 0.1 0.95
39 9+087.65 9+097.65 1 10 0.8 0.9 0.85 0.1 0.1 0.1 0.85
40 9+097.65 9+107.65 1 10 1 1.1 1.05 0.1 0.1 0.1 1.05
41 9+107.65 9+117.65 1 10 1.2 0.8 1 0.1 0.1 0.1 1
42 9+117.65 9+127.65 1 10 0.9 0.8 0.85 0.1 0.1 0.1 0.85
43 9+127.65 9+137.65 1 10 0.6 1.1 0.85 0.1 0.1 0.1 0.85
44 9+137.65 9+147.65 1 10 1 1.2 1.1 0.1 0.1 0.1 1.1
45 9+147.65 9+157.65 1 10 0.9 1.1 1 0.1 0.1 0.1 1
46 9+157.65 9+167.65 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
47 9+167.65 9+177.65 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
48 9+177.65 9+187.65 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
49 9+187.65 9+197.65 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
50 9+197.65 9+207.65 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
51 9+207.65 9+217.65 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
52 9+217.65 9+222.65 1 5 0.6 0.6 0.6 0.1 0.1 0.1 0.3
53 9+222.65 9+229.00 0 0 Pipe culvert
Catchpit Bottom 1 4 4.1 3.9 4 0.1 0.1 0.1 1.6
54 9+706.90 9+716.90 1 10 0.7 0.6 0.65 0.1 0.1 0.1 0.65
55 9+716.90 9+726.90 1 10 0.6 0.7 0.65 0.1 0.1 0.1 0.65
56 9+726.90 9+736.90 1 10 0.7 0.7 0.7 0.1 0.1 0.1 0.7
57 9+736.90 9+746.90 1 10 0.7 0.6 0.65 0.1 0.1 0.1 0.65
58 9+746.90 9+756.90 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
59 9+756.90 9+766.90 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
60 9+766.90 9+776.90 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
61 9+776.90 9+786.90 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
62 9+786.90 9+793.02 1 6.12 0.6 0.6 0.6 0.1 0.1 0.1 0.37
63 9+793.02 9+803.02 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
64 9+803.02 9+813.02 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
65 9+813.02 9+823.02 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
66 9+823.02 9+833.02 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
67 9+833.02 9+843.02 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
68 9+843.02 9+853.02 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
69 9+853.02 9+863.02 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
70 9+863.02 9+873.02 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
71 9+873.02 9+883.02 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
72 9+887.90 9+897.90 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9 Slab Culvert
73 9+897.90 9+907.90 1 10 1.1 0.9 1 0.1 0.1 0.1 1
74 9+907.90 9+917.90 1 10 0.9 0.8 0.85 0.1 0.1 0.1 0.85
75 9+917.90 9+927.90 1 10 0.8 0.7 0.75 0.1 0.1 0.1 0.75
76 9+927.90 9+937.90 1 10 0.6 0.7 0.65 0.1 0.1 0.1 0.65
77 9+937.90 9+947.90 1 10 0.9 1.1 1 0.1 0.1 0.1 1
78 9+947.90 9+957.90 1 10 1.2 0.8 1 0.1 0.1 0.1 1
79 9+957.90 9+967.90 1 10 0.9 1.1 1 0.1 0.1 0.1 1

Approved By:
Submitted By: Checked By:
Page 68 of 101

Chainage Breadth Height


SN No. Length Quantity Remarks
Start End b1 b2 Mean h1 h2 Mean
80 9+967.90 9+977.90 1 10 1.1 1.2 1.15 0.1 0.1 0.1 1.15
81 9+977.90 9+987.90 1 10 0.9 0.8 0.85 0.1 0.1 0.1 0.85
82 9+987.90 9+997.90 1 10 0.9 1 0.95 0.1 0.1 0.1 0.95
83 9+997.90 10+007.90 1 10 1.1 1.2 1.15 0.1 0.1 0.1 1.15
84 10+007.90 10+017.90 1 10 0.8 1 0.9 0.1 0.1 0.1 0.9
85 10+017.90 10+027.90 1 10 1.1 1 1.05 0.1 0.1 0.1 1.05
86 10+027.90 10+037.90 1 10 1 1.3 1.15 0.1 0.1 0.1 1.15
87 10+037.90 10+047.90 1 10 0.9 1.1 1 0.1 0.1 0.1 1
88 10+047.90 10+057.90 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9
89 10+057.90 10+067.90 1 10 0.9 1.1 1 0.1 0.1 0.1 1
90 10+067.90 10+077.90 1 10 1.2 0.8 1 0.1 0.1 0.1 1
91 10+077.90 10+080.20 1 2.3 0.9 1.1 1 0.1 0.1 0.1 0.23
92 10+080.20 10+086.00 0 0 Pipe culvert
Catchpit Bottom 1 3.3 5.2 4.2 4.7 0.1 0.1 0.1 1.55
Third Layer 1 2 2 2 2 0.15 0.15 0.15 0.6
Second Layer 1 2 0.6 0.8 0.7 0.15 0.15 0.15 0.21
Fourth Layer 1 2.5 2 2 2 0.15 0.15 0.15 0.75
Third Layer 1 0.5 2 2 2 0.15 0.15 0.15 0.15
Second Layer 1 0.5 2 2 2 0.15 0.15 0.15 0.15
First Layer 1 0.5 2 2 2 0.15 0.15 0.15 0.15
93 10+086.00 10+096.00 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
94 10+096.00 10+106.00 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
95 10+106.00 10+116.00 1 10 0.7 0.6 0.65 0.1 0.1 0.1 0.65
96 10+116.00 10+126.00 1 10 0.8 0.6 0.7 0.1 0.1 0.1 0.7
97 10+126.00 10+136.00 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
98 10+136.00 10+146.00 1 10 1.1 1.1 1.1 0.1 0.1 0.1 1.1
99 10+146.00 10+156.00 1 10 1 0.9 0.95 0.1 0.1 0.1 0.95
100 10+156.00 10+166.00 1 10 0.8 1 0.9 0.1 0.1 0.1 0.9
101 10+166.00 10+176.00 1 10 1.2 1.4 1.3 0.1 0.1 0.1 1.3
102 10+176.00 10+186.00 1 10 1.6 1 1.3 0.1 0.1 0.1 1.3
103 10+186.00 10+196.00 1 10 0.9 1.1 1 0.1 0.1 0.1 1
104 10+196.00 10+206.00 1 10 1.2 1.4 1.3 0.1 0.1 0.1 1.3
105 10+206.00 10+216.00 1 10 1.4 1.1 1.25 0.1 0.1 0.1 1.25
106 10+216.00 10+226.00 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
107 10+226.00 10+236.50 1 10.5 1 0.8 0.9 0.1 0.1 0.1 0.95
108 10+236.50 10+246.50 1 10 0.8 0.9 0.85 0.1 0.1 0.1 0.85
109 10+246.50 10+256.50 1 10 1 1.1 1.05 0.1 0.1 0.1 1.05
110 10+256.50 10+266.50 1 10 1.2 1.3 1.25 0.1 0.1 0.1 1.25
111 10+266.50 10+276.50 1 10 1.1 1.2 1.15 0.1 0.1 0.1 1.15
112 10+276.50 10+277.80 1 1.3 1.2 0.8 1 0.1 0.1 0.1 0.13
113 10+277.80 10+287.80 1 10 0.8 1.1 0.95 0.1 0.1 0.1 0.95
114 10+287.80 10+297.80 1 10 1.1 1 1.05 0.1 0.1 0.1 1.05
115 10+297.80 10+307.80 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9
116 10+307.80 10+317.80 1 10 3 2.5 2.75 0.1 0.1 0.1 2.75
117 10+317.80 10+327.80 1 10 2.5 3 2.75 0.1 0.1 0.1 2.75
118 10+327.80 10+337.80 1 10 1.2 1.5 1.35 0.1 0.1 0.1 1.35
119 10+337.80 10+348.30 1 10.5 1.5 1.1 1.3 0.1 0.1 0.1 1.37
120 10+348.30 10+358.30 1 10 1.2 1.4 1.3 0.1 0.1 0.1 1.3
121 10+358.30 10+362.00 1 3.7 1 0.8 0.9 0.1 0.1 0.1 0.33
122 10+362.00 10+373.90 1 11.9 0.8 1.2 1 0.1 0.1 0.1 1.19
123 10+373.90 10+385.80 1 11.9 1.2 0.8 1 0.1 0.1 0.1 1.19
124 10+385.80 10+390.00 0 0

Approved By:
Submitted By: Checked By:
Page 69 of 101

Chainage Breadth Height


SN No. Length Quantity Remarks
Start End b1 b2 Mean h1 h2 Mean
Catchpit Bottom 1 3.3 5.2 4.2 4.7 0.1 0.1 0.1 1.55
Second Layer 1 2 2 2 2 0.15 0.15 0.15 0.6
Third Layer 1 2 0.6 0.8 0.7 0.15 0.15 0.15 0.21
Fourth Layer 1 2.5 2 2 2 0.15 0.15 0.15 0.75
Third Layer 1 0.5 2 2 2 0.15 0.15 0.15 0.15
Second Layer 1 0.5 2 2 2 0.15 0.15 0.15 0.15
First Layer 1 0.5 2 2 2 0.15 0.15 0.15 0.15
125 10+390.00 10+400.40 1 10.4 0.6 0.6 0.6 0.1 0.1 0.1 0.62
126 10+400.40 10+410.40 1 10 0.6 0.8 0.7 0.1 0.1 0.1 0.7
127 10+410.40 10+420.40 1 10 0.8 1 0.9 0.1 0.1 0.1 0.9
128 10+420.40 10+425.40 1 5 1 0.8 0.9 0.1 0.1 0.1 0.45
129 10+425.40 10+435.40 1 10 0.8 1.1 0.95 0.1 0.1 0.1 0.95
130 10+435.40 10+445.40 1 10 1.1 0.9 1 0.1 0.1 0.1 1
131 10+445.40 10+455.40 1 10 0.9 1.2 1.05 0.1 0.1 0.1 1.05
132 10+455.40 10+465.40 1 10 1.2 1 1.1 0.1 0.1 0.1 1.1
133 10+465.40 10+475.40 1 10 1 1.1 1.05 0.1 0.1 0.1 1.05
134 10+475.40 10+485.40 1 10 0.9 1 0.95 0.1 0.1 0.1 0.95
135 10+485.40 10+495.40 1 10 1.1 1.2 1.15 0.1 0.1 0.1 1.15
136 10+495.40 10+505.40 1 10 1.4 1.6 1.5 0.1 0.1 0.1 1.5
137 10+505.40 10+515.40 1 10 1.6 1.4 1.5 0.1 0.1 0.1 1.5
138 10+515.40 10+525.40 1 10 1.4 1.2 1.3 0.1 0.1 0.1 1.3
139 10+525.40 10+531.70 1 6.3 1.2 1 1.1 0.1 0.1 0.1 0.69
140 10+531.70 10+538.50 1 6.8 1 0.9 0.95 0.1 0.1 0.1 0.65
141 10+538.50 10+547.80 1 9.3 0.9 1.1 1 0.1 0.1 0.1 0.93
142 10+547.80 10+554.10 1 6.3 1.1 0.8 0.95 0.1 0.1 0.1 0.6
143 10+554.10 10+564.10 1 10 0.8 1 0.9 0.1 0.1 0.1 0.9
144 10+564.10 10+574.10 1 10 1 1.1 1.05 0.1 0.1 0.1 1.05
145 10+574.10 10+584.10 1 10 1.1 1.2 1.15 0.1 0.1 0.1 1.15
146 10+584.10 10+594.10 1 10 1.3 0.8 1.05 0.1 0.1 0.1 1.05
147 10+594.10 10+604.10 1 10 0.8 1 0.9 0.1 0.1 0.1 0.9
148 10+604.10 10+614.10 1 10 1 1.1 1.05 0.1 0.1 0.1 1.05
149 10+614.10 10+624.10 1 10 1.1 0.9 1 0.1 0.1 0.1 1
150 10+624.10 10+634.10 1 10 0.9 1 0.95 0.1 0.1 0.1 0.95
151 10+634.10 10+644.10 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9
152 10+644.10 10+654.10 1 10 0.8 1.1 0.95 0.1 0.1 0.1 0.95
153 10+654.10 10+664.10 1 10 1.1 0.9 1 0.1 0.1 0.1 1
154 10+664.10 10+674.10 1 10 0.9 1 0.95 0.1 0.1 0.1 0.95
155 10+674.10 10+684.10 1 10 1 1.1 1.05 0.1 0.1 0.1 1.05
156 10+684.10 10+694.10 1 10 1.1 1.2 1.15 0.1 0.1 0.1 1.15
157 10+694.10 10+704.10 1 10 1.2 1.4 1.3 0.1 0.1 0.1 1.3
158 10+704.10 10+714.10 1 10 1.4 0.9 1.15 0.1 0.1 0.1 1.15
159 10+714.10 10+724.90 1 10.8 0.9 1.1 1 0.1 0.1 0.1 1.08
160 10+724.90 10+735.60 1 10.7 1.1 0.6 0.85 0.1 0.1 0.1 0.91
161 10+735.60 10+745.60 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
162 10+745.60 10+755.60 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
163 10+755.60 10+765.60 1 10 0.6 0.7 0.65 0.1 0.1 0.1 0.65
164 10+765.60 10+775.60 1 10 0.7 0.7 0.7 0.1 0.1 0.1 0.7
165 10+775.60 10+785.60 1 10 0.8 0.9 0.85 0.1 0.1 0.1 0.85
166 10+785.60 10+795.60 1 10 0.9 1 0.95 0.1 0.1 0.1 0.95
167 10+795.60 10+805.60 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9
168 10+805.60 10+815.60 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
169 10+815.60 10+825.60 1 10 0.6 1 0.8 0.1 0.1 0.1 0.8

Approved By:
Submitted By: Checked By:
Page 70 of 101

Chainage Breadth Height


SN No. Length Quantity Remarks
Start End b1 b2 Mean h1 h2 Mean
170 10+825.60 10+835.60 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9
171 10+835.60 10+845.60 1 10 0.8 0.9 0.85 0.1 0.1 0.1 0.85
172 10+845.60 10+856.30 1 10.7 1 0.6 0.8 0.1 0.1 0.1 0.86
173 10+856.30 10+860.60 0 0 Pipe culvert
Catchpit Bottom 1 4.3 1.95 1.85 1.9 0.1 0.1 0.1 0.82
Second Layer 1 3 2 2 2 0.15 0.15 0.15 0.9
174 10+860.60 10+870.60 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
175 10+870.60 10+880.60 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
176 10+880.60 10+890.60 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
177 10+890.60 10+898.70 1 8.1 0.9 0.9 0.9 0.1 0.1 0.1 0.73
178 10+898.70 10+908.70 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9
179 10+908.70 10+918.70 1 10 0.8 1 0.9 0.1 0.1 0.1 0.9
180 10+918.70 10+928.70 1 10 1 0.9 0.95 0.1 0.1 0.1 0.95
181 10+928.70 10+938.70 1 10 0.9 1.1 1 0.1 0.1 0.1 1
182 10+938.70 10+948.70 1 10 1.1 0.8 0.95 0.1 0.1 0.1 0.95
183 10+948.70 10+958.70 1 10 0.8 0.9 0.85 0.1 0.1 0.1 0.85
184 10+958.70 10+968.70 1 10 0.9 1 0.95 0.1 0.1 0.1 0.95
185 10+968.70 10+978.70 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9
186 10+978.70 10+988.70 1 10 0.8 1.1 0.95 0.1 0.1 0.1 0.95
187 10+988.70 10+992.10 1 3.4 1.2 1 1.1 0.1 0.1 0.1 0.37
188 10+992.10 11+002.10 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9
189 11+002.10 11+012.10 1 10 0.8 0.9 0.85 0.1 0.1 0.1 0.85
190 11+012.10 11+022.10 1 10 0.9 0.8 0.85 0.1 0.1 0.1 0.85
191 11+012.10 11+022.10 1 10 0.8 1.2 1 0.1 0.1 0.1 1
192 11+022.10 11+032.10 1 10 1.1 0.9 1 0.1 0.1 0.1 1
193 11+032.10 11+042.10 1 10 0.9 1 0.95 0.1 0.1 0.1 0.95
194 11+042.10 11+052.10 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9
195 11+052.10 11+055.60 1 3.5 0.8 0.9 0.85 0.1 0.1 0.1 0.3
196 11+055.60 11+065.60 1 10 0.9 1.2 1.05 0.1 0.1 0.1 1.05
197 11+065.60 11+075.60 1 10 1.2 1.4 1.3 0.1 0.1 0.1 1.3
198 11+075.60 11+080.30 1 4.7 1.4 1.6 1.5 0.1 0.1 0.1 0.71
199 11+080.30 11+090.30 1 10 1.6 1.2 1.4 0.1 0.1 0.1 1.4
200 11+090.30 11+100.30 1 10 1.2 0.8 1 0.1 0.1 0.1 1
201 11+100.30 11+110.30 1 10 0.8 1 0.9 0.1 0.1 0.1 0.9
202 11+110.30 11+120.30 1 10 1 0.8 0.9 0.1 0.1 0.1 0.9
203 11+120.30 11+130.30 1 10 0.8 0.6 0.7 0.1 0.1 0.1 0.7
204 11+130.30 11+140.30 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
205 11+140.30 11+151.30 1 11 0.6 0.7 0.65 0.1 0.1 0.1 0.72
206 11+151.30 11+161.30 1 10 0.7 0.9 0.8 0.1 0.1 0.1 0.8
207 11+161.30 11+171.30 1 10 0.9 0.8 0.85 0.1 0.1 0.1 0.85
208 11+171.30 11+181.30 1 10 0.8 0.9 0.85 0.1 0.1 0.1 0.85
209 11+181.30 11+191.30 1 10 0.9 1 0.95 0.1 0.1 0.1 0.95
210 11+191.30 11+201.30 1 10 1 1.1 1.05 0.1 0.1 0.1 1.05
211 11+201.30 11+211.30 1 10 0.6 0.6 0.6 0.1 0.1 0.1 0.6
212 11+211.30 11+216.74 1 5.44 0.8 0.8 0.8 0.1 0.1 0.1 0.44
213 11+216.74 11+226.74 1 10 0.7 0.8 0.75 0.1 0.1 0.1 0.75
214 11+226.74 11+229.40 1 2.66 0.9 0.7 0.8 0.1 0.1 0.1 0.21
Current Quantity Claim 211.01

Approved By:
Submitted By: Checked By:
Page 71 of 101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.07 Unit : m2
Providing and installing formwork including necessary support and removing after comletion for foundation,footing and
slabs precast elements
SN Chainage No. Length Breadth Height Quantity Remarks
1 Pipe Culvert at 8+226 4 2.5 1.4 0.1 2.28 For hume pipe bed
2 Pipe Culvert at 8+470 5 2.5 1.4 0.1 2.78 For hume pipe bed
3 Pipe Culvert at 8+817.45 5 2.5 1.4 0.1 2.78 For hume pipe bed
4 Pipe Culvert at 9+229 2 2.5 1.4 0.1 1.28 For hume pipe bed
5 Pipe Culvert at 10+086 5 2.5 1.4 0.1 2.78 For hume pipe bed
6 Pipe Culvert at 10+370 5 2.5 1.4 0.1 2.78 For hume pipe bed
7 Pipe Culvert at 10+840.60 5 2.5 1.4 0.1 2.78 For hume pipe bed
8 8+217.50 8+226.00 Pipe culvert
wing wall 1 1.5 1.2 0.1 0.54
1 2 1.1 0.1 0.62
LHS wall 1 9.2 2.5 0.1 2.34
RHS wall 1 9.2 1 0.1 2.04
9 8+248.05 8+283.05 1 35.00 0.6 0.1 7.12
10 8+465.60 8+470.00 Pipe culvert
wing wall 1 9.4 1.35 0.1 2.15
1 7.6 1.35 0.1 1.79
1 6 1.35 0.1 1.47
LHS wall 1 4.4 1.35 0.1 1.15
RHS wall 1 12 2.2 0.1 2.84
Second Layer 1 2 0.15 0.3
Third Layer 1 2 0.15 0.3 RHS CASCADE
Fourth Layer 1 2 0.15 0.3
11 8+817.45 8+821.45 Pipe culvert
wing wall 1 4 1.65 0.1 1.13
1 1.9 1.65 0.1 0.71
1 2.3 1.65 0.1 0.79
LHS wall 1 4 1.3 0.1 1.06
RHS wall 1 6.95 2.5 0.1 1.89
Second Layer 1 2 0.15 0.3 RHS CASCADE
12 9+222.65 9+229.00 Pipe culvert
LHS wall 1 6.35 1.35 0.1 1.54
13 10+080.20 10+086.00 Pipe culvert
wing wall 1 3.1 0.9 0.1 0.8
1 3.8 0.9 0.1 0.94
LHS wall 1 5.8 1.3 0.1 1.42
RHS wall 1 14.1 2 0.1 3.22
14 10+365.80 10+370.00
wing wall 1 3.3 1.35 0.1 0.93 Pipe culvert
1 2.9 1.35 0.1 0.85
1 5.2 1.35 0.1 1.31
LHS wall 1 4.2 1.65 0.1 1.17
RHS wall 1 10.85 2 0.1 2.57

Submitted by: Checked by: Approved by:


Page 72 of 101

SN Chainage No. Length Breadth Height Quantity Remarks


Second Layer 1 2 0.15 0.3
LHS CASCADE
Third Layer 1 2 0.15 0.3
First Layer 1 2 0.15 0.3
Second Layer 1 2 0.15 0.3
RHS CASCADE
Third Layer 1 2 0.15 0.3
Fourth Layer 1 2 0.15 0.3
15 10+836.30 10+840.60 Pipe culvert
wing wall 1 1.95 1.1 0.1 0.61
1 1.85 1.1 0.1 0.59
LHS wall 1 4.3 1.1 0.1 1.08
RHS wall 1 19.3 2 0.1 4.26
Second Layer 1 2 0.15 0.3 RHS CASCADE
Quantity Claim 69.69

Submitted by: Checked by: Approved by:


Page 73 of 101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.08 Unit : lin.m

Providing and laying RCC pipes (class NP3) diameter 900mm (internal) with or without collars, jointed with stiff mixture
of cement motar in the proportion of 1:2 (cement :sand), all complete

SN Chainage No. Length Quantity Remarks


1 Pipe Culvert at 8+226 4 2.5 10
2 Pipe Culvert at 8+470 5 2.5 12.5
3 Pipe Culvert at 8+817.45 5 2.5 12.5
4 Pipe Culvert at 9+229 2 2.5 5
5 Pipe Culvert at 10+086 5 2.5 12.5
6 Pipe Culvert at 10+370 5 2.5 12.5
7 Pipe Culvert at 10+840.60 5 2.5 12.5
Current Quantity Claim 77.50

Submitted by: Checked by: Approved by:


Page 74 of 101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.10 Unit : m3
Back filling with graded materials
SN Chainage No. Length Breadth Height Quantity Remarks
1 Pipe Culvert at 8+226 4 10 0.5 1.4 14 Both Side
2 Pipe Culvert at 8+470 5 12.5 0.5 1.4 17.5 Both Side
3 Pipe Culvert at 8+817.45 5 12.5 0.5 1.4 17.5 Both Side
4 Pipe Culvert at 9+229 2 5 0.5 1.4 7 Both Side
5 Pipe Culvert at 10+086 5 12.5 0.5 1.4 17.5 Both Side
6 Pipe Culvert at 10+370 5 12.5 0.5 1.4 17.5 Both Side
7 Pipe Culvert at 10+840.60 5 12.5 0.5 1.4 17.5 Both Side
Current Quantity Claim 108.50

Submitted by: Checked by: Approved by:


Page 75 of 101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.11 Unit : m2
Providing , laying and fixing geo-textile (filter fabric)
S.No. Chainage No. Length Breadth Height Quantity Remarks
Laying at inner side of gabion walls
Gabion
Downstream
1 8+458.00 8+470.00 1 4 4 16 Cascade
2 8+817.45 8+821.45 1 4 2 8 Cascade
3 10+365.80 10+370.00 1 4 4 16 Cascade
Locking Gabion from
10+361.8 to 10+365.80 1 4 3.2 12.8
4 10+865.70 10+870.00 1 4 3 12 Cascade
Upstream
5 9+223.20 9+229.00 1 8 5.4 43.2 Cascade
6 10+365.80 10+370.00 1 4 3 12 Cascade
Wall in Pipe Culvert
1 8+217.50 8+226.00 Pipe culvert
LHS wall 10 0.3 0.3 0.9
RHS wall 5 0.3 0.3 0.45
2 8+465.60 8+470.00 Pipe culvert
LHS wall 10 0.3 0.3 0.9
RHS wall 10 0.3 0.3 0.9
3 8+817.45 8+821.45 Pipe culvert
LHS wall 5 0.3 0.3 0.45
RHS wall 10 0.3 0.3 0.9
4 9+222.65 9+229.00 Pipe culvert
LHS wall 5 0.3 0.3 0.45
5 10+080.20 10+086.00 Pipe culvert
LHS wall 5 0.3 0.3 0.45
RHS wall 10 0.3 0.3 0.9
6 10+365.80 10+370.00
LHS wall 8 0.3 0.3 0.72
RHS wall 12 0.3 0.3 1.08
7 10+836.30 10+840.60 Pipe culvert
LHS wall 5 0.3 0.3 0.45
RHS wall 8 0.3 0.3 0.72
Quantity Claim 129.27

Submitted by: Checked by: Approved by:


Page 76 of 101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 5.12 Unit : m3
Providing and laying dry stone soling in foundation
Chainage Breadth
SN No Length Height Quantity Remarks
Start End b1 b2 Mean
Hume Pipe Below
1 Pipe Culvert at 8+226 3 2.5 1.4 1.4 1.4 0.1 1.05 for hume pipe bed
2 Pipe Culvert at 8+470 5 2.5 1.4 1.4 1.4 0.1 1.75 for hume pipe bed
3 Pipe Culvert at 8+817.45 5 2.5 1.4 1.4 1.4 0.1 1.75 for hume pipe bed
4 Pipe Culvert at 9+229 2 2.5 1.4 1.4 1.4 0.1 0.7 for hume pipe bed
5 Pipe Culvert at 10+086 5 2.5 1.4 1.4 1.4 0.1 1.75 for hume pipe bed
6 Pipe Culvert at 10+370 5 2.5 1.4 1.4 1.4 0.1 1.75 for hume pipe bed
7 Pipe Culvert at 10+840.6 5 2.5 1.4 1.4 1.4 0.1 1.75 for hume pipe bed
0.1 0
8 8+217.50 8+226.00 0.1 0
wing wall 1 1.8 1.8 1.8 1.8 0.1 0.33
1 2.2 1.375 1.375 1.375 0.1 0.31
LHS wall 1 7 2.5 2.5 2.5 0.1 1.75
1 1.9 0.9 0.9 0.9 0.1 0.18
Catchpit Bottom 1 5.5 2.2 1.8 2 0.1 1.1
upstream river training 1 4.6 2.2 1.6 1.9 0.1 0.88
1 3.8 1.6 2.3 1.95 0.1 0.75
1 3 2.3 4.5 3.4 0.1 1.02
1 8.8 4.5 9 6.75 0.1 5.94
9 8+248.05 8+258.05 1 10.00 1.2 1.3 1.250 0.1 1.25
10 8+258.05 8+268.05 1 10.00 1 1 1.000 0.1 1
11 8+268.05 8+278.05 1 10.00 1 1 1.000 0.1 1
12 8+278.05 8+283.05 1 5.00 1 1 1.000 0.1 0.5
13 8+465.60 8+470.00 0.1 0 Pipe culvert
wing wall 1 9.4 1.35 1.35 1.35 0.1 1.27
1 7.6 1.35 1.35 1.35 0.1 1.03
1 6 1.35 1.35 1.35 0.1 0.81
LHS wall 1 4.4 1.35 1.35 1.35 0.1 0.6
RHS wall 1 12 2.2 2.2 2.2 0.1 2.64
Catchpit Bottom 1 7.1 11.3 4.4 7.85 0.1 5.58
1 2.3 1.1 0.9 1 0.1 0.23
Fourth Layer 1 3 2 2 2 0.1 0.6 RHS CASCADE
1 5 2 2 2 0.1 1
Third Layer 1 2 0.5 0.5 0.5 0.1 0.1
Second Layer 1 2 0.5 0.5 0.5 0.1 0.1
14 8+779.85 8+789.85 1 10 1 1 1 0.1 1
15 8+789.85 8+799.85 1 10 1 1.1 1.05 0.1 1.05
16 8+799.85 8+809.85 1 10 1.1 1.2 1.15 0.1 1.15
17 8+809.85 8+817.45 1 7.6 1.2 1.5 1.35 0.1 1.03
18 8+817.45 8+821.45 0.1 0 Pipe culvert
wing wall 1 4 1.65 1.65 1.65 0.1 0.66
1 1.9 1.65 1.65 1.65 0.1 0.32
1 2.3 1.65 1.65 1.65 0.1 0.38
LHS wall 1 4 1.3 1.3 1.3 0.1 0.52
RHS wall 1 6.95 2.5 2.5 2.5 0.1 1.74
Catchpit Bottom 1 3 1.9 1.7 1.8 0.1 0.54

Submitted by: Checked by: Approved by:


Page 77 of 101

Chainage Breadth
SN No Length Height Quantity Remarks
Start End b1 b2 Mean
Second Layer 1 2.5 2 2 2 0.1 0.5 RHS CASCADE
0.1 0
19 8+821.45 8+831.45 1 10 1.3 1.5 1.4 0.1 1.4
20 8+831.45 8+835.95 1 4.5 1.5 1.1 1.3 0.1 0.59
21 8+835.95 8+845.95 1 10 1.1 1.1 1.1 0.1 1.1
22 8+845.95 8+855.95 1 10 1 1 1 0.1 1
23 8+855.95 8+865.95 1 10 1 1 1 0.1 1
24 8+865.95 8+875.95 1 10 1.05 1 1.025 0.1 1.03
25 8+875.95 8+887.65 1 11.7 1 1 1 0.1 1.18
26 8+887.65 8+897.65 1 10 1.1 1.2 1.15 0.1 1.15
27 8+897.65 8+907.65 1 10 1.5 1.9 1.7 0.1 1.7
28 8+907.65 8+917.65 1 10 1.3 1.2 1.25 0.1 1.25
29 8+917.65 8+927.65 1 10 1.2 1.3 1.25 0.1 1.25
30 8+927.65 8+937.65 1 10 1.3 1.5 1.4 0.1 1.4
31 8+937.65 8+947.65 1 10 1.6 1.4 1.5 0.1 1.5
32 8+947.65 8+957.65 1 10 1.9 1.2 1.55 0.1 1.55
33 8+957.65 8+967.65 1 10 1.3 1.5 1.4 0.1 1.4
34 8+967.65 8+977.65 1 10 1.3 1.2 1.25 0.1 1.25
35 8+977.65 8+987.65 1 10 1.4 1.5 1.45 0.1 1.45
36 8+987.65 8+997.65 1 10 1.3 1.2 1.25 0.1 1.25
37 8+997.65 9+007.65 1 10 1.5 1.4 1.45 0.1 1.45
38 9+007.65 9+017.65 1 10 1.3 1.4 1.35 0.1 1.35
39 9+017.65 9+027.65 1 10 1.4 1.1 1.25 0.1 1.25
40 9+027.65 9+037.65 1 10 1.2 1.3 1.25 0.1 1.25
41 9+037.65 9+047.65 1 10 1.1 1.4 1.25 0.1 1.25
42 9+047.65 9+057.65 1 10 1.5 1.6 1.55 0.1 1.55
43 9+057.65 9+067.65 1 10 1.3 1.7 1.5 0.1 1.5
44 9+067.65 9+077.65 1 10 1.5 1.8 1.65 0.1 1.65
45 9+077.65 9+087.65 1 10 1.3 1.4 1.35 0.1 1.35
46 9+087.65 9+097.65 1 10 1.2 1.3 1.25 0.1 1.25
47 9+097.65 9+107.65 1 10 1.4 1.5 1.45 0.1 1.45
48 9+107.65 9+117.65 1 10 1.6 1.2 1.4 0.1 1.4
49 9+117.65 9+127.65 1 10 1.3 1.2 1.25 0.1 1.25
50 9+127.65 9+137.65 1 10 1 1.5 1.25 0.1 1.25
51 9+137.65 9+147.65 1 10 1.4 1.6 1.5 0.1 1.5
52 9+147.65 9+157.65 1 10 1.3 1.5 1.4 0.1 1.4
53 9+157.65 9+167.65 1 10 1 1 1 0.1 1
54 9+167.65 9+177.65 1 10 1 1 1 0.1 1
55 9+177.65 9+187.65 1 10 1 1 1 0.1 1
56 9+187.65 9+197.65 1 10 1 1 1 0.1 1
57 9+197.65 9+207.65 1 10 1 1 1 0.1 1
58 9+207.65 9+217.65 1 10 1 1 1 0.1 1
59 9+217.65 9+222.65 1 5 1 1 1 0.1 0.5
60 9+222.65 9+229.00 0.1 0 Pipe culvert
Wing Wall 1 4.1 1.35 1.35 1.35 0.1 0.56
1 3.9 1.35 1.35 1.35 0.1 0.53
LHS wall 1 6.35 1.35 1.35 1.35 0.1 0.86
Catchpit Bottom 1 4 4.1 3.9 4 0.1 1.6
61 9+706.90 9+716.90 1 10 1.1 1 1.05 0.1 1.05
62 9+716.90 9+726.90 1 10 1 1.1 1.05 0.1 1.05
63 9+726.90 9+736.90 1 10 1.1 1.1 1.1 0.1 1.1
64 9+736.90 9+746.90 1 10 1.1 1 1.05 0.1 1.05
65 9+746.90 9+756.90 1 10 1 1 1 0.1 1
66 9+756.90 9+766.90 1 10 1 1 1 0.1 1
67 9+766.90 9+776.90 1 10 1 1 1 0.1 1
68 9+776.90 9+786.90 1 10 1 1 1 0.1 1

Submitted by: Checked by: Approved by:


Page 78 of 101

Chainage Breadth
SN No Length Height Quantity Remarks
Start End b1 b2 Mean
69 9+786.90 9+793.02 1 6.12 1 1 1 0.1 0.62
70 9+793.02 9+803.02 1 10 1 1 1 0.1 1
71 9+803.02 9+813.02 1 10 1 1 1 0.1 1
72 9+813.02 9+823.02 1 10 1 1 1 0.1 1
73 9+823.02 9+833.02 1 10 1 1 1 0.1 1
74 9+833.02 9+843.02 1 10 1 1 1 0.1 1
75 9+843.02 9+853.02 1 10 1 1 1 0.1 1
76 9+853.02 9+863.02 1 10 1 1 1 0.1 1
77 9+863.02 9+873.02 1 10 1 1 1 0.1 1
78 9+873.02 9+883.02 1 10 1 1 1 0.1 1
79 9+887.90 9+897.90 1 10 1.4 1.2 1.3 0.1 1.3 Slab Culvert
80 9+897.90 9+907.90 1 10 1.5 1.3 1.4 0.1 1.4
81 9+907.90 9+917.90 1 10 1.3 1.2 1.25 0.1 1.25
82 9+917.90 9+927.90 1 10 1.2 1.1 1.15 0.1 1.15
83 9+927.90 9+937.90 1 10 1 1.1 1.05 0.1 1.05
84 9+937.90 9+947.90 1 10 1.3 1.5 1.4 0.1 1.4
85 9+947.90 9+957.90 1 10 1.6 1.2 1.4 0.1 1.4
86 9+957.90 9+967.90 1 10 1.3 1.5 1.4 0.1 1.4
87 9+967.90 9+977.90 1 10 1.5 1.6 1.55 0.1 1.55
88 9+977.90 9+987.90 1 10 1.3 1.2 1.25 0.1 1.25
89 9+987.90 9+997.90 1 10 1.3 1.4 1.35 0.1 1.35
90 9+997.90 10+007.90 1 10 1.5 1.6 1.55 0.1 1.55
91 10+007.90 10+017.90 1 10 1.2 1.4 1.3 0.1 1.3
92 10+017.90 10+027.90 1 10 1.5 1.4 1.45 0.1 1.45
93 10+027.90 10+037.90 1 10 1.4 1.7 1.55 0.1 1.55
94 10+037.90 10+047.90 1 10 1.3 1.5 1.4 0.1 1.4
95 10+047.90 10+057.90 1 10 1.4 1.2 1.3 0.1 1.3
96 10+057.90 10+067.90 1 10 1.3 1.5 1.4 0.1 1.4
97 10+067.90 10+077.90 1 10 1.6 1.2 1.4 0.1 1.4
98 10+077.90 10+080.20 1 2.3 1.3 1.5 1.4 0.1 0.33
99 10+080.20 10+086.00 0.1 0 Pipe culvert
wing wall 1 3.3 1.35 1.35 1.35 0.1 0.45 Pipe culvert
1 2.9 1.35 1.35 1.35 0.1 0.4
1 5.2 1.35 1.35 1.35 0.1 0.71
LHS wall 1 4.2 1.65 1.65 1.65 0.1 0.7
RHS wall 1 10.85 2 2 2 0.1 2.17
Catchpit Bottom 1 3.3 5.2 4.2 4.7 0.1 1.56
Third Layer 1 2 2 2 2 0.1 0.4 LHS CASCADE
Second Layer 1 2 0.6 0.8 0.7 0.1 0.14
Fourth Layer 1 2.5 2 2 2 0.1 0.5 RHS CASCADE
Third Layer 1 0.5 2 2 2 0.1 0.1
Second Layer 1 0.5 2 2 2 0.1 0.1
First Layer 1 0.5 2 2 2 0.1 0.1
100 10+086.00 10+096.00 1 10 1 1 1 0.1 1
101 10+096.00 10+106.00 1 10 1 1 1 0.1 1
102 10+106.00 10+116.00 1 10 1.1 1 1.05 0.1 1.05
103 10+116.00 10+126.00 1 10 1.2 1 1.1 0.1 1.1
104 10+126.00 10+136.00 1 10 1 1 1 0.1 1
105 10+136.00 10+146.00 1 10 1.5 1.5 1.5 0.1 1.5
106 10+146.00 10+156.00 1 10 1.4 1.3 1.35 0.1 1.35
107 10+156.00 10+166.00 1 10 1.2 1.4 1.3 0.1 1.3
108 10+166.00 10+176.00 1 10 1.6 1.8 1.7 0.1 1.7
109 10+176.00 10+186.00 1 10 2 1.4 1.7 0.1 1.7
110 10+186.00 10+196.00 1 10 1.3 1.5 1.4 0.1 1.4
111 10+196.00 10+206.00 1 10 1.6 1.8 1.7 0.1 1.7
112 10+206.00 10+216.00 1 10 1.8 1.5 1.65 0.1 1.65

Submitted by: Checked by: Approved by:


Page 79 of 101

Chainage Breadth
SN No Length Height Quantity Remarks
Start End b1 b2 Mean
113 10+216.00 10+226.00 1 10 1 1 1 0.1 1
114 10+226.00 10+236.50 1 10.5 1.4 1.2 1.3 0.1 1.37
115 10+236.50 10+246.50 1 10 1.2 1.3 1.25 0.1 1.25
116 10+246.50 10+256.50 1 10 1.4 1.5 1.45 0.1 1.45
117 10+256.50 10+266.50 1 10 1.6 1.7 1.65 0.1 1.65
118 10+266.50 10+276.50 1 10 1.5 1.6 1.55 0.1 1.55
119 10+276.50 10+277.80 1 1.3 1.6 1.2 1.4 0.1 0.19
120 10+277.80 10+287.80 1 10 1.2 1.5 1.35 0.1 1.35
121 10+287.80 10+297.80 1 10 1.5 1.4 1.45 0.1 1.45
122 10+297.80 10+307.80 1 10 1.4 1.2 1.3 0.1 1.3
123 10+307.80 10+317.80 1 10 3.4 2.9 3.15 0.1 3.15
124 10+317.80 10+327.80 1 10 2.9 3.4 3.15 0.1 3.15
125 10+327.80 10+337.80 1 10 1.6 1.9 1.75 0.1 1.75
126 10+337.80 10+348.30 1 10.5 1.9 1.5 1.7 0.1 1.79
127 10+348.30 10+358.30 1 10 1.6 1.8 1.7 0.1 1.7
128 10+358.30 10+362.00 1 3.7 1.4 1.2 1.3 0.1 0.49
129 10+362.00 10+373.90 1 11.9 1.2 1.6 1.4 0.1 1.67
130 10+373.90 10+385.80 1 11.9 1.6 1.2 1.4 0.1 1.67
131 10+385.80 10+390.00 0.1 0
wing wall 1 3.3 1.35 1.35 1.35 0.1 0.45
1 2.9 1.35 1.35 1.35 0.1 0.4
1 5.2 1.35 1.35 1.35 0.1 0.71
LHS wall 1 4.2 1.65 1.65 1.65 0.1 0.7
RHS wall 1 10.85 2 2 2 0.1 2.17
Catchpit Bottom 1 3.3 5.2 4.2 4.7 0.1 1.56
Second Layer 1 2 2 2 2 0.1 0.4
Third Layer 1 2 0.6 0.8 0.7 0.1 0.14
Fourth Layer 1 2.5 2 2 2 0.1 0.5
Third Layer 1 0.5 2 2 2 0.1 0.1
Second Layer 1 0.5 2 2 2 0.1 0.1
First Layer 1 0.5 2 2 2 0.1 0.1
132 10+390.00 10+400.40 1 10.4 1 1 1 0.1 1.04
133 10+400.40 10+410.40 1 10 1 1.2 1.1 0.1 1.1
134 10+410.40 10+420.40 1 10 1.2 1.4 1.3 0.1 1.3
135 10+420.40 10+425.40 1 5 1.4 1.2 1.3 0.1 0.65
136 10+425.40 10+435.40 1 10 1.2 1.5 1.35 0.1 1.35
137 10+435.40 10+445.40 1 10 1.5 1.3 1.4 0.1 1.4
138 10+445.40 10+455.40 1 10 1.3 1.6 1.45 0.1 1.45
139 10+455.40 10+465.40 1 10 1.6 1.4 1.5 0.1 1.5
140 10+465.40 10+475.40 1 10 1.4 1.5 1.45 0.1 1.45
141 10+475.40 10+485.40 1 10 1.3 1.4 1.35 0.1 1.35
142 10+485.40 10+495.40 1 10 1.5 1.6 1.55 0.1 1.55
143 10+495.40 10+505.40 1 10 1.8 2 1.9 0.1 1.9
144 10+505.40 10+515.40 1 10 2 1.8 1.9 0.1 1.9
145 10+515.40 10+525.40 1 10 1.8 1.6 1.7 0.1 1.7
146 10+525.40 10+531.70 1 6.3 1.6 1.4 1.5 0.1 0.95
147 10+531.70 10+538.50 1 6.8 1.4 1.3 1.35 0.1 0.92
148 10+538.50 10+547.80 1 9.3 1.3 1.5 1.4 0.1 1.31
149 10+547.80 10+554.10 1 6.3 1.5 1.2 1.35 0.1 0.86
150 10+554.10 10+564.10 1 10 1.2 1.4 1.3 0.1 1.3
151 10+564.10 10+574.10 1 10 1.4 1.5 1.45 0.1 1.45
152 10+574.10 10+584.10 1 10 1.5 1.6 1.55 0.1 1.55
153 10+584.10 10+594.10 1 10 1.7 1.2 1.45 0.1 1.45
154 10+594.10 10+604.10 1 10 1.2 1.4 1.3 0.1 1.3
155 10+604.10 10+614.10 1 10 1.4 1.5 1.45 0.1 1.45
156 10+614.10 10+624.10 1 10 1.5 1.3 1.4 0.1 1.4

Submitted by: Checked by: Approved by:


Page 80 of 101

Chainage Breadth
SN No Length Height Quantity Remarks
Start End b1 b2 Mean
157 10+624.10 10+634.10 1 10 1.3 1.4 1.35 0.1 1.35
158 10+634.10 10+644.10 1 10 1.4 1.2 1.3 0.1 1.3
159 10+644.10 10+654.10 1 10 1.2 1.5 1.35 0.1 1.35
160 10+654.10 10+664.10 1 10 1.5 1.3 1.4 0.1 1.4
161 10+664.10 10+674.10 1 10 1.3 1.4 1.35 0.1 1.35
162 10+674.10 10+684.10 1 10 1.4 1.5 1.45 0.1 1.45
163 10+684.10 10+694.10 1 10 1.5 1.6 1.55 0.1 1.55
164 10+694.10 10+704.10 1 10 1.6 1.8 1.7 0.1 1.7
165 10+704.10 10+714.10 1 10 1.8 1.3 1.55 0.1 1.55
166 10+714.10 10+724.90 1 10.8 1.3 1.5 1.4 0.1 1.52
167 10+724.90 10+735.60 1 10.7 1.5 1 1.25 0.1 1.34
168 10+735.60 10+745.60 1 10 1 1 1 0.1 1
169 10+745.60 10+755.60 1 10 1 1 1 0.1 1
170 10+755.60 10+765.60 1 10 1 1.1 1.05 0.1 1.05
171 10+765.60 10+775.60 1 10 1.1 1.1 1.1 0.1 1.1
172 10+775.60 10+785.60 1 10 1.2 1.3 1.25 0.1 1.25
173 10+785.60 10+795.60 1 10 1.3 1.4 1.35 0.1 1.35
174 10+795.60 10+805.60 1 10 1.4 1.2 1.3 0.1 1.3
175 10+805.60 10+815.60 1 10 1 1 1 0.1 1
176 10+815.60 10+825.60 1 10 1 1.4 1.2 0.1 1.2
177 10+825.60 10+835.60 1 10 1.4 1.2 1.3 0.1 1.3
178 10+835.60 10+845.60 1 10 1.2 1.3 1.25 0.1 1.25
179 10+845.60 10+856.30 1 10.7 1.4 1 1.2 0.1 1.29
180 10+856.30 10+860.60 0.1 0 Pipe culvert
wing wall 1 1.95 1.1 1.1 1.1 0.1 0.22
1 1.85 1.1 1.1 1.1 0.1 0.21
LHS wall 1 4.3 1.1 1.1 1.1 0.1 0.48
RHS wall 1 19.3 2 2 2 0.1 3.86
Catchpit
Bottom 1 4.3 1.95 1.85 1.9 0.1 0.82
Second Layer 1 3 2 2 2 0.1 0.6 RHS CASCADE
181 10+860.60 10+870.60 1 10 1 1 1 0.1 1
182 10+870.60 10+880.60 1 10 1 1 1 0.1 1
183 10+880.60 10+890.60 1 10 1 1 1 0.1 1
184 10+890.60 10+898.70 1 8.1 1.3 1.3 1.3 0.1 1.06
185 10+898.70 10+908.70 1 10 1.4 1.2 1.3 0.1 1.3
186 10+908.70 10+918.70 1 10 1.2 1.4 1.3 0.1 1.3
187 10+918.70 10+928.70 1 10 1.4 1.3 1.35 0.1 1.35
188 10+928.70 10+938.70 1 10 1.3 1.5 1.4 0.1 1.4
189 10+938.70 10+948.70 1 10 1.5 1.2 1.35 0.1 1.35
190 10+948.70 10+958.70 1 10 1.2 1.3 1.25 0.1 1.25
191 10+958.70 10+968.70 1 10 1.3 1.4 1.35 0.1 1.35
192 10+968.70 10+978.70 1 10 1.4 1.2 1.3 0.1 1.3
193 10+978.70 10+988.70 1 10 1.2 1.5 1.35 0.1 1.35
194 10+988.70 10+992.10 1 3.4 1.6 1.4 1.5 0.1 0.51
195 10+992.10 11+002.10 1 10 1.4 1.2 1.3 0.1 1.3
196 11+002.10 11+012.10 1 10 1.2 1.3 1.25 0.1 1.25
197 11+012.10 11+022.10 1 10 1.3 1.2 1.25 0.1 1.25
198 11+012.10 11+022.10 1 10 1.2 1.6 1.4 0.1 1.4
199 11+022.10 11+032.10 1 10 1.5 1.3 1.4 0.1 1.4
200 11+032.10 11+042.10 1 10 1.3 1.4 1.35 0.1 1.35
201 11+042.10 11+052.10 1 10 1.4 1.2 1.3 0.1 1.3
202 11+052.10 11+055.60 1 3.5 1.2 1.3 1.25 0.1 0.44
203 11+055.60 11+065.60 1 10 1.3 1.6 1.45 0.1 1.45
204 11+065.60 11+075.60 1 10 1.6 1.8 1.7 0.1 1.7

Submitted by: Checked by: Approved by:


Page 81 of 101

Chainage Breadth
SN No Length Height Quantity Remarks
Start End b1 b2 Mean
205 11+075.60 11+080.30 1 4.7 1.8 2 1.9 0.1 0.9
206 11+080.30 11+090.30 1 10 2 1.6 1.8 0.1 1.8
207 11+090.30 11+100.30 1 10 1.6 1.2 1.4 0.1 1.4
208 11+100.30 11+110.30 1 10 1.2 1.4 1.3 0.1 1.3
209 11+110.30 11+120.30 1 10 1.4 1.2 1.3 0.1 1.3
210 11+120.30 11+130.30 1 10 1.2 1 1.1 0.1 1.1
211 11+130.30 11+140.30 1 10 1 1 1 0.1 1
212 11+140.30 11+151.30 1 11 1 1.1 1.05 0.1 1.16
213 11+151.30 11+161.30 1 10 1.1 1.3 1.2 0.1 1.2
214 11+161.30 11+171.30 1 10 1.3 1.2 1.25 0.1 1.25
215 11+171.30 11+181.30 1 10 1.2 1.3 1.25 0.1 1.25
216 11+181.30 11+191.30 1 10 1.3 1.4 1.35 0.1 1.35
217 11+191.30 11+201.30 1 10 1.4 1.5 1.45 0.1 1.45
218 11+201.30 11+211.30 1 10 1 1 1 0.1 1
219 11+211.30 11+216.74 1 5.44 1.2 1.2 1.2 0.1 0.66
220 11+216.74 11+226.74 1 10 1.1 1.2 1.15 0.1 1.15
221 11+226.74 11+229.40 1 2.66 1.3 1.1 1.2 0.1 0.32
Current Quantity Claim 326.72

Submitted by: Checked by: Approved by:


Page 82 of 101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 6.01 Unit : m2
Preperation of subgrade by filling or cutting in all types of materials including compaction and watering all complete
Chainage Breadth
SN No. Length Quantity Remarks
Start End b1 b2 Mean
1 8+470.00 8+480.00 1 10 10 10 10 100
2 8+480.00 8+490.00 1 10 10 10 10 100
3 8+490.00 8+500.00 1 10 10 10 10 100
4 8+500.00 8+510.00 1 10 10 10 10 100
5 8+510.00 8+520.00 1 10 10 10 10 100
6 8+520.00 8+530.00 1 10 10 10 10 100
7 8+530.00 8+540.00 1 10 10 10 10 100
8 8+540.00 8+550.00 1 10 10 10 10 100
9 8+550.00 8+560.00 1 10 10 10 10 100
10 8+560.00 8+570.00 1 10 10 10 10 100
11 8+570.00 8+580.00 1 10 10 10 10 100
12 8+580.00 8+590.00 1 10 10 10 10 100
13 8+590.00 8+600.00 1 10 10 10 10 100
14 8+600.00 8+610.00 1 10 10 10 10 100
15 8+610.00 8+620.00 1 10 10 10 10 100
16 8+620.00 8+630.00 1 10 10 10 10 100
17 8+630.00 8+640.00 1 10 10 10 10 100
18 8+640.00 8+650.00 1 10 10 10 10 100
19 8+650.00 8+660.00 1 10 10 10 10 100
20 8+660.00 8+670.00 1 10 10 10 10 100
21 8+670.00 8+680.00 1 10 10 10 10 100
22 8+680.00 8+690.00 1 10 10 10 10 100
23 8+690.00 8+700.00 1 10 10 10 10 100
24 8+700.00 8+710.00 1 10 10 10 10 100
25 8+710.00 8+720.00 1 10 10 10 10 100
26 8+720.00 8+730.00 1 10 10 10 10 100
27 8+730.00 8+740.00 1 10 10 10 10 100
28 8+740.00 8+750.00 1 10 10 10 10 100
29 8+750.00 8+760.00 1 10 10 10 10 100
30 8+760.00 8+770.00 1 10 10 10 10 100
31 8+770.00 8+780.00 1 10 10 10 10 100
32 8+780.00 8+790.00 1 10 10 10 10 100
33 8+790.00 8+800.00 1 10 10 10 10 100
34 8+800.00 8+810.00 1 10 10 10 10 100
35 8+810.00 8+820.00 1 10 10 10 10 100

Submitted by: Checked by: Approved by:


Page 83 of 101

Chainage Breadth
SN No. Length Quantity Remarks
Start End b1 b2 Mean
36 8+820.00 8+830.00 1 10 10 10 10 100
37 8+830.00 8+840.00 1 10 10 10 10 100
38 8+840.00 8+850.00 1 10 10 10 10 100
39 8+850.00 8+860.00 1 10 10 10 10 100
40 8+860.00 8+870.00 1 10 10 10 10 100
41 8+870.00 8+880.00 1 10 10 10 10 100
42 8+880.00 8+890.00 1 10 10 10 10 100
43 8+890.00 8+900.00 1 10 10 10 10 100
44 8+900.00 8+910.00 1 10 10 10 10 100
45 8+910.00 8+920.00 1 10 10 10 10 100
46 8+920.00 8+930.00 1 10 10 10 10 100
47 8+930.00 8+940.00 1 10 10 10 10 100
48 8+940.00 8+950.00 1 10 10 10 10 100
49 8+950.00 8+960.00 1 10 10 10 10 100
50 8+960.00 8+970.00 1 10 10 10 10 100
51 8+970.00 8+980.00 1 10 10 10 10 100
52 8+980.00 8+990.00 1 10 10 10 10 100
53 8+990.00 9+000.00 1 10 10 10 10 100
54 9+000.00 9+010.00 1 10 10 10 10 100
55 9+010.00 9+020.00 1 10 10 10 10 100
56 9+020.00 9+030.00 1 10 10 10 10 100
57 9+030.00 9+040.00 1 10 10 10 10 100
58 9+040.00 9+050.00 1 10 10 10 10 100
59 9+050.00 9+060.00 1 10 10 10 10 100
60 9+060.00 9+070.00 1 10 10 10 10 100
61 9+070.00 9+080.00 1 10 10 10 10 100
62 9+080.00 9+090.00 1 10 10 10 10 100
63 9+090.00 9+100.00 1 10 10 10 10 100
64 9+100.00 9+110.00 1 10 10 10 10 100
65 9+110.00 9+120.00 1 10 10 10 10 100
66 9+120.00 9+130.00 1 10 10 10 10 100
67 9+130.00 9+140.00 1 10 10 10 10 100
68 9+140.00 9+150.00 1 10 10 10 10 100
69 9+150.00 9+160.00 1 10 10 10 10 100
70 9+160.00 9+170.00 1 10 10 10 10 100
71 9+170.00 9+180.00 1 10 10 10 10 100
72 9+180.00 9+190.00 1 10 10 10 10 100
73 9+190.00 9+200.00 1 10 10 10 10 100
74 9+200.00 9+210.00 1 10 10 10 10 100
75 9+210.00 9+220.00 1 10 10 10 10 100
76 9+220.00 9+230.00 1 10 10 10 10 100
77 9+230.00 9+240.00 1 10 10 10 10 100
78 9+240.00 9+250.00 1 10 10 10 10 100
79 9+250.00 9+260.00 1 10 10 10 10 100
80 9+260.00 9+270.00 1 10 10 10 10 100
81 9+270.00 9+280.00 1 10 10 10 10 100

Submitted by: Checked by: Approved by:


Page 84 of 101

Chainage Breadth
SN No. Length Quantity Remarks
Start End b1 b2 Mean
82 9+280.00 9+290.00 1 10 10 10 10 100
83 9+290.00 9+300.00 1 10 10 10 10 100
84 9+300.00 9+310.00 1 10 10 10 10 100
85 9+310.00 9+320.00 1 10 10 10 10 100
86 9+320.00 9+330.00 1 10 10 10 10 100
87 9+330.00 9+340.00 1 10 10 10 10 100
88 9+340.00 9+350.00 1 10 10 10 10 100
89 9+350.00 9+360.00 1 10 10 10 10 100
90 9+360.00 9+370.00 1 10 10 10 10 100
91 9+370.00 9+380.00 1 10 10 10 10 100
92 9+380.00 9+390.00 1 10 10 10 10 100
93 9+390.00 9+400.00 1 10 10 10 10 100
94 9+400.00 9+410.00 1 10 10 10 10 100
95 9+410.00 9+420.00 1 10 10 10 10 100
96 9+420.00 9+430.00 1 10 10 10 10 100
97 9+430.00 9+440.00 1 10 10 10 10 100
98 9+440.00 9+450.00 1 10 10 10 10 100
99 9+450.00 9+460.00 1 10 10 10 10 100
100 9+460.00 9+470.00 1 10 10 10 10 100
101 9+470.00 9+480.00 1 10 10 10 10 100
102 9+480.00 9+490.00 1 10 10 10 10 100
103 9+490.00 9+500.00 1 10 10 10 10 100
104 9+500.00 9+510.00 1 10 10 10 10 100
105 9+510.00 9+520.00 1 10 10 10 10 100
106 9+520.00 9+530.00 1 10 10 10 10 100
107 9+530.00 9+540.00 1 10 10 10 10 100
108 9+540.00 9+550.00 1 10 10 10 10 100
109 9+550.00 9+560.00 1 10 10 10 10 100
110 9+560.00 9+570.00 1 10 10 10 10 100
111 9+570.00 9+580.00 1 10 10 10 10 100
112 9+580.00 9+590.00 1 10 10 10 10 100
113 9+590.00 9+600.00 1 10 10 10 10 100
114 9+600.00 9+610.00 1 10 10 10 10 100
115 9+610.00 9+620.00 1 10 10 10 10 100
116 9+620.00 9+630.00 1 10 10 10 10 100
117 9+630.00 9+640.00 1 10 10 10 10 100
118 9+640.00 9+650.00 1 10 10 10 10 100
119 9+650.00 9+660.00 1 10 10 10 10 100
120 9+660.00 9+670.00 1 10 10 10 10 100
121 9+670.00 9+680.00 1 10 10 10 10 100
122 9+680.00 9+690.00 1 10 10 10 10 100
123 9+690.00 9+700.00 1 10 10 10 10 100
124 9+700.00 9+710.00 1 10 10 10 10 100
125 9+710.00 9+720.00 1 10 10 10 10 100
126 9+720.00 9+730.00 1 10 10 10 10 100
127 9+730.00 9+740.00 1 10 10 10 10 100

Submitted by: Checked by: Approved by:


Page 85 of 101

Chainage Breadth
SN No. Length Quantity Remarks
Start End b1 b2 Mean
128 9+740.00 9+750.00 1 10 10 10 10 100
129 9+750.00 9+760.00 1 10 10 10 10 100
130 9+760.00 9+770.00 1 10 10 10 10 100
131 9+770.00 9+780.00 1 10 10 10 10 100
132 9+780.00 9+790.00 1 10 10 10 10 100
133 9+790.00 9+800.00 1 10 10 10 10 100
134 9+800.00 9+810.00 1 10 10 10 10 100
135 9+810.00 9+820.00 1 10 10 10 10 100
136 9+820.00 9+830.00 1 10 10 10 10 100
137 9+830.00 9+840.00 1 10 10 10 10 100
138 9+840.00 9+850.00 1 10 10 10 10 100
139 9+850.00 9+860.00 1 10 10 10 10 100
140 9+860.00 9+870.00 1 10 10 10 10 100
141 9+870.00 9+880.00 1 10 10 10 10 100
142 9+880.00 9+890.00 1 10 10 10 10 100
143 9+890.00 9+900.00 1 10 10 10 10 100
144 9+900.00 9+910.00 1 10 10 10 10 100
145 9+910.00 9+920.00 1 10 10 10 10 100
146 9+920.00 9+930.00 1 10 10 10 10 100
147 9+930.00 9+940.00 1 10 10 10 10 100
148 9+940.00 9+950.00 1 10 10 10 10 100
149 9+950.00 9+960.00 1 10 10 10 10 100
150 9+960.00 9+970.00 1 10 10 10 10 100
151 9+970.00 9+980.00 1 10 10 10 10 100
152 9+980.00 9+990.00 1 10 10 10 10 100
153 9+990.00 10+000.00 1 10 10 10 10 100
154 10+000.00 10+010.00 1 10 10 10 10 100
155 10+010.00 10+020.00 1 10 10 10 10 100
156 10+020.00 10+030.00 1 10 10 10 10 100
157 10+030.00 10+040.00 1 10 10 10 10 100
158 10+040.00 10+050.00 1 10 10 10 10 100
159 10+050.00 10+060.00 1 10 10 10 10 100
160 10+060.00 10+070.00 1 10 10 10 10 100
161 10+070.00 10+080.00 1 10 10 10 10 100
162 10+080.00 10+090.00 1 10 10 10 10 100
163 10+090.00 10+100.00 1 10 10 10 10 100
164 10+100.00 10+110.00 1 10 10 10 10 100
165 10+110.00 10+120.00 1 10 10 10 10 100
166 10+120.00 10+130.00 1 10 10 10 10 100
167 10+130.00 10+140.00 1 10 10 10 10 100
168 10+140.00 10+150.00 1 10 10 10 10 100
169 10+150.00 10+160.00 1 10 10 10 10 100
170 10+160.00 10+170.00 1 10 10 10 10 100
171 10+170.00 10+180.00 1 10 10 10 10 100
172 10+180.00 10+190.00 1 10 10 10 10 100
173 10+190.00 10+200.00 1 10 10 10 10 100

Submitted by: Checked by: Approved by:


Page 86 of 101

Chainage Breadth
SN No. Length Quantity Remarks
Start End b1 b2 Mean
174 10+200.00 10+210.00 1 10 10 10 10 100
175 10+210.00 10+220.00 1 10 10 10 10 100
176 10+220.00 10+230.00 1 10 10 10 10 100
177 10+230.00 10+240.00 1 10 10 10 10 100
178 10+240.00 10+250.00 1 10 10 10 10 100
179 10+250.00 10+260.00 1 10 10 10 10 100
180 10+260.00 10+270.00 1 10 10 10 10 100
181 10+270.00 10+280.00 1 10 10 10 10 100
182 10+280.00 10+290.00 1 10 10 10 10 100
183 10+290.00 10+300.00 1 10 10 10 10 100
184 10+300.00 10+310.00 1 10 10 10 10 100
185 10+310.00 10+320.00 1 10 10 10 10 100
186 10+320.00 10+330.00 1 10 10 10 10 100
187 10+330.00 10+340.00 1 10 10 10 10 100
188 10+340.00 10+350.00 1 10 10 10 10 100
189 10+350.00 10+360.00 1 10 10 10 10 100
190 10+360.00 10+370.00 1 10 10 10 10 100
191 10+370.00 10+380.00 1 10 10 10 10 100
192 10+380.00 10+390.00 1 10 10 10 10 100
193 10+390.00 10+400.00 1 10 10 10 10 100
194 10+400.00 10+410.00 1 10 10 10 10 100
195 10+410.00 10+420.00 1 10 10 10 10 100
196 10+420.00 10+430.00 1 10 10 10 10 100
197 10+430.00 10+440.00 1 10 10 10 10 100
198 10+440.00 10+450.00 1 10 10 10 10 100
199 10+450.00 10+460.00 1 10 10 10 10 100
200 10+460.00 10+470.00 1 10 10 10 10 100
201 10+470.00 10+480.00 1 10 10 10 10 100
202 10+480.00 10+490.00 1 10 10 10 10 100
203 10+490.00 10+500.00 1 10 10 10 10 100
204 10+500.00 10+510.00 1 10 10 10 10 100
205 10+510.00 10+520.00 1 10 10 10 10 100
206 10+520.00 10+530.00 1 10 10 10 10 100
207 10+530.00 10+540.00 1 10 10 10 10 100
208 10+540.00 10+550.00 1 10 10 10 10 100
209 10+550.00 10+560.00 1 10 10 10 10 100
210 10+560.00 10+570.00 1 10 10 10 10 100
211 10+570.00 10+580.00 1 10 10 10 10 100
212 10+580.00 10+590.00 1 10 10 10 10 100
213 10+590.00 10+600.00 1 10 10 10 10 100
214 10+600.00 10+610.00 1 10 10 10 10 100
215 10+610.00 10+620.00 1 10 10 10 10 100
216 10+620.00 10+630.00 1 10 10 10 10 100
217 10+630.00 10+640.00 1 10 10 10 10 100
218 10+640.00 10+650.00 1 10 10 10 10 100
219 10+650.00 10+660.00 1 10 10 10 10 100

Submitted by: Checked by: Approved by:


Page 87 of 101

Chainage Breadth
SN No. Length Quantity Remarks
Start End b1 b2 Mean
220 10+660.00 10+670.00 1 10 10 10 10 100
221 10+670.00 10+680.00 1 10 10 10 10 100
222 10+680.00 10+690.00 1 10 10 10 10 100
223 10+690.00 10+700.00 1 10 10 10 10 100
224 10+700.00 10+710.00 1 10 10 10 10 100
225 10+710.00 10+720.00 1 10 10 10 10 100
226 10+720.00 10+730.00 1 10 10 10 10 100
227 10+730.00 10+740.00 1 10 10 10 10 100
228 10+740.00 10+750.00 1 10 10 10 10 100
229 10+750.00 10+760.00 1 10 10 10 10 100
230 10+760.00 10+770.00 1 10 10 10 10 100
231 10+770.00 10+780.00 1 10 10 10 10 100
232 10+780.00 10+790.00 1 10 10 10 10 100
233 10+790.00 10+800.00 1 10 10 10 10 100
234 10+800.00 10+810.00 1 10 10 10 10 100
235 10+810.00 10+820.00 1 10 10 10 10 100
236 10+820.00 10+830.00 1 10 10 10 10 100
237 10+830.00 10+840.00 1 10 10 10 10 100
238 10+840.00 10+850.00 1 10 10 10 10 100
239 10+850.00 10+860.00 1 10 10 10 10 100
240 10+860.00 10+870.00 1 10 10 10 10 100
241 10+870.00 10+880.00 1 10 10 10 10 100
242 10+880.00 10+890.00 1 10 10 10 10 100
243 10+890.00 10+900.00 1 10 10 10 10 100
244 10+900.00 10+910.00 1 10 10 10 10 100
245 10+910.00 10+920.00 1 10 10 10 10 100
246 10+920.00 10+930.00 1 10 10 10 10 100
247 10+930.00 10+940.00 1 10 10 10 10 100
248 10+940.00 10+950.00 1 10 10 10 10 100
249 10+950.00 10+960.00 1 10 10 10 10 100
250 10+960.00 10+970.00 1 10 10 10 10 100
251 10+970.00 10+980.00 1 10 10 10 10 100
252 10+980.00 10+990.00 1 10 10 10 10 100
253 10+990.00 11+000.00 1 10 10 10 10 100
254 11+000.00 11+010.00 1 10 10 10 10 100
255 11+010.00 11+020.00 1 10 10 10 10 100
256 11+020.00 11+030.00 1 10 10 10 10 100
257 11+030.00 11+040.00 1 10 10 10 10 100
258 11+040.00 11+050.00 1 10 10 10 10 100
259 11+050.00 11+060.00 1 10 10 10 10 100
260 11+060.00 11+070.00 1 10 10 10 10 100
261 11+070.00 11+080.00 1 10 10 10 10 100
262 11+080.00 11+090.00 1 10 10 10 10 100
263 11+090.00 11+100.00 1 10 10 10 10 100
264 11+100.00 11+110.00 1 10 10 10 10 100
265 11+110.00 11+120.00 1 10 10 10 10 100

Submitted by: Checked by: Approved by:


Page 88 of 101

Chainage Breadth
SN No. Length Quantity Remarks
Start End b1 b2 Mean
266 11+120.00 11+130.00 1 10 10 10 10 100
267 11+130.00 11+140.00 1 10 10 10 10 100
268 11+140.00 11+150.00 1 10 10 10 10 100
269 11+150.00 11+160.00 1 10 10 10 10 100
270 11+160.00 11+170.00 1 10 10 10 10 100
271 11+170.00 11+180.00 1 10 10 10 10 100
272 11+180.00 11+190.00 1 10 10 10 10 100
273 11+190.00 11+200.00 1 10 10 10 10 100
274 11+200.00 11+210.00 1 10 10 10 10 100
275 11+210.00 11+220.00 1 10 10 10 10 100
Quantity Claim 27500.00

Submitted by: Checked by: Approved by:


Page 89 of 101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 6.02 Unit : m3
Providing , laying, spreading, watering, levelling, and compaction of natural gravel subbase all complete
Chainage Breadth Height
SN No. Length Quantity
Start End b1 b2 Mean h1 h2 Mean
For Subbase
13 10+080.00 10+090.00 1 10 10 10 10 0.2 0.2 0.2 20
14 10+090.00 10+100.00 1 10 10 10 10 0.2 0.2 0.2 20
15 10+100.00 10+110.00 1 10 10 10 10 0.2 0.2 0.2 20
16 10+110.00 10+120.00 1 10 10 10 10 0.2 0.2 0.2 20
17 10+120.00 10+130.00 1 10 10 10 10 0.2 0.2 0.2 20
18 10+130.00 10+140.00 1 10 10 10 10 0.2 0.2 0.2 20
19 10+140.00 10+150.00 1 10 10 10 10 0.2 0.2 0.2 20
20 10+150.00 10+160.00 1 10 10 10 10 0.2 0.2 0.2 20
21 10+160.00 10+170.00 1 10 10 10 10 0.2 0.2 0.2 20
22 10+170.00 10+180.00 1 10 10 10 10 0.2 0.2 0.2 20
23 10+180.00 10+190.00 1 10 10 10 10 0.2 0.2 0.2 20
24 10+190.00 10+200.00 1 10 10 10 10 0.2 0.2 0.2 20
25 10+200.00 10+210.00 1 10 10 10 10 0.2 0.2 0.2 20
26 10+210.00 10+220.00 1 10 10 10 10 0.2 0.2 0.2 20
27 10+220.00 10+230.00 1 10 10 10 10 0.2 0.2 0.2 20
28 10+230.00 10+240.00 1 10 10 10 10 0.2 0.2 0.2 20
29 10+240.00 10+250.00 1 10 10 10 10 0.2 0.2 0.2 20
30 10+250.00 10+260.00 1 10 10 10 10 0.2 0.2 0.2 20
31 10+260.00 10+270.00 1 10 10 10 10 0.2 0.2 0.2 20
32 10+270.00 10+280.00 1 10 10 10 10 0.2 0.2 0.2 20
33 10+280.00 10+290.00 1 10 10 10 10 0.2 0.2 0.2 20
34 10+290.00 10+300.00 1 10 10 10 10 0.2 0.2 0.2 20
35 10+300.00 10+310.00 1 10 10 10 10 0.2 0.2 0.2 20
36 10+310.00 10+320.00 1 10 10 10 10 0.2 0.2 0.2 20
37 10+320.00 10+330.00 1 10 10 10 10 0.2 0.2 0.2 20
38 10+330.00 10+340.00 1 10 10 10 10 0.2 0.2 0.2 20
39 10+340.00 10+350.00 1 10 10 10 10 0.2 0.2 0.2 20
40 10+350.00 10+360.00 1 10 10 10 10 0.2 0.2 0.2 20
41 10+360.00 10+370.00 1 10 10 10 10 0.2 0.2 0.2 20
42 10+370.00 10+380.00 1 10 10 10 10 0.2 0.2 0.2 20
43 10+380.00 10+390.00 1 10 10 10 10 0.2 0.2 0.2 20
44 10+390.00 10+400.00 1 10 10 10 10 0.2 0.2 0.2 20
45 10+400.00 10+410.00 1 10 10 10 10 0.2 0.2 0.2 20
46 10+410.00 10+420.00 1 10 10 10 10 0.2 0.2 0.2 20
47 10+420.00 10+430.00 1 10 10 10 10 0.2 0.2 0.2 20
48 10+430.00 10+440.00 1 10 10 10 10 0.2 0.2 0.2 20
49 10+440.00 10+450.00 1 10 10 10 10 0.2 0.2 0.2 20
50 10+450.00 10+460.00 1 10 10 10 10 0.2 0.2 0.2 20
51 10+460.00 10+470.00 1 10 10 10 10 0.2 0.2 0.2 20
52 10+470.00 10+480.00 1 10 10 10 10 0.2 0.2 0.2 20
53 10+480.00 10+490.00 1 10 10 10 10 0.2 0.2 0.2 20
54 10+490.00 10+500.00 1 10 10 10 10 0.2 0.2 0.2 20
55 10+500.00 10+510.00 1 10 10 10 10 0.2 0.2 0.2 20
56 10+510.00 10+520.00 1 10 10 10 10 0.2 0.2 0.2 20

Submitted by: Checked by: Approved by:


Page 90 of 101

Chainage Breadth Height


SN No. Length Quantity
Start End b1 b2 Mean h1 h2 Mean
57 10+520.00 10+530.00 1 10 10 10 10 0.2 0.2 0.2 20
58 10+530.00 10+540.00 1 10 10 10 10 0.2 0.2 0.2 20
59 10+540.00 10+550.00 1 10 10 10 10 0.2 0.2 0.2 20
60 10+550.00 10+560.00 1 10 10 10 10 0.2 0.2 0.2 20
61 10+560.00 10+570.00 1 10 10 10 10 0.2 0.2 0.2 20
62 10+570.00 10+580.00 1 10 10 10 10 0.2 0.2 0.2 20
63 10+580.00 10+590.00 1 10 10 10 10 0.2 0.2 0.2 20
64 10+590.00 10+600.00 1 10 10 10 10 0.2 0.2 0.2 20
65 10+600.00 10+610.00 1 10 10 10 10 0.2 0.2 0.2 20
66 10+610.00 10+620.00 1 10 10 10 10 0.2 0.2 0.2 20
67 10+620.00 10+630.00 1 10 10 10 10 0.2 0.2 0.2 20
68 10+630.00 10+640.00 1 10 10 10 10 0.2 0.2 0.2 20
69 10+640.00 10+650.00 1 10 10 10 10 0.2 0.2 0.2 20
70 10+650.00 10+660.00 1 10 10 10 10 0.2 0.2 0.2 20
71 10+660.00 10+670.00 1 10 10 10 10 0.2 0.2 0.2 20
72 10+670.00 10+680.00 1 10 10 10 10 0.2 0.2 0.2 20
73 10+680.00 10+690.00 1 10 10 10 10 0.2 0.2 0.2 20
74 10+690.00 10+700.00 1 10 10 10 10 0.2 0.2 0.2 20
75 10+700.00 10+710.00 1 10 10 10 10 0.2 0.2 0.2 20
76 10+710.00 10+720.00 1 10 10 10 10 0.2 0.2 0.2 20
77 10+720.00 10+730.00 1 10 10 10 10 0.2 0.2 0.2 20
78 10+730.00 10+740.00 1 10 10 10 10 0.2 0.2 0.2 20
79 10+740.00 10+750.00 1 10 10 10 10 0.2 0.2 0.2 20
80 10+750.00 10+760.00 1 10 10 10 10 0.2 0.2 0.2 20
81 10+760.00 10+770.00 1 10 10 10 10 0.2 0.2 0.2 20
82 10+770.00 10+780.00 1 10 10 10 10 0.2 0.2 0.2 20
83 10+780.00 10+790.00 1 10 10 10 10 0.2 0.2 0.2 20
84 10+790.00 10+800.00 1 10 10 10 10 0.2 0.2 0.2 20
85 10+800.00 10+810.00 1 10 10 10 10 0.2 0.2 0.2 20
86 10+810.00 10+820.00 1 10 10 10 10 0.2 0.2 0.2 20
87 10+820.00 10+830.00 1 10 10 10 10 0.2 0.2 0.2 20
88 10+830.00 10+840.00 1 10 10 10 10 0.2 0.2 0.2 20
89 10+840.00 10+850.00 1 10 10 10 10 0.2 0.2 0.2 20
90 10+850.00 10+860.00 1 10 10 10 10 0.2 0.2 0.2 20
91 10+860.00 10+870.00 1 10 10 10 10 0.2 0.2 0.2 20
92 10+870.00 10+880.00 1 10 10 10 10 0.2 0.2 0.2 20
93 10+880.00 10+890.00 1 10 10 10 10 0.2 0.2 0.2 20
94 10+890.00 10+900.00 1 10 10 10 10 0.2 0.2 0.2 20
95 10+900.00 10+910.00 1 10 10 10 10 0.2 0.2 0.2 20
96 10+910.00 10+920.00 1 10 10 10 10 0.2 0.2 0.2 20
97 10+920.00 10+930.00 1 10 10 10 10 0.2 0.2 0.2 20
98 10+930.00 10+940.00 1 10 10 10 10 0.2 0.2 0.2 20
99 10+940.00 10+950.00 1 10 10 10 10 0.2 0.2 0.2 20
100 10+950.00 10+960.00 1 10 10 10 10 0.2 0.2 0.2 20
101 10+960.00 10+970.00 1 10 10 10 10 0.2 0.2 0.2 20
102 10+970.00 10+980.00 1 10 10 10 10 0.2 0.2 0.2 20
103 10+980.00 10+990.00 1 10 10 10 10 0.2 0.2 0.2 20
104 10+990.00 11+000.00 1 10 10 10 10 0.2 0.2 0.2 20
105 11+000.00 11+010.00 1 10 10 10 10 0.2 0.2 0.2 20
106 11+010.00 11+020.00 1 10 10 10 10 0.2 0.2 0.2 20
107 11+020.00 11+030.00 1 10 10 10 10 0.2 0.2 0.2 20
108 11+030.00 11+040.00 1 10 10 10 10 0.2 0.2 0.2 20

Submitted by: Checked by: Approved by:


Page 91 of 101

Chainage Breadth Height


SN No. Length Quantity
Start End b1 b2 Mean h1 h2 Mean
109 11+040.00 11+050.00 1 10 10 10 10 0.2 0.2 0.2 20
110 11+050.00 11+060.00 1 10 10 10 10 0.2 0.2 0.2 20
111 11+060.00 11+070.00 1 10 10 10 10 0.2 0.2 0.2 20
112 11+070.00 11+080.00 1 10 10 10 10 0.2 0.2 0.2 20
113 11+080.00 11+090.00 1 10 10 10 10 0.2 0.2 0.2 20
114 11+090.00 11+100.00 1 10 10 10 10 0.2 0.2 0.2 20
115 11+100.00 11+110.00 1 10 10 10 10 0.2 0.2 0.2 20
116 11+110.00 11+120.00 1 10 10 10 10 0.2 0.2 0.2 20
117 11+120.00 11+130.00 1 10 10 10 10 0.2 0.2 0.2 20
118 11+130.00 11+140.00 1 10 10 10 10 0.2 0.2 0.2 20
119 11+140.00 11+150.00 1 10 10 10 10 0.2 0.2 0.2 20
120 11+150.00 11+160.00 1 10 10 10 10 0.2 0.2 0.2 20
121 11+160.00 11+170.00 1 10 10 10 10 0.2 0.2 0.2 20
122 11+170.00 11+180.00 1 10 10 10 10 0.2 0.2 0.2 20
123 11+180.00 11+190.00 1 10 10 10 10 0.2 0.2 0.2 20
124 11+190.00 11+200.00 1 10 10 10 10 0.2 0.2 0.2 20
125 11+200.00 11+210.00 1 10 10 10 10 0.2 0.2 0.2 20
126 11+210.00 11+220.00 1 10 10 10 10 0.2 0.2 0.2 20
127 11+220.00 11+230.00 1 10 10 10 10 0.2 0.2 0.2 20
128 11+230.00 11+240.00 1 10 10 10 10 0.2 0.2 0.2 20
129 11+240.00 11+250.00 1 10 10 10 10 0.2 0.2 0.2 20
130 11+250.00 11+260.00 1 10 10 10 10 0.2 0.2 0.2 20
Quantity Claim 2360.00
Quantity Taken 1652.00
Quantity Withheld 708.00

Submitted by: Checked by: Approved by:


Page 92 of 101

Government of Nepal
nistry of Physical Infrastructure and Transport
Department of Roads
ki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet

compaction of natural gravel subbase all complete

Remarks

Submitted by: Checked by: Approved by:


Page 93 of 101

Remarks

Submitted by: Checked by: Approved by:


Page 94 of 101

Remarks

Submitted by: Checked by: Approved by:


95/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 8.03 Unit : hr
Equipment
c) Tipper truck (8-10 ton capacity)
Chainage Worked Hrs. Quantity in
SN Date No. Remarks
From To From To Total hrs
1 8/15/2076 8560 8600 1 7 11 4 4 Debris Removal
2 8/15/2076 8560 8600 1 13 17 4 4 Debris Removal
3 8/17/2076 8600 8640 1 7 11 4 4 Debris Removal
4 8/17/2076 8600 8640 1 13 17 4 4 Debris Removal
5 8/18/2076 8660 8710 1 7 11 4 4 Debris Removal
6 8/18/2076 8660 8710 1 13 17 4 4 Debris Removal
7 8/19/2076 8720 8770 1 7 11 4 4 Debris Removal
8 8/19/2076 8720 8770 1 13 17 4 4 Debris Removal
9 8/21/2076 8800 8890 1 7 11 4 4 Debris Removal
10 8/21/2076 8800 8890 1 13 17 4 4 Debris Removal
11 8/24/2076 8950 9030 1 7 11 4 4 Debris Removal
12 8/24/2076 8950 9030 1 13 17 4 4 Debris Removal
13 8/25/2076 9050 9100 1 7 11 4 4 Debris Removal
14 8/25/2076 9050 9100 1 13 17 4 4 Debris Removal
15 8/26/2076 9150 9230 1 7 11 4 4 Debris Removal
16 8/26/2076 9150 9230 1 13 17 4 4 Debris Removal
17 8/29/2076 9250 9360 1 7 11 4 4 Debris Removal
18 8/29/2076 9250 9360 1 13 17 4 4 Debris Removal
19 9/5/2076 9400 9490 1 7 11 4 4 Debris Removal
20 9/5/2076 9400 9490 1 13 17 4 4 Debris Removal
21 9/7/2076 9510 9600 1 7 11 4 4 Debris Removal
22 9/7/2076 9510 9600 1 13 17 4 4 Debris Removal
23 9/9/2076 9610 9670 1 7 11 4 4 Debris Removal
24 9/9/2076 9610 9670 1 13 17 4 4 Debris Removal
25 9/11/2076 9670 9740 1 7 11 4 4 Debris Removal
26 9/11/2076 9670 9740 1 13 17 4 4 Debris Removal
27 9/14/2076 9750 9990 1 7 11 4 4 Debris Removal
28 9/14/2076 9750 9990 1 13 17 4 4 Debris Removal
29 9/15/2076 11250 11320 1 7 11 4 4 Debris Removal
30 9/15/2076 11250 11320 1 13 17 4 4 Debris Removal
31 9/16/2076 11340 11420 1 7 11 4 4 Debris Removal
32 9/16/2076 11340 11420 1 13 17 4 4 Debris Removal
33 9/18/2076 11420 11510 1 7 11 4 4 Debris Removal
34 9/18/2076 11420 11510 1 13 17 4 4 Debris Removal
35 9/20/2076 6700 6780 1 7 11 4 4 Debris Removal
36 9/20/2076 6700 6780 1 13 17 4 4 Debris Removal
37 9/21/2076 6780 6890 1 7 11 4 4 Debris Removal
38 9/21/2076 6780 6890 1 13 17 4 4 Debris Removal
39 9/23/2076 6890 7020 1 7 11 4 4 Debris Removal
40 9/23/2076 6890 7020 1 13 17 4 4 Debris Removal
Quantity Claim 160.00

Submitted by: Checked by: Approved by:


96/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 8.03 Unit : hr
Equipment
d) Loader (1-1.5 m3 bucket capacity)
Chainage Worked Hrs. Quantity in
SN Date No. Remarks
From To From To Total hrs
1 8/15/2076 8560 8600 1 7 11 4 4 Debris Removal
2 8/15/2076 8560 8600 1 13 17 4 4 Debris Removal
3 8/17/2076 8600 8640 1 7 11 4 4 Debris Removal
4 8/17/2076 8600 8640 1 13 17 4 4 Debris Removal
5 8/18/2076 8660 8710 1 7 11 4 4 Debris Removal
6 8/18/2076 8660 8710 1 13 17 4 4 Debris Removal
7 8/19/2076 8720 8770 1 7 11 4 4 Debris Removal
8 8/19/2076 8720 8770 1 13 17 4 4 Debris Removal
9 8/21/2076 8800 8890 1 7 11 4 4 Debris Removal
10 8/21/2076 8800 8890 1 13 17 4 4 Debris Removal
11 8/24/2076 8950 9030 1 7 11 4 4 Debris Removal
12 8/24/2076 8950 9030 1 13 17 4 4 Debris Removal
13 8/25/2076 9050 9100 1 7 11 4 4 Debris Removal
14 8/25/2076 9050 9100 1 13 17 4 4 Debris Removal
15 8/26/2076 9150 9230 1 7 11 4 4 Debris Removal
16 8/26/2076 9150 9230 1 13 17 4 4 Debris Removal
17 8/29/2076 9250 9360 1 7 11 4 4 Debris Removal
18 8/29/2076 9250 9360 1 13 17 4 4 Debris Removal
19 9/5/2076 9400 9490 1 7 11 4 4 Debris Removal
20 9/5/2076 9400 9490 1 13 17 4 4 Debris Removal
21 9/7/2076 9510 9600 1 7 11 4 4 Debris Removal
22 9/7/2076 9510 9600 1 13 17 4 4 Debris Removal
23 9/9/2076 9610 9670 1 7 11 4 4 Debris Removal
24 9/9/2076 9610 9670 1 13 17 4 4 Debris Removal
25 9/11/2076 9670 9740 1 7 11 4 4 Debris Removal
26 9/11/2076 9670 9740 1 13 17 4 4 Debris Removal
27 9/14/2076 9750 9990 1 7 11 4 4 Debris Removal
28 9/14/2076 9750 9990 1 13 17 4 4 Debris Removal
29 9/15/2076 11250 11320 1 7 11 4 4 Debris Removal
30 9/15/2076 11250 11320 1 13 17 4 4 Debris Removal
31 9/16/2076 11340 11420 1 7 11 4 4 Debris Removal
32 9/16/2076 11340 11420 1 13 17 4 4 Debris Removal
33 9/18/2076 11420 11510 1 7 11 4 4 Debris Removal
34 9/18/2076 11420 11510 1 13 17 4 4 Debris Removal
35 9/20/2076 6700 6780 1 7 11 4 4 Debris Removal
36 9/20/2076 6700 6780 1 13 17 4 4 Debris Removal
37 9/21/2076 6780 6890 1 7 11 4 4 Debris Removal
38 9/21/2076 6780 6890 1 13 17 4 4 Debris Removal
39 9/23/2076 6890 7020 1 7 11 4 4 Debris Removal
40 9/23/2076 6890 7020 1 13 17 4 4 Debris Removal
Quantity Claim 160.00

Submitted by: Checked by: Approved by:


97/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 8.03 Unit : hr
Equipment
e) Excavator (200hp)
Chainage Worked Hrs. Quantity in
SN Date No.
From To From To Total hrs
1 8/15/2076 8560 8600 1 7 11 4 4
2 8/15/2076 8560 8600 1 13 17 4 4
3 8/17/2076 8600 8640 1 7 11 4 4
4 8/17/2076 8600 8640 1 13 17 4 4
5 8/18/2076 8660 8710 1 7 11 4 4
6 8/18/2076 8660 8710 1 13 17 4 4
7 8/19/2076 8720 8770 1 7 11 4 4
8 8/19/2076 8720 8770 1 13 17 4 4
9 8/21/2076 8800 8890 1 7 11 4 4
10 8/21/2076 8800 8890 1 13 17 4 4
11 8/24/2076 8950 9030 1 7 11 4 4
12 8/24/2076 8950 9030 1 13 17 4 4
13 8/25/2076 9050 9100 1 7 11 4 4
14 8/25/2076 9050 9100 1 13 17 4 4
15 8/26/2076 9150 9230 1 7 11 4 4
16 8/26/2076 9150 9230 1 13 17 4 4
17 8/29/2076 9250 9360 1 7 11 4 4
18 8/29/2076 9250 9360 1 13 17 4 4
19 9/5/2076 9400 9490 1 7 11 4 4
20 9/5/2076 9400 9490 1 13 17 4 4
21 9/7/2076 9510 9600 1 7 11 4 4
22 9/7/2076 9510 9600 1 13 17 4 4
23 9/9/2076 9610 9670 1 7 11 4 4
24 9/9/2076 9610 9670 1 13 17 4 4
25 9/11/2076 9670 9740 1 7 11 4 4
26 9/11/2076 9670 9740 1 13 17 4 4
27 9/14/2076 9750 9990 1 7 11 4 4
28 9/14/2076 9750 9990 1 13 17 4 4
29 9/15/2076 11250 11320 1 7 11 4 4
30 9/15/2076 11250 11320 1 13 17 4 4
31 9/16/2076 11340 11420 1 7 11 4 4
32 9/16/2076 11340 11420 1 13 17 4 4
33 9/18/2076 11420 11510 1 7 11 4 4
34 9/18/2076 11420 11510 1 13 17 4 4
35 9/20/2076 6700 6780 1 7 11 4 4
36 9/20/2076 6700 6780 1 13 17 4 4
37 9/21/2076 6780 6890 1 7 11 4 4
38 9/21/2076 6780 6890 1 13 17 4 4

Submitted by: Checked by: Approved by:


98/101

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Kaligandaki Corridor (Beni Jomsom Korolla Road Project)
Jomsom
Detailed Measurement Sheet
Sub-Contractor :Omkareshwor Construction PVT. LTD Interim Payment Certificate No.
Contract No.: 337145/NS/BJK/073/74-001 Measurement Date : '2076/12/06
Item No. 8.03 Unit : hr
Equipment
e) Excavator (200hp)
Chainage Worked Hrs. Quantity in
SN Date No.
From To From To Total hrs
39 9/23/2076 6890 7020 1 7 11 4 4
40 9/23/2076 6890 7020 1 13 17 4 4
Quantity Claim 160.00

Submitted by: Checked by: Approved by:


99/101

ent Certificate No.


Date : '2076/12/06

Remarks

Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal
Debris Removal

Submitted by: Checked by: Approved by:


100/101

ent Certificate No.


Date : '2076/12/06

Remarks

Debris Removal
Debris Removal

Submitted by: Checked by: Approved by:


Earthwork in excavation detail
Chainage
S.No. Distance Remarks
Start end
1 04+000 07+010 3020.00 Gap
2 07+020 07+930 920.00 Worked
3 07+940 08+280 350.00 Gap
4 08+290 08+710 430.00 Worked
5 08+720 08+940 230.00 Gap
6 08+950 10+500 1560.00 Worked
7 10+510 10+620 120.00 Gap
8 10+630 10+750 130.00 Worked
9 10+760 10+870 120.00 Gap
10 10+880 11+970 1100.00 Worked
11 11+980 14+680 2710.00 Gap
12 14+690 14+720 40.00 Worked
13 14+730 14+930 210.00 Gap
14 14+940 15+080 150.00 Worked
15 15+090 17+660 2580.00 Gap
16 17+670 17+970 310.00 Worked
17 17+980 18+590 620.00 Gap
18 18+600 18+720 130.00 Worked
19 18+730 19+630 910.00 Gap
20 19+640 19+930 300.00 Worked
21 19+940 23+000 3060.00 Gap
19000.00

You might also like