DAY 1 – 25-05-2020
A1) Suitable Economic location
1) TC = TFC + TVC.
Fixed cost Variable cost Total cost
2) ECONOMIC LOCATION
TC = TFC + TVC.
Fixed cost Variable cost Total cost
X Y VOLUME COS D TC
T
300 320 4000 1 M(375-300)+M(320-320) 75 30000
375 470 6000 1 M(375-375)+M(320-420) 100 600000
470 180 3000 1 M(375-470)+M(320-180) 235 705000
TTC 1335000
DISTANCE = modulus (X-Xi) + modulus (Y- Yi)
A3) CENTRE OF GRAVITY
CX= SUM(XI*LI)/SUM(LI)
CY =SUM(YI*LI)/SUM(LI)
DISTANCE = SQ. ROOT[SQUARE(CX-XI) + SQUARE(CY-YI)]
A B C
A 55 40
B 25
C
DAY 3 – 27-05-2020
A1) EXISTING LAYOUT
A B C
A 10 20
B 10
C
DISTANCE MATRIX
TOTAL COST
A B C TOTAL
A 550 800 1350
B 250 250
C TOTA 1600
A B C
A 20 10
B 10
C
PROPOSED LAYOUT
DISTANCE MATRIX
A B C TOTAL
A 1100 400 1500
B 250 250
C TOTA 1750
L
TOTAL COST
A B C D
A 25 60 45
B 30 57
C 60
D
A2) EXISTING LAYOUT
A B C D
A 10 20 20
B 10 10
C 20
D
DISTANCE MATRIX
A B C D TOTAL
A 250 1200 900 2350
B 300 570 870
C 1200 1200
D TOTAL 4420
TOTAL COST
A B C D
A 10 20 10
B 10 20
C 10
D
PROPOSED LAYOUT
DISTANCE MATRIX
A B C D TOTAL
A 250 1200 450 1900
B 300 1140 1440
C 600 600
D TOTAL 3940
TOTAL COST
THE PROPOSED LAYOUT SHOULD BE SELECTED AS IT
HAS DELIVERS LOW COST
Week no. 1 2 3 4 5 6 7 8
Gross req. 100 150
Scheduled receipts
Stock in hand
Planned order 100 150
receipts
Net Req. 100 150
Planned order 150 150
releases
DAY 4 – 28-05-2020
A2) Material requirements planning
LT = 1 WEEK
Gross req. 200 300
Scheduled receipts
Stock in hand
Planned order 200 300
receipts
Net Req. 200 300
Planned order 200 300
releases
LT = 2 WEEK
Week no. 1 2 3 4 5 6 7 8
Gross req. 100 150
Scheduled receipts
Stock in hand
Planned order 100 150
receipts
Net Req. 100 150
Planned order 100 150
releases
LT = 1 WEEK
Gross req. 400 600
Scheduled receipts 70
Stock in hand 70 70 70
Planned order 330 600
receipts
Net Req. 330 600
Planned order 330 600
releases
LT = 1 WEEK