Professional Documents
Culture Documents
Fig: 2A
Fig: 2A shows 1oo2 Manifold assembly with common bypass, with
visual indicator option
Fig: 1
Page 3 of 9
4 IM-IND-536985-RevAA-sec1
No. 57, Kundrathur Main Rd., Gerugambakkam, Chennai -6000128, India www.asco.com
WARNING: Secure the bypass valve operation until
maintenance has been completed.
WARNING: Explosion Hazard. Do not remove or
replace any component while circuit is live unless
area is known to be non--hazardous.
6. Turn off power to the ARCS; disconnect appropriate wires
from terminal block.
7. Remove device (coil or solenoid valve) and install the new
device.
8. Re-connect wires to appropriate terminal, Turn on power to
the ARCS. Verify that each device has power and is in the
correct state.
9. Remove the lockout and lockpin; push the knob to upwards.
10. Put the lockpin, lockout and make it secured. Now system
is in “normal” mode.
CAUTION: While placing valve on the manifold
ensure that all O-rings(3x) are placed on the valve
Pressure Gauge(3x) correctly.
Pressure Gauge(3x) CAUTION: While doing valve maintenance, Do
not try to operate corresponding bypass or isolation
valve. Which will make pressure drop and lead to fail
safe condition of actuator.
Fig: 2B 2oo2 REDUNDANT VALVE SYSTEM
Fig: 2B shows 1oo2 Manifold Fig: assembly
2B with common bypass 2oo2 is for increased availability. It is enough to open one of the
with Pressure gauge option. two solenoid valves to supply the outlet. Each valve V1 & V2
CAUTION: De-energizing one or two valves will are channel 1&2. Both solenoid valves must be close to fulfill
initiate a shutdown. safety function.
Maintenance ⚠️ CAUTION:
CAUTION:De-energizing
De-energizing two two valves
valves willwill initiate
initiateaa
The Pneumatic ARCS requires no routine maintenance except shutdown.
shutdown.
periodic inspections for loose wires and fittings. The solenoid 2oo2 without online maintenance and diagnostic
2oo2 without online maintenance and diagnostic
enclosure should be opened occasionally and the components 2oo2
2oo2 redundantvalve
redundant valvesystem
systemhas
hastwo
two solenoid valves which
solenoid valves whichare
are
checked to make sure they are tight, clean, and dry. The Breather/ connected
connectedininParallel (Normallyclosed
Parallel (Normally closed valve).
valve). Any Any one valve
one valve gets
Vent valve shall be inspected for obstruction and that it is free gets fail/de-energized
fail/de-energized systemsystem
does does not
not go to go
venttoposition.
vent position. Fig-3
Fig-3 shows
of debris during routine maintenance cycles and during manual shows
circuitcircuit
diagramdiagram
and logicand logic table.
table.
proof testing.
Adaptor
(3x)
2oo2 wit
The man
isolate an
to do ma
air supply
Pressure Fig: 3
Gauge(3x)
er(2x),
nitiate aa
nitiate O-rings
(3x)
which are
which are
valve gets
alve gets
g-3 shows
-3 shows
Screw-M5 (4x)
Torque-6.7Nm
Visual
Visual Hex Nipple
Pressure Indicator
Pressure Indicator (3x)
switch(2x) (2x)
switch(2x) (2x) Visual Indicator/
Valve in
Fig:4A
Fig: 4A Bypass mode Pressure gauge
(3x)
2oo22oo2
2oo2 with
withcommon
with commonbypass
common bypass
bypassand and with
andwith
with diagnostic
diagnostic
diagnostic Fig: 5B
The Themanually
The operated
manually operated
manually maintenance
operatedmaintenance bypass
maintenancebypass
bypass valve
valve
valve isused
isisused used
toto to
isolate
isolate and
isolateand depressurize
anddepressurize
depressurize thethe
the solenoid
solenoid
solenoid valves.
valves.
valves. This allows
Thisfunction
This function function
allows
allows
totodo to do maintenance
domaintenance
maintenance ofofsolenoidof valve
solenoid solenoid valve
valvewithout
without without
disturbing
disturbing disturbing
the
the outlet
outlet
CAUTION: De-energizing two valves will initiate a
the airoutlet
air supply.air
supply. supply.
Fig-5
Fig-5 shows
shows Fig-5 shows
circuit
circuit circuit diagram.
diagram.
diagram. shutdown.
Maintenance
The Pneumatic ARCS requires no routine maintenance except
periodic inspections for loose wires and fittings. The solenoid
enclosure should be opened occasionally and the components
checked to make sure they are tight, clean, and dry. The Breather/
Vent valve shall be inspected for obstruction and that it is free
of debris during routine maintenance cycles and during manual
proof testing.
Manual Bypass valve operation (Fig: 5B)
(for maintenance only)
1. Remove the lockout and lock pin from the bypass valve.
2. Pull the knob downwards and put back the lockpin.
3. Put lockout and make it secured.
4. The system pressure is now bypassed directly from “inlet”
to “outlet” so that the process valve position is maintained.
5. Verify the visual indicator/pressure gauge of bypass, it
shows pressure availability.
t
st Fig:
Fig:5 5 WARNING: Secure the bypass valve operation until
r(2x)
er(2x) maintenance has been completed.
ASCO Valves® E290699 - 01/2019 All Rights Reserved. IM-IND-536985-RevAA-sec2
No. 57, Kundrathur Main Rd., Gerugambakkam, Chennai -6000128, India www.asco.com Page 15 of
Page of 49
WARNING: Explosion Hazard. Do not remove or Maintenance
replace any component while circuit is live unless The Pneumatic ARCS requires no routine maintenance except
area is known to be non--hazardous. periodic inspections for loose wires and fittings. The solenoid
6. Turn off power to the ARCS; disconnect appropriate wires enclosure should be opened occasionally and the components
from terminal block. checked to make sure they are tight, clean, and dry. The Breather/
7. Remove device (coil or solenoid valve and install the new Vent valve shall be inspected for obstruction and that it is free
device. of debris during routine maintenance cycles and during manual
proof testing.
8. Re-connect wires to appropriate terminal, Turn on power to
the ARCS. Verify that each device has power and is in the Isolation valve operation
correct state. (for maintenance only)
9. Remove the lockout and lockpin; push the knob to upwards. 1. Remove the lockout and lock pin from the isolation
valve(I2).
10. Put the lockpin, lockout and make it secured. Now system
is in “normal” mode. 2. Pull the knob downwards and put back the lockpin.
CAUTION: While placing valve on the manifold 3. Put lockout and make it secured.
ensure that all O-rings(3x) are placed on the valve
correctly.
Screw-M5 (4x)
CAUTION: While doing valve maintenance, Do Torque-6.7Nm
not try to operate corresponding bypass or isolation
valve. Which will make pressure drop and lead to fail
safe condition of actuator.
2oo2 with individual isolation and with diagnostic
The manually operated maintenance isolation valves(2x) is used
to isolate and depressurize the each solenoid valve separately.
This function allows to do maintenance of solenoid valve without Valve
disturbing the outlet air supply. We can monitor each solenoid assembly
valve healthiness at any time. Fig-6 shows circuit diagram. (2x)
O-rings
(3x)
Sealing-
ring (2x)
Pressure
switch (2x)
Valve in Isolation
mode
Fig: 6B
Fig. 6B shows Manual Operator/Manual reset valve Construction
Fig: 7 Fig: 7A
Fig: 7A
Fig: 7A
Solenoid
valve(4x)
Solenoid
valve(4x)
Exhaust
Silencer(4x)
Exhaust
Silencer(4x)
Fig: 7B
2oo3 without online maintenance and with diagnostic Fig: 7B
Exhaust
Silencer(2x), Exhaust Pressure
Silencer(2x) Switch(4x)
Fig: 8
CAUTION: De-energizing two channels will initiate a shutdown.
Page 7
3 of 9
4
Exhaust
IM-IND-536985-RevAA-sec2
No. 57, Kundrathur Main Rd., Gerugambakkam, Chennai -6000128, India
Silencer(2x), Exhaust
Pressure www.asco.com
Silencer(2x) Switch(4x)
Channel- Channel-
Channel- Channel-
Channel-1Channel-1 Visual Visual
Visual Visual
Visual Visual
Visual Visual
2 32 3
Indicator Indicator
Indicator Indicator
Indicator Indicator
Indicator Indicator
A/ A/D/ D/B/ B/C/ C/
Outlet Outlet
V1 V1
V4 V4
V2 V2
V3 V3
Pressure Pressure
Pressure Pressure
Pressure Pressure
Pressure Pressure
Switch P1Switch P1P4Switch
Switch P4P2Switch
Switch P2P3Switch P3
Switch
Green Green
Red Red
Red Red
Red Red
1 01 00 00 0
(Close) (Open) (Open) 0
(Open)
0
(Close) (Open) (Open) (Open)
Green Green
Red Red
Green Green
Red Red
1 01 10 01 0
(Close) (Open) (Close) 0
(Open)
0
(Close) (Open) (Close) (Open)
Green Green
Red Red
Green Green
Green Green
1 01 10 11 1
(Close) (Open) (Close) 1
(Close)
1
(Close) (Open) (Close) (Close)
Green Green
Green Green
Green Green
Green Green
1 11 11 11 1
(Close) (Close) (Close) 1
(Close)
1
(Close) (Close) (Close) (Close)
Red Red
Red Red
Green Green
Red Red
0 00 10 01 0
(Open) (Open) (Close) 0
(Open)
0
(Open) (Open) (Close) (Open)
Red Red
Red Red
Green Green
Green Green
0 00 10 11 1
(Open) (Open) (Close) 1
(Close)
1
(Open) (Open) (Close) (Close)
Red Red
Green Green
Green Green
Green Green
0 10 11 11 1
(Open) (Close) (Close) 1
(Close)
1
(Open) (Close) (Close) (Close)
Red Red
Green Green
Green Green
Red Red
0 10 11 01 0
(Open) (Close) (Close) 1
(Open)
1
(Open) (Close) (Close) (Open)
Red Red
Red Red
Red Red
Red* Red*
0 00 00 10 1
(Open) (Open) (Open) 0
(Open)
0
(Open) (Open) (Open) (Open)
Red Red
Red* Red*
Red Red
Red* Red*
0 10 01 10 1
(Open) (Open) (Open) 0
(Open)
0
(Open) (Open) (Open) (Open)
Green Green
Red* Red*
Red Red
Green Green
1 11 01 10 1
(Close) (Open) (Open) 1
(Close)
1
(Close) (Open) (Open) (Close)
Green Green
Red Red
Red Red
Green Green
1 01 00 10 1
(Close) (Open) (Open) 1
(Close)
1
(Close) (Open) (Open) (Close)
Red Red
Red* Red*
Red Red
Red Red
0 De-energized
– Valve De-energized 0 10 01 00 0 0 0
0 – Valve (Open) (Open)
(Open) (Open)
(Open) (Open)
(Open) (Open)
1 – Valve1 energized
– Valve energized 1 11 01 00
Green
0
Green
Red* Red*
Red Red
Red Red
0 0
(Close) (Close)
(Open) (Open)
(Open) (Open)
(Open) (Open)
Green Green
Green Green
Green Green
Red Red
1 11 11 01 0 1 1
(Close) (Close)
(Close) (Close)
(Close) (Close)
(Open) (Open)
Red Red
Red Red
Red Red
Red Red
Fig: 8A 0 00 00 00 0
(Open) (Open)
(Open) (Open)
(Open) (Open)
(Open)
0
(Open)
0
* Indicators
* Indicators show Redshow Red
which which isstate,
is "False" "False"
duestate, due to unavailability
to unavailability of Pneumatic
of Pneumatic air air
since the since
valvesthe
arevalves are connected
connected in series
in series (Refer (Refer Circuit).
Circuit).
2oo3 with Individual isolation, with diagnostic
In this logic four valves and two shuttle valves are connected. The manually operated
3/2 way maintenance isolation valves(4x) are used to isolate and depressurize the
each solenoid valve separately. This function allows to do maintenance of solenoid
valve without disturbing the outlet air supply. We can monitor each solenoid valve
healthiness at any time without disturbing process valve. It has visual indicator and
pressure switch options. Fig-9 shows circuit diagram. Logic table refer Fig: 8A.
CAUTION: De-energizing any two Channels will initiate a shutdown.
Maintenance
The Pneumatic ARCS requires no routine maintenance except periodic inspections for
loose wires and fittings. The solenoid enclosure should be opened occasionally and
the components checked to make sure they are tight, clean, and dry. The Breather/
Vent valve shall be inspected for obstruction and that it is free of debris during routine
maintenance cycles and during manual proof testing.
Isolation valve operation
(for maintenance only)
1. Remove the lockout and lock pin from the isolation valve(I1).
2. Pull the knob downwards and put back the lockpin.
3. Put lockout and make it secured.
4. The valve V1 pressure is now vented and valve is isolated from “inlet”. But
Channel 2 & 3 will supply the air to “outlet” so that the process valve position is
maintained.
5. Verify the visual indicator/pressure gauge of valve V1, it shows Red. Remaining
valves visual indicator/pressure gauge shows Green.
WARNING: Secure the isolation valve operation until maintenance has
been completed. Fig: 9
WARNING: Explosion Hazard. Do not remove or replace any
component while circuit is live unless area is known to be non--
hazardous.
6. Turn off power to the ARCS valve V1; disconnect appropriate wires from
terminal block.
7. Remove device (coil, solenoid valve, Visual indicator, Pressure switch) and
install the new device.
8. Re-connect wires to appropriate terminal, Turn on power to the ARCS valve V1.
Verify the device has power and is in the correct state.
9. Remove the lockout and lockpin; push the knob to upwards.
Page 8
4 of 9
4 IM-IND-536985-RevAA-sec2
No. 57, Kundrathur Main Rd., Gerugambakkam, Chennai -6000128, India www.asco.com
IM-IND-536985-RevAA-sec3
10. Put the lockpin and lockout and make it secured. Now Limited Warranty
system is in “normal” mode. WARRANTIES: The manufacturer warrants its products and
11. Do the above same process for other valve maintenance. equipment to be free from defects in material and workmanship
CAUTION: While placing valve on the manifold for a period of one year from the date of shipment from its
ensure that all O-rings(3x) are placed on the valve factory. The Manufacturer is not responsible for damage to its
correctly. products through normal wear and tear, improper installation,
CAUTION: While doing valve maintenance, Do not maintenance, use, repairs or adjustment, or attempts to operate
try to operate corresponding bypass or isolation it above its rated capacity or voltage, intentional or otherwise,
valve. Which will make pressure drop and lead to fail or for unauthorized repairs. To the extent the Manufacturer
safe condition of actuator. has relied upon specifications, information, representation of
operating conditions or other are supplied by Buyer or its agents
Spare Parts to Seller in the selection or design of the goods, and the operation
WARNING: Replacement parts are only to be conditions or other conditions differ from those represented by
obtained from ASCO or an authorized distributor the Buyer and relied upon by Manufacture, and warranties or
or the certifications may be invalidated or there other provisions contained herein which are affected by such
may be a risk of explosion. conditions shall be null and void.
Visual
Valve
indicator (4x)
Assembly(4x) Visual
Valve
indicator (4x)
Assembly(4x)
Isolation
valve(4x)
Isolation
valve(4x)