ICONS

ICON MEANING
Execute
Save

Create

Copy As

Note that
R/O/M Required/Optional/Mandatory
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

TABLE OF CONTENTS

1. SITE CREATION..................................................................................................... 3
2. CONFIGURATION OF ENTERPRISE STRUCTURE..................................... 75
3. CREATION OF ARTICLE TYPE ....................................................................... 84
4. CREATION OF PURCHASING DOCUMENT.................................................. 88
5. CREATION OF UNIT OF MEASUREMENT.................................................... 90
6. PRICING ................................................................................................................. 90
7. SETTING FOR SALES SET ................................................................................. 90
8. CREATION OF PURCHASE GROUP................................................................ 90
9. RELEASE STRATEGY......................................................................................... 90

Note: Modification in version 2.0:

POINT 7. SETTING FOR SALES SET… PAGE Error! Bookmark not defined.

1
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Materials Management and Supply Chain Management: Configuration Guide

A. Purpose: This guide describes configuration and process modules that contain
configuration and functional instructions enabling you to carry out the following
processes in the MM & SCM scenario.

• Site creation
• Configuration of enterprise structure
• Creation of article type
• Creation of purchasing document
• Creation of unit of measurement
• Setting for sales set

2
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1. SITE CREATION

Responsibility MM Champion
Prerequisites Creation of shipping point for the site to be created (process
shown in step no. 1.1 to 1.7)
Purpose The following steps show how a site is created and is
configured in the system
T. Codes SPRO, WB01

CREATION OF SHIPPING POINT

1.1 Enter SPRO. Go to Sap Reference IMG

3
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.2 The following screen gets displayed as “SAP Reference IMG” has been clicked.

4
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.3 Go to IMG Menu:

Enterprise Structure Æ Definition Æ Logistics Execution Æ Define, copy, delete,


check shipping point

5
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.4 Click on “Define, shipping point

6
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.5 Click on “New Entries”

7
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.6 Enter the required details

Description R/O/M Remarks


Shipping point R Should be same as site code
Shipping Point Description R Description of the shipping point
Country R Country of shipping point

1.7 Save the data to create the Shipping Point.

8
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

CREATION OF SITE

1.8 Enter T. CodeWB01

1.9 Enter Site Code & the Site profile

Description R/O/M Remarks


Site Code M Should be 4 digit numeric code
Site Profile M “0100” for DC & “0120” for store

9
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.10 Enter the details under “Organization/calendar” tab.

Description R/O/M Remarks


Company code M “1000” for PRHPL, “3000” for QRPL
Purch. Organization R “1000” for PRHPL, “3000” for QRPL
Sales organization M “1000” for PRHPL, “3000” for QRPL
Distribution channel M “02” for DC, “01” for store
Division M “01”
District O Optional
Sales office O Optional
Calendar R “IN”

10
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.11 Enter the details under “Address” tab.

Description R/O/M Remarks


Title O
Name R
Search term 1/2 R
Street/House number O
Postal Code/City O
Country M
Required as it is used in various
Region R condition types
PO Box O
Postal code O
Company postal code O
Language M
Telephone O

11
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.12 Enter the details under “Valuation/Inv Mgmnt” tab.

Description R/O/M Remarks


Grouping Code R Should be “0001”
IM Profile R Should be “0002”
Revaluat. profile R Should be “11”
“1000” for PRHPL, “3000” for
SOrg Retail Price R QRPL
DistChl RP R “02” for DC, “01” for store

12
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.13 Enter the details under “Listing/req plng” tab.

Description R/O/M Remarks


Subsequent Listing Ind. R Should be “1”
Listng Procedures R Should be “01”
Listing Basic Rule R Should be blank

13
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.14 Enter the details under “Purchasing/Distribution” tab.

Description R/O/M Remarks


Regular vendor R Tick
Conds at Site Level O
Supply Region O
ROI required R
Time increment O

14
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.15 Enter the details under “POS” tab.

Description R/O/M Remarks


POS outbound profile R “ZPRO” for store
“SAPD” for store, “ZPRI” for
POS Inbound Profile R “VAMA” store
POS currency R Should be “INR”
Assort. List Profile R Should be “Z001” for stores

15
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.16 Enter the details under “Layout/blocks” tab.

Description R/O/M
Layout Optional Field
Area Schema Optional Field
Sales Area Optional Field
Space Mgmt Profile Optional Field

16
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.17 Click on customer and enter the details.

Description R/O/M Remarks


Customer R Should be same as the site code
Company Code R “1000” for PRHPL, “3000” for QRPL
Sales Organization R “1000” for PRHPL, “3000” for QRPL
Distribution Channel R “1000” for PRHPL, “3000” for QRPL
Division R Should be “01”
Account group R Should be “Site”
Contact Person O

17
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.18 Enter the details

Description R/O/M
All the fields in the screen O

18
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.19 Enter the details

Description R/O/M
All the fields in the screen O

19
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.20 Enter the details

Description R/O/M
All the fields in the screen O

20
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.21 Enter the details

Description R/O/M
All the fields in the screen O

21
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.22 Enter the details

Description R/O/M
All the fields in the screen O

22
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.23 Enter the details

Description R/O/M
All the fields in the screen O

23
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.22 Enter the details

Description R/O/M
Recon. Account R
All the fields in the screen O

24
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.23 Enter the details

Description R/O/M
All the fields in the screen O

25
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.24 Enter the details

Description R/O/M
All the fields in the screen O

26
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.25 Enter the details

Description R/O/M
All the fields in the screen O

27
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.26 Enter the details

Description R/O/M Remarks


Sales district O Optional Field
Sales Office O Optional Field
Sales Group O Optional Field
Customer group O Optional Field
ABC class O Optional Field
Currency R Should be “INR”
Price group O Optional Field
Cust.pric.proc. M Should be “1”
Price List O Optional Field
Cust.Stats.Grp O Optional Field

28
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.27 Enter the details

Description R/O/M Remarks


Delivery Priority O Optional Field
Shipping Condition M Should be “01”
Delivering Site O Optional Field
POD timeframe O Optional Field
Part.dlv./item O Optional Field
Max.Part.Deliverie O Optional Field
Underdel. Tol. O Optional Field
Overdeliv. Tol. O Optional Field

29
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.28 Enter the details

Description R/O/M
All the fields in the screen O

30
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.29 Enter the details

Description R/O/M
All the fields in the screen O

31
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.30 Enter the details

Description R/O/M
All the fields in the screen O

32
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.31 Go to CustomizingÆ For site

1.32 Double click on “Shipping-specific data for stock tfr. for purch. doc. Type” under
Purchasing.

33
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.33 Double click on V_161V

34
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.34 Enter “F” in Purch Doc Category.

35
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.35 Press Enter

36
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.36 Enter the details

Description Remarks
Should be "UDS" when supplying site is DC & "USS" when supplying
Type site is a store
SPl Site Code
Del Type Should be "NL"
CRl Should be "01"
Sh Schd Tick

37
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.37 Double click on “Order Types for Stock Transfer”

38
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.38 Enter “F” as Purch. Doc Category.

39
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.39 Enter all the valid combinations of supplying site, receiving site and purchasing
document type. Use “UDS” as the doc type when the supplying site is a DC and “USS”
when the supplying is a store.

Note: Here one must fill up all the valid combination for following two cases:

1. When the new site is a supplying site


2. When the new site is the receiving site

40
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.40 Double click on storage location

41
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.41 Double click on V_T001L.

42
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.42 Enter the storage locations

43
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.43 Save the data

44
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.44 Double click on Storage Location Determination

45
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.45 Enter the following details

Description Remarks
Situation Enter "01", "02", "03", "04"
Storage Location Enter "SS01"

46
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.46 Save the data

47
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.47 Double click on “Org. units: allowed sites per sales organization”.

48
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.48 Check the details

49
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.49 Double click on shipping points per site

50
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.50 Assign the shipping point to the site.

51
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.51 Double click on Org. units: shipping points per site

52
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.52 Enter the details for the new site code.

Description Remarks
SC Should be "01"
LGrp Should be "0001"
Site The new site code
PrShP Shipping point created earlier for the new site
MShP Shipping point created earlier for the new site

53
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.53 Double click on “Picking: storage location determination in deliveries”

54
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.54 Enter the details

Description Remarks
ShPt Shipping point for the new site
Site New site code
SC Leave it blank
Sloc Should be "SS01"

55
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.55 Double click on “Control of qty/value update, from Release 30A”

56
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.56 Select the relevant article types. Double click on Quantity/value update.

57
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.57 Double click on Quantity/value update. Tick on Qty Update and Value Update
for the new store for all the article types.

58
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.58 The relevant check-boxes have been ticked

59
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.59 Double click on “Default values for inventory management and physical invent.”

60
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.60 Select the view V_159L

61
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.61 Click on “New Entries”.

62
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.62 Tick on the relevant check boxes (as shown below). Save the data.

63
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.64 Release the transport request created from development server and import it to
Quality server and after testing to Production server.

1.65 Enter/Select T.code WBTE from development server

64
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.66 Add the site code to the path name (for easy identification). Click on “Execute”.

1.67 File will be exported to the mentioned path in dev server.

1.68 Now Basis team will transfer the file (at OS level) to quality server in such a
way so that the same file can be accessed from quality server through the same path.

65
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.69 Enter T.Code WBTI.

66
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.70 Now one can import the site by clicking execute button. (It is better to have a “test
run” first by clicking on test run).

1.71 Now site created has been transferred to quality client after successful import.

1.72 Check in quality server whether the site has been transferred properly.

1.73 Use WBTE and WBTI in the same (for exporting it from Quality and importing it to
production server).

67
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

1.74. For maintaining EDI partner profile the following steps need to be maintained.

IDOC partner profile Settings


The following steps are to be followed in case any new Store/Site is created in SAP ISR

Step-1
Transaction code - WE20 Create Partner Profile.
Create Partner Profile in SAP ISR & POS DM .

68
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Use create option in the toolbar or Copy the existing matching partner profile and enter
new Partner no(Store no) , Partner type as KU and press ENTER. Then the new partner
profile will be created in the system.

If any new message type needs to be included, then click on “PLUS” icon in Inbound or
Outbound Parameter and add.

Copy partner profile

69
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Step-2 Conversion rule for OUTBOUND IDOC

Rule name : ZEAN11_CONV , ZMATKL_CONV

Transaction code – BD55

Enter Message type as WBBDLD

70
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Select any 2 entries of the same store no from the list where 2 conversion rules are
mentioned (ZMATKL_CONV& ZEAN11_CONV ) and click “COPY” OR click on
“New Entries” for adding conversion rules.

Step-3

Change the sender & receiver no as client number and new store number respectively
;then SAVE. So the conversion rules ZMATKL_CONV& ZEAN11_CONV will be
created for the new store.

Sender: CLNT110 - PRD


CLNT200 - PRQ
CLNT300 - PRP

Example: Copy store no 1652 and Change it as 1355.

71
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Add Conversion Rule for the new store for INBOUND


Step-1
Transaction code – BD55
Rule name : ZMIXID_CONV, ZTAXID_CONV
Enter Message type as WPUUMS

Step-2
Select any 2 entries of the same store no from the list where rule zmixid_conv&
ztaxid_conv is mentioned ; then click “COPY” OR click on “New Entries” for adding
conversion rules.

72
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Eg: Copy the highlighted store (ref above screen shot) and enter the New store number
3073 and SAVE.

Step-3
Change the sender receiver no as new store number and SAVE.

73
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

The EDI Profile has been maintained.

74
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

2. CONFIGURATION OF ENTERPRISE STRUCTURE

Responsibility MM Consultant
Prerequisites Company Code
Purpose The following steps show how enterprise structure is configured
in the system
T. Codes SPRO

2.1 Valuation area

75
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Valuation area has been defined at site level

2.2 Division

Division is “01”

76
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

2.3 Storage location

Storage locations can also be defined from here

77
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

ENTER SITE

78
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Enter the storage locations

Save the data.

79
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

2.4 Purchasing. Organisation

Purchasing organization is defined from here

80
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Purchasing Organization has been maintained

81
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

2.6 Assignments

Purchasing organization is assigned to company code from here

82
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Purch. Org has been assigned to co. code

83
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

3. CREATION OF ARTICLE TYPE


Responsibility MM Champion
Prerequisites None
Purpose The following steps show how article type is configured in the
system
T. Codes SPRO

Click on “define attributes of article types”.

84
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Select an existing Article type which are being used in the company

Click on

Give a new name to the article type to be created

85
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

86
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Save the data.

Tick on Qty and Value update for all the sites

87
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

4. CREATION OF PURCHASING DOCUMENT

Responsibility MM Champion
Prerequisites None
Purpose The following steps show how purchasing document is
configured in the system
T. Codes SPRO

88
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Click on define Number Ranges. Select

Click on

89
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Create new interval range

Save.

Click on “Define Document Type”

Select a document type.

Copy using

Enter new name, description, no range interval (created earlier).

90
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Click on “Copy all”

Save

Document type has been created.

91
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

5. CREATION OF UNIT OF MEASUREMENT

Responsibility MM Champion
Prerequisites None
Purpose The following steps show how an unit of measurement is
configured in the system
T. Codes CUNI

Enter T.Code CUNI

Click on

92
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Click on

93
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Fill in the details:

Save the data to create the UOM.

94
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

6. PRICING

Responsibility MM Consultant
Prerequisites NA
Purpose The following points describes different aspects of Purchasing
T. Codes SPRO

PURCHASE SCHEMA

The following schemas have been used.

SCHEMA GROUP VENDOR

The following schema-groups have been used.

95
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

CONDITION TYPE

The following condition types have been used.

96
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

MODIFICATION IN VERSION-2.0

7. SETTING FOR SALES SET

Go to path Logistics-GeneralÆ Material masterÆ Retail-Specific SettingsÆ Settings for


structured materialsÆ Structured Article in Logistics Process

Double click on

97
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Press F4 in Work Area

Select

Set the setting as below

98
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

8. CREATION OF PURCHASE GROUP

Responsibility MM Champion
Prerequisites NA
Purpose The following steps show how purchasing document is
configured in the system
T. Codes SPRO

In this step, you can create purchasing groups.


A purchasing group can be an individual or a group of individuals

99
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Click on

Fill in the details

Save to create the purchase group.

100
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

9. RELEASE STRATEGY

Responsibility MM Consultant
Prerequisites NA
Purpose The following steps show how release strategy has been
configured
T. Codes SPRO

Go to: IMGÆ Materials ManagementÆ PurchasingÆ Purchase OrderÆ Release


procedure for purchase order

101
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Enter Characteristic PO_REL_DOCTYPE

The doc types have been maintained here

102
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Enter Characteristic PO_REL_VALUE

The values have been maintained here

The class has been defined here

103
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

The characteristics have been maintained here

104
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

105
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

Double-click on it

106
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

107
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

108
CONFIGURATION DOCUMENT
MODULE-MM & SCM 2.0
SAP ECC 6.0
ANIRBAN BOSE 10/15/2008

One can choose the value from here