You are on page 1of 2

Stage 1: Schedule of Waterway Bridges and Viaducts (Main

Abut- ment A Chainage (m) Abut- ment B Chainage (m) Structure Type Total Length (m)

1685 1735 BRIDGE 50


2725 2775 BRIDGE 50
3025 3075 BRIDGE 50
3365 3415 BRIDGE 50
3900 4000 BRIDGE 100
4110 4190 BRIDGE 80
4660 4740 BRIDGE 80
5190 5250 BRIDGE 60
5400 5650 VIADUCT 250
5860 RCBC
7420 RCBC
7615 8065 VIADUCT 450
9490 9510 BRIDGE 20
10030 RCBC
10290 10430 VIADUCT 140
11050 RCBC
12425 13775 VIADUCT 1350
12450 RCBC
14000 RCBC
14140 RCBC
14410 RCBC
14550 RCBC
14720 RCBC
16880 RCBC
17340 RCBC
17700 RCBC
18475 19125 VIADUCT 650
19630 19670 BRIDGE 40
20050 21000 VIADUCT 950
21270 RCBC
21760 22310 VIADUCT 550
22555 RCBC
22800 RCBC
22980 RCBC
23160 23220 BRIDGE 60
23740 23840 BRIDGE 100
24410 24450 BRIDGE 40
24717.5 24842.5 VIADUCT 125
25740 25940 VIADUCT 200
27110 27460 VIADUCT 350
27940 27980 BRIDGE 40
Bridges and Viaducts (Main Control Line)
FINAL FLOOD
No of spans (No) Span (m) full description
LEVEL
3 25 3.1 Kalu_Oya Main
2 25 3.1 Kalu_Oya_floodplain
2 25 3.1 Kalu_Oya_floodplain
2 25 3.1 Kalu_Oya_floodplain
4 25 3.1 Kalu_Oya_floodplain
4 20 3.1 Kalu_Oya_floodplain
4 20 3.1
3 20 3.1
10 25 5.4

18 25 10 viaduct over flowpath


1 20 6

7 20 6 Canal under railway

54 25 7.6 Uruwal_Attanagalu_Oyas

Irrigation
Irrigation
Irrigation
Irrigation
Irrigation
Irrigation
Irrigation
Irrigation
26 25 10.1 Attanagalu_Oya
2 20 10.8
38 25 11.2 Diyaelle_Oya

22 25 12.4 redundant
Irrigation

Irrigation
3 20 12.4
4 25 13.5 Diyaelle_Oya
2 20 13.8 Diyaelle_Oya
5 25 14 Diyaelle_Oya
8 25 14.9 Diyaelle_Oya
14 25 15.4 combined road waterway
2 20 15.6 local inflow

You might also like