The document is a bill for exploratory boring work for bridge construction under a government program. It details 4 bore holes at 2 bridge locations, with depths ranging from 1 to 5 meters below bed level. The total cost for the boring work is Rs. 104,252, with an additional 18% GST of Rs. 18,765, bringing the total amount to Rs. 123,017.
The document is a bill for exploratory boring work for bridge construction under a government program. It details 4 bore holes at 2 bridge locations, with depths ranging from 1 to 5 meters below bed level. The total cost for the boring work is Rs. 104,252, with an additional 18% GST of Rs. 18,765, bringing the total amount to Rs. 123,017.
The document is a bill for exploratory boring work for bridge construction under a government program. It details 4 bore holes at 2 bridge locations, with depths ranging from 1 to 5 meters below bed level. The total cost for the boring work is Rs. 104,252, with an additional 18% GST of Rs. 18,765, bringing the total amount to Rs. 123,017.
Kindly find enclosed herewith for Exploratory Boring work at Bridge Location Under PMGSY-III DPR Year 2019-2020. Summary of Bore Work as mentioned below:
No of Depth of Rate per Amount
S. no DISTRICT BLOCK ROAD NAME Bore Bore metre (Rs) CHABI TO MANDLA GUGHRI SUREHALI 1 Ch- 0+125 Mtr Length of Bridge 60 Mtr Location - A1, P1 , A2
Ch- 8+475 Mtr Length of Bridge 70 Mtr
Location - A1 a) Upto 1.0 m below bed level 4 1 2450 9800 b) Beyond 1.0 m depth upto 5.0 m 4 4 2562 40992 c) Beyond 5.0 m depth 4 5 2673 53460 40 104252 Total 104252 Add GST 18 % 18765 Total Amount i/e GST 123017