OF DAYS CALCULATION TO DRILL UP TO 4700 WITHOUT MUD MOTOR


DAY OPERATION PLANNED DEPTH CUM. DEPTH
1 SPUD well with new PDC Bit and Drilling 300 300
2 Continue drilling 200 500
3 Continue drilling 200 700

Drop totco POOH up to surface to check totco reading for


4 angle, RIH back and Tag bottom, Start drilling 100 800
5 Continue drilling 200 1000
6 Continue drilling 250 1250
Continue drilling, UP to 1400 meter, Drop totco START
7 POOH 150 1400
POOH up surface and check angle/ Remove stabilizer/ RIH
8 back and TaG BOTTOM 0 1400
9 Resume Drilling 200 1600
10 Continue drilling 200 1800
POOH up to surface and check angle/ RIH back and Tag
11 bottom 0 1800
12 Continue drilling up to 2000 meter 200 2000
12 Wiper trip up to 1400m, POOH for Casing 0 2000
13 Lowering of Casing and Cementing 0 2000

WOC 18 hr/ Arrangement for well head, release casing/


14 Counducter pipe CUTTING AND CASING CUTTING 0 2000
15 Well head installation/ N/up BOP/ Function test 0 2000
Riser nipple fabrication/ Flow line welding/ Drill line cut
16 and slip 0 2000
RIH with 8-1/2"Assembly for float coller and float shoe
17 drilling 0 2000
18 Continue Drilling 150 2150
19 Continue Drilling 150 2300
20 Continue Drilling 150 2450
21 Continue Drilling 150 2600
22 Wiper trip up to 2000 meter and Resume drilling 50 2650
23 Continue drilling 150 2800
24 Continue drilling 150 2950
25 Continue drilling 150 3100
POOH for Bit change/RIH Back up to shoe/ Drill line cut
26 and slip 0 3100
27 RIH up to bottom, Resume drilling 50 3150
28 Continue Drilling 50 3200
29 Continue Drilling 50 3250
30 Continue Drilling 50 3300
31 Continue Drilling 50 3350
32 Continue Drilling 50 3400
33 Continue Drilling 50 3450
34 Continue Drilling 50 3500
35 Continue Drilling 50 3550
36 POOH for Bit change/ RIH back and tag bottom 0 3550
37 Continue Drilling 50 3600
38 Continue Drilling 50 3650
39 Continue Drilling 50 3700
40 Wiper trip up to pariwar top and POOH for Logging 0 3700
41 Logging 20 hr, Drill line cut and slip 0 3700
42 RIH up to bottom, Resume drilling 0 3700
43 Continue drilling 40 3740
44 Continue drilling 40 3780
45 Continue drilling 40 3820
46 Continue drilling 40 3860
47 Continue drilling 40 3900
48 Continue drilling 40 3940
49 Continue drilling 40 3980
50 Continue drilling 40 4020
51 POOH for Bit Change/ RIH back and tag bottom 0 4020
52 Continue drilling 40 4060
53 Continue drilling 40 4100
54 Continue drilling 40 4140
55 Continue drilling 40 4180
56 Continue drilling 40 4220
57 Continue drilling 40 4260
58 Continue drilling 40 4300
59 Continue drilling 40 4340
60 POOH for Bit Change/ RIH back and tag bottom 0 4340
61 Continue drilling 40 4380
62 Continue drilling 40 4420
63 Continue drilling 40 4460
64 Continue drilling 40 4500
65 Continue drilling 40 4540
66 Continue drilling 40 4580
67 Continue drilling 40 4620
68 Continue drilling 40 4660
69 Continue drilling 40 4700
70 Wiper trip up to 2000 meter 0 4700
71 POOH for Logging/ Logging 0 4700
72 Logging/ RIH for hole prove prior to casing 0 4700
73 TAG bottom, wiper trip up to pariwar top 0 4700
74 POOH for Casing 18 hr/ Start lowering of Casing 0 4700
75 Continue lowering of casing 0 4700
76 Cementing/ WOC 0 4700
77 WOC/ L/nd of DP 0 4700
78 Release casing set Casing slip/ N/dn BOP 0 4700
Final cut of casing Tubing head installation/ X-Mas tree
79 Installation/ Pressure testing 0 4700
80 One Day for cut and slip for whole well drilling 0 4700
81 Emergency breakdown if any 0 4700
82 Emergency breakdown if any 0 4700
83 Emergency breakdown if any 0 4700
84 Emergency breakdown if any 0 4700
85 Emergency breakdown if any 0 4700
UT MUD MOTOR
REMARK
40
NO. OF DAYS CALCULATION TO DRILL UP TO 4700 WITH MUD MOTOR
DAY OPERATION PLANNED DEPTH
1 SPUD well with new PDC Bit and Drilling 300
POOH upto 300m and RIH stabilizer + Mud motor + Flo drift and tag bottom &
2 start drilling 200
3 Continue drilling 400
4 Continue drilling 300
5 Continue drilling and POOH for stabilizer remove 200
6 RIH with Mud motor and bottom tagged, start drilling 300
7 Continue drilling 300
8 Wiper trip up to 1400m, POOH for Casing 0
9 Lowering of Casing and Cementing 0
WOC 18 hr/ Arrangement for well head, release casing/ Counducter pipe
10 CUTTING AND CASING CUTTING 0
11 Well head installation/ N/up BOP/ Function test 0
12 Riser nipple fabrication/ Flow line welding/ Drill line cut and slip 0
13 RIH with 8-1/2"Assembly for float coller and float shoe drilling 25
14 POOH for bit change & Mud motor RIH and start Drilling 100
15 Continue Drilling 250
16 Continue Drilling 250
17 Wiper trip upto shoe and start Drilling 100
18 Continue Drilling 275
19 Continue Drilling and POOH for remove mud motor 0
20 RIH up to bottom, Resume drilling 20
21 Continue Drilling 65
22 Continue Drilling 65
23 Continue Drilling 50
24 Continue Drilling 50
25 Continue drilling 50
26 POOH FOR BIT CHANGE 0
27 Continue drilling 50
28 RIH up to bottom, Resume drilling 50
29 Continue drilling 50
30 Continue drilling 50
31 Continue drilling 50
32 Continue drilling 50
33 Continue drilling 50
34 Continue drilling 50
35 Wiper trip up to 2000 casing shoe, and Start POOH for logging 0
36 POOH up to surface and Logging 0
37 Logging complete and start RIH for further drilling 0
38 Resume drilling 45
39 Continue Drilling 45
40 Continue Drilling 45
41 Continue Drilling 45
42 Continue Drilling 45
43 Continue drilling 45
44 Continue drilling 45
45 Continue drilling 45
46 POOH for Bit change 0
47 RIH with New Bit and start drilling 45
48 Continue drilling 45
49 Continue drilling 45
50 Continue drilling 45
51 Continue drilling 45
52 Continue drilling 45
53 Continue drilling 45
54 Continue drilling 45
55 POOH for Bit change 0
56 RIH with New Bit and start drilling 45
57 Continue drilling 45
58 Continue drilling 45
59 Continue drilling 45
60 Continue drilling 45
61 Continue drilling 45
62 Continue drilling, Wiper Trip 10
63 POOH for logging 0
64 logging/ RIH for hole prove prior to casing 0
65 TAG bottom, wiper trip up to pariwar top 0
66 POOH for Casing 18 hr/ Start lowering of Casing 0
67 Continue lowering of casing 0
68 Cementing/ WOC 0
69 WOC/ L/nd of DP 0
70 Release casing set Casing slip/ N/dn BOP 0
Final cut of casing Tubing head installation/ X-Mas tree Installation/ Pressure
71 testing 0
72 1 Day for drill line cut and slip for whole well 0
WITH MUD MOTOR
CUM. DEPTH REMARK
300

500
900
1200
1400
1700
2000
2000
2000

2000
2000
2000
2025
2125
2375
2625
2725
3000
3000
3020
3085
3150
3200
3250
3300
3300
3350
3400
3450
3500
3550
3600
3650
3700
3700
3700
3700
3745
3790
3835
3880
3925
3970
4015
4060
4060
4105
4150
4195
4240
4285
4330
4375
4420
4420
4465
4510
4555
4600
4645
4690
4700
4700
4700
4700
4700
4700
4700
4700
4700

4700
4700