Bill Exploratory Boring

Kindly find enclosed herewith for Exploratory Boring work at Bridge Location Under PMGSY-III DPR
Year 2019-2020. Summary of Bore Work as mentioned below:

No of Depth of Rate per Amount


S. no DISTRICT BLOCK ROAD NAME Bore Bore metre (Rs)
CHABI TO
MANDLA GUGHRI
SUREHALI
1 Ch- 0+125 Mtr Length of Bridge 60 Mtr
Location - A1, P1 , A2

Ch- 8+475 Mtr Length of Bridge 70 Mtr


Location - A1
a) Upto 1.0 m below bed level 4 1 2450 9800
b) Beyond 1.0 m depth upto 5.0 m 4 4 2562 40992
c) Beyond 5.0 m depth 4 5 2673 53460
40 104252
Total 104252
Add GST 18 % 18765
Total Amount i/e GST 123017