Parameters for WBS scheduling in SAP


The following training tutorials guides you how to define parameters for WBS scheduling in SAP PS step by
step. You can define parameters for wbs scheduling in SAP PS by using one of the following navigation
method.

SAP IMG Path: – SPRO >> IMG (F5) >> Project system >> Dates >> Data planning in WBS >>
Define parameters for wbs scheduling
Transaction code: – OPTQ

Step 1: – Enter transaction code “OPTQ” in the SAP command field and press enter.

Step 2: – On control parameters for wbs scheduling overview screen, click on new entries.
https://www.saponlinetutorials.com/define-parameters-for-wbs-scheduling/ 1/3
11/3/23, 1:30 PM Define parameters for WBS scheduling in SAP - SAP Tutorial

Discover related topics

Element Table

Report

Table

Router Table

Element

Step 3: – On new entries screen, update the following fields.

1. WBS scheduling profile: – Update the unique ID that identifies WBS scheduling profile in SAP and
enter its description of WBS profile.
2. Scheduling type: – It specifies the type of scheduling that to be performed, possible entries are
(backwards, backwards in time, current date, forwards, forwards in time and only capacity
requirements)
3. Start in past: – Update the number of past days that the scheduling starts in past.
4. Scheduling method: – Update the scheduling method from the options, i,e WBS determines dates or
Network determine rules.
5. Adjust basic date: – Select this option to specify the wbs dates based on network activity dates.
6. Automatic log: – Select this option for automatic log during logging.
7. Shift order: – If this option is selected, it determines not to take the dates for rescheduling.
8. Automatic scheduling: – Select this option for automatic scheduling after network has been saved.
9. Latest staging: – Select this option for latest dates of an activity.
10. Reduction: – It determines the account for reduction lead time, the following are types of reduction.
Maximum reduction level: -Update the maximum reduction of lead time, for e.g. (0- do not
reduce, 1- do not reduce beyond reduction level 1, 2- beyond level 2 and so on)
Reduction type: – Update the type of operation that be applied for reduction type.

https://www.saponlinetutorials.com/define-parameters-for-wbs-scheduling/ 2/3
11/3/23, 1:30 PM Define parameters for WBS scheduling in SAP - SAP Tutorial

After updating all the mandatory fields, click on save button and save the configured wbs scheduling
parameters data.

Define Pricing Procedure (Calculation Schema) in SAP S4 Hana


Activate Material Ledger for Valuation Areas in SAP S4 Hana
Assign Material Ledger Types to Valuation Area in SAP S4 Hana
Assign Currency Types and Define Material Ledger types in SAP S4 Hana
Activate Quantity / Value Updating in SAP S4 Hana

© 2021 SAP online tutorials


Back to Top

https://www.saponlinetutorials.com/define-parameters-for-wbs-scheduling/ 3/3

You might also like