Document Title: Document No. MAS-
Project Sustainability Plan 1A-PQP- 01
Project Title: Revision
Date:
MIST 1A Ancillary Buildings and No. 0
Infrastructure
22, Oct, Page 1 of
Car Park & Podium (Phase 1B), Abu Dhabi,
2009 31
UAE
Document Title
2
Empl
oyer General
Contractor: Project Manager: Sub-
Subcontr
Abu actor:
CH2MHILL/
Dh KEO
abi Parsons
Brinckerhoff Taahud Sustain
ability
Fut Genera
Special
ure Architect: l
Foster & Contra Projects
MAS Ene Amana/Walb
DAR Partners/WS cting
ridge J.V.
rgy P Co.
Unit
Co.
Document Title: Document No. MAS-
Project Sustainability Plan 1A-PQP- 01
Project Title: Revision
Date:
MIST 1A Ancillary Buildings and No. 0
Infrastructure
22, Oct, Page 3 of
Car Park & Podium (Phase 1B), Abu Dhabi,
2009 31
UAE
This document describes The Subcontractor's proposed Sustainability Management Plan applicable to
the project titled,
As part of Owner's and General Contractor’s commitment to sustainability, this project is covered
by a Project Specific Sustainability Plan in compliance with the relevant elements of the Masdar
Development Construction Environmental Management Plan (CEMP) project 1 for as applicable to
the project. Additionally, this document addresses section 7000 of Fosters and Partners Tender Issue 1
of April 2009.
This Sustainability Plan ensures that Subcontractor has implemented the appropriate environmental
policies and objectives, established a system of procedures to monitor these targets, assigned duties,
delegated authority and set up suitable inspection, examination, reporting and auditing programs to
verify that the requisite standards of Sustainability are achieved. This Sustainability Plan is designed
to accomplish and demonstrate achievement / compliance of / to all contractual sustainability
performance requirements specified by contract and the Owner.
The Project Safety Management System and Quality Control and Assurance are addressed separately by
the specific Project SHE and QAQC Plan documents.
1. Full mobilization including preparation of the assigned site area and the entire
necessary Subcontractor's site office with related services.
2. The supply and installation of architectural trade works as applicable to the Subcontract and
defined in the Letter of Award dated 7th May 2009. A brief description of work is presented
in document titled “Scope of Work” Section 00210 of tender document dated 22.3.09.
This Sustainability Plan is overall applicable for the project. The project works include
This Sustainability Plan is prepared by the Subcontractor and should be approved by the
General Contractor/Owner for implementation on site. It is a controlled document and the
Subcontractor Head Office in Abu Dhabi controls its issue and distribution.
2.0 DEFINITIONS
4
Empl
oyer General
Contractor: Project Manager: Sub-
Subcontr
Abu actor:
CH2MHILL/
Dh KEO
abi Parsons
Brinckerhoff Taahud Sustain
ability
Fut Genera
Special
ure Architect: l
Foster & Contra Projects
MAS Ene Amana/Walb
DAR Partners/WS cting
ridge J.V.
rgy P Co.
Unit
Co.
Document Title: Document No. MAS-
Project Sustainability Plan 1A-PQP- 01
Project Title: Revision
Date:
MIST 1A Ancillary Buildings and No. 0
Infrastructure
22, Oct, Page 5 of
Car Park & Podium (Phase 1B), Abu Dhabi,
2009 31
UAE
RM Restricted Material
It is our policy to ensure that all projects are executed in accordance with contract
Sustainability standards within the contractual time frame, and in compliance to all legal
requirements so as to provide good value and satisfaction to our Client.
The Sustainability Management system adopted by us to fulfil this objective will comply
with all the applicable requirements of the Masdar Development Construction and
Environmental Management Plan.
Tracking and logging the material specifications data required by Masdar as part of
their Key Performance Indicators and delivering it in a timely fashion as required to
the General Contractor’s representative
Following the Masdar CEMP guidelines and promptly reporting any breaches of
policy to appropriate supervisor
Educating all our employees about Sustainability and providing all employees on site
with proper Masdar Environmental inductions as per requirements of Masdar
representative PB.
The Sustainability Plan will apply to all the construction sites and Departments within
the framework of the agreed contract.
We believe that our clients, employees, suppliers/sub-tiers and the society in general are
important contributors in our business. This fact will be evenly considered in our overall
business dealings vis-à-vis the interests of company management. Additionally, we have a
commitment to exercise appropriate Corporate Social Responsibility in all our endeavours.
6
Employer General Contractor: Project Manager: Sub-
Abu
CH2MHILL/ Subcontractor: KEO
Dhabi Taahud International
Future Parsons Brinckerhoff General
Energy Architect: Contracting Sustainability
Foster & Co.
Co. Partners/WSP
Projects Unit
MASDAR Amana/Walbridge J.V.
Document Title:
Document No. MAS-1A-PQP- 01
Project Sustainability Plan
Project Title: Revision No. 0
Date: June 5,
MIST 1A Ancillary Buildings and Infrastructure
2009 Page 7 of 31
Car Park & Podium (Phase 1a), Abu Dhabi, UAE
2. Safety No Fatalities
4.1 General
Subcontractor will implement and maintain the Sustainability Management system for this
project as detailed in this Sustainability plan.
The following will describe how Subcontractor will execute the project the Sustainability plan:
The key processes are grouped into three main process groups –
Key Process Group (1) Management, Resources and Administration (Sections
5-6)
Key Process Group (2) Project / Construction Operations (section 7)
Key Process Group (3) Measurement, Analysis and Improvement (Section 8)
Process (1) - Management, Resources and Administration covers all the management
activities of planning, implementing and managing the system and determining and providing
those resources needed to operate the system effectively and assure product/service conformity.
Process (1) enables Process (2) - Project/Construction Operations to take place in a planned
and systematic way in order to comply with contract/project requirements and eventually Employer
satisfaction and realization of payments. Process (2) covers all those elements of product and
service realization, those activities pertinent to the sustainability management system which take
place during the planning, purchasing, design, fabrication and installation of the product or
8
Employer General Contractor: Project Manager: Sub-
Abu
CH2MHILL/ Subcontractor: KEO
Dhabi Taahud International
Future Parsons Brinckerhoff General
Energy Architect: Contracting Sustainability
Foster & Co.
Co. Partners/WSP
Projects Unit
MASDAR Amana/Walbridge J.V.
Document Title:
Document No. MAS-1A-PQP- 01
Project Sustainability Plan
Project Title: Revision No. 0
Date: June 5,
MIST 1A Ancillary Buildings and Infrastructure
2009 Page 9 of 31
Car Park & Podium (Phase 1a), Abu Dhabi, UAE
Process (3) - Measurement, Analysis and Improvement measures and monitors the
effectiveness of Process (1) and Process (2) and provides feedback to those processes for
improvement.
Document control will ensure that valid issues of documents related to the
sustainability of the project are available and used in the execution of the work,
and that obsolete documents are promptly removed from all points of use.
Distribution is controlled and is detailed in the Document Distribution Matrix.
b) Unique series has been allocated for various project management / control
activities. These are reproduced as under:
10
Employer General Contractor: Project Manager: Sub-
Abu
CH2MHILL/ Subcontractor: KEO
Dhabi Taahud International
Future Parsons Brinckerhoff General
Energy Architect: Contracting Sustainability
Foster & Co.
Co. Partners/WSP
Projects Unit
MASDAR Amana/Walbridge J.V.
Document Title:
Document No. MAS-1A-PQP- 01
Project Sustainability Plan
Project Title: Revision No. 0
Date: June 5,
MIST 1A Ancillary Buildings and Infrastructure
2009 Page 11 of 31
Car Park & Podium (Phase 1a), Abu Dhabi, UAE
d. The first submission will have a Revision Number '0' and subsequent submissions
will be followed by A, B, C and so on.
e. Revisions/Changes will be indicated with a vertical line in the left margin. Brief
details necessitating the revision will be indicated in the revision history block on
the first page.
The letter, transmittal and fax numbering system will be as agreed with General
Contractor. The Subcontractor's Project Manager together with the Site
Secretary/Document Controller is responsible for control of all documents and
informing all affected departments/personnel. Whenever possible the
Subcontractor and Subcontractors employees will limit use of paper and instead
use digital communication methods as per Masdar City policy mandates.
The following sustainability records will be maintained digitally on and off site by
the Sustainability Manager:
Subcontractor copy will be retained for a minimum of 1 year after receipt of Final
Acceptance Certificate. All records are stored for 2 years in the Subcontractor's
Head Office.
Subcontractor will also ensure regular interactions with Owner/General Contractor and shall comply
with Sustainability requirements. Sustainability Manager will be at meetings whenever possible
with owner Project Manager. Commitments made during meetings will be implemented by
Sustainability Manager. Every Tuesday KEO Sustainability Manager and KEO Sustainability QAQC
representative will attend site visits and communicate with Masdar Environmental Project manager.
KEO QAQC representative will be available for four hours each week to communicate with General
Contractor’s Project Manager and any other individuals who have queries of the reporting and auditing
practices of Subcontractor’s Sustainability Management team.
The project will be managed with adequate resources on site for executing contract
requirements for Sustainability Management. Subcontractor has retained Afsar Suleman of
KEO International as consultant Sustainability Manager. Mr Suleman will be on site six days a
12
Employer General Contractor: Project Manager: Sub-
Abu
CH2MHILL/ Subcontractor: KEO
Dhabi Taahud International
Future Parsons Brinckerhoff General
Energy Architect: Contracting Sustainability
Foster & Co.
Co. Partners/WSP
Projects Unit
MASDAR Amana/Walbridge J.V.
Document Title:
Document No. MAS-1A-PQP- 01
Project Sustainability Plan
Project Title: Revision No. 0
Date: June 5,
MIST 1A Ancillary Buildings and Infrastructure
2009 Page 13 of 31
Car Park & Podium (Phase 1a), Abu Dhabi, UAE
week. Additionally, KEO International Director of Corporate Sustainability Holley Chant will
be on site once a week for Quality Control and Quality Assurance supervision of the
Sustainability Manager as detailed in 5.0 above.
Subcontractor will ensure all internal communications are effective either verbal or written
format (memo's). Copies of General Contractor correspondence will be copied to relevant
personnel. Site meetings for co-ordination and progress will be held periodically.
Prior to the commencement of major work activities, the Consultant Sustainability Manager and
Sustainability QAQC Manager will partake in induction-training sessions at Masdar. The
Sustainability Manager will periodically repeat the induction training to insure that Subcontractor
is informed of any amendments to Masdar policy.
The Lead Sustainability Manager and Sustainability QAQC Consultant are organizationally
independent from Site Management and as such have the necessary freedom and authority to
carry out the Sustainability Related Activities / duties required for the successful execution of
the project.
Formal Management Reviews of the overall Subcontractor Sustainability System are done at
least quarterly to ensure continuing suitability and effectiveness in satisfying the requirements
of contracts. This review by senior management considers the results of the KEO consultant
sustainability audits, the Owner/General Contractor audits on sites, and the Non
Conformance's and the corrective/preventive and improvement actions are taken.
Evaluations during these reviews form the basis of any changes in the project quality
system. This management review will be recorded either as a report or as minutes and
circulated/maintained by the Lead Sustainability Manager. All recommendations and action
points arising out of this review will be acted upon within agreed times.
The review participants will include the KEO Consultant Sustainability Manager, KEO
Sustainability QAQC consultant, representative Subcontractor's Project Manager and key site
personnel as required.
Subcontractor will ensure that all resources required for the successful execution of the project are
provided on time for implementing the Sustainability Management system; personnel including
KEO Consultant Sustainability experts, document controller and document control systems.
Regular training sessions following the initial induction training will be conducted on site to
keep and update the personnel of contract and sustainability technical requirements. The
Project Manager/Lead Sustainability Manager /Lead HSE Engineer will identify training needs
on site. Necessary training for any specialized activity shall be provided to personnel as
applicable. Any other training for specialist operations on site will be provided.
6.2 Infrastructure
All equipment deployed on site will be fit for use on site as per Masdar’s CEMP
requirements. Authority requirements/Legal requirements/Owner requirements for vehicles,
lifting equipment and tackles will be complied with. Fuel usage of all vehicles will be reported
to KEO Sustainability manager and recorded appropriately for carbon tracking purposes.
Proper infrastructure, Safety Tools and Tackles, necessary rest/ablution facilities and other
requirement to provide a safe and sustainable conducive work environment will be provided.
Necessary sustainability prompts, safety procedures and relevant contract requirements will be
posted at pertinent locations.
All the Subcontractor's Sustainability and Health Safety and Environment requirements will be
proactively implemented onsite, to ensure safe working environment and to successful
execution of the project with as little environmental impact as possible, no fatalities, lost time
accidents and lost time.
The project will be executed strictly in accordance with the contract Sustainability specifications,
14
Employer General Contractor: Project Manager: Sub-
Abu
CH2MHILL/ Subcontractor: KEO
Dhabi Taahud International
Future Parsons Brinckerhoff General
Energy Architect: Contracting Sustainability
Foster & Co.
Co. Partners/WSP
Projects Unit
MASDAR Amana/Walbridge J.V.
Document Title:
Document No. MAS-1A-PQP- 01
Project Sustainability Plan
Project Title: Revision No. 0
Date: June 5,
MIST 1A Ancillary Buildings and Infrastructure
2009 Page 15 of 31
Car Park & Podium (Phase 1a), Abu Dhabi, UAE
Subcontractor will adhere and fulfil all Sustainability Requirement as per the Contract relevant
clauses of the Sustainability and Environmental Section.
> Contract review - which is done at tender stage and immediately after award
> Design Control –. Sustainable materials approvals reporting and tracking will be submitted
in a timely fashion to General Contractor Project Manager.
> Purchasing Control - use of approved materials and Sub-Subcontractors and store control.
Specific requirements related to sustainable material/products should be observed and
implemented wherever possible.
> Inspection and Testing - including receiving inspection, in process inspections and
testing, inspections at vendor premises (if required) and testing.
All the above processes forming the Project/Construction operations are covered by
Subcontractor’s procedures and/or project specific procedures. Records required to demonstrate
compliance are indicated in each of the procedures, which will be verified during internal
audits. Data relating to sustainability will be submitted on a monthly basis and then again as a
compilation for handover at the end of the project.
Method Statements will be submitted to ensure planning of the detailed construction activities
including sustainability specification requirements and environmental impact controls that need
to be in place for a Masdar CEMP compliant operation.
Subcontractor has reviewed the Sustainability contractual requirements in detail at tender, the
time of post-tender negotiations and on award of contract. All addenda and bulletins issued
during tender period, post tender clarifications and other queries are all retained as contractual
documents.
Where requirements are not clear, the General Contractor will be contacted by the KEO
Consultant Sustainability Manager and clarifications will be sought. Records are kept of all
reviews and any exchange of correspondence on contractual requirements is also filed as
evidence of contract review.
The post award contract review is done in Subcontractor's Head Office and attended by the
Managing Partner, the Lead Consultant Sustainability Manager and Sustainability QAQC
Consultant and the Project Manager.
7.3 Purchasing
Materials and Sub-Subcontractors to be used in the works shall be first submitted for
Owner/General Contractor approval. Consideration will be given on quality, sustainability,
price, delivery, reliability and service. Criteria for selection of Sub-Subcontractors and
Suppliers/Vendors besides complying with Specifications and legal/local Authority
registrations are; organizational structure, prior Sustainable Construction experience,
Quality and HSE systems, compliance with sustainability requirements, past performance,
previous experience with Owner/General Contractor, current workload and adequate
expertise/experience in the particular service shall be considered and complied with. Where
there are proprietary items and the above criteria cannot be adhered to, Owner/General
Contractor would be placed on the actual picture with details during submission for approvals.
Material approval and deliveries will be tracked and reported in progress reports. Material is
purchased only from the approved sources. Material requisitions are sent from site, detailing
the requirements. All materials to be permanently incorporated into the project will be
subjected to receiving checks by KEO Consultant Sustainability Manager, Lead QA/QC
Inspector / Project Manager and Storekeeper.
All Sub-Subcontractors used in the project are subjected to the same project Sustainability
requirements as applicable to Subcontractor. Subcontract agreements are made on a back-to-
back basis, thus making all Sub-Subcontractors bound to the main contract requirements.
Subcontractor understands the critical operations involved during the construction works. As
such, coordination, use of dated and approved drawings, and strict compliance to safety
and sustainability requirements and approved method statement will be ensured.
16
Employer General Contractor: Project Manager: Sub-
Abu
CH2MHILL/ Subcontractor: KEO
Dhabi Taahud International
Future Parsons Brinckerhoff General
Energy Architect: Contracting Sustainability
Foster & Co.
Co. Partners/WSP
Projects Unit
MASDAR Amana/Walbridge J.V.
Document Title:
Document No. MAS-1A-PQP- 01
Project Sustainability Plan
Project Title: Revision No. 0
Date: June 5,
MIST 1A Ancillary Buildings and Infrastructure
2009 Page 17 of 31
Car Park & Podium (Phase 1a), Abu Dhabi, UAE
The construction activities shall be controlled by the use of this Sustainability Plan,
HSE Plan, Master Construction Schedule, Inspection and Test Plans, Project
Specific Procedures/Method Statements and Check sheets together with the contract
drawings and specifications.
The KEO Consultant’s initial focus on the material reviews has been to address
existing materials tracking issues on hand, as identified by General Contractor’s
Project Manager in comments on the Material submittals thus far. This process
involves:
Communicating with the suppliers to obtain necessary data missing in the
initial submission,
Investigating possible alternatives,
Discussing the usage of renewable/ recycled raw material,
Inquiring on their outlook, goals and sustainable practices within their factory
etc.
In the absence of a database of sustainable companies and products within the UAE,
emphasis is with Subcontractor to name 3 companies whose products comply with the
Consultants Architectural Specifications. Subcontractor uses the Ecospecifier system
for specification alternatives. Discussions will be undertaken with General Contractor
and the project Consultant’s as required to facilitate the material approval process.
A data base will be created tracking all technical correspondence and the
sustainability component of all outgoing material submittals.
It is understood that waste management is under General Contractor scope and will
not require assessment; similarly any fuel bought directly from General Contractor
does not require accounting. As is customary for commercial and logistic reasons,
most of the necessary data for the carbon tracking can be availed from Subcontractor’s
document control, in the absence of such records internal tracking forms will be
created as required.
The product - in this case the architectural finishes to the buildings and other structures
in the scope of work of the subcontractor, are visually identifiable as to the status of
work and the numbering as indicated in the approved drawings and the Owner
preferred numbering system.
Incoming materials are correctly identified for sustainability requirements and stored.
Most of the construction materials are identifiable by means of labels and packaging
by the manufacturer/supplier. Where not available, materials will be suitably
identified by using coloured markers and or tags. All materials coming out of store
shall be either traceable by marking/labels, store records, test certificate, etc.
Care will be taken of Owner property by complying with all sustainability, safety
and security requirements. Subcontractor also understands the confidentiality of
drawings and the property contained therein and will only exchange information as
required for the project.
Material received on site for permanent incorporation in the project, are subject to
Receiving Inspection by Sustainability Manager, Lead QA/QC Engineer/Project
Manager and Storekeeper. Presence of Owner/General Contractor will be as per
contract requirements and as indicated in the ITP's. Acceptable materials are listed
on the Site Receipts and logged into the database of Sustainability records. Store data
is continuously updated on receipt and issue to site.
8.1 General
Subcontractor will plan and implement assessment methods to demonstrate conformity with
the contract Sustainability requirement (as detailed in above section 7), process
performance objectives, conformity of the planned quality management system, and for the
continuous improvement of the Sustainability management system.
An additional Project HSE Plan covers all aspects of SHE control on site. All
reporting required shall be as per the SHE Plan and Owner’s SHE contractual
documents.
8.3 Improvement
The Lead Sustainability Manager will ensure all agreed corrective actions have been
completed and related Non Conformance Reports closed out.
The Subcontractor's Sustainability Manager is responsible to initiate suitable
preventive action to ensure the Non Conformances do not repeat. Preventive actions
like project documentation and method statements together with the control measures
required are already documented. Compliance with these will ensure that potential
non-conformities will be prevented from occurring.
22
Employer General Contractor: Project Manager: Sub-
Abu
CH2MHILL/ Subcontractor: KEO
Dhabi Taahud International
Future Parsons Brinckerhoff General
Energy Architect: Contracting Sustainability
Foster & Co.
Co. Partners/WSP
Projects Unit
MASDAR Amana/Walbridge J.V.
Document Title:
Document No. MAS-1A-PQP- 01
Project Sustainability Plan
Project Title: Revision No. 0
Date: June 5,
MIST 1A Ancillary Buildings and Infrastructure
2009 Page 23 of 31
Car Park & Podium (Phase 1a), Abu Dhabi, UAE
SUSTAINABILITY MANAGER
Reports to : Site Manager/Project Manager
Major Responsibility : Ensure that construction complies with the sustainability principle,
administration, Coordination with General Contractor and coordination of
procurement activities and site activities and reporting to Site Agent.
Related Responsibilities:
a) Ensure that all contractual requirements of Owner and local authority requirements for
Sustainability, Quality, Health Safety & Environment (HSE) requirements are complied with
b) Ensure that all temporary and permanent materials/products comply with the Construction
Products Directive (CPD) or acceptable equivalent directive and properly labelled with CE or
equivalent marking.
c) Ensure that materials and products are from sustainable sources.
d) Keep a database of all materials and products that comply with sustainable construction
requirements.
e) Follow up with suppliers/vendors and product/material sources to obtain all necessary data
related to sustainability and fill in all necessary tabulations and issue relevant
daily/weekly/monthly reports to the General Contractor and Owner as required by the Contract.
f) Coordinate closely with the General Contractor Sustainability Manager and daily basis.
g) Ensure that workmanship/fabrication/installation/transportation methods etc are in line with
sustainable construction requirements and meets requirements of US Green Building Council
(wherever applicable).
h) Obtain, verify and appraise quotations for materials and products and obtain material/product
data that is needed and that has to be tabulated and related to the sustainability program assigned
to the project by Owner.
a) Ensuring site activities are all coordinated to meet sustainability programme requirements
and that work activities are properly planned to ensure work is completed as per the
construction work schedule.
i) Monitor, control and coordinate work with Sub-Subcontractor.
j) Ensuring works are done in strict compliance to Environmental requirements.
k) Ensuring and coordinating ordering of all approved materials.
l) Interact with responsible engineer and ensure all materials are approved, ordered and
available on site.
m) Coordinating with the independent testing laboratory together with QA/QC and ensuring
necessary resources are provided.
n) Coordinating the interface between other Subcontractor's secondary Sub-Subcontractors on
site.
o) Implementing and coordinating corrective actions to arrest slippages are being implemented.
p) Ensuring Non-Conformance's if any are closed and taking timely preventive and corrective
actions
q) Responsible for completing of all punch items and project close out & handover
documentation.
r)Responsible for reporting to KEO QAQC Consultant for performance and administrational review
once a week and when any situation warrants third party advise.
24
Employer General Contractor: Project Manager: Sub-
Abu
CH2MHILL/ Subcontractor: KEO
Dhabi Taahud International
Future Parsons Brinckerhoff General
Energy Architect: Contracting Sustainability
Foster & Co.
Co. Partners/WSP
Projects Unit
MASDAR Amana/Walbridge J.V.
Document Title:
Document No. MAS-1A-PQP- 01
Project Sustainability Plan
Project Title: Revision No. 0
Date: June 5,
MIST 1A Ancillary Buildings and Infrastructure
2009 Page 25 of 31
Car Park & Podium (Phase 1a), Abu Dhabi, UAE
Document Title
1.0 PURPOSE
2.0 SCOPE
3.0 REFERENCES
4.0 DEFINITIONS
5.0 RESPONSIBILITIES
6.0 EQUIPMENT
7.0 PROCEDURE
8.0 DOCUMENTATION
Names & Designations of Personnel Trained: (Use additional Sheet if required) No. of Personnel Trained:
Remarks if any:
26
Employer General Contractor: Project Manager: Sub-
Abu
CH2MHILL/ Subcontractor: KEO
Dhabi Taahud International
Future Parsons Brinckerhoff General
Energy Architect: Contracting Sustainability
Foster & Co.
Co. Partners/WSP
Projects Unit
MASDAR Amana/Walbridge J.V.
Document Title:
Document No. MAS-1A-PQP- 01
Project Sustainability Plan
Project Title: Revision No. 0
Date: June 5,
MIST 1A Ancillary Buildings and Infrastructure
2009 Page 27 of 31
Car Park & Podium (Phase 1a), Abu Dhabi, UAE
Compliance
Specificati
N
on Clause Remarks
o Requirements Proposed Material Specification
Reference
Yes No.
Material is to supplied
Section No material is coming from
3 from an 800km radius
00910 Europe
zone
Notes / Comments:
Note:
28
Employer General Contractor: Project Manager: Sub-
Abu
CH2MHILL/ Subcontractor: KEO
Dhabi Taahud International
Future Parsons Brinckerhoff General
Energy Architect: Contracting Sustainability
Foster & Co.
Co. Partners/WSP
Projects Unit
MASDAR Amana/Walbridge J.V.
Document Title:
Document No. MAS-1A-PQP- 01
Project Sustainability Plan
Project Title: Revision No. 0
Date: June 5,
MIST 1A Ancillary Buildings and Infrastructure
2009 Page 29 of 31
Car Park & Podium (Phase 1a), Abu Dhabi, UAE
5.0 Summary Status of Client / Internal Audits and Corrective Action Request
No of No of Status of
Total No of No of Audit Corrective Corrective Corrective
Audited By Audits Conducted Action Action /
Conducted This Week Request Request Preventive
Issued Closed actions
Owner/General
Contractor
Internal-
Subcontractor
Type of Training
Total Number of Training Conducted
This Week
Cumulative
Quality Tool Box
Sustainability Induction
Job Skill
Quality System
Safety
Special Application
TOTAL
Owner:
MASDAR
General Contractor:
Amana/Walbridge J.V.
Subcontractor:
Clause No.:
Non Conformity Description:
Actions:
Signature:
Name: Date:
Acceptance and Verification of Corrections/Remedial actions:
Signature:
Name: Date:
Corrective actions taken to prevent recurrence of Non conformity:
Taahud