WASA MITRA ENGINEERING

LIST OF MAJOR WORKS FOR POWER PLANT


as of October 2009
NO. PROJECT NAME LOCATION OWNER CUSTOMER WORK ASSIGNMENT YEAR

1 MUARA KARANG STEAM MUARA KARANG PT. PLN MARUBENI CORPORATION - MECHANICAL & PIPING WORKS 1975-1976
POWER PLANT UNIT 1, 2 & 3 (JAKARTA) (PERSERO) MITSUBISHI HEAVY INDUS. - ELECTRICAL WORKS
100 MW X 3 UNITS BABCOCK

2 GRESIK STEAM POWER PLANT GRESIK PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 1979-1981
UNIT 1 & 2 (EAST JAVA) (PERSERO) TOSHIBA CORPORATION - TURBINE GENERATOR & AUX
100 MW X 2 UNITS - MECHANICAL WORK
- ELECTRICAL & INSTRUMENT WORKS
- SUB STATION 150 KV

3 ASAHAN SIGURA-GURA HYDRO NORTH SUMATERA PT. INALUM TOSHIBA CORPORATION INSTALLATION OF : 1980-1982
POWER PLANT - DRAFT TUBE
73.2 MW X 4 UNITS - SPIRAL CASE
- STAY RIVERS
- TURBINE GENERATOR
- SUB STATION 275 KV

4 BELAWAN STEAM POWER PLANT NORTH SUMATRA PT. PLN ALSHTOM ATLANTIQUE INSTALLATION OF : 1982-1984
65 MW X 2 UNITS (PERSERO) - TURBINE GENERATOR
- AUXILIARY EQUIPMENT

5 SURALAYA STEAM POWER PLANT WEST JAVA PT. PLN HITACHI ZOSEN INSTALLATION OF POWER HOUSE 1982-1983
UNIT 1 & 2 400 MW X 2 UNITS (PERSERO)

6 SAGULING HYDRO POWER PLANT WEST JAVA PT. PLN MITSUBISHI CORPORATION INSTALLATION OF : 1983-1985
17.5 MW X 4 UNITS (PERSERO) MITSUBISHI ELECTRIC CO. - GENERATOR
- ELECTRICAL WORK
- OVERHEAD CRANE 2 X 100 TON
- GIS SUB STATION 500 KV

7 BUKIT ASAM STEAM POWER PLANT WEST SUMATRA PT. PLN ALSHTOM ATLANTIQUE INSTALLATION OF : 1985-1988
65 MW X 2 UNITS (PERSERO) - TURBINE & GENERATOR
- AUXILIARY EQUIPMENT
8 GRESIK STEAM POWER PLANT EAST JAVA PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 1986-1989
UNITS 3 & 4 (PERSERO) TOSHIBA CORPORATION - TURBINE & GENERATOR
200 MW X 2 UNITS - AUXILIARY EQUIPMENT
- PIPING WORK
- ELECTRICAL & INSTRUMENT WORKS
- SUB STATION 150 KV
PT. WASA MITRA ENGINEERING

LIST OF MAJOR WORKS FOR POWER PLANT


as of October 2009
NO. PROJECT NAME LOCATION OWNER CUSTOMER WORK ASSIGNMENT YEAR
9 KAMOJANG GEOTHERMAL WEST JAVA PT. PLN MARUBENI CORPORATION INSTALLATION OF : 1988-1989
POWER PLANT UNIT 2 & 3 (PERSERO) - ELECTRICAL WORK
55 MW X 2 UNITS - INSTRUMENT WORK
- MECHANICAL WORK
- INSULATION WORK

10 BAKARU HYDRO POWER PLANT SOUTH SULAWESI PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 1988-1989
65 MW X 2 UNITS (PERSERO) - TURBINE
- DRAFT TUBE
- SPIRAL CASE

11 MUARA KARANG GAS TURBINE JAKARTA PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 1990-1992
OPEN CYCLE (PERSERO) GENERAL ELECTRIC - TURBINE & GENERATOR
100 MW X 3 UNITS - AUXILIARY EQUIPMENT
- MECHANICAL WORK
- ELECTRICAL & INSTRUMENT WORK
- GIS SUB STATION 150 KV

12 GRESIK COMBINED CYCLE EAST JAVA PT. PLN MITSUBISHI CORPORATION INSTALLATION OF : 1991-1994
POWER PLANT 3 BLOCKS (PERSERO) MITSUBISHI HEAVY INDUS. - ALL ELECTRICAL & INSTRUMENT
1500 MW SIEMENS GMBH - GIS 500 KV & 150 KV

13 PAITON STEAM POWER PLANT EAST JAVA PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 1991-1994
UNIT 1 & 2 (PERSERO) TOSHIBA CORPORATION - TURBINE & GENERATOR
400 MW X 2 UNITS - AUXILIARY EQUIPMENT
- MECHANICAL AND ELECTRICAL WORK

14 TAMBAK LOROK GAS TURBINE CENTRAL JAVA PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 1992-1994
OPEN CYCLE (PERSERO) GENERAL ELECTRIC - GAS TURBINE GENERATOR
100 MW X 3 UNITS - AUXILIARY EQUIPMENT
- MECHANICAL WORK
- ELECTRICAL / INSTRUMENT WORKS
- GIS SUB STATION 150 KV

15 TANJUNG PRIOK COMBINED CYCLE JAKARTA PT. PLN MARUBENI CORPORATION INSTALLATION OF : 1993-1994
POWER PLANT (PERSERO) ASEA BROWN BOVARY - GAS TURBINE GENERATOR
1.5 BLOCK, 1,000 MW - AUXILIARY EQUIPMENT
- MECHANICAL WORK
- ELECTRICAL & INSTRUMENT WORKS
PT. WASA MITRA ENGINEERING

LIST OF MAJOR WORKS FOR POWER PLANT


as of October 2009
NO. PROJECT NAME LOCATION OWNER CUSTOMER WORK ASSIGNMENT YEAR
16 MUARA KARANG COMBINED CYCLE JAKARTA PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 1994-1995
POWER PLANT (PERSERO) GENERAL ELECTRIC - STEAM TURBINE
158 MW X 1 UNIT - GENERATOR
- AUXILIARY EQUIPMENT
- MECHANICAL WORK
- ELECTRICAL & INSTRUMENT WORKS
- SUB STATION 150 KV

17 GRATI COMBINED CYCLE JAKARTA PT. PLN MITSUBISHI CORPORATION INSTALLATION OF : 1995-1997
POWER PLANT 1.5 BLOCKS, (PERSERO) MITSUBISHI HEAVY INDUSTRI - ELECTRICAL & INSTRUMENT WORKS
1,200 MW - GIS SUB STATION 500 KV / 150 KV

18 SURALAYA STEAM POWER PLANT WEST JAVA PT. PLN MARUBENI CORPORATION INSTALLATION OF : 1995-1997
UNIT 5, 6, 7 (PERSERO) - ELECTRICAL FOR BOILER
600 MW X 3 UNITS

19 TAMBAK LOROK COMBINED CYCLE CENTRAL JAVA PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 1995-1996
POWER PLANT (PERSERO) GENERAL ELECTRIC - STEAM TURBINE GENERATOR
BLOCK 1 PHASE 2 & BLOCK 2 - GAS TURBINE GENERATOR
- ELECTRICAL & INSTRUMENTATION WORK

20 SURALAYA STEAM POWER PLANT WEST JAVA PT. PLN SAMSUNG HEAVY INDUSTRIES INSTALLATION OF :
UNIT 5, 6, 7 (PERSERO) - COAL HANDLING 1997-1998
600 MW X 3 UNITS - ELECTRICAL WORK

21 MUARA TAWAR COMBINED CYCLE WEST JAVA PT. PLN MARUBENI CORPORATION INSTALLATION OF :
PWER PLANT (PERSERO) - STEAM TURBINE 225 MW X 1 UNIT
- BOP ELECTRICAL & INSTRUMENT

22 PAITON PRIVATE POWER PLANT EAST JAVA PT. PEC SHINWA ENG. & CONST. INSTALLATION OF : 1997-1998
PHASE I 600 MW X 2 UNITS - TANK 4 UNIT
- PIPING BOILER SIDE
- COM PLANT & ASH PLANT
- ELECTRICAL & INSTRUMENT NON
- POWER BLOCK

23 WONOREJO HYDRO POWER PLANT WONOREJO PT. PLN TOSHIBA ENGINEERING CORP. INSTALLATION OF : 1999-2000
6 MW X 1 UNIT EAST JAVA (PERSERO) - MECHANICAL WORK
- ELECTRICAL/INSTRUMENT WORK
SUPPLY OF ELECTRIAL MATERIALS
PT. WASA MITRA ENGINEERING

LIST OF MAJOR WORKS FOR POWER PLANT


as of October 2009
NO. PROJECT NAME LOCATION OWNER CUSTOMER WORK ASSIGNMENT YEAR
24 SIPANSI HAPORAS HYDRO SIBOLGA PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 1999-2002
POWER PLANT NORTH SUMATRA (PERSERO) TOSHIBA CORPORATION - TURBINE
17.6 MW X 1 UNIT - MECHANICAL WORK
34 MW X 1 UNIT - ELECTRICAL/INSTRUMENT WORK
SUPPLY OF :
- ELECTRIAL MATERIALS

25 SIPANSI HAPORAS HYDRO SIBOLGA PT. PLN PT. MEIDEN ENGINEERING INSTALLATION OF : 2000-2002
POWER PLANT NORTH SUMATRA (PERSERO) - GENERATOR
17.6 MW X 1 UNIT - ELECTRICAL WORK
34 MW X 1 UNIT - INSTRUMENT WORK

26 BATUTEGI HYDRO POWER PLANT LAMPUNG PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 2000-2002
14.9 MW X 2 UNITS (PERSERO) TOSHIBA CORPORATION - TURBINE & GENERATOR
- MECHANICAL WORK
- ELECTRICAL/INSTRUMENT WORK
SUPPLY OF :
- ELECTRIAL MATERIALS

27 RELOCATION OF PLTG/GE FROM TJ. BALI PT. INDONESIA PT. INDONESIA POWER ENGINEERING WORK 2003-2004
PRIOK TO PEMARON, 2 X 50 MW POWER SUPPLY OF :
- ELECTRICAL & MECHANICAL EQUIPMENT
INSTALLATION OF :
- TURBINE & GENERATOR
- MECHANICAL WORK
- ELECTRICAL & INSTRUMENT WORK

28 TANJUNG JATI B POWER STATION TANJUNG JATI PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 2003-2006
660 MW X 2 UNITS CENTRAL JAVA (PERSERO) TOSHIBA CORP. - MECHANICAL WORK
- ELECTRICAL WORK

29 PALEMBANG GFCC POWER PLANT PALEMBANG CHENGDA ENG. PT. TRUBA JURONG ENG. INSTALLATION OF : 2003-2006
150 MW SOUTH SUMATRA CORPORATION - ELECTRICAL WORK
OF CHINA - INSTRUMENT WORK

30 CILACAP CFSPP 2 X 300 MW CILACAP PT.SUMBER SEGARA CHENGDA ENGINEERING INSTALLATION OF : 2004-2006
CENTRAL JAVA PRIMADAYA CORPORATION OF CHINA - ELECTRICAL WORK
- INSTRUMENT WORK

31 TANJUNG BIN CCPP 2 X 700 MW MALAYSIA METAL PIPE LINE Co. Ltd. SUPERVISION WORK 2004 - 2006
PT. WASA MITRA ENGINEERING

LIST OF MAJOR WORKS FOR POWER PLANT


as of October 2009
NO. PROJECT NAME LOCATION OWNER CUSTOMER WORK ASSIGNMENT YEAR
32 JEBEL ALI CCPP UNI EMIRAT ARAB TOSHIBA ENGINEERING Co. Ltd. SUPERVISION WORK 2005

33 BILI -BILI HYDROELECTRIC POWER PLANT SOUTH SULAWESI PT. PLN SUMITOMO CORPORATION INSTALLATION OF : 2004-2005
1 X 12.75 MW (PERSERO) - TURBINE & AUXILIARY
1 X 6.5 MW - GENERATOR & AUXILIARY
- ELECTRICAL & INSTRUMENT

34 MUSI HYDROELECTRIC POWER PLANT BENGKULU - SUMATERA PT. PLN MITSUBISHI CORPORATION - TURBINE & AUXILIARY 2005-2006
2 X 70 MW (PERSERO) - ELECTRICAL & INSTRUMENT

35 TARAHAN CFSPP 2 X 100 MW LAMPUNG - SUMATERA PT. PLN PT. JURONG ENGINEERING - TURBINE & AUXILIARY 2005-2007
(PERSERO) LESTARI - GENERATOR & AUXILIARY
- B.O.P
- ELECTRICAL & INSTRUMENT/CONTROL

36 KERAMASAN GTTP 2 X 50 MW PALEMBANG PT. PLN PT. ASTA KERAMASAN ENGINEERING OF : 2007-2008
SOUTH SUMATERA (PERSERO) ENERGI - CIVIL
- B.O.P

PROCUREMENT OF :
- CIVIL
- B.O.P

CONSTRUCTION OF :
- RECONDITION
- CIVIL
- GT & ASST. COMMISSIONING
- B.O.P
- ELECTRICAL & INSTRUMENT

37 WAYANG WINDU GPP 1 X 110 MW PENGALENGAN PT. MAGMA SUMITOMO CORPORATION MECHANICAL & ELECTRICAL WORK 2007-2008
WEST JAVA NUSANTARA LIMITED

38 PLTU 1 JAWA TENGAH 2 X (300-400) MW REMBANG PT. PLN ZELAN PRIAMANAYA TRONOH CONSTRUCTION WORK : 2007-2009
CFPPP CENTRAL JAVA (PERSERO) JOINT OPERATION - BOILER & AUXILIARY
- STEAM TURBINE GENERATOR & AUX.
- B.O.P
- ELECTRICAL & INSTRUMENT

39 TANJUNG PRIOK GFPPEP 720 - 780 MW NORTH JAKARTA PT. PLN MITSUBISHI CORPORATION * DEMOLISH & RELOCATION WORK 2008 - 2011
(PERSERO) MITSUBISHI HEAVY INDUSTRY * CONTRUCTION WORKS (on progress)
PT. WASA MITRA ENGINEERING

LIST OF MAJOR WORKS FOR POWER PLANT


as of October 2009
NO. PROJECT NAME LOCATION OWNER CUSTOMER WORK ASSIGNMENT YEAR
TAKASAGO - MECHANICAL (TURBINE GEN. & HRSG)
- [PIPING
- ELECTRICAL & INSTRUMENT

40 MUARA KARANG GFPP NORTH JAKARTA PT. PLN SUMITOMO CORPORATION REPOWERING SUBSTATION & SWICTHYARD 2008 - 2010
(PERSERO) (150kV) (on progress)
- DISMANTLING & INSTALLATION OF
ELECTRICAL WORKS

41 TANJUNG JATI "B" EXPANSION 2 x 660 MW JEPARA PT. PLN PT. JURONG ENGINEERING CONSTRUCTION WORKS : 2009 - 2011
CFPP UNIT 3 & 4 CENTRAL JAVA (PERSERO) LESTARI - ERECTION OF ELECTRICAL & INSTRUMENT (on progress)
OF BOILER PORTION

42 TANJUNG JATI "B" EXPANSION 2 x 660 MW JEPARA PT. PLN SUMITOMO CORPORATION ERECTION WORKS OF 500/150 kV 2009 - 2011
CFPP UNIT 3 & 4 CENTRAL JAVA (PERSERO) SWICTH YARD (on progress)

43 TANJUNG JATI "B" EXPANSION 2 x 660 MW JEPARA PT. PLN CENTRAL JAVA POWER INPROVEMENT OF ACCESS ROAD 2009 - 2010
CFPP UNIT 3 & 4 CENTRAL JAVA (PERSERO) (on progress)

44 TANJUNG JATI "B" EXPANSION 2 x 660 MW JEPARA PT. PLN SUMITOMO CORPORATION CONSTRUCTION WORKS SERVICES 2009 - 2012
CFPP UNIT 3 & 4 CENTRAL JAVA (PERSERO) (on progress)

45 TANJUNG JATI "B" EXPANSION 2 x 660 MW JEPARA PT. PLN TOSHIBA CORPORATION MAKE UP WATER TANK FOR XITO3, XITO4 2009 - 2010
CFPP UNIT 3 & 4 CENTRAL JAVA (PERSERO) (on progress)

46 PAITON III EXPANSION 1 x 880 MW CFPP EAST JAVA PT. PLN TAIHEI DENGYO KAISHA, LTD CONSTRUCTION WORKS : 2010 - 2011
(PERSERO) - ELECTRICAL & INSTRUMENT/CONTROL (on progress)