Professional Documents
Culture Documents
Installation Guide
Notice
This document contains information that is proprietary to Ceragon Networks Ltd. No part of this
publication may be reproduced, modified, or distributed without prior written authorization of
Ceragon Networks Ltd. This document is provided as is, without warranty of any kind.
Trademarks
Ceragon Networks®, FibeAir® and CeraView® are trademarks of Ceragon Networks Ltd.,
registered in the United States and other countries.
Ceragon® is a trademark of Ceragon Networks Ltd., registered in various countries.
CeraMap™, PolyView™, EncryptAir™, ConfigAir™, CeraMon™, EtherAir™, CeraBuild™, CeraWeb™,
and QuickAir™, are trademarks of Ceragon Networks Ltd.
Other names mentioned in this publication are owned by their respective holders.
Statement of Conditions
The information contained in this document is subject to change without notice. Ceragon
Networks Ltd. shall not be liable for errors contained herein or for incidental or consequential
damage in connection with the furnishing, performance, or use of this document or equipment
supplied with it.
Information to User
Any changes or modifications of equipment not expressly approved by the manufacturer could
void the user’s authority to operate the equipment and the warranty for such equipment.
Table of Contents
1. About This Guide.............................................................................................. 8
When working with a FibeAir IDU, note the following risk of electric
shock and energy hazard: Disconnecting one power supply disconnects
! only one power supply module. To isolate the unit completely,
disconnect all power supplies.
Beachten Sie beim Arbeiten mit FibeAir IDU das folgende Stromschlag-
und Gefahrenrisiko: Durch Abtrennen einer Stromquelle wird nur ein
! Stromversorgungsmodul abgetrennt. Um die Einheit vollständig zu
isolieren, trennen Sie alle Stromversorgungen ab.
3. Target Audience
This guide contains technical information about 1500HP/RFU-HP installation, and
is intended for use by qualified Ceragon technical personnel at all levels.
4. Related Documents
FibeAir IP-20A Installation Guide – DOC-00040961
FibeAirIP-10G Installation Guide –DOC-00023199
FibeAir IP-10E Installation Guide –DOC-00029444
FibeAir IP-10Q Installation Guide, DOC-00029546
5. Important Notes
1500HP/RFU-HP is intended for installation in a Restricted Access
Location.
1500HP/RFU-HP must be installed and permanently connected to
protective earth by qualified service personnel in accordance with
applicable national electrical codes.
The FibeAir system is to be installed in Network Telecommunication
Facilities.
7.2 OCB
The OCB is optimized for configurations that do not use IFC Space Diversity.
To support IFC Space Diversity, a diversity block is added.
The OCB has just one type, and can be connected to an antenna via a flexible
waveguide.
The OCB connection is at the rear of the OCB. It includes proprietary
accessories (different than those used for the older OCB).
Each OCB has three waveguide access points: The In/Out port is located at the
rear of the OCB.
The OCB ports include:
Tx port
Rx Port
Diversity port
If the system is not configured for diversity, all the relevant access points on
the OCB must be terminated using waveguide shorts. Unused Rx ports will be
terminated with a WG termination.
Couplers
3 Gently slide the RFU in the OCB, making sure that the two empty spaces in
the RFU correspond to the filter positions on the OCB.
4 Tighten the Allen Head screws to the OCB using an Allen wrench. The
torque for the screws should be 17Nm.
2 Fasten the kit to the pole using the 4 screws, as shown in the photo above.
8.5 Assembling the Hanger Kit (with RFU and OCB) and
Pole Mount Kit
To assemble the Hanger Kit and the Pole Mount Kit:
1 Lift the Hanger Kit with the fastened RFU and OCB, and hang it, using the
Hanger Bend, on the Pole Mount Kit, as shown in the following
illustrations.
2 Fasten the Hanger Kit to the Pole Mount Kit using 4 large (M-10 type)
screws, as shown in the following illustration.
Each Pole Mount Kit can accommodate two RFUs and OCB units, as shown in
the following illustration.
Important! The diameter of the pole upon which the kit is mounted
must be between 50 mm (2") and 125 mm (5").
2 Connect shorts and WG terminations on all OCBs (shorts on main antenna
ports, WG terminations on diversity antenna ports).
3 Assemble both couplers on the OCBs.
4 Attach the hanging bracket to the OCBs and tighten the screws that fasten
the OCB to the hanging-bracket.
5 Gently lift the assembled unit to the pole using the lifting handle.
6 Place the assembled units on the pole mount clamp bracket and fasten the
M10 screws, as shown in the following illustration.
7 Connect the XPIC cables between the units, as shown in the following
illustration.
The following example shows a 4+1 space diversity dual pole configuration.
1 Insert two screws (3) into the two lower hanging profile (4) holes and
secure them with four nuts (1) and two washers (2) (do not tighten) (Step
I in illustration below).
2 Arrange the OCBs (5) in a straight line and place the hanging profile (4)
(Step II).
WARNING!
1 Carefully insert the RFUs (2) into the slots on the OCB units (1).
2 Fasten two screws (3) using the angled Allen wrench. The torque for the
screws should be 17Nm.
Description Quantity
Pillar Housing 1
Hanging Profile 1
Screw, Phillips Pan head, SS, ANSI, #8-
2
32UNCx1/2"
Washer, Helical spring lock, SS, ANSI, #8 2
Description Quantity
Nut, Hex, SS, DIN 934-M10-A2-70 8
Washer, Helical spring lock SS, DIN 127-B10-A2-70 4
Pillar Clamp 1
Hanging Profile 1
Screw, Hex cap, SS, DIN 933-M10x200-A2-70 4
WARNING!
1 Lift the OBN OCB Housing (3) using the lifting eye (5).
2 Tilt the OBN OCB Housing (shown below without the RFU) (3) backwards,
and hook it to the Hanging Profile (4) so that the screw holes are aligned.
3 Fasten two screws (1) and spring washers (2).
4 Hang up to five OBN OCB Housing (3) units (in accordance with the
relevant configuration).
5 Install the RFU (6).
IF Cable
Source
Sharing /
RSL
Waveguide
Waveguide
Ground
Waveguide
Tooth Washer
Nut
Terminal
19.1 1+0
RFU-HP-1R-f or
RFU 1Rx 1
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 1
Procedure
1 Mount the termination and short flange on the rear side, as described in
Short Installation on page 34 and Termination Installation on page 35.
2 Mount the OCB to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.
3 Mount the radio to the OCB, as described in Outdoor Branching Network
(OBM) Housing Hanging Procedure on page 41.
4 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
5 Mount the flexible waveguide and O-ring to the main (upper) port using
the screws and washers supplied with the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.
19.2 1+0 SD
Procedure
1 Mount the termination and short flange on the rear side, as described in
Short Installation on page 34 and Termination Installation on page 35.
2 Mount the OCB to the OCB pole mount, as described in as described in Pole
Mount Preliminary Assembly on page 31.
3 Mount the radio to the OCB, as described in Outdoor Branching Network
(OBM) Housing Hanging Procedure on page 41.
4 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
5 Mount both the flexible waveguide and the O-ring to the MAIN port and
the DIV port using the screws and washers supplied in the Flexible
Waveguide kit, as described in Connecting a Flexible Waveguide on
page 42.
Procedure
2 Mount the OCB to the OCB pole mount, as described in as described in Pole
Mount Preliminary Assembly on page 31.
4 Attach a coupler to the Main OCB Waveguides and secure it with screws.
5 Attach a coupler to the Div OCB Waveguides and secure it with screws.
6 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2
Procedure
1 Mount the termination and short flange on the rear side, as described in
Short Installation on page 34 and Termination Installation on page 35.
2 Mount the OCB to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.
5 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
19.5 2+0 DP
RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2
Procedure
1 Mount the termination and short flange on the rear side, as described in
Short Installation on page 34 and Termination Installation on page 35.
2 Mount the OCB to the pole mount, as described in Pole Mount Preliminary
Assembly on page 31.
3 Mount the radio to the OCB, as described in Outdoor Branching Network
(OBM) Housing Hanging Procedure on page 41.
4 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
5 Mount the flexible waveguide and O-ring to the MAIN (upper) port using
the screws and washers supplied in the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.
19.6 2+0 SP
RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2
Procedure
1 Mount the OCBs to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.
2 Slide and tighten both radios to the OCB, as described in Outdoor
Branching Network (OBM) Housing Hanging Procedure on page 41.
3 On the rear side, mount the termination and short to the OCB flanges, as
shown below and as described in Short Installation on page 34 and
Termination Installation on page 35.
4 Mount the S-Bend between the OCBs, as shown below and as described in
Installing S-Bends and the DCB on page 33.
5 Attach the OCB pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
6 Mount the flexible waveguide and O-ring to the MAIN (upper) port using
the screws and washers supplied in the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.
19.7 2+0 SD SP
Procedure
1 Mount the OCBs to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.
2 Slide and tighten both radios to the OCB, as described in Outdoor
Branching Network (OBM) Housing Hanging Procedure on page 41.
3 On the rear side, mount the termination flange, as shown below and as
described in Termination Installation on page 35.
4 Mount the S-Bend and DCB to the OCBs, as shown below and as described
in Installing S-Bends and the DCB on page 33.
6 Attach the OCB pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
7 Mount the flexible waveguide and O-ring to the MAIN (upper) port using
the screws and washers supplied in the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.
19.8 2+0 SD DP
Procedure
1 Mount the termination and short flange on the rear side, as described in
Short Installation on page 34 and Termination Installation on page 35.
2 Mount the OCB to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.
3 Mount the radio to the OCB, as described in Outdoor Branching Network
(OBM) Housing Hanging Procedure on page 41.
4 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
5 Mount the flexible waveguide and O-ring to the MAIN (upper) port using
the screws and washers supplied in the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.
19.9 2+2 SD SP
Procedure
1 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31
2 Mount the four OCBs to the pole mount bracket, as described in Pole Mount
Preliminary Assembly on page 31.
3 On the rear side, mount termination plates to the RX ports of the second
and fourth radios using the screws and washers supplied in the
termination kit, as described in Termination Installation on page 35.
5 Mount two S-Bends; the first S-Bend between the EXT port of radio 1 and
the MAIN port of radio 2, and the second S-Bend between the EXT port of
radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on
page 33.
6 Mount two DCBs; the first DCB between the DIV ports of radio 1 and radio
2, and the second between the DIV ports of radio 3 and radio 4. See
Installing S-Bends and the DCB on page 33.
7 Mount two couplers, one to the MAIN port of radio 1 and the other to the
left port of the left DCB, as described in Installing Couplers on page 32.
8 Mount two terminations to the right ports of both DCBs using the screws
and washers supplied with the termination kit, as described in
Termination Installation on page 35.
9 Mount a flexible waveguide with O-ring between the MAIN port in radio 3
and the Coupler port on the top coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.
10 Mount a flexible waveguide with O-ring between the left port in the right
DCB and the Coupler port on the bottom coupler using the screws and
washers supplied with the Flexible Waveguide kit, as described in
Connecting a Flexible Waveguide on page 42.
11 Mount a flexible waveguide with O-ring between the main antenna and the
Antenna port on the top coupler using the screws and washers supplied
with the Flexible Waveguide kit, as described in Connecting a Flexible
Waveguide on page 42.
Procedure
2 Mount the OCB to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.
4 Attach a coupler to the left two main OCB waveguides and secure it with
screws.
5 Attach a coupler to the left two Div OCB waveguides and secure it with
screws.
6 Attach a coupler to the right two main OCB waveguides and secure it with
screws.
7 Attach a coupler to the right two Div OCB waveguides and secure it with
screws.
8 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
RFU-HP-1R-f or
RFU 1Rx 4
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 4
Procedure
2 Mount two of the OCBs to the OCB pole mount bracket, as described in Pole
Mount Preliminary Assembly on page 31.
5 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
7 Attach the pole mount bracket to the pole mount, as described in Pole
Mount Preliminary Assembly on page 31.
RFU-HP-1R-f or
RFU 1Rx 4
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 4
Procedure
2 Mount the OCB to the OCB pole mount bracket, as described in Pole Mount
Preliminary Assembly on page 31.
6 Attach the pole mount bracket to the pole mount, as described in Pole
Mount Preliminary Assembly on page 31.
RFU-HP-1R-f or
RFU 1Rx 4
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 4
OCB-Sbend OCB-SBend-f 2
1500HP WG Termination, WRccc 15HP-TERM-ccc 2
15HP Short for WRccc 15HP-SHORT-ccc 4
OCB Coupler f GHz OCB-CPLR-f 1
Procedure
1 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
2 Mount the four OCBs to the pole mount bracket, as described in Pole Mount
Preliminary Assembly on page 31.
3 On the rear side, mount termination plates to the EXT ports of the second
and fourth radios using the screws and washers supplied in the
termination kit, as described in Termination Installation on page 35.
4 On the rear side, mount shorts to the DIV ports of all four radios using the
screws and washers supplied in the short kit, as described in Short
Installation on page 34.
6 Mount two S-Bends; the first S-Bend between the EXT port of radio 1 and
the MAIN port of radio 2, and the second S-Bend between the EXT port of
radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on
page 33.
8 Mount a flexible waveguide with O-ring between the MAIN port in radio 3
and the Coupler port on the coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.
9 Mount a flexible waveguide with O-ring between the antenna and the
Antenna port on the coupler, using the screws and washers supplied with
the Flexible Waveguide kit, as described in Connecting a Flexible
Waveguide on page 42.
RFU 2 Rx 15HP-RFU-fx 2
OCB 2Rx with filters 15OCBfx-SD-xxxY-aa-L/H 2
OCB-Sbend OCB-SBend-f 2
DCB Diversity Block fxGHz kit DCBfx 2
1500HP WG Termination, WRccc 15HP-TERM-ccc 2
Flex. WG kit WR-ccc, 4 FT WAVEGUIDE-f-4FT 2
OCB-Pole Mount OCB-Pole Mount 1
Procedure
2 On the rear side, disassemble the termination from the EXT port on
radio 1.
4 On the rear side of the new radios, mount the termination to the EXT port
of the fourth radio using the screws and washers supplied in the
termination kit, as described in Termination Installation on page 35.
5 Mount the two new radios to the OCB, as described in Outdoor Branching
Network (OBM) Housing Hanging Procedure on page 41.
6 Mount two S-Bends; the first S-Bend between the EXT port of radio 1 and
the MAIN port of radio 2, and the second S-Bend between the EXT port of
radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on
page 33.
7 Mount two DCBs; the first DCB between the DIV ports of radio 1 and radio
2, and the second between the DIV ports of radio 3 and radio 4. See
Installing S-Bends and the DCB on page 33.
8 Mount two couplers, one to the MAIN port of radio 1 and the other to the
left port of the left DCB, as described in Installing Couplers on page 32.
9 Mount two terminations to the right ports of both DCBs using the screws
and washers supplied with the termination kit, as described in
Termination Installation on page 35.
10 Mount a flexible waveguide with O-ring between the MAIN port in radio 3
and the Coupler port on the top coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.
11 Mount a flexible waveguide with O-ring between the left port in the right
DCB and the Coupler port on the bottom coupler using the screws and
washers supplied with the Flexible Waveguide kit, as described in
Connecting a Flexible Waveguide on page 42.
12 Mount the flexible waveguide with O-ring between the main antenna and
the Antenna port on the top coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.
RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2
OCB-Sbend OCB-SBend-f 2
1500HP WG Termination, WRccc 15HP-TERM-ccc 2
15HP Short for WRccc 15HP-SHORT-ccc 2
Flex. WG kit WR-ccc, 4 FT WAVEGUIDE-f-4FT 1
Procedure
2 On the rear side, disassemble the termination from the EXT port on
radio 1.
4 On the rear side of the two new radios, mount shorts to the DIV ports using
the screws and washers supplied in the short kit, as described in Short
Installation on page 34.
5 On the rear side of the new radios, mount termination plates to the EXT
port of the fourth radio using the screws and washers supplied in the
termination kit, as described in Termination Installation on page 35.
6 Mount the two new radios to the OCB, as described in Outdoor Branching
Network (OBM) Housing Hanging Procedure on page 41.
7 Mount two S-Bends; the first S-Bend between the EXT port of radio 1 and
the MAIN port of radio 2, and the second S-Bend between the EXT port of
radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on
page 33.
9 Mount a flexible waveguide with O-ring between the MAIN port on radio 3
and the Coupler port on the coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.
10 Mount a flexible waveguide with O-ring between the antenna and the
Antenna port on the coupler, using the screws and washers supplied with
the Flexible Waveguide kit, as described in Connecting a Flexible
Waveguide on page 42.
RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2
Procedure
2 Disconnect the couplers and the terminations on the first and third OCB.
5 Mount the OCB to the pole mount, as described in Pole Mount Preliminary
Assembly on page 31.
6 Mount a flexible waveguide and O-ring to the MAIN (upper) port of the
OCB and the Coupling port of the coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.
7 Mount a flexible waveguide and O-ring to the antenna port of the coupler
using the screws and washers supplied with the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.
8 On the second OCB pole mount, perform a mounting similar to a 1+1 HSB
configuration, as described in 1+1 HSB on page 55.
Procedure
WG #3
WG #1
WG #2
Coax to WG
2 Remove the coax to waveguide and all three flexible waveguides (both
sides).
3 Remove the S-Bend, four terminations, and marked screws from the DCB.
S-Bend 2
WG #2
Remove 6
screws
WG #3
WG #1
WG #4
OCB
8 Mount three of the OCBs to the OCB pole mount, as described in Pole
Mount Preliminary Assembly on page 31.
10 Attach two S-bend to both left OCBs, as described in Installing S-Bends and
the DCB on page 33.
11 Attach two DCBs to both right OCBs, as described in Installing S-Bends and
the DCB on page 33.
15 Attach the pole mount bracket to the pole mount beneath the 2+2 SD SP
assembly that is already installed, as described in Pole Mount Preliminary
Assembly on page 31.
Already
installed
Upgrade addition
16 Attach flexible waveguide 1 from the Main port of the radio to coupler 1.
Flexible WG #1
Coupler #1
Main Radio
Flexible WG #2
Coupler #2
DCB
18 Mount a flexible waveguide with O-ring between the main antenna and the
Antenna port on the top coupler using the screws and washers supplied
with the Flexible Waveguide kit, as described in Connecting a Flexible
Waveguide on page 42.
Flexible WG to
Main antenna
Coax to WG to
diversity antenna
Procedure
2 Disconnect the couplers and the terminations on the first and third OCB.
3 Mount S-Bends and DCBs to the OCBs, as shown below and as described in
Installing S-Bends and the DCB on page 33.
6 Mount the OCB to the pole mount, as described in Pole Mount Preliminary
Assembly on page 31.
7 Mount a flexible waveguide and O-ring between the MAIN (upper) port of
both OCBs and the coupling port of the upper couplers using the screws
and washers supplied with the Flexible Waveguide kit, as described in
Connecting a Flexible Waveguide on page 42.
8 Mount a flexible waveguide and O-ring to the antenna port of each coupler
using the screws and washers supplied with the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.
9 On the second OCB pole mount, perform a mounting similar to a 1+1 HSB
SD configuration, as described in 1+1 HSB on page 55.
Ceragon Proprietary and Confidential Page 138 of 175
FibeAir® 1500HP/RFU-HP Installation Guide
RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2
OCB-Sbend OCB-SBend-f 2
15HP Short for WRccc 15HP-SHORT-ccc 2
OCB-Pole Mount OCB-Pole Mount 1
Procedure
2 Install an additional pole mount bracket on the pole beneath the existing
pole mount bracket, as described in Pole Mount Preliminary Assembly on
page 31.
3 Disconnect the flexible waveguides from the MAIN port on radio 3.
4 Disconnect the terminations from the EXT port on radio 2 and radio 4.
5 Disassemble OCB 3 with radio 3 and OCB 4 with radio 4 from the old pole
mount bracket.
6 Mount OCB 3 with radio 3 and OCB 4 with radio 4 on the new pole mount
bracket, as described in Pole Mount Preliminary Assembly on page 31.
7 For the two radios on the rear side, mount a termination plate to the EXT
ports using the screws and washers supplied in the termination kit, as
described in Termination Installation on page 35.
8 For the two new radios on the rear side, mount a short to the DIV ports
using screws and washers supplied in the short kit, as described in Short
Installation on page 34.
9 Mount one new radio to each pole mount bracket, as described in Outdoor
Branching Network (OBM) Housing Hanging Procedure on page 41.
10 Mount two S-Bends in the top and bottom assemblies; between the EXT
port of radio 2 and the MAIN port of radio 3, as described in Installing S-
Bends and the DCB on page 33.
11 Connect the loose side of the flexible waveguide with O-ring to the MAIN
port on radio 1 in the bottom assembly, as described in Connecting a
Flexible Waveguide on page 42.
RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2
Procedure
2 On the OCB pole with two OCBs, disconnect the coupler, add two OCBs, and
slide in two radios.
6 Mount the OCB to the pole mount, as described in Pole Mount Preliminary
Assembly on page 31.
7 Mount a flexible waveguide and O-ring between the MAIN (upper) port of
the OCB and the Coupling port of the coupler using the screws and
washers supplied with the Flexible Waveguide kit, as described in
Connecting a Flexible Waveguide on page 42.
8 Mount a flexible waveguide and O-ring to the antenna port of the coupler
using the screws and washers supplied with the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.
Procedure
2 On the OCB pole with two OCBs, disconnect both couplers, add two OCBs,
and slide in two radios as shown below.
3 Mount S-Bends and DCBs to the OCBs, as shown below and as described in
Installing S-Bends and the DCB on page 33.
6 Mount the OCB to the pole mount, as described in Pole Mount Preliminary
Assembly on page 31.
7 Mount a flexible waveguide and O-ring between the MAIN (upper) port of
both OCBs and the coupling port of the upper couplers using the screws
and washers supplied with the Flexible Waveguide kit, as described in
Connecting a Flexible Waveguide on page 42.
8 Mount a flexible waveguide and O-ring to the antenna port of each coupler
using the screws and washers supplied with the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.
Procedure
4 Tighten the screws between both DCBs and the assembled OCBs.
6 Attach an S-bend between the new OCB and the one close to it. Do this for
both pole mounts.
RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2
OCB-Sbend OCB-SBend-f 2
15HP Short for WRccc 15HP-SHORT-ccc 2
Procedure
2 Disconnect the terminations from the EXT port on radio 3 in the bottom
and top assemblies.
3 For the two new radios on the rear side, mount terminations to the EXT
ports using screws and washers supplied in the termination kit, as
described in Termination Installation on page 35.
4 For the two new radios on the rear side, mount shorts to the DIV ports
using screws and washers supplied in short kit, as described in Short
Installation on page 34.
5 Mount one new radio to each pole mount bracket, as described in Outdoor
Branching Network (OBM) Housing Hanging Procedure on page 41.
6 Mount two S-Bends in the top and bottom assemblies between the EXT
port of radio 3 and the MAIN port of radio 4, as described in Installing S-
Bends and the DCB on page 33.
1+0 IP-10
21.1.2 Assembly
1 Insert the termination gaskets in their places on the OCB 19” Rack Adapter
(MK-3230-0), and fasten the Termination Plates to the Adapter using 16
screws (4 in the table above) and 16 washers (3), as shown in the
following illustration.
2 Fasten the left bracket to the OCB 19” Rack Adapter (MK-3230-0) using 8
screws (number 2 in the table above) 8 washers (3), and another 8
washers (1), as shown in the following illustration.
The following illustrations show the New OCB assembled with the 19” Rack
Adapter.
21.2.2 Assembly
1 Insert the termination gaskets in their places on the OCB 19” Rack Adapter
(MK-3230-0), and fasten the Termination Plates to the Adapter using 24
screws (4 in the table above) and 24 washers (3), as shown in the
following illustration.
2 Fasten the left bracket to the OCB 19” Rack Adapter (MK-3230-0) using 8
screws (number 2 in the table above) 8 washers (3), and another 8
washers (1), as shown in the following illustration.
The following illustrations show the New OCB assembled with the 19” Rack
Adapter.
21.3.2 Assembly
1 Insert the termination gaskets in their places on the OCB 19” Rack Adapter
(MK-3230-0), and fasten the Termination Plates to the Adapter using 24
screws (4 in the table above) and 24 washers (3), as shown in the
following illustration.
2 Fasten the left bracket to the OCB 19” Rack Adapter (MK-3230-0) using 8
screws (number 2 in the table above) 8 washers (3), and another 8
washers (1), as shown in the following illustration.
4 Fasten the HSB Coupler to the New OCB 19” Rack Adapter Main Terminals
using 10 screws (number 4 in the table above), and 10 washers (5), as
shown in the following illustration.
The following illustrations show the New OCB assembled with the 19” Rack
Adapter.