spesifikasi pipa hasil running PIPA

Label Length (m) Diameter (in) Material Hazen-Williams C Label Length (m)

P-1 200 4 Cast Iron 130 P-1 200


P-2 200 4 Cast Iron 130 P-2 200
P-3 200 4 Cast Iron 130 P-3 200
P-4 200 4 Cast Iron 130 P-4 200
P-5 200 4 Cast Iron 130 P-5 200
P-6 200 4 Cast Iron 130 P-6 200
P-7 200 4 Cast Iron 130 P-7 200
P-8 200 4 Cast Iron 130 P-8 200
P-9 200 4 Cast Iron 130 P-9 200
P-10 190 4 Cast Iron 130 P-10 190
P-11 60 4 Cast Iron 130 P-11 60
P-12 150 4 Cast Iron 130 P-12 150
P-13 130 4 Cast Iron 130 P-13 130
P-14 30 3 PVC 150 P-14 30
P-15 60 3 PVC 150 P-15 60
P-16 200 3 PVC 150 P-16 200
P-17 200 3 PVC 150 P-17 200
P-18 140 3 PVC 150 P-18 140
P-19 60 3 PVC 150 P-19 60
P-20 200 3 PVC 150 P-20 200
P-21 200 3 PVC 150 P-21 200
P-22 200 3 PVC 150 P-22 200
P-23 160 3 PVC 150 P-23 160
P-24 90 3 PVC 150 P-24 90
P-25 30 3 PVC 150 P-25 30
P-26 170 3 PVC 150 P-26 170
P-27 176.66667
P-28 216.66667
P-29 256.66667
nning PIPA

Diameter (in) Material Hazen-Williams C Flow (L/s) Velocity (m/s) Headloss Gradient (m/km)

4 Cast Iron 130 0


4 Cast Iron 130 0
4 Cast Iron 130 0
4 Cast Iron 130 0
4 Cast Iron 130 0
4 Cast Iron 130 0
4 Cast Iron 130 0
4 Cast Iron 130 0
4 Cast Iron 130 0
4 Cast Iron 130 0
4 Cast Iron 130 1
4 Cast Iron 130 1
4 Cast Iron 130 1
3 PVC 150 1
3 PVC 150 1
3 PVC 150 1
3 PVC 150 1
3 PVC 150 1
3 PVC 150 1
3 PVC 150 1
3 PVC 150 1
3 PVC 150 1
3 PVC 150 0
3 PVC 150 0
3 PVC 150 0
3 PVC 150 0
3 PVC 150 0
3 PVC 150 0
3 PVC 150 0
hasil runing junction
1 1580.0

Titik Simpul
Label Elevation Hydraulic Grade Pressure No Pipa Panjang (m)
(m) (m) (atm) Dari
J-1 83.00 85.30 0 P1a 0.0 R1
J-2 82.04 85.29 0 P1b 180.0 J
J-3 80.89 84.86 0 P2 200.0 T1
J-4 80.44 84.58 0 P3 200.0 J1
J-5 79.59 84.30 0 P4 200.0 J2
J-6 78.76 84.02 1 P5 200.0 J3
J-7 78.51 83.74 1 P6 200.0 J4
J-8 78.13 83.46 1 P7 200.0 J5
J-9 77.51 83.19 1 P8 100.0 J6
J-10 77.11 82.91 1 P9 100.0 PRV-1
J-11 76.25 82.63 1 P10 200.0 J7
J-12 75.62 82.35 1 P11 200.0 J8
J-13 75.94 82.07 1 P12 100.0 J9
J-14 75.95 81.79 1 P13 100.0 PRV-2
J-15 75.21 80.66 1 P14 130.0 J10
J-16 74.69 79.53 0 P15 50.0 J11
J-17 74.49 78.40 0 P16 50.0 J11
J-18 73.92 77.26 0 P17 200.0 J13
J-19 73.63 76.13 0 P18 200.0 J14
J-20 P19 100.0 J15
J-21 P20 100.0 PRV-3
J-22 P21 200.0 J16
J-23 P22 200.0 J17
J-24 P23 200.0 J18
J-25 P24 150.0 J19
J-26 P25 50.0 J20
P26 100.0 J20
P27 100.0 PRV-4
00.00
Demand
Titik Simpul Label Elevasi
Diameter (in) Material (L/s)
Ke J 710.00 -5.50
J 4.0 Galvanized Iron J1 689.00 0.00
T1 4.0 Galvanized Iron J2 683.00 0.00
J1 4.0 Galvanized Iron J3 676.00 0.00
J2 4.0 Galvanized Iron J4 665.00 0.00
J3 4.0 Galvanized Iron J5 656.00 0.00
J4 4.0 Galvanized Iron J6 640.00 0.00
J5 4.0 Galvanized Iron J7 634.00 0.00
J6 4.0 Galvanized Iron J8 617.00 0.00
PRV-1 4.0 Galvanized Iron J9 595.00 0.00
J7 4.0 Galvanized Iron J10 571.00 0.00
J8 4.0 PVC J11 564.00 0.00
J9 4.0 PVC J12 564.00 0.45
PRV-2 4.0 PVC J13 559.00 0.00
J10 4.0 PVC J14 536.00 0.00
J11 4.0 PVC J15 519.00 0.00
J12 3.0 PVC J16 507.00 0.00
J13 3.0 PVC J17 498.00 0.00
J14 3.0 PVC J18 477.00 0.00
J15 3.0 PVC J19 465.00 0.00
PRV-3 3.0 PVC J20 459.00 0.00
J16 3.0 PVC J21 459.00 0.33
J17 3.0 PVC J22 390.00 0.24
J18 3.0 PVC
J19 3.0 PVC
J20 3.0 PVC
J21 3.0 PVC
PRV-4 2.0 PVC
J22 2.0 PVC
00.00 Jam Ke 07.00
Tinggi Demand
Tekanan (atm) Keterangan Label Elevasi
Hidrolis (m) (L/s)
710.00 0.00 Memenuhi J 710.00 -5.50
709.64 1.99 Memenuhi J1 683.00 0.00
709.58 2.57 Memenuhi J2 689.00 0.00
709.52 3.24 Memenuhi J3 676.00 0.00
709.46 4.29 Memenuhi J4 665.00 0.00
709.40 5.16 Memenuhi J5 656.00 0.00
709.34 6.70 Memenuhi J6 640.00 0.00
647.33 1.29 Memenuhi J7 634.00 0.00
647.29 2.93 Memenuhi J8 617.00 0.00
647.25 5.05 Memenuhi J9 595.00 0.00
582.48 1.11 Memenuhi J10 571.00 0.00
582.45 1.78 Memenuhi J11 564.00 0.00
582.45 1.78 Memenuhi J12 564.00 2.51
582.44 2.26 Memenuhi J13 559.00 0.00
582.39 4.48 Memenuhi J14 536.00 0.00
582.33 6.12 Memenuhi J15 519.00 0.00
523.33 1.58 Memenuhi J16 507.00 0.00
523.27 2.44 Memenuhi J17 498.00 0.00
523.22 4.46 Memenuhi J18 477.00 0.00
523.16 5.62 Memenuhi J19 465.00 0.00
523.12 6.19 Memenuhi J20 459.00 0.00
523.12 6.19 Memenuhi J21 459.00 1.82
423.96 3.28 Memenuhi J22 390.00 1.34
Jam Ke 07.00 Tabel 4.13 Hasil Sim

Tinggi Hidrolis (m) Tekanan (atm) Keterangan Panjang Start Stop


Pipa
(m) Node Node
710.00 0.00 Memenuhi
707.53 1.79 Memenuhi P1a 0.0 R1 J
706.11 2.23 Memenuhi P1b 180.0 J T1
704.68 2.77 Memenuhi P2 200.0 T1 J1
703.25 3.69 Memenuhi P3 200.0 J1 J2
701.82 4.43 Memenuhi P4 200.0 J2 J3
700.39 5.83 Memenuhi P5 200.0 J3 J4
646.64 1.22 Memenuhi P6 200.0 J4 J5
645.70 2.77 Memenuhi P7 200.0 J5 J6
644.75 4.81 Memenuhi P8 100.0 J6 PRV-1
582.03 1.07 Memenuhi P9 100.0 PRV-1 J7
581.41 1.68 Memenuhi P10 200.0 J7 J8
581.20 1.66 Memenuhi P11 200.0 J8 J9
581.09 2.13 Memenuhi P12 100.0 J9 PRV-2
579.79 4.23 Memenuhi P13 100.0 PRV-2 J10
578.48 5.75 Memenuhi P14 130.0 J10 J11
522.71 1.52 Memenuhi P15 50.0 J11 J12
521.41 2.26 Memenuhi P16 50.0 J11 J13
520.10 4.16 Memenuhi P17 200.0 J13 J14
518.80 5.20 Memenuhi P18 200.0 J14 J15
517.83 5.68 Memenuhi P19 100.0 J15 PRV-3
517.71 5.67 Memenuhi P20 100.0 PRV-3 J16
423.04 3.19 Memenuhi P21 200.0 J16 J17
P22 200.0 J17 J18
P23 200.0 J18 J19
P24 150.0 J19 J20
P25 50.0 J20 J21
P26 100.0 J20 PRV-4
P27 100.0 PRV-4 J22
Sumber: Hasil Analisa Program WaterCAD V8i

Keterangan : 1. Kecepatan 0,1-2,5 m/detik


2. Headloss Gradient 0-15 m/km
Tabel 4.13 Hasil Simulasi pada Pipa Pukul 00.00
Headloss
Diameter Hazen- Flow Kecepatan
Bahan Gradient Keterangan
(in) Williams C (L/s) (m/s)
(m/km)
4.0 GI 120 0.00 0.00 0.00 Memenuhi
4.0 GI 120 2.58 0.32 1.67 Memenuhi 1580.0
4.0 GI 120 1.03 0.13 0.30 Memenuhi
4.0 GI 120 1.03 0.13 0.30 Memenuhi
4.0 GI 120 1.03 0.13 0.30 Memenuhi
4.0 GI 120 1.03 0.13 0.30 Memenuhi
4.0 GI 120 1.03 0.13 0.30 Memenuhi
4.0 GI 120 1.03 0.13 0.30 Memenuhi
4.0 GI 120 1.03 0.13 0.30 Memenuhi
4.0 GI 150 1.03 0.13 0.30 Memenuhi 700.0
4.0 PVC 150 1.03 0.13 0.20 Memenuhi
4.0 PVC 150 1.03 0.13 0.20 Memenuhi
4.0 PVC 150 1.03 0.13 0.20 Memenuhi
4.0 PVC 150 1.03 0.13 0.20 Memenuhi
4.0 PVC 150 1.03 0.13 0.20 Memenuhi 1630.0
3.0 PVC 150 0.45 0.10 0.18 Memenuhi
3.0 PVC 150 0.57 0.13 0.27 Memenuhi
3.0 PVC 150 0.57 0.13 0.28 Memenuhi
3.0 PVC 150 0.57 0.13 0.27 Memenuhi
3.0 PVC 150 0.57 0.13 0.28 Memenuhi
3.0 PVC 150 0.57 0.13 0.28 Memenuhi
3.0 PVC 150 0.57 0.13 0.27 Memenuhi
3.0 PVC 150 0.57 0.13 0.28 Memenuhi
3.0 PVC 150 0.57 0.13 0.28 Memenuhi
3.0 PVC 150 0.57 0.13 0.28 Memenuhi
3.0 PVC 150 0.33 0.07 0.10 Memenuhi
2.0 PVC 150 0.24 0.12 0.41 Memenuhi 100.0
2.0 PVC 150 0.24 0.12 0.41 Memenuhi 100.0
ram WaterCAD V8i 4010.0

atan 0,1-2,5 m/detik


oss Gradient 0-15 m/km
Tabel 4.14 Hasil Simulasi pada Pipa Pukul 08.00
Headloss
Panjang Start Stop Diameter Hazen- Flow Kecepatan
Pipa Bahan Gradient
(m) Node Node (in) Williams C (L/s) (m/s)
(m/km)
P1a 0.0 R1 J 4.0 GI 120 0.00 0.00 0.00
P1b 180.0 J T1 4.0 GI 120 5.05 0.62 5.77
P2 200.0 T1 J1 4.0 GI 120 5.67 0.70 7.14
P3 200.0 J1 J2 4.0 GI 120 5.67 0.70 7.14
P4 200.0 J2 J3 4.0 GI 120 5.67 0.70 7.14
P5 200.0 J3 J4 4.0 GI 120 5.67 0.70 7.14
P6 200.0 J4 J5 4.0 GI 120 5.67 0.70 7.14
P7 200.0 J5 J6 4.0 GI 120 5.67 0.70 7.14
P8 100.0 J6 PRV-1 4.0 GI 120 5.67 0.70 7.14
P9 100.0 PRV-1 J7 4.0 GI 150 5.67 0.70 7.14
P10 200.0 J7 J8 4.0 PVC 150 5.67 0.70 4.72
P11 200.0 J8 J9 4.0 PVC 150 5.67 0.70 4.72
P12 100.0 J9 PRV-2 4.0 PVC 150 5.67 0.70 4.72
P13 100.0 PRV-2 J10 4.0 PVC 150 5.67 0.70 4.72
P14 130.0 J10 J11 4.0 PVC 150 5.67 0.70 4.74
P15 50.0 J11 J12 3.0 PVC 150 2.51 0.55 4.23
P16 50.0 J11 J13 3.0 PVC 150 3.16 0.69 6.50
P17 200.0 J13 J14 3.0 PVC 150 3.16 0.69 6.50
P18 200.0 J14 J15 3.0 PVC 150 3.16 0.69 6.50
P19 100.0 J15 PRV-3 3.0 PVC 150 3.16 0.69 6.50
P20 100.0 PRV-3 J16 3.0 PVC 150 3.16 0.69 6.50
P21 200.0 J16 J17 3.0 PVC 150 3.16 0.69 6.50
P22 200.0 J17 J18 3.0 PVC 150 3.16 0.69 6.50
P23 200.0 J18 J19 3.0 PVC 150 3.16 0.69 6.50
P24 150.0 J19 J20 3.0 PVC 150 3.16 0.69 6.51
P25 50.0 J20 J21 3.0 PVC 150 1.82 0.40 2.33
P26 100.0 J20 PRV-4 2.0 PVC 150 1.34 0.66 9.63
P27 100.0 PRV-4 J22 2.0 PVC 150 1.34 0.66 9.63
Sumber: Hasil Analisa Program WaterCAD V8i

Keterangan : 1. Kecepatan 0,1-2,5 m/detik


2. Headloss Gradient 0-15 m/km
Elevation Elevation Elevation Elevation
Panjang Lebar
Keterangan Label (Base) (Min) (Initial) (Max)
(m) (m) (m) (m) (m) (m)
Memenuhi T-1 707.8 708.00 709.70 710.00 5 3
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
Memenuhi
0.00
Volume Elevation Diameter Pressure Setting Flow Hydraulic Grade
Label
Full (m) (Valve) (in) (Initial) (atm) (L/s) (From) (m)
(L) PRV-1 637.0 4.0 1.00 1.03 709.31
30,000.00 PRV-2 582.5 3.0 0.00 1.03 647.23
PRV-3 513.0 3.0 1.00 0.57 582.30
PRV-4 424.0 2.0 0.00 0.24 523.08
8.00
Hydraulic Grade Headloss Elevation Diameter Pressure Setting Flow
Label
(To) (m) (m) (m) (Valve) (in) (Initial) (atm) (L/s)
647.36 61.95 PRV-1 637.0 4.0 1.00 5.67
582.50 64.73 PRV-2 582.5 3.0 0.00 5.67
523.36 58.95 PRV-3 513.0 3.0 1.00 3.16
424.00 99.08 PRV-4 424.0 2.0 0.00 1.34
0.00
Hydraulic Grade Hydraulic Grade Headloss Elevation
Label Demand (l/s)
(From) (m) (To) (m) (m) (m)
699.68 647.36 52.32 H1 561 0.31
644.28 582.5 61.78 H2 450 0.22
577.83 523.36 54.48 H3 438 0.17
516.86 424.00 92.86
7.00
Hydraulic Grade Pressure Elevation Demand Hydraulic Grade Pressure
Label
(To) (m) (atm) (m) (l/s) (To) (m) (atm)
598.33 3.61 H1 561 1.7 594.42 3.23
513.27 6.11 H2 450 1.24 507.98 5.6
513.23 7.27 H3 438 0.93 507.15 6.68
ALTERNATIF PERTAMA " 2 BRONCAPTERING + TAND

Jam Debit Masuk Debit Keluar


liter/dtk liter/jam m3/jam liter/dtk liter/jam m3/jam
[1] [2] [3] [4] [5] [6] [7]
0 5.5 19800 19.8 3.67 13212 13.21
1 5.5 19800 19.8 3.67 13212 13.21
2 5.5 19800 19.8 3.67 13212 13.21
3 5.5 19800 19.8 3.67 13212 13.21
4 5.5 19800 19.8 3.67 13212 13.21
5 5.5 19800 19.8 3.67 13212 13.21
6 5.5 19800 19.8 3.67 13212 13.21
7 5.5 19800 19.8 3.67 13212 13.21
8 5.5 19800 19.8 3.67 13212 13.21
9 5.5 19800 19.8 3.67 13212 13.21
10 5.5 19800 19.8 3.67 13212 13.21
11 5.5 19800 19.8 3.67 13212 13.21
12 5.5 19800 19.8 3.67 13212 13.21
13 5.5 19800 19.8 3.67 13212 13.21
14 5.5 19800 19.8 3.67 13212 13.21
15 5.5 19800 19.8 3.67 13212 13.21
16 5.5 19800 19.8 3.67 13212 13.21
17 5.5 19800 19.8 3.67 13212 13.21
18 5.5 19800 19.8 3.67 13212 13.21
19 5.5 19800 19.8 3.67 13212 13.21
20 5.5 19800 19.8 3.67 13212 13.21
21 5.5 19800 19.8 3.67 13212 13.21
22 5.5 19800 19.8 3.67 13212 13.21
23 5.5 19800 19.8 3.67 13212 13.21
24 5.5 19800 19.8 3.67 13212 13.21
Sumber: Hasil perhitungan
1. jam 3. Debit sumber x 60 x 60 5. Kebutuhan air 7. [6] / 1000
2. Debit Sumber 4. [3] / 1000 6. Kebutuhan air x 60 x 60 8. Load Factor
RONCAPTERING + TANDON 24 M3

Load Factor Debit Sisa Tandon 24 m3


m3/jam m3/jam m3/jam
[8] [9] [10] [11] [12]
0.25 3.30 16.50 4.00
0.31 4.10 - 15.70 4.00
0.37 4.89 - 14.91 4.00
0.45 5.95 - 13.85 4.00
0.64 8.46 - 11.34 4.00
1.15 15.19 - 4.61 4.00
4.50
1.4 18.50 3.67 4.00
1.53 20.21 -0.41 - 3.59 4.00
1.56 20.61 -0.81 - 2.77 3.50
1.42 18.76 3.67 4.00
3.00
1.38 18.23 3.67 4.00

volume tandon m3
1.27 16.78 - 3.02 4.00 2.50
1.2 15.85 - 3.95 4.00 2.00
1.14 15.06 - 4.74 4.00
1.50
1.17 15.46 - 4.34 4.00
1.18 15.59 - 4.21 4.00 1.00
1.22 16.12 3.68 4.00 0.50
1.31 17.31 3.67 4.00
0.00
1.38 18.23 3.67 4.00 0 1 2 3 4 5 6
1.25 16.52 - 3.29 4.00
0.98 12.95 - 6.85 4.00
0.62 8.19 - 11.61 4.00
0.45 5.95 - 13.85 4.00
0.37 4.89 - 14.91 4.00
0.25 3.30 16.50 4.00

9. [7] x [8] 11. Jika hasil [7] x [8] > 1


10. Jika hasil [7] x [8] < 0 12. Maksimal 24
4.50

4.00

3.50

3.00
volume tandon m3

2.50

2.00

1.50

1.00

0.50

0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Waktu (jam)
(
Tracking Location No Elevasi

GPS Sumber 552 709

553 630
Tandon
Hidran 554 598
Hidran 555 497
No
1
2
2
3
4
5
6

561

443
Lokasi Elevasi (+m) Google earth
Sumber Mata Air 1 692 713
Sumber Mata Air 2 699 713
Sumber Mata Air 3 710 718
Tandon 630 594
HU Dsn.Krajan 598
HU Dsn.Andung 497
HU Dsn.Taman  468

Elevasi Asli Latihan 1

Juction Elevasi (+m) Google earth Juction Elevasi (+m)

Sumber Mata Air 1 696 Sumber Mata Air 1 696


Sumber Mata Air 2 699 Sumber Mata Air 2 699
Sumber Mata Air 3 710 Sumber Mata Air 3 710
1 689 694 1 689
2 683 685 2 683
3 676 676 3 676
4 665 665 4 665
5 656 656 5 656
6 642 642 6 642
7 640 640 7 640
8 634 634 8 634
9 617 617 9 617
Tandon 25 595 Tandon 25 595
10 594 594 10 594
11 571 571 11 571
HU Dsn.Krajan 12 564 HU Dsn.Krajan 12 564
13 559 559 13 559
14 536 536 14 536
15 519 519 15 519
16 507 507 16 507
17 498 498 17 498
18 477 477 18 477
19 465 465 19 465
HU Dsn.Andung 20 460 HU Dsn.Andung 20 460
21 449 449 21 449
HU Dsn.Taman 22 390 HU Dsn.Taman 22 390
23 443 23 443
24 561 24 561
Latihan 2
Pergantian El Pergantian El Beda Tinggi
Google earth Juction Elevasi (+m)
(m) (m) (m)
Sumber Mata Air 710 710
1 689 689 21
2 683 683 6
694 3 676 676 7
685 4 665 665 11
676 5 656 653 9
665 6 642 641 14
656 7 640 629 2
642 PRV 1 623 6
640 8 634 617 17
634 9 617 604 24
617 T1 593 571 22
10 571 571 10
594 11 561 561 2
571 12 559 559 4
13 555 555 6
559 14 536 536 17
536 15 519 519 12
519 16 507 507 15
507 PRV 2 499.5 16
498 17 492 492 15
477 18 476 476 12
465 19 461 461 2
20 449 449 21
449 21 447 447 3
22 428 428
23 425 425
Elevasi Asli
Pergantian El
Juction Elevasi (+m)
(m)
Sumber Mata Air 710 692
1 689 686
2 683 681
3 676 677
4 665 671
5 656 664
6 642 657
7 640 650
PRV 1
8 634 643
9 617 636
T1 593 630 62 6.888889
10 571 613
11 561 598
12 559 597
13 555 590
14 536 579
15 519 568
16 507 554
PRV 2
17 492 542
18 476 520
19 461 509
20 449 497 101
21 447 495
22 428 473
23 425 468
elevasi J2 640 m
Elevasij3 634 m
Panjang Pipa 200 m
debit 1.03 L/s 0.00103 m3/s 3.67 0.9175
C hw 120
Diameter Pipa 4 in 0.1016 m

Penyelesaian
k= 2140
0.102343
20910.1
Hf 0.062245
0.000311 m/m 3.67
0.311225 m/km 1.223333

s=hf/L 0.000311
V 0.85 120 0.0988656 0.012772
0.128797
t 69.28 mH19 8
6.79 bar
6.70 atm
elevasi J2 640 m
Elevasij3 634 m
Panjang Pipa 200 m
debit 5.6151 L/s 0.0056151 m3/s 3.67 5.6151
C hw 120
Diameter Pipa 4 in 0.1016 m

Penyelesaian
k= 2140
0.102343
20910.1
Hf 1.434391
0.007172 m/m 3.67
7.171954 m/km 1.223333

s=hf/L 0.007172
V 0.85 120 0.0988656 0.06951
0.700954
t 58.96 mH19 8
5.78 bar
5.70 atm
elevasi J2 42 m
Elevasij3 40 m
Panjang Pipa 93.8 m
debit 48.99 L/s 0.04899 m3/s 588 147
C hw 150
Diameter Pipa 4 in 0.406 m

Penyelesaian
k= 1003.66
131.6105
7.625986
Hf 0.028774
0.000307 m/m
0.306755 m/km 0.061351 200m

s=hf/L 0.000307
V 0.85 150 0.2366321 0.012673
0.382341
t 8.82 mH20 8
0.86 bar
0.85 atm

t 667.28 mH20 8
65.42 bar
64.56 atm