Transit
Wilson Facility TTC’s Wilson Yard is undergoing a significant
Credit: Robb Williamson, AECOM
Remediation
Between 1948 and 2004, the Giant Mine was a major economic driver
Credit: Aboriginal Affairs and Northern Development Canada
Wastewater
The Lions Gate Secondary Wastewater complements the neighbourhood. The facility
Credit: Metro Vancouver
Energy
Environment
Port Hope Area Initiative Deep Geological Repository
Top 100 Rank: 39 Top 100 Rank: 47
Cost: $1.28 billion Cost: $1 billion
Location: Port Hope and Clarington, Ontario Location: Kincardine, Ontario
Owner: Natural Resources Canada and Owner: Ontario Power Generation
Atomic Canada Limited
AECOM’s Role: Environmental Consulting
AECOM’s Role: Engineer (Port Granby) (Socio-Economic Impact Assessments,
and Environmental Assessment Communications, and Consultation Programs)
Funding: Public Funding: Public
Transportation
Gordie Howe International Bridge East Side Transportation Initiative
Top 100 Rank: 20 Top 100 Rank: 44
Cost: $2.14 billion Cost: $1.125 billion
Location: Windsor, Ontario to Detroit, Michigan Location: Eastern Manitoba
Owner: Windsor-Detroit Owner: Government of Manitoba
Bridge Authority
AECOM’s Role: Engineer
AECOM’s Role: Engineer
Funding: Public
Funding: P3
Wastewater
Hanlan Water Project Bonnybrook North End Sewage Treatment
Top 100 Rank: 89 Wastewater Treatment Plant Biological Nutrient
Cost: $450 million Plant D Expansion Removal Upgrade
Location: Mississauga, Ontario Top 100 Rank: 77 Top 100 Rank: 61
Owner: Region of Peel Cost: $600 million Cost: $794.6 million
AECOM’s Role: Environmental Location: Calgary, Alberta Location: Winnipeg, Manitoba
Assessment, Preliminary Design Owner: City of Calgary Owner: City of Winnipeg
Report, Tunnel Design and Engineering
AECOM’s Role: Engineer AECOM’s Role: Engineer
Funding: Public
Funding: Public Funding: Public
Rail
East Rail Maintenance Facility
Top 100 Rank: 56
Cost: $859.2 million
Location: Whitby, Ontario
Owner: Toronto Transit Commission
AECOM’s Role: Owner’s Engineer
Funding: P3