You are on page 1of 68
‘eatth Softy; & Environment Department SISCO Emergency Response Plan (ERP) ont Project ite | Unctional Gor EaryPreauton Puss ot afer SOUmh a Nermalyah SISCO & SAPMT CAMP EMERGENCY RESPONSE PROCEDURE (ERP) Pre Anpiaved Stati [ Rapraved Fee [ Meaith, Safety, & Environment Department | nar | emeear sisco W Emergency Response Plan (ERP) | ,,, 02 ‘Contract No. | 6500039444 Page Fora Project Tle Uncenventional Gas Early Preduction Facilities at Jaturah NSouth & Harmatyan INDEX ‘Section Description 1.0 | scope 4 2.0 REFERENCES & Se 3.0 | GLOSSARY, FORMULAE & DEFINITIONS 4 40 PROCEDURE 10 4.1 CONSIDERED EMERGENCY SCENARIO 10 4.2 EMERGENCY REPORTING 12 4.3 DETAILED ACTION PLAN 19 4.3.1 CAMP & OFFICE FIRE 19 4.3.1.1 CLASSIFICATION OF FIRE 19 4.3.2 ACCIDENTS 25 4.3.3 CHEMICAL SPILL & LEAK 28 4.3.4 NATURAL CALAMITY 31 = 4.3.5 SEARCH & RESCUE OPERATION 3 44 EMERGENCY EVACUATION PLANS as 4S EMERGENCY MEDICAL 7 4.6 RESOURCES & Locisries 3a 4n7 RECOVERY 38 | 4-8 MAINTAINING, EMERGENCY PREPAREDNESS 39 5.0 | artacHmenT 4 =] | Health, ‘Safety, & Environment Department | Ref, [ JFHseP-oon sisco W Emergency Response Plan (ERP) | ., | oz ott Contract No. sso00394e4 Page | Provect Tae Unconventional Gas Early Production Facilities at Jafurah South @ 1.0 20 3.0 Harmaliyah ‘SCOPE REFERENCE 2-1 OHSAS 18001: 2007 Health & Safety Management Syetemn 2.2 CSM Vol, 1 CSAR, 4.18 Emergency Response 2.3 8A Emergency Management Guide (SACSM) 24 2.5 OSHA 29 CFR 1910.1200 Hazard Communication Standard SLOSSARY, FORMULAE & DEFINITIONS 3:1 Certifeation: Certiteation refers to the verification of skills and knowledge that meet the objectives of an established standard. For ERT Certification to be Considered valid within ERT organizations, it must be accredited os having met the relevant NFPA oF other standard by elter the NEFSEQ 3:2 Class D Alt: Air that meets the requirements of CGA (Compressed Gas ‘Asso¢iation) G7, 79 Sonfnes Soage: Any enclosure having & tmited opening for entry and ext; Unfavorable natural ventilation which could contain br product Gengerous ay contaminants; resents serious hazards to occupentas or which Is not intended for continuous employee occupancy, Confined Spaces include, but are not limited to, storage tanks, process vessels, ventilation and exhaust ducts, manholes, pits, and excavations more. than 1.2 meters in depth. 3-4 Decontamination: The physical ant/or chemical process of reducing and preventing {he spread of contamination from persons and equpment. Health, Safety, & Environment Department | Ref. JFMSE-P-001 sisco Emergency Response Plan (ERP) | ;., 2 Contact, ssoonsesss | Pace | Soran Project Title | secon ‘Gas Early Production Facilities at Jafurah South & 3-5 Defensive Fire Fighting: The mode: of manwal fire control in which the only fire suppression activities taken are limited to those required to keep a fire from extending from one area ta another. 3.6 Drill: An emergency exercise, involving a credible emergency, requiring the ERT ta perform emergency operations. 3-7 Education: The process of imparting knowledsa or akill through systematic Instruction. It does nat necessarily require formal classroom Instruction. 3.8 Emergency: A fire, explosion, toxic release or condition that poses an immediate threat to the safety of life to persans-or serious damage to property or environment, 39 Emeraency Operations: Activities related to emergency incidents, induding response to the scene of the incident and specific dutles performed at the scene, 3-10 Emergency Operations Center (ERT Station}: A fixed, designated area to be used | supporting and coordinating operations during emergencies. 3-11 Emergency Response Plan (ERP): A documented and exercised plan of Incident Mitigation; formulated after conducting a hazard assessment of the subject area or condition, 3.42 Emeraency Response Team (ERT): An organized group of employees SISCD who are desianated, knowledgeable, trained, certified and. skilled im Arefighting, hazardous materials, first-aid and technical rescue ‘operations and related activities, Members may be employed fulltime, part-time or voluntarily In this capacity, 3-43ERT Gaptan/L¢ader: The lead responder who is a shift worker and responds to the Emergency and establishes initial ICS. Members fulfilling this role. are gupected te have Rescue Technician Certification, and Incident Commander Certification, Team Leader Certification and Fire Officer level-r certincation, 3.14 ERT Committe: A Committes, appointed by SISCO that is responsible for administration and monitoring of the ERT activities within Company. 3.15 ERT Personal Protective Equipment (ERT-PPE): Consists of rul thermal protective clothing, plus a self-contained breathing apparatus (SCBA) and a personal alert safety system (PASS) device, Pass device is mandatory BPE whenever structural firefighting activities are performed. 3-16 Eaglity: The physical structure or area within which @ manufecturing, research or tank farm {5 operated. It inctudes product handling, associated utlitics ‘and support infrastructure incated on the premises. SS ae SISCON | termepassmrcney 1c. Sass |) esena me lees Project Title Unconventional Gas Earty Preduction Facilities at Jafurah South a ae 3.17 fire Chief ot eauivalent: An employce within the SISCO- Safety and Security Department; who at minimum has the primary responsibility for the overall management, and operations of the ERT including backup team, ‘This includes responsiblity for the affiliate’s Emergency Respanse Preparedness, systems, resources, and processes. according to needs of the affiliate, he may serve in the role of Incident Commander or any Bosition included under the Incident Command System as. circumstances. dictate. Fire Chiefs shall, as minimum, possess Fire Officer Level-Ill certification in accordance: with SISCO Emergency Response Team (ERT) Selection, Training & Scone Sarety, 3.18 i: An emergency response vehicle designed and Intended primarily for fre suppression, rescue, of other specialized function. This apperatus includes pumpers, foam apparatus, aerial ladders, rescue vehicles, and other such epparahus 3.19 Fite Fichter |: The person, at the first level of progression who hes demonstrated the knowledge and skills to function as an integral member of a fire- fighting team under direct supervision in hazardaus: conditions. 3.20 Fire Banter II: The person, at the second level of progression who has Gemonstrated the skills and depth of knowledge to function under General supervision, 3:21 Fire Incident Hot Zone: The area immediately surrounding the physical location of a fire. The outer boundary of the hot zone extends far enough from the {ire to protect ERT members pasitioned outside the hot zone from being Camp Boss/ tn-chargey Supervisors shall be thoroughly Familiar ‘with this procadure and with their individual responsibilities Fegarding its implemantation and enforcement. Supervisor shall ensure thet only competent persons are ‘assigned to emeroency response duties. This includes ensuring tthe worker has the skills and knowledge to safely execute thelr emergency duties, h. Camp Occupant + Gécupant nil be trained on the emergency response plan during site orientation and must know and understand the Emergency Response requirements that apply to them. + Qccupant must report ta their Supervisor any equipment Taltnetion or other incidents that may fequire. emergency ‘actions. Employees must advise their immediate Supervisor if they are unsure of the emergency Instructions that require them to take action, i. Security Personnel * Security personne! shall also be trained on the emergency response lan including bacic nebifeation and coordination of emergeney * Security pereonnal will secure the cemp gate In the event during emergency or drill Serve as crowd contro! personnel and an active member of ERT * Report emergency to nearby local authartty under the instruction of the PM, 4. Camp HSE officers + Assist ERT Team Leader. Farilier with donning @f SCBA. Should receive training trom supplier for newly acquired SCBA. + Shall manage tha Emergency Aetion Plan for Camp site, + Shall also maintain all training racerds pertaining to this plan, + Responsible for scheduling routine tests of the Camp emergency: notification system with the appropriate authorities, First Aider/ Company Nurse * Administer first aid to injured personnel. Accompany injured person {0 hospital. Responsible for the Emergency Mobile Phone Assist during an emergency * During an emergency authorized to use all available resaurces without rior approval from ewner |. Ambulance Driver 5 Familiar with well site and routes to nearest hospitals, Must undergone defensive driving, Must follow the First-Aid Provider ‘or Camnpany Nurse instruction, Health, Safety, & Environment Department | Ref. | 15-H8€-rsr-oo2 SISCO a Emergency Response Plan (ERP) Rev. ar Contract Ne. 6600039404 Pore | 19 0f a1 Project Title | Unconventional Gas Early Produetion Facilities at Jafurah South & Harmaliyah m. Sub-contractors © Sub-contract employees are responsible for complying with this: Blan, and shall be provided the training described herein by HSE. Officer 4.3 DETAILED ACTION PLAN (DAP) 4.3.1 CAMP & OFFICE FIRE Objective: ‘To ensure that the persons warking in the organization is safely evacuated in case of any fire or explosion occurs and to keep those In a place protect their integrity while overcoming the emergency. 4.3.1.1 Classification af Fire; ‘The fire is classified according to type of fuel to: a. Fire cass (A): this type of fire covers wood, paper, cloth, trash, Dlasti¢ solid Combustible material that are not metols (clase A fires generally leave an Ash) 6 Fire class (B): this type covers flammable liquids (such as gasaline, il, grease, acetone and any non ~ metal In a liquid stata, on fire, ‘This cassification also Includes flammable gases. ( ciass B fice generally involve materials thet Boil or Bubble ) ‘¢ Fire class (C): this area covers energized electrical equipment as long as i's “plugged in "it would be considered a dass C fire. (Clase C fires generally deal with electrical Current.) ‘d. Fire class (D): this area covers heavy metalé (potassium, sodium, alurninum, magnesium), Unless you work In a laboratory or In an Industry that uses these materials, it is unlikely you will Nave to deal with a class D FIRE, Fire class (k}: It covers fire related to cooking oily foods. Also known as kitchen fire, Eine Hazard Gassification 1, Laydown Yard & Site office: it has been Identified as area class (A) due ‘te that it contains wooden boxes, plaste films, papers. 2. Camp Accommodation: it has been identified as area dass (A) dué to that it has accommodated clothes and wood which considered as fuel of fire class (i). 3. Electrical Panel Boards, Control Panel, & Generator: it has been entified class (C) due to the presence of high voltage electricity, Health, Safety, & Environment Department | Ref. | INSHSEFSoo2 SISCO Emergency Response Plan (ERP) | a, a | Contract No 6600035e44 rege | 20 of at _ Project Title | Uncomentional Gas Early Production Facilities at lafurah South & Harmatiyan Seneral Evacuation \- Upon hearing an emergency alarm (Camp Fire Alarm System), Personnel shal 1. Stop ail work immediatety, 2. Safoly shut down main electrical control panel, 3. Evacuate to the predetermined assembly point, 4, Remain at assembly ares until ALLCLEAR signal from Emergency Command Center iead By PM of the ‘eantractor in coordination with SAPMT, 5. Incase gate WI will be used during emergency evacuation the gate key shall be available ot SAPMT Camp office & duplicate key with scourity in-charge. il, Ske Supervisors shall 41. Stop all work immediately and cancel work permts, 2. Safely shut down all equmert, 3. Evacuate all personnel to a pradetenmined assembly Point or shelter area. 4. Conduct a roll call or head count to account for avery person. In the event & person is missing, his/her name and last known Iaeation shall be communicated to the, Incident Commander immediately, Prevent personnel from returning to Work until not#ieatien has been Feeeived from ECC and Incigent Commander, ‘Camp 8 Office Class-A Fire Procedure: + Occupants: 1. When diecovering the fire, Push the nearest (Manual call point) button to alert others, 2. Once the fire alarm sounds, shut down all electrical and gas supplies, 3. Evacuate the area towards the assembly point. 4. Use the nearest emergency exit 5, Report your presence to your superior and cafeey officer, 6. Report the emergency on emergency contact list based on type of ‘emergency 1. In case of fre class (4), all fire fighters or ERT shall run toward the Nearest fire extinguishers. 2. Pull it anc run towards the fre lacation 3. Assess the situation according to the following conditions: 3:1 The fire doesn’t exceed the fighter’s height in standing pasition 3.2 The air is safe te breath ond the smicke raised doesnt require respiratory protection equipment sisco W Health, Safety, & Environment Department | Ref. | iNtnse-rs-coz | Emergency Response Plan (ERP) ‘ewe aa ‘Contract No, I e600075444 Page 21 of dd Project Te ‘Unconventional Gas Early Production Facilities at Jafurah South @ Harmatiyah 3.3 Heat not really increased in the place and the visibility is good 3.4 There Is a clear evacuation path behind you as you fight the fire IF the conditions are met, proceed to the following steps. If not, evacuate the area immediately Stand 2-3 meters away from the fire Diract the fire extinguish hose toward the fire base (fuel) Remove the pin if you use the portable fire extinguisher and squeeze the top handla /open the water valve in the fire hose, ‘Sweep side to side until the fire completely out Ensure that the fire completely controlled and monitor-the chance or re-ignition . Evacuate the area to assembly area 10. Report your presence to the safety officer/safety representative and inform him about the case © @N ame * Camp Safety Stott; 3. Count the assembled staff and make sure that all of them are precent. 2, Report any missing person and take the proper action. 3. After the fire completely off; start the investigation of the incidents and @eclare the main reasons of incidents nccurrence, 4. Report the complete information te Dept, Manager for further actions, . Study the given infermation and Verify the root cause of the incident, &. Farm 2 committee involving the department heads and concern perties to analyze the situation and to set the correstve actions. 7, Follow up the corrective actions implementation until ensuring that the situation returns to the nomal moce and the actions are effective. sisco Health, Safety, & Environment Department Ref, | IG-NEEPsm on Emergency Response Pian (ERP) Rev. oz Contract No. ss00079444 Pege | 22 of ai Project Title | Unconventional Gas Early Production Facilities at Jafurah South & Harmaliyah Fire class A ERT teem — | coum aston | Hretightiog am | camp catey emt | Prict HSE minor xq —— __ Process Flow Healthy Safety, & Environment Department | Ref. | IMS-HSEPSr002 sisco W Emergency Response Pian (ERP) Rev, 02 Contract No. Seo003s444 Page | 23 ota Project Title | Unconventional Gas Early Production Facilities at Jafurah South & Marmaliyah * Occupants: 1, Once hearing fire alarm sounds, shut down the electrical and gas valves. 2, Run teward the nearest evacuation route 3. Evacuate the area towards assembly point. 4. Report your presence to your superior and safety officer as well, 5: Report the emergency by calling the emergency contact numbers posted in each location 0 Emerpancy Response Team; 1, In case of fire class (C), all fire fighters shall run toward ‘the nearest fire extinguishers, 2. Pull and run towards the fire location 3. Assess the situation according ta the following conditions: 344 The fire doesn’t exceed the fighter's head in standing position 3.2 The air is safe to breath and the smoke raised doesn't require ‘respiratory protection equipment 3.3 Meat not really increased in the place and the visibiity Is good 3.4 There is @ clear evacuation path behind you as you fight the fire If the conditions are met, proceed te the following steps. If not, evacuate the area immediately 4, Stand 2-3 meters away from the nre 5. Direct the fire extinguish hose toward the fire base (Fuel) 6 Remove the pin if you use the portable fire extinguisher and squeeze the top handie /opan the water valve in the fre hase, 7. Sweep side to side until the fire completely out & Ensure that the fire completely controlled 9. Evacuate the area to assembly arsa 10. Report your presence to the safety officer and inform him about the case Count the assembied staff and make sure that all ef'them ere present, Report any missing person and take the proper action, ‘After the fire completely off; start the investigation of tha ineidents and deciare the main reasons of incidents occurrence. Report the complete information to safety engineer for further actions Verify the results out of the investigation. Verify loses and damages afficted the persons or the company properties, Form @ eommittes involving various levels to review the situation and to agree upon the efficent corrective action. Supervise the implementation, maintenance and monitoring of the set corrective action. Inform the management aout the final condusion, 2 @ | Meath, Satety, & Environment Department | Ail) | weseosmon sisco Emergency Response Plan (ERP) | jay, a L Contract No ssoooz0aes | rage | 2 ort Project Titie | Unconventional Gas Early Production Facilities st Jarurah South & Harmatiyany Fire class C ERT members Sain: Firenanter camp sate 1 HOE ranar | pe 26: | Sieecan ep Satety | Pier Hse Process Flow Chart Health, Safety, & Environment Department | fel | Deeps SISCO a Emergency Response Plan (ERP) | 2, on Contract fto, Gea0039444 Page | 25 of aL Project Title | Unconventional Gas Early Production Facilities at Jafurah South & Harmaliyah 4.3.2 ACCIDENTS Objective: ‘To determine the pre-preparation acts to handle, treat and manage any work related incidents which might effects the employee's integrity as well as the Company properties. In addition, ensure that any incidents eccur during the Gaily work activities are treated In a quickest time and to keep the outcome of aay incidents under control. Inckdects.are aivided tet 1) Accidents: am Incident which has given rise to Injury, ill health or fatality, 2. Near miss: an incident where no injuries, ill health, or fatality occurs. Procedure: 1, Camp Boss! Manager: 1.1, In case of any accidents occurs within the respective department; assess the severity of injury. 41.2. If the situation not severe, provide the first aid trestment. If the Injury is severe, call the security guard to provide pick up service ta haspital 1.3. Don't move the casualty until the arrival of the medical service. 1.4. Assist the medical service person(s) # required, 1.5, Report the detaled event to the safety Omicer, 1,6. Be involved in the investigation committee. 1.7, Follow up the corrective action implementation and moniter the efficiency. 41.8. Report eny deviatian to concem parties to revassess the Corrective Action, 1.9. Carry out @ tisk assessment for the respectwe department if naaded, 2. Occunants: 1. Always look for your own and ether's safety durin work: 2. Inform sbout any accident might occur within your department or other department. 3. Report ail information ragardless haw much sight tt is 4 F an aecident occurs within your werking area; inferm your superior and ask for help, 2.5. Dont try to move or lift the victim until you have been requested 2.6 Keep the area vertilater’ around the location of the victim 2.7. Walt the arrival of the medical help. 2.8. Assist the medical help team if needed. ith, Safety, & Environment Department | Ret, | D1S-Kse-Pse-oo2 sisco W Emergency Response Plan (ERP) | 2, 02 Contract Wo, sc00039ee0 Page | 25 of at Project Titi | Unconventional Gas Early Production Facilities at Jafureh South & [ Marmativah 2.9. Report the detailed event tothe safety representative/Superior for further investigation purposes, 2.10. Contribute to Investigation processes to ensure correct information s given, 2.11.Help in the implementation of the corrective action and make sure that it is fully undorstood by you and your working area's staff 2.12.Report any deviation or non-cenfermance to-your superior as well 8 the safety representative. 3. Camp Safety Officer: Ba 32 3.3 34. 3 In case of any medical services required, call the nurse immediately Give him the complete information he require: 1. Your Name 2. location 3. Describe the event occurred and ask the Immediate help % Communicate any information given by them to all concern Parties and make sure it is well understood. ‘Once arrival of the nurse and company ambulance, Guide them to the location where the casualty is availabe, Assist them if needed. Report to Site Safety Manager 4, Emieroency Response Team 45. 46. 47. 48. 49. 4.10 ‘Move immediately to the area where the casualty is available Assess the severity of the injury(s) and decide in llaison with the area Manager/Supervisor/Team Leadars the need of the treatment If the injuries not severe, call the First Aid provider or nurse for treatment first oid. If the injunes severe, call the company ambulance to transfer the victim in hospital. Restrict any mavement of the victim to avoid any unaccountable consequences. Assist the medical service team to mavethe victim te the hospital. Issue accident report Investigate the accident Contribute te the determination of the root cause(s) of the accident and the implementation of the corrective action. Monitor the outcome of the comective action and report any deviation, Once the situation i over, close the accident report Health, Safety, & Environment Department | Rel. | I= isiPsr. sisco W Emergency Response Plan (ERP) | 2, oa ‘Contract No. se00039444 Page 27 af aL Project Title | Unconventional Gas Early Production Facilities at Jaturah South & Harmatiyats 5. Site Sat 5.1, Supervise overall accident stuation. 5.2. Once the accident oxcurs, form a com mittee from various levets in the organization ta investigate the subject and determine the root causes. 5.3. Ask all staff present in the accident jocation about their feedback, 5.4, Assess the situation and define the efficient corrective action in ‘seerdination with all departmentts) superiors. 55, Implement the defined corrective action(s) and examine their ‘efficiency. 5.6. If the corrective action is efficient, close the subject ana report the findings to HR enardinator. If not, re-assess the corrective action, 5.7. In case the root cause(s) indicates fallure in the control measures, carry out a risk assesement for the respective department, © Company Nurse: 5.8 Follow! up with the medical clinic¢Hospital the medication provided to the casualty and make sure of the efficient treatment. 5.9 Request a medical report describing the complete injuries «afflicting the casualty and the treatment provided. 5.10 Follow up the situation of the employee Until Full recoweny or heal is ensured. 5.11 Copy of the medical report and recommendations has to be filed in the employee tle. 5.12 Update the medical service contract whenever needed and update concer parties, Health, Safety, & Environment Department | ef, | meNsEHSE.o03 sisco W Emergency Response Plan (ERP) cents | enmees [een | aaa Fait | eee sao aca NS Harmatiyan Accidents Management = ergraeney [camp a Se TERY | occumme | gieeaet |eagy at mae = ! oe pesca Stn he ane ‘Seosiae Sat saw . * <=p.| | SE 43.3 CHEMICAL SPILL mieaK Obiective: {1 limit the spread ¢f any material spillage might occurs within the aress Gf handling flammable liquids and to ensure that the quickest control Measures are in place, | sisco™ Health, Safety, & Environment Department | Re/, | mesieesr-o0) Emergency Response Plan (ERP) ee ax Contract Ne, 6600039494 Page | 29ctat Project Title | Unconventional Ges Carly Production Faciities at Jafurah South & Harmatiyat | Procedures: + Ememency Response Team: 1. Once the spillage cecurred in the ares, ales the area occupants and supervisor for evacuation and restrict the access te the area, 2. Cantral any source of ignition and ventilate the area 3. Wear the mask, solvent resistant glover and the goggles 4, Protect floor drains or other means for environmental rolease, Spill socks and absorbents may be placed around drains, ag needed. 5: Contain and clean-up the Soill By eistributing loose spill centrat materials over the entre spill area, working fram the outside, Circling to the inside, This reduces the chance ef splash or spread ‘Of the spilled chemical. Bulk absorbents and many spill pillows are used to absorb the spill of this ink/solvent/diesel 6. When spiled materials absorbed, use brush or scoop to place ‘moterials In an appropriate dsposal container. 7. Decontaminate the surface where the spill occurred using a mild detergent and water, when appropriate 8. Report all spills to your acca managerfsupervisor and safety officer. 9. Follow tha set corrective/preventive actions, + Camp Boss/ Manager: 4. Ensure that the occurrence is totally cleaned up. 2. Communicate the occurrence to safety officer and set the needed Corrective and/or preventive action, 3. Communicate the set actions to your sub-ordinates and make sure of thelr compllance and understanding, 4. Verify/Review any feedback from staff and communicate it to other concern parties. + Came Safety Stott: 1, Issue Incident report and describe the whole event. 2. Investigate the incident and define root couses 4. Report all findings to area manager/supervisor/Team Leaders, 4, Set the needed actions to avoid re-ceourrence. 5.Communicate the actions to all thraugh the available ‘communication facilities. &. Monitor the rhaintained action(s) and act accordingly, Act to any reported non-confarmity. Health, Safety, & Environment Department | fel. | INE HEreronz sisco W Emergency Response Plan (ERP) o connate seooossaes | ease | avon resect Tie | Unconventional Gee early Prduton Failte at Jturah South Harmatva Spllage conto! procedure es | eee = 2s TESS | eanpsamgyomee | one ancy waar See ee ee asec) | | | eee een | | etree I Vee 1 if 3 oe rman | na rei ||| SSI ee art amos ||| FS tet = ’ | , com a | ester - naar Se Com ae me | Tana 1 : ore ees Seco ela IMs-MGE-PsP-a02 | Health, Safety, & Environment Department | Rel | SISCO a Emergency Response Pian (ERP) | aay, a Sica | iiecwadn ee a a Project Title | Unconventional Gas Early Production Facilities at Jafurah South & Harmaliyah 434 1. Objectives: Its not possible ta prevent earthquakes or change the likelihood of an ‘earthquake occurring. However, we can greatly increase our chenoes of safety and survival, by being avrare and prepared. Since knowledge and Preparation are keys to your survival during and after an earthquake, ‘you should take steps to become informed. 2 ‘ * The actual movement of the ground in an earthquake Is seldom the Girect cause of injury or death. Most casualties result from falling Objects and debris or collapsing structures. Injuries are commonly caused by: * Partial building collapse, such as faling masonry, collapsing walls, falling celing plaster, etc. + Flying glass from broken windows. + Overturned bookeases, filing cabinets, fixtures, furniture, office machines and appliances * Fires, broken gas lines, etc, These dangers may be aggravated by lack of water due to broken mains, + Fallen power lines + Inappropriate actions resulting from panic. Procedures: + Alloccupents: 1, During start of earthquake, all cecupants shall stop their activities 2, Evaluate if itis safe to turn off the machines ar running equipment i. Move under the table ar pratected area, don't panic and stay calm 4: Proceed to Safe Assembly area after the earthquake subside Emeroency Response Team 41, After Tne earthquake, assist ali employees going to safe assembly area . After conducting head count, verify if there are missing employees 3. If there are missing employees, conduct search and rescue operation 4. Tf there are injured personnel, mave the victim to a safe place and perform first sid measure 5. If the injury is severe, Inform nurse to ready the company ambulance O Camo Safety Start 1. Ver iy head count and notify Emergency Response Team Ret, | INEHSE-PSP-0e2 Health, Safety, & Environment Department SISCO " Emergency Response Plan (ERP) [Ber 02 Contract no, 6600039444 Page | 320ra3 Project Title | Unconventional Gas Ea: Harmaliyah rly Production Facilities at Jafurah South & 2. Assess the assembly area if itis safe or If safe assembly area needs to be relocated 3. Record all scenario that hava occurred 4. Coordinate to Project Manager for recommended decision to take, Natural Galamities Emergency Procedure i—__— _— Mom ue hs tabla rected hea (at pane ae gps nl he ‘ocean Wk cami url reaching tte com a cin LI —— Occupants ] Emergency Response Team ‘Safety Omicer (Naural alae Ite etal eneloyens gringo sate ert Head count (Eartquang an A 5 at nenay (Cont mast wait ‘Races ve Aran Sooty a ee Tun of a macknae Pt of soto at Pero a ae cparation art THsd id caer Health, Safety, & Environment Department | Ret. | mwoersr-on2 sisco Emergency Response Plan (ERP) oz Contract Mo, sen0039446 Pege | 33 of ai Project Titie | Unconventional Gas Early Production Facilties at Jafurah South & [Marmaliyah 4.3.5 SEARCH & RESCUE OPERATION O Search & Rescue Equipment This emergency rescue equipment is at minimum which could be increased based from response needed and exposura/papulation of camp sie. 1 2 3. 4 5 Emergency Mobile Phone with recharged card (twa units) Ambulance Emergency Rescue Stretcher First Aid it (in accordance with SANSO Requirements) Sticks and Wathing Tapes (minimum oF three rolls) 0 One-rescuer Techniques Ifa victim can stand or walk, assist to a safe piace. If there are ne indications of injury to the spine or an extremity: but the casualty is not ombuletery, he can be ried by means oF any of the following: + Flreman‘s Carry: One of ‘the easiest ways to carry an unconscious person is by means of the fireman's carry. Figure below shows the steps of this procedure. + Paek-strap Carry: Hath the pack-strap carry, shown in figure below, it Is possible to carry a heavy person fer some distance. Use the following pracedt 2. 3 Place the casualty in a supine position. Lc down on your side alang the casualy’s uninjured or less Injured side. Your shoulder should be next to the casualty’s armpit. Full the casualty’s far leg over your awn, holding it there if necessary, WF Health, Safety, & Environment Department | fet SISCO insiseraeo7 | Emergency Response Plan (ERP) fee ae | ‘ceria no ss000a9844 Page | a4 ctan Priest Tle | Unconventional ot fryProductn Pocnineatataran SOUR | Harmaliyaty Tilustrations: Health, Safety, & Environment Department| Ref, | ieinerenoez | SISCO a Emergency Response Plan (ERP) | a. a entrat Wo, ss00039414 rage | 35 of a Harmaliyah Project Title | Unconventional Gas Early Production Facilities at Jafurah South & Two Rescuer Techniques cee or more Rescuer Techniques Note! These techniques must be regularly taught to all rescuers assigned for each well site. 4.4 EMERGENCY EVACUATION PLANS 1 Evacuation Routes Emergency evacuation escape route plans are posted in Designated Areas throughout the Job site. In the event that e fire/emergency alarm is sounded oF Instructions fer evacuation are given by the Emergency Commander, all employees shall immediately exit the building at the nearest exits as shavin in the ‘escape route plans, and shall meet as soon as possible at the Designated Assembly Point Area. Employees with offices shall close the doors (unlocked) as they exit the area. Refer te SAPMT & SISCO Camp Emergency Evacuation Pian (Attachment No. 4) to be followed during emergency evacuation, a ‘Health, Safety, & Environment: Department | Ret. TMS-4SE-PSP-002 SISCO Emergency Response Plan (ERP) | 2, 2 Contract No, se00039444 Pege | 36 of 1 Project Title | Unconventional Gas Early Production Facilities at Jofurah South & Harmatiyah 4.4.2 Securing Property and Equipment In the event that evacuation of the premises is necessary, some items may need to be secured to prevent further detriment to the facility and personnel on hand (such as securing confidentialirreplaceable records, or shutting down equibmnent to prevent release of hazardous materials). Only the Camp Boss may remain in the building for the prescribed amount of time to eeeure the property ond equipment to which they have been assigned All individuals remaining behind ta shut down critical systems or utilities chall be Gepable of recognizing when to abandon the operatian ar task. Once the property and/or equipment has been secured, or the situation becomes too dangerous ty remain, these individuals shall exit the bullding by the nearest escape route oo $007 as possible and meet the remainder of the employees at the Designated Assembly Arca, 4.4.3 Accounting for Occupants after Evacuation Feported to the HSE Officer as Scon as possible. Use the Head Count Form (Attachment No, 10) for dacumented recording of head count .4.4 Sheltering in Place 1. In the event that chemical, biological, or radiological contaminants are feleasad into the environment in such quantity andar proximity to camp site; authorities and/or HSE Officer may deteamine that is saler to remein donee Or within the Job site rather than to evacuate employees, The ERT Commanaer, In conjunction with SAPMT shall announce Shelter in Piace status by telephone Sf mnobile device oF other means of immediate notfication available at camp. site. 2, Project Menager shali immediately close camp ste access, If there are ‘{ustomers, clients, oF vistors in the site area, they shall be advised to stay in tthe office for their cafety. 3. Unless there is an imminent threat, employees, customers, cents, and visitors shall call thelr emergency contacts ta let them know winere they are and thet they are sate, 4. Staff familiar with the equiement mechanical systems shall tum off, seal, or sable all fens, heating and air conditioning systems, especially those systems that automaticalty provide for exchange of inside air with outside amr, 5. Ht there & a danger of explosion, staff shall close the window shedes, blinds, or curtains. Health, Safety, & Environment Department | ef. IMS-4S2-PSP-002 Sisco W mens ee alee Contract No, Se00039444 Page | a7 of at Project Title | Unconventional Gas Early Production Facilities at Jafurah South & Harmaliyan 6. ERT members shall gather essential disaster supplies (i.2,, nonperishable food, betticd water, battery-powered radios, first-aid supplies, fashiights, batteries, duct tape, plastic sheeting, and plastic garbage bags), vihich are stored at ERT Station, end shall take them to the Shelter in Place Lacation within the site office. Cellular telephone equipment may be overwhelmed or damaged during en emergency. Call emergency contacts and have the telephone available iF you need te report a life-threstsning condition. 7, All employees, customers, and visitors shall move immediately to the Sneiter in Place Location within the building. ERT members shall seal all windows, doors, and vents with plastic sheeting and duct tape. 8. ERT Commandershell write doum the names of everyone in the room, and call the designated emergency contact outside of the building ta report who is the room, and thelr affiliations with SISCO & SAPMT (occupant, visitor, client, and customer}. 10. HSE Officer shall monitor telephone and television and internet reports for further instructions from authorities to determine when it is safe to leeve the building 4.4.5 Severe Weather The HSE Officer shall announce severe weather aleits (such as sandstorm, earthquake, flood, heavy rainfall, and extremely hot weather, extremely cold weather and hall storm) by telephane or mobile device er any other means cf immadiate notification available ot camp site. All employees shail immediately retreat to the Designated Area until the threat of severe weather has passed as ‘communicated by the HSE Officer. 4.5 EMERGENCY MEDICAL D Advanced Medical Care Under no circumstances: shall an employee provide advanced medical care and treatment. These situations shall be left to emergency services professionals, or Company Nurse, who have the necessary training, equipment, and experience. Untrained individuals may endanger themselves and/ar thase they are trying to assist. Refer to Emergency Contact List for details (Attachment No. 2) USISCO Site Ambulance In an event ef emergency, company ambulance is readily avallable to provide medical assistance, Ambulance are packed of complete facilities for medical life Support until arrival to nearest hospital, Health, Safety, & Environment Department | ket, | osnserse-aca | sisco Emergency Response Plan (ERP) | ga, 2 T Contract No, ‘8600039404 Pose | 38 ora Project Tkle | Unconventional Gas Early Production Faciities at Jafuran South & Harmaliyah 4.6 RESOURCES AND LOGISTICS + List of Emergency Equipment available at camp: te Emergency Mobile Phone with recharged card (two units) 2. Camp Ambulance 3 Emergency Rescue Stretcher 4 First Aid fot (in accordance wich SAMSO Requirements) 5. Stieks and Werning Tepes 6. Emergency Trauma kit 7, Camp Clinie Medical Supplies 8. Automated Extemal Befbrilotor (AED) 9. High Visibilty vests 10, Emergency Spill containment kit + List of mutual aid and government emergency organizations and contacts: 1. Saudi Aramen Emergency contact # 911 2. Saudi Arabla Government Emergency Contact Numbers: Fire: $98 Police/Sheri 399 ‘Ambulance /EMS: 997 Traffic Accidents: 993 4.7 RECOVERY 7.4 Re-entry Once the Site premises hes been evacuated, no ane shall re-enter the site for any Feason, except for designated and properly trained rescue personnel (such as fre department or emervency medical professionals). Unbsined individuals may endanger themseives and/or thoce they are trying to rescue, All employees shall remain at the Designated Assembly Area until the fre department or ather emergency response Team notifies HSE Omncar thet ethers ‘The afea is safe for re-entry, in which case personnel shall return to their (Rorkstations; or the site/assambly area is not safe, in which case personnel chap be Instructed by HSE Omicer on how/when to vacate the premises * Restoration and replenishment of fire pratection and ether emergency + Water supply systems and all utiities. + Clearing of debris, * Decontamination & disposal of contaminated materials. EEE ar cpecialzed equipment such as Cranes, Vacuum trucks, cutting Sauipment, lighting equipment, etc., intemal or externally with contractor, contoet to hep reduce project down time Health, Safety, & Environment Department | Aa! | aense-rorcar sisco W Emergency Response Plan (ERP) |, cn Contract He, Ssoonasees | tage | acta Project Tite | Unconventional Ges Eariy Proauetion Faclation at Jafurah South & Haraliyan “al ‘4.8 MAINTAINING EMERGENCY PREPAREDNESS 1, Employee Training eg Rpayees shall receive instruction on this Emergency Action lan as part of ‘New Employee Orientation upan hire- Additonal train shall oe provided: ~ hen there are ay changes to the plen and/or Taciity; U when an employee's responsibilties change; and annually as refresher training. fo ebproved ERT members, they wil be screened and ensure that they are fit Seetorm the Job. Refer to ERT application torm (Attachment No.L1) for selection and screening of ERT members, Trees Dass OF the selection, they will undergo a taining dedicated for eT Members that was lited on the ERT Training Pragram (attackiee a pe 6) ‘Teems ta be reviewed during the training include: ‘ Droper housekeeping; fire prevention practices; fire extinguisher locations, usage, and limitations; threats, hazards, and protective actions; meats of reporting fires and other emeryencies: names of Emergency Action Plan Coordinators, individual responsibilities alarm systems; escape routes and procedures; amergency shut-down procedures; brocedures for accountiag for employaes and visitors; ‘losing doors; sheltering in place: * Severe weather procedures; and 0 Emergency Actin Plon evaieblty, 2. Fire/Evacuation Drills Gre/Evacuation aris shall be conducted at least twice & year, and shall be Sri aree 3 Eeersination with tocal police and fire departrarts, ‘Additional drils shall be conducted if physical properties of the Businere change, processes mt (Mtactoncy ice domed necessary, Observer shall use Evacueton tril Navan (Attachment No. 8) and Combination cil evaluation reve (Attachment No. 9) to ensure effectiveness of the drill conducted Health, Safety, & Environment Department | ser, | ma-nserancol SISCO Emergency Response Plan (ERP) Rew. mm Contract Wo, 6so003sa44 Pose | coor an Project Tite | Unconventional Gas Early Production Facilities at Jafurah South a | Harmaliyat 3, Periodic Inspection of Emergency Equipment 2h tmergency devices and equipment shall be inspected, tested and calibrated Miata aes, 2 er the schedule and recommendation fone te ‘manufacturer, Below are the Ist of equipment requiring periadie Ieecton? 2 Eng Extinguisher ~ Monthiy basis for ocular & pressure testing 2. Fire Hose Cabinet - Monthly Basis ocular inspection aed purging, 3. Emergency Light — Monthly Bosis testing £ Smoke & Heat Detector ~ Monthly basis testing 5. Fire Alarm bell ~ Monthly basis ocular inspection & Fire Water pump = Weld pump run testing 7. Ambulance ~ Monthly Inspection 8. First Ald Kits - Monthly Inspection Emetgency Equipment inspection shall also be included on quartety comp Inspection as well.as on camp electrical system inspection. Be er MeneY equIPMent issues and findings are to be treated eitical aad shal bbe put into priority an ciasing the issues. 4. Training Records TSE Ofreer shall dacument ei taining pertaining to this plan and shall maintain Feger at HSE Office. Refer to ERT Training Program (Attadhineat Wa ) For the st of trainings plained and scheduled for the project, 5. Verification mre Emergency Action Plan shall be reviewed as part of the Health a Safety management review, the worksite are made, by Entety Committee. Following each fire oil, Responsible Manse Ce), Employee Representatives, epresentatives (primarily ERT Commander) shall evaluate the dril far effectiveness and weak oa in the Plan, and shail implement changes to improve it Health, Safety, & Environment Department | ae, | mesnacoanoor sISco slerdency Respofea fas apy es 7 one seooestuae | nm | nwa PORATS | estima at tans Wotan eam gos eos 5.0 ATTACHMENT 1. Emergency Preparedness Plan 2. Emergency Contact List 3. ERT Organizational Structure 4. Emergency Evacuation Plan 5. Firefighting, Detection & Alarm Register ‘&. Roll Call / Accountability Checklist 7. Evacuation Drill Report 8, Combinstion Drill Evaluation 9. Head Count Form 10. ERT Application Form 14. Fire pump Inspection Checklist 12. First Ald Provider List 13. Fire Extinguisher Tag 14, Fire Extinguisher Chactlist 15, Emergency Light Inspection Checklist 46-Smake & Haat Detector Inspection Checklist 17.Fire Alarm 8 Suppression System Test Report 8. Fire Warden Responsibilities 19.Camp Quarterly HSE Inspection 20.Camp Electrical System Semi-Annual Inspection Nauith, Safety & Environment Department” Emergency Preparedness Plan ial EMERGENCY CONTACT LIST tatly Onconventianal Gas Production Facilities wl Norih Ri South iatarah Project Number; 6500033404 s isco W (CAMP EMERGENGY ACTIONS: All emergencies shall be reported immediately by any of the following methods: TRAINED FIRST AID PROVIDER BLS EMERGENCY SERVICES NUMBERS, = 7 ame pivot | concen on L Crise Terence wesay2ms | o50280:187 = o + —$ toca Potice . tern Bice msuipanis | ose-as-6508 a Traffic Accidents. atmisiomans | sesutpaer9 | aseang srt ou In Seva drames From Oana i 2 perl shia | ena | ge, aa We Reporting on emergency by telephone, rte ‘ve se Savery ano HEALTH COMMITTEE shone, ora Thicapal ensure te long 2 ___] Fepert: This is fmerganeyi* Exact lnzation. as igual) decnanneceneaas ten [ * Mune of nred/misin peice M4. Perumal pa eae S0-822-2887 . ‘Type of Service(s| required (ie, fire, medical, security), ‘Nishat Ahmad Préject Manager 995-611-2117, [Name and badge/i0 number * Numb you ae cling rom, #regueed Terence Wesco | Campaiana SPAT] BSOIED TET Wat todo tring Lmertencies? Gite | reser era | eee + fameineab Aiea enetermas [seas] 7 eee PROPOMENT REPRESENTATIVES: "Proceed safely te assembly point. — Dasigniin [Canis] + Reman ace ares one Char gen [Hussam Sabi Project Monager S582. | alter lisa tT eee our EMERGENCY conTact NUMBERS shervinGimaco_| FaidConplane | 05708-7158 | Wama ‘Besignation Coniact oie tha seers [rion Avie | _msetupvtoremay | Glgsseuce veel freee [serene saunar| emai [eon Mohamenag ist | Campion HRML 055-674-578], Taaa | Giacine SAAT ear ‘Sie ara “Camp Raise FAL Ree EMERGNNCY RESPONSE TEAM Ea! | vente Hl Lrpaiation Cart APM $560 Caw Sit, fra roc) Sisco || ica L | aries eae ee se cota z La [Sama LO a {aa === —— a Satety & Environment Departm saree ees Ml emencency £v EVACUATION PLAN SAPHIT C r CAMP MP FACILITIES © a EY Aarmthecound: say CAN betcuro"the Duitong anctinicw the PYRCLET COA ROUTE(res dotted ine) tase nearesassavar POINT: 2 Sm nthe-asieniaty PONT sons; reumee Met utnennien alt CUES Ls auDURI=t0 and WAITFOR THE PROPER EAD COAT, PREPARED BY ALLAH ALLADO (GAP HE Health, Safety & Envitanment Depart ment eee Fire Fighting, Detection, & Alarm Register Sal Health, Safety & Environment Department INS-HSE-F-O17 SISCO a Rev. No. 0 Roll Call/ Accountability Checklist [2021 2017 Poge 1 062 1 Sunersoi/tcam leaders complete the roll call accountability Checklist and Identify that all people are accounted far Identify that all peop! nt = Yer No ‘Comments: 7. 7 2. Supervisor/team leaders provided his checklist to the assembly point coordinator ee ee Yes No Comments: 3. Supervisorfteam leaders remained in the assembly point and kept their Bersonnel assembled by group waiting for further instructions Yes No Comments: 4, Supervisor/team leaders in Conjunction with the assembly point Soordinater took action for all personnel not accounted for Yes No ‘Comments: 5. The assembly point coardinator reported information on accounta bility to the HSE representative Yes No [NVA Comments: 6. The site emergency response team was activated Page tat? a Yes No Comments a Health, Safety & Environment Department IMS-HSE-F0a7 ] SISCO Roll Call/ Accountability Checklist 22127 2017 lev. Ne. 08 Page 2 of 2 7, Supervisor/team leaders’ personnel cooperated wih the assembly point coordinator Yes No Comments: &. The assembly point coordinator and in conjunction with the ERT and HSE conducted @ formal debriefing on the emergency evacuation ee ‘Comments: no 9. Additional training will be provided and the guidelines for emergency evacuations will be NO. ‘Comments: NA ee | Health, Safety & Environment Department IMS-HSE-F-03e [iret Departrenit Seer SISCO a | Rev, Wo, 00 Evacuation Drill Report fanuery 2017 Page t of 2 1 Location: Plant, __ Buliding, Office Area Equipmene. Date and Time of test: Method of Evacuation Drill Announcement; (Check appropriate) Fire Alarm System o P.A System a1 Simulated 3 (Method of Simulation a. Fire Suppression System Ware fire evacuation routes posted? Yes Noo N/Ag Amount of time to complete total building evacuation? Time of Drill Time Taken to complete Was @ fire evacuation assembly area properly identified? Yes No D N/A Were emergency evacuation wardens identified and utilized during the rill? YesONOON/AG ee Health, Safety & Environment Department IMS-HSE-F-038 SISCO q Rev. Wa. 5 Evacuation Drill Report jamuear 2017 _| Page 2of 2 oH Page THE 8. Comments / Corrective measures taken (List Concerns @s a result of rill) ] item close Description of Concern Date 9. Type of Emergeney Health & Safety 0 Equipment Shutdown 3 Environment 0 10. Signatures Project Manager Date dete HSE Manager Date HSE Supervisor __Date HSE Officer Date —— “Paget ol —————— ‘eaith, Safety & Environmant Oepartincat sisco 2 Combination Drill Evaluation [Pants] Fage os PLAN ————___ 1 Date of Dei Time Started: | Time Completed: | Time Duration: ACTUAL ACTIVITY OBSERVATION COMMENT 1. Sinerwalaem ome startet 2, SirenyAlarm Audible 3. ERT response te alarm 4, Employees response ‘te alarm 5. Activity stopped | ‘ypon hearing alarm ‘6. ERT Ume to reach Incident command Center F-ERT time to reach) ‘Assigned Ares L ‘SCENARIO-2: EVACUATION RESPONSE LOCATION: ACTIVITY OBSERVATION 41. ERT Evacuation Call Time 2. ERT ablity to evacuate ares personnel | 3. Employee response tp evocation call Health, Safety & Environment Department INS SEro siscoW =e ; = Jonny 2017, Combination Drill Evaluation eevee 20 4. Employes evacuate tna calm attitude 5. Borsonnel wae proper evacuation routefenit 6. Time to reach assembly pol area 7, Personnel behavior In assembly point area ‘SaRano 7 ELV eonrmaaasay ———_| LOCATION: OBSERVATION COMMENT team presence 2. ERT abiity to. i= ose h control personae! in |___ proper manner 3 Head count procedure Maintained properly 4. Personnel behavior during head eount 5. Missing personnel ‘SCENARIG-4: LOCATION: = LOCATIONS ACTIVITY OBSERVATION COMMENT 1. Time of firefighters arrived in the fire area 2, ERT Firenghting TEAM presence 3. Availablity of firefighting equipment [+ 4. Accessibilty of firefighting ‘equipment, ee [500 a ‘Combination Drill Evaluation 5. Efficiency of firefighting }——Sauipment: Behavior of frefighters Firengnting techniques applied 8. Time fre extinguished 3. Fine fighter observed for reionitin fre lcation my 10.Firengnter ‘solatefearden the area 41.Time duration of frefighting activity SCENARIO-5: LOCATION: ERT RESCUE OPERATION ACTIVITY OBSERVATION sae 1. Time of rescue team arrived inthe area 2. Availability of rescuer, 3. Availabilty of raSCue equipment depends an’ the Severity of injury 4. Rescwer ability to. assist the victi¢n properly 7 5. Rescuer ablity to tronsport the victim to Triage Ares ACTIVITY OBSERVATION maz 1. Time start when sisco W __Hesith Sify & Rovroament Department | WETCTGH ‘ev, Ne. 00 ‘Combination Drill Evaluation §— |e du Page ¢ of 8 6. Behavior of rescuars 7. Time duration oF | __ftscue operation ‘SCENARIO-6: FIR LOCATION: first aid provided 2, Avallability of first ald providers ‘Avallbllity of First ald equipment 4. First alder ability to assess the victim for trage priartty lavel 5. abiiky to perform PR 6. Abily to pravieie first a te injury. 7. Duretion of first ald ravided to victims [ SCEWARIO-7: SPILL/ FAK CONTROO RESPONSE LocaTrow: ACTIVITY, OBSERVATION COMMENT ] 4 Time start tne spill control response 2, Availablity of spi ‘control team 2. Availablity of spi ‘control kit ang Special PPE 4. AbliRy to perform spill containment procedure 5. Team isolates the ‘chemical spilt area. 6, Duration of spat control response Health, Safty & Environment Departinent | IMS TERGID | | Raw, Ne. oo Combination Drill Evaluation fees sisco W SCENARIO-B: RECOVERY acspoNse LOCATION: [| acriviry OBSERVATION 7. Time arrival oF ambulance B. Time arrival oF all ERT members te assembly paint area 9. Head count verification _| proceeding) 10."All Clear Announced” EMERGENCY RESPONSE ORILL EVALUATION OVERALL RATING EXCELLENT | VERYGOOD | SATISFACTORY] ACCEPTABLE NEEDS: IMPROVEMENT. ‘ADDITIONAL REMARKS ON THE DRILL: NAME OF OBSERVER DEPARTMENT | a Health, Safety & Environment Department ISISCO HEAD COUNT FORM Total MumBer oF Emaovaes Reparted to 4+— Work at your sedion Total numba af opines Superriae / an 8g Paget TASHSEF-040 Head Count Form IMS-HSE-F-042, sisco W HEALTH, SAFETY & ENVIRONMENT DEPARTMENT. ERT Application Form Rev ao lEducation: ERT Job Tine Signature: Department $ = [Department Manager: Bic Cl taigoeasi Tegan Date: f f Safety Supervisor; J ceroved:) ee sopra) _sinatue: Remarks! Comments: , 5 4 a & < Manager QHSE: faoproves: [] wot Approved: (_] signature: ate ‘UME INSPECTION CHECKLIST Tel ma.ano mencomou eet ‘aU waren ate aera} sisco W Health, Safety & Environment Department M00 Fearary First Aid Provider List m2 ay ie [Petignstion| Paparimens ‘Training Title/ Provider [Assioned Prajet srme| ae Sac Amc [a [ewan [uz ed PS a ee eee A 2 [son musa Sor | | lawmenianieeten|| soso. siege | Geaenan Sera aa nee Oe | PE _ | fonts (Ma uS | veer enterioeme|| pers lame | Gameu | od ESnra Race nae Sa 4 forum corn | ome vat | emia 7Snabeaaesaeer | sare | wc | wa Sea TaERCT . fore | tt | seen vimctarsen | anny | awe | ame Sacerign ae oe 7 . teomsre | onmere | ommtmtnaterinecess | wor | ane | aacouw i= Sac rsaaa SET 2 | atat oman cere | nse | seemtonina ttincom | aes | wore | aawreue at Tasha ae | peewee a Jaron] TASER eesti omc werar | wore senctuaron) coment on| supple Ss ane anon Por = B [errennowes | oti | vet | See utnertanen | xcs | vatnas fanmoncams T Sarre Ee [2 [rec nununeno thy "=| Semncnierettettomean | wore | sams | ance ume TREWSEL oor First Ald Provider List Basipnaicn) Besant See res soa) Sa traintog | Mire | "aeer_| Tema Gas Fitada mone Oo 1, |mtnerio sano [ABWLANCE | op smerny saa reer | amar | sapere | ssemrcmp eee Soa Feta a ml 12, [aoa provanp beans [nse oFFicEH) Hse Supparcra) Sci Heme | iamez | secre | sem Aesocin ae Beat Fst i RELI | notation | PSE | se Strmrs@n) ema Heer | sworn | swans | vem a ends HE Beier ad & sie 1 | mzatecnuoom | thee | ise Swopericrai rsmdlicor | wont | iwewe | em L posocueon ise Gave Prat ha 8 boa 1 [ Mmcwageme | lewewison| nse | dapontei faster | anon | amram | eam tisoconon Fire Extinguisher Inspection [ont [= | Ome trepected) Tyne Activity T frome i Lae = Hee t 1 ‘onan on EB | 4 - — = prspersee ey: —L [ssaibonal Comments Wl Health, Safety & Environment Department RSET SISCO Emergency Light Inspection Reve Checklist eat PROTEST RR 7 peer Fa ae ‘ania rT a frome. | cron |, S6ral tes i [ i amas | i : aT F + SS E | mole ese = a ano Signatur a Health, Safety & Environment Department SISCO Smoke Detector Inspection Checklist Bev 80 Breei7 ORT = area pas oor aa ie an es aT ie | i] ij i +d i] i) 4 T cL [> t i= freed [Rtonsl Comment le a fee oo Heat Detector Inspection Checklist PROJECT: Contract Ne: J ras 7 pera] tmane face! oF Ej me eal Ht i aly pF) gl | sf alana [eal i. [ all pte f ss C 7 pected By = [Adcitional Comments: = Health, Safety & Environment Department IMS-HSE-F-162 SISCO Rev. Nooo | February 2017 Fire Alarm and Suppression System = >———— Test Report pac st 1. Location: Building 3 camp Q 2. Date and Time of test: 3. Type of system, which was tested; Fire Alarms: (Check appropriate) Fire Control Panel 0 Smoke Detector Units 0 Manual Pull Stations 7 Fire Alarm Bell Portable Air Horn 0 4, Fire Suppression Systems? Water Sprinkler System; Wet Dry o Halon System a Carbon Dioxide (CO2) System 0 Dry Chemical System 91 Fire Hose 0 FM-200 System 0 5, Did the tested systems perform as designed? Yes Noa List any deficiencies &, Was a fire hydrant readily available for the building? Yes ONoO 7. Comments / Corrective measures taken SS SS SS ee Signature over printed name a Health, Safety & Environment SISCO Fire Warden Duties & \_—|_IMS-HSE-F-166 Rev. No, 09 Below are the Duties & Responsibilities of Fire Warden: + ° OOo e eee oe Poe tooe ‘Administer the Office emergency procedures program Organize, train, and direct the activities for the officer teams Make decisions or recommendations regarding relocation or other Emergency measures. Explain the emergency to people and tell them what to do Supervise relocation or other emergeney actions Help search buildings or other areas, when applicable Keep HSE manager advised of the situation Tentify and assist mobility impaired persons, Direct relocation of mobility impaired employees, if necessary, Oversee a building search by the team to ensure that everyone has left; The fire warden is last to leave. Keep the HSE manager informed of emergency actions. Gomimit to memory the locations of Firefighting equipment on your Floor, extra extinguishers, etc, Assist other fire warden(s) during emergencies as directed, Accept special assignments, Toke responsibility for head count activities in absence of the Aree Marshall. Explain the emergency ta employees in a calm manner. If evacuation is necessary, supervise an orderly relocation with the Following quidelines: © Check stairwells to make sure they are clear in the direction of the Evacuation, © Remind all personne! to keep quiet and remove any high heels. Direct personnel ta the exits, Check for special assistance needs: Check area for stragglers, Direct Personnel to the specified refuge area outside the bullding. LHesith, Safety, & Environment Bepartoven! CAMP QUARTERLY HSE INSPECTION CHECKLIST StaEP aT ry aie sisco camp Mo Date oF inspection: Vee] nue | [Eeerzenc poeadurtresponse char sana marboa nd evocuton lpout ae pred nes fan sbos coon” )s Bes und iv the roam a5 cng b pone Cooor Tr 7 tices ries Ta, 5S aha a a ra lr IE goo TE geod nor skree I Fu aie evs ess Ciesitonet acre ws pny aad pang RET tikes se Segoe oa cman ‘ae era eh ran oe oe Jute anc eracutes wut sre pred nade ne ed wie payer We GEM waving Kenton Onlina wre: sep aoe sa ecg ond tat re Scec lee once spa nai [ke detecorsive goed wong ection” RRGMTOY wr oat wencrg CoS ide pont fea t-te, [reac GN ren 58 woking eon, seb hae sac bps we ese cra sertwriow tow efi, Biase Say a [Seni tank ee af akc ond Rey mara iio (reed agmage Concivoints fe [PCSSINe lphtng is ped Ron mans Te TS Te poe, P3_[Snereney ersten pan mop dateanl pa camp Nant Date of inaction: Yes] mo |r ES CAMP QUARTERLY HSE INSPECTION CHECKLIST Soe Ray P+ _[terowrcy responce tam avslable wd cream peoind 75 lento iat recede pall apa P58 _Jemerency et eared ut we gar hes Aid Feeley epee i ae ol faa [ead bo vena Ra ab tie a Ra Rar lexus. [Ft db inspection cheba wd ono up auto i wells, corel dem paReE BA GOTO rate wan resend (Wak Gag Sai he ee os rien nn te ow i ot [Posty eecion reir aie arm i up wean hs hy nepacin rent sata deer up la eae iy Riecion raph ot aneenny RRR Font past earl ram erm aka 1 Fe tenia reseed OE OTe eran Sasa | Jor reat Saeoete! crete ac ere dainty ban, Te Targa compton ame grate ate: ————— ee ——__

You might also like