You are on page 1of 175

FibeAir® 1500HP/RFU-HP

Installation Guide

Part ID: BM-0111-0


Doc ID: DOC-00015514 Rev B
September 2013

Copyright © 2013 by Ceragon Networks Ltd. All rights reserved.


FibeAir® 1500HP/RFU-HP Installation Guide

Notice
This document contains information that is proprietary to Ceragon Networks Ltd. No part of this
publication may be reproduced, modified, or distributed without prior written authorization of
Ceragon Networks Ltd. This document is provided as is, without warranty of any kind.

Trademarks
Ceragon Networks®, FibeAir® and CeraView® are trademarks of Ceragon Networks Ltd.,
registered in the United States and other countries.
Ceragon® is a trademark of Ceragon Networks Ltd., registered in various countries.
CeraMap™, PolyView™, EncryptAir™, ConfigAir™, CeraMon™, EtherAir™, CeraBuild™, CeraWeb™,
and QuickAir™, are trademarks of Ceragon Networks Ltd.
Other names mentioned in this publication are owned by their respective holders.

Statement of Conditions
The information contained in this document is subject to change without notice. Ceragon
Networks Ltd. shall not be liable for errors contained herein or for incidental or consequential
damage in connection with the furnishing, performance, or use of this document or equipment
supplied with it.

Open Source Statement


The Product may use open source software, among them O/S software released under the GPL or
GPL alike license ("GPL License"). Inasmuch that such software is being used, it is released under
the GPL License, accordingly. Some software might have changed. The complete list of the
software being used in this product including their respective license and the aforementioned
public available changes is accessible on http://www.gnu.org/licenses/.

Information to User
Any changes or modifications of equipment not expressly approved by the manufacturer could
void the user’s authority to operate the equipment and the warranty for such equipment.

Ceragon Proprietary and Confidential Page 2 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Table of Contents
1. About This Guide.............................................................................................. 8

2. What You Should Know ................................................................................... 8


3. Target Audience ............................................................................................... 8
4. Related Documents .......................................................................................... 8

5. Important Notes ................................................................................................ 9


6. 1500HP/RFU-HP Models and Part Numbers ................................................. 10
7. FibeAir 1500HP/RFU-HP OCBs ...................................................................... 12
7.1 Old OCB ....................................................................................................................... 13
7.2 OCB.............................................................................................................................. 14
7.2.1 OCB Components ........................................................................................................ 14

8. Split-Mount Installation with Old OCB .......................................................... 16


8.1 Installing Couplers ........................................................................................................ 16
8.2 Assembling the RFU and OCB .................................................................................... 17
8.3 Assembling the Hanger Kit .......................................................................................... 20
8.4 Assembling the Pole Mount Kit .................................................................................... 21
8.5 Assembling the Hanger Kit (with RFU and OCB) and Pole Mount Kit ......................... 22
8.6 Configuration Example: 2+2 XPIC Installation ............................................................. 26
8.6.1 Installation Components............................................................................................... 26
8.6.2 Installation Procedure .................................................................................................. 27
8.7 N+1 Split Mount Installation ......................................................................................... 28

9. Split-Mount Installation with the OCB ........................................................... 30


9.1 Required Tools for the OCB Installation ...................................................................... 30
9.2 Special Tools/Materials ................................................................................................ 30
9.3 Pole Mount Preliminary Assembly ............................................................................... 31
9.4 Installing Couplers ........................................................................................................ 32
9.5 Installing S-Bends and the DCB .................................................................................. 33
9.6 Short Installation .......................................................................................................... 34
9.7 Termination Installation ................................................................................................ 35

Ceragon Proprietary and Confidential Page 3 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

10. Final Branching Installation ........................................................................... 36


11. Connecting the RFU to the OCB .................................................................... 37
12. Housing Assembly and Lifting Harness ....................................................... 38

13. Pole Installation .............................................................................................. 39


14. Hanging Positions .......................................................................................... 40
15. Outdoor Branching Network (OBM) Housing Hanging Procedure .............. 41

16. Connecting a Flexible Waveguide ................................................................. 42


17. RFU Cable Connections ................................................................................. 43
18. Grounding the 1500HP/RFU-HP ..................................................................... 45

19. Installation Instructions for Specific Configurations ................................... 46


19.1 1+0 ............................................................................................................................... 47
19.2 1+0 SD ......................................................................................................................... 49
19.3 1+1 SD IFC .................................................................................................................. 51
19.4 1+1 HSB ....................................................................................................................... 55
19.5 2+0 DP ......................................................................................................................... 58
19.6 2+0 SP ......................................................................................................................... 61
19.7 2+0 SD SP ................................................................................................................... 64
19.8 2+0 SD DP ................................................................................................................... 67
19.9 2+2 SD SP ................................................................................................................... 70
19.10 2+2 SD DP (Non-Upgradable) ..................................................................................... 81
19.11 2+2 HSB DP (Ready for Upgrade) ............................................................................... 86
19.12 2+2 HSB DP (Non-Upgradable) ................................................................................... 90
19.13 2+2 HSB SP ................................................................................................................. 94

20. Upgrade Instructions.................................................................................... 100


20.1 Upgrading from 1+1 SD to 2+2 SD SP ...................................................................... 100
20.2 Upgrading from 1+1 HSB SP to 2+2 HSB SP ........................................................... 112
20.3 Upgrading from 2+2 DP to 3+3 DP ............................................................................ 119
20.4 Upgrading from 2+2 SD SP to 3+3 SD SP ................................................................ 123
20.5 Upgrading from 2+2 SD DP to 3+3 SD DP ................................................................ 135
20.6 Upgrading from 2+2 HSB SP to 3+3 HSB SP ........................................................... 139
20.7 Upgrading from 3+3 DP to 4+4 DP ............................................................................ 146
20.8 Upgrading from 3+3 SD DP to 4+4 SD DP ................................................................ 151
20.9 Upgrading from 3+3 SD SP to 4+4 SD SP ................................................................ 156
20.10 Upgrading from 3+3 HSB SP to 4+4 HSB SP ........................................................... 160
Ceragon Proprietary and Confidential Page 4 of 175
FibeAir® 1500HP/RFU-HP Installation Guide

21. All Indoor Horizontal Installation ................................................................. 165


21.1 1+0 Installation ........................................................................................................... 166
21.1.1 Parts Used ................................................................................................................. 166
21.1.2 Assembly .................................................................................................................... 166
21.2 1+0 East-West Installation ......................................................................................... 169
21.2.1 Parts Used ................................................................................................................. 169
21.2.2 Assembly .................................................................................................................... 169
21.3 1+1 HSB (Hot Standby) Installation ........................................................................... 172
21.3.1 Parts Used ................................................................................................................. 172
21.3.2 Assembly .................................................................................................................... 172

22. Appendix A: Electrical Diagrams................................................................. 175

Ceragon Proprietary and Confidential Page 5 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Safety Precautions & Declared Material


General Equipment Precautions

Use of controls, adjustments, or performing procedures other than those


! specified herein, may result in hazardous radiation exposure.

When working with a FibeAir IDU, note the following risk of electric
shock and energy hazard: Disconnecting one power supply disconnects
! only one power supply module. To isolate the unit completely,
disconnect all power supplies.

Machine noise information order - 3. GPSGV, the highest sound pressure


! level amounts to 70 dB (A) or less, in accordance with ISO EN 7779.
Static electricity may cause body harm, as well as harm to electronic
components inside the device.
Anyone responsible for the installation or maintenance of the FibeAir RFU-C
must use an ESD Wrist Strap.
ESD protection measures must be observed when touching the RFU.
To prevent damage, before touching components inside the device, all
electrostatic must be discharged from both personnel and tools.

! In Norway and Sweden:


Equipment connected to the protective earthing of the building installation
through the mains connection or through other equipment with a connection
to protective earthing – and to a cable distribution system using coaxial cable,
may in some circumstances create a fire hazard. Connection to a cable
distribution system has therefore to be provided through a device providing
electrical isolation below a certain frequency range (galvanic isolator, see EN
60728-11).
Utstyr som er koplet til beskyttelsesjord via nettplugg og/eller via annet
jordtilkoplet utstyr – og er tilkoplet et kabel-TV nett, kan forårsake brannfare.
For å unngå dette skal det ved tilkopling av utstyret til kabel-TV nettet
installeres en galvanisk isolator mellom utstyret og kabel- TV nettet.
Utrustning som är kopplad till skyddsjord via jordat vägguttag och/eller via
annan utrustning och samtidigt är kopplad till kabel-TV nät kan i vissa fall
medfőra risk főr brand. Főr att undvika detta skall vid anslutning av
utrustningen till kabel-TV nät galvanisk isolator finnas mellan utrustningen
och kabel-TV nätet.

Ceragon Proprietary and Confidential Page 6 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Précautions générales relatives à l'équipement

L’utilisation de commandes ou de réglages ou l'exécution de procédures


! autres que celles spécifiées dans les présentes peut engendrer une
exposition dangereuse aux rayonnements.

L’usage de FibeAir IDU s’accompagne du risque suivant d'électrocution


et de danger électrique : le débranchement d'une alimentation
! électrique ne déconnecte qu'un module d'alimentation électrique. Pour
isoler complètement l'unité, il faut débrancher toutes les alimentations
électriques.

Bruit de machine d’ordre - 3. GPSGV, le plus haut niveau de pression


! sonore s'élève à 70 dB (A) au maximum, dans le respect de la norme ISO
EN 7779.

Allgemeine Vorsichtsmaßnahmen für die Anlage

Wenn andere Steuerelemente verwendet, Einstellungen vorgenommen


! oder Verfahren durchgeführt werden als die hier angegebenen, kann
dies gefährliche Strahlung verursachen.

Beachten Sie beim Arbeiten mit FibeAir IDU das folgende Stromschlag-
und Gefahrenrisiko: Durch Abtrennen einer Stromquelle wird nur ein
! Stromversorgungsmodul abgetrennt. Um die Einheit vollständig zu
isolieren, trennen Sie alle Stromversorgungen ab.

Maschinenlärminformations-Verordnung - 3. GPSGV, der höchste


! Schalldruckpegel beträgt 70 dB(A) oder weniger gemäß EN ISO 7779.

Ceragon Proprietary and Confidential Page 7 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

1. About This Guide


This guide describes the FibeAir 1500HP/RFU-HP installation procedures and
provides additional information concerning system parts and frequency bands.

2. What You Should Know


This guide provides general instructions for assembling the 1500HP/RFU-HP
components, as well as instructions for assembling specific split-mount and
all-indoor configurations.
Important! For the warranty to be honored, install the unit in accordance
with the instructions in this manual.

3. Target Audience
This guide contains technical information about 1500HP/RFU-HP installation, and
is intended for use by qualified Ceragon technical personnel at all levels.

4. Related Documents
 FibeAir IP-20A Installation Guide – DOC-00040961
 FibeAirIP-10G Installation Guide –DOC-00023199
 FibeAir IP-10E Installation Guide –DOC-00029444
 FibeAir IP-10Q Installation Guide, DOC-00029546

Ceragon Proprietary and Confidential Page 8 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

5. Important Notes
 1500HP/RFU-HP is intended for installation in a Restricted Access
Location.
 1500HP/RFU-HP must be installed and permanently connected to
protective earth by qualified service personnel in accordance with
applicable national electrical codes.
 The FibeAir system is to be installed in Network Telecommunication
Facilities.

The intra-building port(s) of the equipment or subassembly is suitable


for connection to intra-building or exposed wiring or cabling only. The
intra-building port(s) of the equipment or subassembly MUST NOT be
WARNING! metallically connected to interfaces that connect to the OSP or its
wiring. These interfaces are designed for use as intra-building interfaces
only (Type 2 or Type 4 port as described in GR-1089-CORE, Issue 4) and
require isolation from the exposed OSP cabling. The addition of Primary
Protectors is not sufficient protection in order to connect these
interfaces metallically to OSP wiring.

Ceragon Proprietary and Confidential Page 9 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6. 1500HP/RFU-HP Models and Part Numbers


The RFU-HP can be installed in split-mount and all-indoor configurations.
The 1500HP has a 1 receiver (1RX) and 2 receiver (2RX) options. The 1500HP
2RX can be used for IF Combining (IFC) Space Diversity. However, 1500 HP
(11 GHz) 40 MHz bandwidth does not support IFC Space Diversity.
1500HP, both 1RX and 2RX, can be used in both split-mount and all-indoor
configurations.

1500HP 2RX Models – Split Mount or All Indoor

Marketing Model Description


15HP-RFU-7 1500HP 7G 2RX SM / All Indoor
15HP-RFU-8 1500HP 8G 2RX SM / All Indoor
15HP-RFU-6L 1500HP 6LG 2RX SM / All Indoor
15HP-RFU-6H 1500HP 6HG 2RX SM / All Indoor
15HP-RFU-11 1500HP 11G 2RX SM / All Indoor

1500HP 1RX Models – Split Mount

Marketing Model Description


15HPS-1R-RFU-7 1500HP 7G 1RX SM
15HPS-1R-RFU-8 1500HP 8G 1RX SM
15HPS-1R-RFU-6L 1500HP 6LG 1RX SM
15HPS-1R-RFU-6H 1500HP 6HG 1RX SM
15HPS-1R-RFU-11 1500HP 11G 1RX SM
15HPS-1R-RFU-11w 1500HP 11G 1RX SM 40M (24-40MHz)

1500HP 1RX Models – All Indoor

15HPA-1R-RFU-7 1500HP 7G 1RX All Indoor


15HPA-1R-RFU-8 1500HP 8G 1RX All Indoor
15HPA-1R-RFU-6L 1500HP 6LG 1RX All Indoor
15HPA-1R-RFU-6H 1500HP 6HG 1RX All Indoor
15HPA-1R-RFU-11 1500HP 11G 1RX All Indoor

Ceragon Proprietary and Confidential Page 10 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

1500HP 2RX Models – All Indoor

15HPA-2R-RFU-7 1500HP 7G 2RX All Indoor


15HPA-2R-RFU-8 1500HP 8G 2RX All Indoor
15HPA-2R-RFU-6L 1500HP 6LG 2RX All Indoor
15HPA-2R-RFU-6H 1500HP 6HG 2RX All Indoor
15HPA-2R-RFU-11 1500HP 11G 2RX All Indoor

RFU-HP Models – Split Mount or All Indoor

RFU-HP-1R-6H RFU-HP 6HG 1Rx up to 56M SM / All Indoor


RFU-HP-1R-6L RFU-HP 6LG 1Rx up to 56M SM / All Indoor
RFU-HP-1R-7 RFU-HP 7G 1Rx up to 56M SM / All Indoor
RFU-HP-1R-8 RFU-HP 8G 1Rx up to 56M SM / All Indoor

Ceragon Proprietary and Confidential Page 11 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7. FibeAir 1500HP/RFU-HP OCBs


FibeAir 1500HP/RFU-HP supports two types of OCBs:
 Old OCB
 OCB
Both OCBs are compatible with all RFU-HP/1500HP part numbers.
Old OCB OCB

Note: This installation guide describes the installation of both


types. You will need to verify which type you are using.

Ceragon Proprietary and Confidential Page 12 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7.1 Old OCB


The Old OCB has two types, Type 1 and Type 2. The main difference between
the two types is the circulator direction. Depending on the configuration, OCB
Type 1 or Type2 is used together with waveguide shorts, waveguide loads, U-
Bends, or couplers.
Each OCB has four waveguide access points: two in the front, and two at the
rear. The diversity access point is optional.
If the system is not configured for diversity, all the relevant access points on
the OCB must be terminated using waveguide shorts.
The two OCB types (with and without IFC Space Diversity) have different part
numbers.
The following block diagrams show the difference between the two OCBs and
the additional Diversity Circulator block which is added in some Diversity
configurations.

Ceragon Proprietary and Confidential Page 13 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7.2 OCB
The OCB is optimized for configurations that do not use IFC Space Diversity.
To support IFC Space Diversity, a diversity block is added.
The OCB has just one type, and can be connected to an antenna via a flexible
waveguide.
The OCB connection is at the rear of the OCB. It includes proprietary
accessories (different than those used for the older OCB).
Each OCB has three waveguide access points: The In/Out port is located at the
rear of the OCB.
The OCB ports include:
 Tx port
 Rx Port
 Diversity port
If the system is not configured for diversity, all the relevant access points on
the OCB must be terminated using waveguide shorts. Unused Rx ports will be
terminated with a WG termination.

7.2.1 OCB Components


The OCB includes the following components:
DCB (Diversity Circulator Block) Coupler Kit

U-Bend S-Bend Pole-Mount Kit

Ceragon Proprietary and Confidential Page 14 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

New OCB components include the following:


 RF Filters – RF Filters are used for specific frequency channels and Tx/Rx
separation. The filters are attached to the OCB, and each RFU contains one
Rx and one Tx filter. In a Space Diversity configuration, with IF combining,
each RFU contains two Rx filters (which combine the IF signals) and one
Tx filter. The filters can be replaced without removing the OCB.
 DCB (Diversity Circulator Block) – An external block which is added in
Space Diversity configurations. The DCB is connected to the diversity port
and can chain two OCBs.
 Coupler Kit – The coupler kit is used for 1+1 Hot Standby configurations.
 U Bend – The U Bend connects the chained DCB (Diversity Circulator
Block) in N+1/N+ 0 configurations.
 S Bend – The S Bend connects the chained OCB (Outdoor Circulator Block)
in N+1 /N+ 0 configurations.
 Pole Mount Kit – The Pole Mount Kit can fasten up to five OCBs and the
RFUs to the pole. The kit enables fast and easy installation.

Ceragon Proprietary and Confidential Page 15 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8. Split-Mount Installation with Old OCB


The following sections describe the installation procedures for FibeAir
1500HP/RFU-HP with the older type OCB.

8.1 Installing Couplers


To install a coupler:
1 Place sealing gaskets (supplied in coupler kit) in the coupler flange
grooves.
2 Connect the coupler with the gaskets to the relevant ports.
3 Tighten the screws and washers (supplied with coupler kit) to the OCB.

Couplers

Ceragon Proprietary and Confidential Page 16 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8.2 Assembling the RFU and OCB


The RFU is generally assembled in the factory with the OCB, and delivered as a
single unit.
If the RFU is delivered separately with the OCB, do the following:
Important: The instructions in this guide should be performed indoors.
1 Remove the RFU and the OCB from the box.

Ceragon Proprietary and Confidential Page 17 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Make sure that the OCB sealing gasket is in place.

3 Gently slide the RFU in the OCB, making sure that the two empty spaces in
the RFU correspond to the filter positions on the OCB.

Ceragon Proprietary and Confidential Page 18 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Tighten the Allen Head screws to the OCB using an Allen wrench. The
torque for the screws should be 17Nm.

Ceragon Proprietary and Confidential Page 19 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8.3 Assembling the Hanger Kit


The Hanger Kit is used to connect two RFUs and OCBs to the Pole Mount Kit. It
consists of a single metal plate.
To assemble the Hanger Kit together with the RFU and OCB:
1 Place the RFU on the floor and hold it upright, as shown in the photo
below.
2 Place the Hanger Kit in line with the OCB, as shown in the illustration
below, and fasten the Kit to the OCB using 3 large (M-10 type) screws.

Ceragon Proprietary and Confidential Page 20 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8.4 Assembling the Pole Mount Kit


The Pole Mount Kit is used to connect the Hanger Kit (together with the RFU
and OCB) to the pole.
The kit consists of a single metal plate with a clamp assembly.
Important! The diameter of the pole upon which the kit is mounted
must be between 50 mm (2") and 125 mm (5").
To assemble the Pole Mount Kit on the pole:
1 Open the Pole Mount Kit clamp, and assemble the kit on the pole, as shown
in the following illustration.

2 Fasten the kit to the pole using the 4 screws, as shown in the photo above.

Ceragon Proprietary and Confidential Page 21 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8.5 Assembling the Hanger Kit (with RFU and OCB) and
Pole Mount Kit
To assemble the Hanger Kit and the Pole Mount Kit:
1 Lift the Hanger Kit with the fastened RFU and OCB, and hang it, using the
Hanger Bend, on the Pole Mount Kit, as shown in the following
illustrations.

Ceragon Proprietary and Confidential Page 22 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Ceragon Proprietary and Confidential Page 23 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Fasten the Hanger Kit to the Pole Mount Kit using 4 large (M-10 type)
screws, as shown in the following illustration.

Ceragon Proprietary and Confidential Page 24 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Each Pole Mount Kit can accommodate two RFUs and OCB units, as shown in
the following illustration.

Ceragon Proprietary and Confidential Page 25 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8.6 Configuration Example: 2+2 XPIC Installation


This section describes the installation procedure for FibeAir 1500HP/RFU-HP
in a 2+2 XPIC configuration.

8.6.1 Installation Components

Ceragon Proprietary and Confidential Page 26 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8.6.2 Installation Procedure


1 Connect both pole mount kits to the pole. If the RFUs are to be assembled
one above the other, there should be a minimum distance of 40 cm
between the two pole mount kits, as shown in the following illustration.

Important! The diameter of the pole upon which the kit is mounted
must be between 50 mm (2") and 125 mm (5").
2 Connect shorts and WG terminations on all OCBs (shorts on main antenna
ports, WG terminations on diversity antenna ports).
3 Assemble both couplers on the OCBs.
4 Attach the hanging bracket to the OCBs and tighten the screws that fasten
the OCB to the hanging-bracket.
5 Gently lift the assembled unit to the pole using the lifting handle.
6 Place the assembled units on the pole mount clamp bracket and fasten the
M10 screws, as shown in the following illustration.

Ceragon Proprietary and Confidential Page 27 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7 Connect the XPIC cables between the units, as shown in the following
illustration.

8 Connect the flexible waveguides to the antennas, as shown in the


illustration above (V and H poles are selected as required - in the
illustration above they are selected arbitrarily).

8.7 N+1 Split Mount Installation


This section describes the installation procedure for FibeAir 1500HP/RFU-HP
in an N+1 split mount configuration, where N is less than or equal to 5.
A split mount N+1 configuration is achieved using Type-1 and Type-2 OCBs
alternatively, or the new OCB.
Two Type 1 and Type 2 OCBs are interconnected via U bends at the rear
extension ports. The third OCB is chained to the second OCB through the main
and diversity ports, using a flexible waveguide.
Each OCB is connected to the relevant IF cable from the 3200T Baseband
Indoor.

Ceragon Proprietary and Confidential Page 28 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

The following example shows a 4+1 space diversity dual pole configuration.

Note: When installing an N+1 configuration, assemble the OCBs in


an inverted order, to maintain the same branching loss
between the carriers, as shown in the following illustration.

Ceragon Proprietary and Confidential Page 29 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9. Split-Mount Installation with the OCB


This section provides installation procedures for the OCB.

9.1 Required Tools for the OCB Installation


 Screwdriver Philips/ screw head bits size 2
 Ratchet 11/16''
 Wrench 3/16"
 Hexagon Socket 5mm
 Allen wrench 2.5mm
 Allen wrench 5mm
 Allen wrench 6mm

9.2 Special Tools/Materials


None.

When assembling, make sure the waveguide connector plastic covers


remain intact. Any damage to the covers may result in improper
operation of waveguides and the RFU.
WARNING!

Note: Every screw fastening operation must comply with the


enclosed Torque Table; make sure you apply appropriate
torque every time.
Tightening Torques

Thread Size Tightening Torque (Nm)


8-32 UNC 3 ± 0.2
10-32 UNF 5.1 ± 0.3
M8x1.25 23 ± 1.1
M10x1.5 44 ± 1.1

Ceragon Proprietary and Confidential Page 30 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9.3 Pole Mount Preliminary Assembly


Description Quantity
Nut, Hex, SS, DIN 934-M10-A2-70 4
Washer, Helical spring lock SS, DIN 127-
2
B10-A2-70
Screw, Hex cap, SS, DIN 933-M10x200-
2
A2-70
Hanging Profile 1

1 Insert two screws (3) into the two lower hanging profile (4) holes and
secure them with four nuts (1) and two washers (2) (do not tighten) (Step
I in illustration below).
2 Arrange the OCBs (5) in a straight line and place the hanging profile (4)
(Step II).

Ceragon Proprietary and Confidential Page 31 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9.4 Installing Couplers


To install a coupler:
1 Place sealing gaskets (supplied in coupler kit) in the coupler flange
grooves.
2 Connect the coupler with the gaskets to the relevant ports.
3 Tighten the built-in screws to the OCB.

Ceragon Proprietary and Confidential Page 32 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9.5 Installing S-Bends and the DCB


1 Place the sealing gaskets (supplied with the S-Bend/DCB kit) in the flange
grooves.
2 Connect the S-Bend/DCB with the gaskets to the relevant ports.
3 Tighten the built-in screws to the OCB.

Ceragon Proprietary and Confidential Page 33 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9.6 Short Installation


1 Install the short plate using the flange gasket, screws, and washers
supplied with the short kit as shown below.

Ceragon Proprietary and Confidential Page 34 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9.7 Termination Installation


1 Install the termination using the flange gasket, screws and washers
supplied with the termination kit as shown below

Ceragon Proprietary and Confidential Page 35 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

10. Final Branching Installation


1 Fasten two screws (1) and spring washers (2) for each installed OCB.
2 Fasten lifting eye to each OCB unit (5) (if not already installed).

Description Quantity Remarks


Screw, Socket hexagon head cap,
2
SS, DIN 912-M8x30-A2-70
The quantities are for one
Washer, Helical spring lock, SS, OCB and may change in
2
DIN 7980-8.1-A2-70 accordance with the
Couplers - installed configuration
(up to five OCBs)
Lifting Collar Eye Bolt M8-1.25
1
steel, Zink plated

Ceragon Proprietary and Confidential Page 36 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

11. Connecting the RFU to the OCB


Make sure the RFUs (2) are inserted correctly; do not force them in!

WARNING!

1 Carefully insert the RFUs (2) into the slots on the OCB units (1).
2 Fasten two screws (3) using the angled Allen wrench. The torque for the
screws should be 17Nm.

Description Quantity Remarks


OCB Assy. 1
The quantities are for one RFU and may
RFU 1 change in accordance with the installed
configuration (up to five RFUs)
Screw (part of RFU Assy) 2

Ceragon Proprietary and Confidential Page 37 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

12. Housing Assembly and Lifting Harness


1 Choose one of four (5) available positions for the pole installation. Refer to
Hanging Positions on page 40.
2 Fasten two screws (3) and spring washers (4) to attach the Pillar Housing
(1) to the Hanging Profile (2).
3 Tie the lifting harness (6) to the lifting ears (7) on all OCB units.
CAUTION!
Before lifting, make sure all OCB units are properly tied to the lifting harness.
4 Carefully lift the assembly for Pole Installation.

Description Quantity
Pillar Housing 1
Hanging Profile 1
Screw, Phillips Pan head, SS, ANSI, #8-
2
32UNCx1/2"
Washer, Helical spring lock, SS, ANSI, #8 2

Ceragon Proprietary and Confidential Page 38 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

13. Pole Installation


1 Insert two screws (in addition to the two screws already inserted (see Pole
Mount Preliminary Assembly on page 31) (4) through the holes in the
Hanging Profile (4).
2 Press the Hanging Profile (4) against the Pillar Housing, while mounting
the Pillar Clamp (3) on the screws (5).
3 Tighten the spring washer (2) and two nuts (1) on each of the four screws,
to fasten the Hanging Profile (6) to the Pole (7).

Description Quantity
Nut, Hex, SS, DIN 934-M10-A2-70 8
Washer, Helical spring lock SS, DIN 127-B10-A2-70 4
Pillar Clamp 1
Hanging Profile 1
Screw, Hex cap, SS, DIN 933-M10x200-A2-70 4

Ceragon Proprietary and Confidential Page 39 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

14. Hanging Positions


You can pole mount the Hanging Profile on any of the four available positions,
as shown in the following illustration.

Ceragon Proprietary and Confidential Page 40 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

15. Outdoor Branching Network (OBM) Housing


Hanging Procedure
Do not lift the OCB using the RFU handle; use the lifting eye only!

WARNING!

1 Lift the OBN OCB Housing (3) using the lifting eye (5).
2 Tilt the OBN OCB Housing (shown below without the RFU) (3) backwards,
and hook it to the Hanging Profile (4) so that the screw holes are aligned.
3 Fasten two screws (1) and spring washers (2).
4 Hang up to five OBN OCB Housing (3) units (in accordance with the
relevant configuration).
5 Install the RFU (6).

Description Quantity Remarks


Screw, Socket hexagon head cap,
2
SS, DIN 912-M8x30-A2-70
The quantities are for one
Washer, Helical spring lock, SS, DIN
2 RFU and may be changed in
7980-8.1-A2-70
accordance with the installed
OBN OCB Housing 1 configuration (up to five
RFUs)
Hanging Profile 4 RFU’s
RFU 1

Ceragon Proprietary and Confidential Page 41 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

16. Connecting a Flexible Waveguide


1 Connect the Flexible Waveguide using the flange gasket, screws, and
washers supplied with the Flexible Waveguide kit as shown below.

Ceragon Proprietary and Confidential Page 42 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

17. RFU Cable Connections


The RFU cable connectors are located on the bottom of the RFU, as shown in
the following photo:

IF Cable

Source
Sharing /
RSL

Ceragon Proprietary and Confidential Page 43 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Waveguide

Waveguide

Ground

Waveguide

The connections include the following:


 XPIC/RSL – For XPIC functionality and radio signal monitoring.
 IF – Connects the RFU to the IDU.
 Ground – Used for electrical ground.
 Flexible Waveguide – Connects the RFU to the antenna.

Ceragon Proprietary and Confidential Page 44 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

18. Grounding the 1500HP/RFU-HP


 The RFU is suitable for installation in a Common Bonding Network (CBN).
 Only copper wire should be used.
 The coaxial port cables should be shielded and grounded at both ends.
 The wire must be at least 14 AWG or thicker.
 Connector and connection surfaces must be plated. Bare conductors must
be coated with antioxidant before crimp connections are made to the
screws.
 FibeAir provides a ground for each drawer, via a one-hole mounted lug
onto a single-point stud. The stud must be installed using a UL-listed ring
tongue terminal, and two star washers for anti-rotation.
 For antenna ports, lightning protection is used that does not permit
transients of a greater magnitude than the following:
 Open Circuit: 1.2-50us 600V
 Short Circuit: 8-20us 300A
 FibeAir’s battery return terminals are in the configuration of an Isolated
DC return (DC-I) and Common DC Return (DC-C).
The grounding point is assembled as shown in the following illustration.

Single point stud

Tooth Washer
Nut

Terminal

Ceragon Proprietary and Confidential Page 45 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19. Installation Instructions for Specific


Configurations
This chapter provides detailed instructions for specific FibeAir 1500HP/RFU-
HP configurations.
Note that in this chapter, the following abbreviations are used:
 HSB - Hot Standby
 FD - Frequency Diversity
 SD - Space Diversity
 DP - Dual Pole
 MP - Main Path
 SP - Secondary Path
 MA - Main Antenna
 DA - Diversity Antenna
 N/A - Not Applicable
 WG - Waveguide
 X/Y dB: X refers to 6-8 GHz, Y refers to 11 GHz

Ceragon Proprietary and Confidential Page 46 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.1 1+0

List of Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 1
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 1

OCB Pole mount kit OCB-Pole Mount 1


15HP Short for WRccc Kit 15HP-SHORT-ccc 1
1500HP WGWG Termination, WRccc
15HP-TERM-ccc 1
Kit
Flexible WG Kit 3200T Flx WG xFT fGHz 1

Procedure

1 Mount the termination and short flange on the rear side, as described in
Short Installation on page 34 and Termination Installation on page 35.
2 Mount the OCB to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.
3 Mount the radio to the OCB, as described in Outdoor Branching Network
(OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 47 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.

5 Mount the flexible waveguide and O-ring to the main (upper) port using
the screws and washers supplied with the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 48 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.2 1+0 SD

List of Items per Terminal

Description Marketing Model Quantity

RFU 2Rx 15HP-RFU-fx 1


OCB 2RX with filters 15OCBfx-xxxY-aa-L/H 1
OCB Pole mount kit OCB-Pole Mount 1

15HP Short for WRccc Kit 15HP-SHORT-ccc 1


1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 1
Flexible WG Kit 3200T Flx WG xFT fGHz 2

Procedure

1 Mount the termination and short flange on the rear side, as described in
Short Installation on page 34 and Termination Installation on page 35.
2 Mount the OCB to the OCB pole mount, as described in as described in Pole
Mount Preliminary Assembly on page 31.
3 Mount the radio to the OCB, as described in Outdoor Branching Network
(OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 49 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.

5 Mount both the flexible waveguide and the O-ring to the MAIN port and
the DIV port using the screws and washers supplied in the Flexible
Waveguide kit, as described in Connecting a Flexible Waveguide on
page 42.

Ceragon Proprietary and Confidential Page 50 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.3 1+1 SD IFC

List of Items per Terminal

Description Marketing Model Quantity

RFU 2Rx 15HP--RFU-f 2


OCB 2Rx with filters 15OCBfx-xxxY-aa-L/H 2
OCB Pole mount kit OCB-Pole Mount 1

1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 2


OCB Coupler f GHz OCB-CPLR-f 2

Procedure

1 Mount the termination on the rear side, as described in Termination


Installation on page 35.

Ceragon Proprietary and Confidential Page 51 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Mount the OCB to the OCB pole mount, as described in as described in Pole
Mount Preliminary Assembly on page 31.

3 Mount the radio to the OCB, as described in Outdoor Branching Network


(OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 52 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Attach a coupler to the Main OCB Waveguides and secure it with screws.

5 Attach a coupler to the Div OCB Waveguides and secure it with screws.

Ceragon Proprietary and Confidential Page 53 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.

Ceragon Proprietary and Confidential Page 54 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.4 1+1 HSB

List of Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2

OCB Pole mount kit OCB-Pole Mount 1


15HP Short for WRccc Kit 15HP-SHORT-ccc 2
1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 2
OCB Coupler f GHz OCB-CPLR-f 1

Procedure

1 Mount the termination and short flange on the rear side, as described in
Short Installation on page 34 and Termination Installation on page 35.

Ceragon Proprietary and Confidential Page 55 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Mount the OCB to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.

3 Mount the radio to the OCB, as described in Outdoor Branching Network


(OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 56 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Attach a coupler to the OCBs and secure it with screws.

5 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.

Ceragon Proprietary and Confidential Page 57 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.5 2+0 DP

List of Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2

OCB Pole mount kit OCB-Pole Mount 1


15HP Short for WRccc Kit 15HP-SHORT-ccc 2
1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 2
Flexible WG Kit 3200T Flx WG xFT fGHz 2

Procedure

1 Mount the termination and short flange on the rear side, as described in
Short Installation on page 34 and Termination Installation on page 35.
2 Mount the OCB to the pole mount, as described in Pole Mount Preliminary
Assembly on page 31.
3 Mount the radio to the OCB, as described in Outdoor Branching Network
(OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 58 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.

5 Mount the flexible waveguide and O-ring to the MAIN (upper) port using
the screws and washers supplied in the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 59 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Repeat the procedure for the second polarization.

Ceragon Proprietary and Confidential Page 60 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.6 2+0 SP

List of Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2

OCB Pole mount kit OCB-Pole Mount 1


OCB-Sbend Kit OCB-SBend-f 1
1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 1
15HP Short for WRccc Kit 15HP-SHORT-ccc 2
Flexible WG Kit 3200T Flx WG xFT fGHz 1

Procedure

1 Mount the OCBs to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.
2 Slide and tighten both radios to the OCB, as described in Outdoor
Branching Network (OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 61 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

3 On the rear side, mount the termination and short to the OCB flanges, as
shown below and as described in Short Installation on page 34 and
Termination Installation on page 35.

4 Mount the S-Bend between the OCBs, as shown below and as described in
Installing S-Bends and the DCB on page 33.

5 Attach the OCB pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.

Ceragon Proprietary and Confidential Page 62 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Mount the flexible waveguide and O-ring to the MAIN (upper) port using
the screws and washers supplied in the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 63 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.7 2+0 SD SP

List of Items per Terminal

Description Marketing Model Quantity

RFU 1Rx 15HP-RFU-f 2


OCB with filters 15OCBfx-xxxY-aa-L/H 2
OCB Pole mount kit OCB-Pole Mount 1

1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 2


OCB-Sbend Kit OCB-SBend-f 1
DCB Diversity Block fxGHz kit DCBfx 1
Flexible WG Kit 3200T Flx WG xFT fGHz 2

Procedure

1 Mount the OCBs to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.
2 Slide and tighten both radios to the OCB, as described in Outdoor
Branching Network (OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 64 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

3 On the rear side, mount the termination flange, as shown below and as
described in Termination Installation on page 35.

4 Mount the S-Bend and DCB to the OCBs, as shown below and as described
in Installing S-Bends and the DCB on page 33.

Ceragon Proprietary and Confidential Page 65 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

5 Mount the termination to the DCB, as shown below and described in


Termination Installation on page 35.

6 Attach the OCB pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
7 Mount the flexible waveguide and O-ring to the MAIN (upper) port using
the screws and washers supplied in the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 66 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.8 2+0 SD DP

List of Items per Terminal

Description Marketing Model Quantity

RFU 2Rx 15HP-RFU-fx 2


OCB 2Rx with filters 15OCBfx-xxxY-aa-L/H 2
OCB Pole mount kit OCB-Pole Mount 1

1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 2


Flexible WG Kit 3200T Flx WG xFT fGHz 4

Procedure

1 Mount the termination and short flange on the rear side, as described in
Short Installation on page 34 and Termination Installation on page 35.
2 Mount the OCB to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.
3 Mount the radio to the OCB, as described in Outdoor Branching Network
(OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 67 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.

5 Mount the flexible waveguide and O-ring to the MAIN (upper) port using
the screws and washers supplied in the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 68 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Repeat the procedure for the second polarization.

Ceragon Proprietary and Confidential Page 69 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.9 2+2 SD SP

List of Items per Terminal

Description Marketing Model Quantity

RFU 2Rx 15HP-RFU-fx 4


OCB 2Rx with filters 15OCBfx-SD-xxxY-aa-L/H 4
OCB-Sbend OCB-SBend-f 2

DCB Diversity Block fxGHz kit DCBfx 2


OCB Coupler f GHz OCB-CPLR-f 2
1500HP WG Termination, WRccc 15HP-TERM-ccc 4
ADPT WG/COAX CPR-ccc G-FLT F/N-
WRccc ADPT G-FLT to N-TYPE kit 1
TYPE KIT
LDF4-Jumper-15m,Andrew LDF4-JA-15M/ LDF 1

Flex. WG kit WR-ccc, 4 FT WAVEGUIDE-f-4FT 3


OCB-Pole Mount OCB-Pole Mount 1

Procedure

1 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31
2 Mount the four OCBs to the pole mount bracket, as described in Pole Mount
Preliminary Assembly on page 31.
3 On the rear side, mount termination plates to the RX ports of the second
and fourth radios using the screws and washers supplied in the
termination kit, as described in Termination Installation on page 35.

Ceragon Proprietary and Confidential Page 70 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Mount the four radios to the OCB, as described in Outdoor Branching


Network (OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 71 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

5 Mount two S-Bends; the first S-Bend between the EXT port of radio 1 and
the MAIN port of radio 2, and the second S-Bend between the EXT port of
radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on
page 33.

Ceragon Proprietary and Confidential Page 72 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Mount two DCBs; the first DCB between the DIV ports of radio 1 and radio
2, and the second between the DIV ports of radio 3 and radio 4. See
Installing S-Bends and the DCB on page 33.

Ceragon Proprietary and Confidential Page 73 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7 Mount two couplers, one to the MAIN port of radio 1 and the other to the
left port of the left DCB, as described in Installing Couplers on page 32.

Ceragon Proprietary and Confidential Page 74 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8 Mount two terminations to the right ports of both DCBs using the screws
and washers supplied with the termination kit, as described in
Termination Installation on page 35.

Ceragon Proprietary and Confidential Page 75 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9 Mount a flexible waveguide with O-ring between the MAIN port in radio 3
and the Coupler port on the top coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 76 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

10 Mount a flexible waveguide with O-ring between the left port in the right
DCB and the Coupler port on the bottom coupler using the screws and
washers supplied with the Flexible Waveguide kit, as described in
Connecting a Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 77 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

11 Mount a flexible waveguide with O-ring between the main antenna and the
Antenna port on the top coupler using the screws and washers supplied
with the Flexible Waveguide kit, as described in Connecting a Flexible
Waveguide on page 42.

Ceragon Proprietary and Confidential Page 78 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

12 If the diversity antenna is connected with a coax cable, connect a


waveguide to coax adapter on the diversity coupler and connect the coax
to the diversity antenna.

Ceragon Proprietary and Confidential Page 79 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

If a waveguide connection is to be used, connect a waveguide directly to


the Coupler port and the diversity antenna.

Ceragon Proprietary and Confidential Page 80 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.10 2+2 SD DP (Non-Upgradable)

List of Items per Terminal

Description Marketing Model Quantity

RFU 2Rx 15HP-RFU-f 4


OCB 2Rx with filters 15OCBfx-xxxY-aa-L/H 4
OCB Pole mount kit OCB-Pole Mount 1

1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 4


OCB Coupler f GHz OCB-CPLR-f 4

Procedure

1 Mount the terminations on the rear side, as described in Termination


Installation on page 35.

Ceragon Proprietary and Confidential Page 81 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Mount the OCB to the OCB pole mount, as described in Pole Mount
Preliminary Assembly on page 31.

3 Mount the radio to the OCB, as described in Outdoor Branching Network


(OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 82 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Attach a coupler to the left two main OCB waveguides and secure it with
screws.

5 Attach a coupler to the left two Div OCB waveguides and secure it with
screws.

Ceragon Proprietary and Confidential Page 83 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Attach a coupler to the right two main OCB waveguides and secure it with
screws.

7 Attach a coupler to the right two Div OCB waveguides and secure it with
screws.

Ceragon Proprietary and Confidential Page 84 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.

Ceragon Proprietary and Confidential Page 85 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.11 2+2 HSB DP (Ready for Upgrade)

List of Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 4
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 4

OCB Pole mount kit OCB-Pole Mount 1


1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 4
OCB Coupler f GHz OCB-CPLR-f 2

Procedure

1 Mount the terminations on the rear side, as described in Termination


Installation on page 35.

Ceragon Proprietary and Confidential Page 86 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Mount two of the OCBs to the OCB pole mount bracket, as described in Pole
Mount Preliminary Assembly on page 31.

3 Mount the radios to the OCBs, as described in Outdoor Branching Network


(OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 87 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Attach a coupler to both radios and secure it with screws.

5 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.

Ceragon Proprietary and Confidential Page 88 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Repeat steps 1 through 4.

7 Attach the pole mount bracket to the pole mount, as described in Pole
Mount Preliminary Assembly on page 31.

Ceragon Proprietary and Confidential Page 89 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.12 2+2 HSB DP (Non-Upgradable)

List of Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 4
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 4

OCB Pole mount kit OCB-Pole Mount 1


1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 4
OCB Coupler f GHz OCB-CPLR-f 2

Procedure

1 Mount the terminations on the rear side, as described in Termination


Installation on page 35.

Ceragon Proprietary and Confidential Page 90 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Mount the OCB to the OCB pole mount bracket, as described in Pole Mount
Preliminary Assembly on page 31.

3 Mount the radios to the OCBs, as described in Outdoor Branching Network


(OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 91 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Attach a coupler to both left radios and secure it with screws.

5 Attach a coupler to both right radios and secure it with screws.

Ceragon Proprietary and Confidential Page 92 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Attach the pole mount bracket to the pole mount, as described in Pole
Mount Preliminary Assembly on page 31.

Ceragon Proprietary and Confidential Page 93 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19.13 2+2 HSB SP

List of Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 4
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 4

OCB-Sbend OCB-SBend-f 2
1500HP WG Termination, WRccc 15HP-TERM-ccc 2
15HP Short for WRccc 15HP-SHORT-ccc 4
OCB Coupler f GHz OCB-CPLR-f 1

Flex. WG kit WR-ccc, 4 FT WAVEGUIDE-f-4FT 2

OCB-Pole Mount OCB-Pole Mount 1

Procedure

1 Attach the pole mount bracket to the pole, as described in Pole Mount
Preliminary Assembly on page 31.
2 Mount the four OCBs to the pole mount bracket, as described in Pole Mount
Preliminary Assembly on page 31.
3 On the rear side, mount termination plates to the EXT ports of the second
and fourth radios using the screws and washers supplied in the
termination kit, as described in Termination Installation on page 35.
4 On the rear side, mount shorts to the DIV ports of all four radios using the
screws and washers supplied in the short kit, as described in Short
Installation on page 34.

Ceragon Proprietary and Confidential Page 94 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

5 Mount the four radios to the OCB, as described in Outdoor Branching


Network (OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 95 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Mount two S-Bends; the first S-Bend between the EXT port of radio 1 and
the MAIN port of radio 2, and the second S-Bend between the EXT port of
radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on
page 33.

Ceragon Proprietary and Confidential Page 96 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7 Mount the coupler to the MAIN port of radio 1, as described in Installing


Couplers on page 32.

Ceragon Proprietary and Confidential Page 97 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8 Mount a flexible waveguide with O-ring between the MAIN port in radio 3
and the Coupler port on the coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 98 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9 Mount a flexible waveguide with O-ring between the antenna and the
Antenna port on the coupler, using the screws and washers supplied with
the Flexible Waveguide kit, as described in Connecting a Flexible
Waveguide on page 42.

Ceragon Proprietary and Confidential Page 99 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

20. Upgrade Instructions

20.1 Upgrading from 1+1 SD to 2+2 SD SP

List of Additional Items per Terminal

Description Marketing Model Quantity

RFU 2 Rx 15HP-RFU-fx 2
OCB 2Rx with filters 15OCBfx-SD-xxxY-aa-L/H 2

OCB-Sbend OCB-SBend-f 2
DCB Diversity Block fxGHz kit DCBfx 2
1500HP WG Termination, WRccc 15HP-TERM-ccc 2
Flex. WG kit WR-ccc, 4 FT WAVEGUIDE-f-4FT 2
OCB-Pole Mount OCB-Pole Mount 1

Procedure

1 Start with a 1+1 SD configuration.

2 On the rear side, disassemble the termination from the EXT port on
radio 1.

Ceragon Proprietary and Confidential Page 100 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

3 On the rear side, disassemble both couplers.

4 On the rear side of the new radios, mount the termination to the EXT port
of the fourth radio using the screws and washers supplied in the
termination kit, as described in Termination Installation on page 35.

Ceragon Proprietary and Confidential Page 101 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

5 Mount the two new radios to the OCB, as described in Outdoor Branching
Network (OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 102 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Mount two S-Bends; the first S-Bend between the EXT port of radio 1 and
the MAIN port of radio 2, and the second S-Bend between the EXT port of
radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on
page 33.

Ceragon Proprietary and Confidential Page 103 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7 Mount two DCBs; the first DCB between the DIV ports of radio 1 and radio
2, and the second between the DIV ports of radio 3 and radio 4. See
Installing S-Bends and the DCB on page 33.

Ceragon Proprietary and Confidential Page 104 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8 Mount two couplers, one to the MAIN port of radio 1 and the other to the
left port of the left DCB, as described in Installing Couplers on page 32.

Ceragon Proprietary and Confidential Page 105 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9 Mount two terminations to the right ports of both DCBs using the screws
and washers supplied with the termination kit, as described in
Termination Installation on page 35.

Ceragon Proprietary and Confidential Page 106 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

10 Mount a flexible waveguide with O-ring between the MAIN port in radio 3
and the Coupler port on the top coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 107 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

11 Mount a flexible waveguide with O-ring between the left port in the right
DCB and the Coupler port on the bottom coupler using the screws and
washers supplied with the Flexible Waveguide kit, as described in
Connecting a Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 108 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

12 Mount the flexible waveguide with O-ring between the main antenna and
the Antenna port on the top coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 109 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

13 If the diversity antenna is connected with a coax cable, connect a


waveguide to coax adapter on the diversity coupler and connect the coax
to the diversity antenna.

Ceragon Proprietary and Confidential Page 110 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

If a waveguide connection is to be used, connect a waveguide directly to


the coupler port and the diversity antenna.

Ceragon Proprietary and Confidential Page 111 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

20.2 Upgrading from 1+1 HSB SP to 2+2 HSB SP

List of Additional Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2

OCB-Sbend OCB-SBend-f 2
1500HP WG Termination, WRccc 15HP-TERM-ccc 2
15HP Short for WRccc 15HP-SHORT-ccc 2
Flex. WG kit WR-ccc, 4 FT WAVEGUIDE-f-4FT 1

Procedure

1 Start with a 1+1 HSB configuration.

2 On the rear side, disassemble the termination from the EXT port on
radio 1.

Ceragon Proprietary and Confidential Page 112 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

3 On the rear side, disassemble the coupler.

4 On the rear side of the two new radios, mount shorts to the DIV ports using
the screws and washers supplied in the short kit, as described in Short
Installation on page 34.
5 On the rear side of the new radios, mount termination plates to the EXT
port of the fourth radio using the screws and washers supplied in the
termination kit, as described in Termination Installation on page 35.

Ceragon Proprietary and Confidential Page 113 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Mount the two new radios to the OCB, as described in Outdoor Branching
Network (OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 114 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7 Mount two S-Bends; the first S-Bend between the EXT port of radio 1 and
the MAIN port of radio 2, and the second S-Bend between the EXT port of
radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on
page 33.

Ceragon Proprietary and Confidential Page 115 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8 Mount the coupler to the MAIN port of radio 1, as described in Installing


Couplers on page 32.

Ceragon Proprietary and Confidential Page 116 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9 Mount a flexible waveguide with O-ring between the MAIN port on radio 3
and the Coupler port on the coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 117 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

10 Mount a flexible waveguide with O-ring between the antenna and the
Antenna port on the coupler, using the screws and washers supplied with
the Flexible Waveguide kit, as described in Connecting a Flexible
Waveguide on page 42.

Ceragon Proprietary and Confidential Page 118 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

20.3 Upgrading from 2+2 DP to 3+3 DP

List of Additional Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2

OCB Pole mount kit OCB-Pole Mount 1


OCB-Sbend Kit OCB-SBend-f 2
15HP Short for WRccc Kit 15HP-SHORT-ccc 2
Flexible WG Kit 3200T Flx WG xFT fGHz 1

Procedure

1 Start with a 2+2 DP configuration.

Ceragon Proprietary and Confidential Page 119 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Disconnect the couplers and the terminations on the first and third OCB.

3 Mount the S-Bend to the OCBs, as shown below and as described in


Installing S-Bends and the DCB on page 33.

Ceragon Proprietary and Confidential Page 120 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Mount the coupler to the OCB, as shown below and as described in


Installing Couplers on page 32.

5 Mount the OCB to the pole mount, as described in Pole Mount Preliminary
Assembly on page 31.
6 Mount a flexible waveguide and O-ring to the MAIN (upper) port of the
OCB and the Coupling port of the coupler using the screws and washers
supplied with the Flexible Waveguide kit, as described in Connecting a
Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 121 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7 Mount a flexible waveguide and O-ring to the antenna port of the coupler
using the screws and washers supplied with the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.

8 On the second OCB pole mount, perform a mounting similar to a 1+1 HSB
configuration, as described in 1+1 HSB on page 55.

Ceragon Proprietary and Confidential Page 122 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

20.4 Upgrading from 2+2 SD SP to 3+3 SD SP

List of Additional Items per Terminal

Description Marketing Model Quantity

RFU 2Rx 15HP-RFU-f 3


OCB 2Rx with filters 15OCBfx-xxxY-aa-L/H 3
OCB Pole mount kit OCB-Pole Mount 1

15HP Short for WRccc 15HP-SHORT-ccc 2


OCB-Sbend Kit OCB-SBend-f 2
DCB-UBend Kit DCB-UBend-f 2
DCB Diversity Block fxGHz kit DCBfx 2
ADPT WG/COAX CPR-ccc G-FLT
WRccc ADPT G-FLT to N-TYPE kit 1
F/N-TYPE KIT

Flex. WG kit WR-ccc, 4 FT WAVEGUIDE-f-4FT 3

Ceragon Proprietary and Confidential Page 123 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Procedure

1 Start with a 2+2 SD SP configuration.

WG #3

WG #1
WG #2

Coax to WG

2 Remove the coax to waveguide and all three flexible waveguides (both
sides).

Ceragon Proprietary and Confidential Page 124 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

3 Remove the S-Bend, four terminations, and marked screws from the DCB.

S-Bend 2

WG #2

Remove 6
screws

WG #3
WG #1
WG #4

4 Remove the marked OCB.

OCB

Ceragon Proprietary and Confidential Page 125 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

5 Attach the S-Bend between the middle OCBs.

6 Mount a termination to the EXT port, as described in Termination


Installation on page 35.

Ceragon Proprietary and Confidential Page 126 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7 Mount a short plate to the DCB, as described in Short Installation on


page 34.

8 Mount three of the OCBs to the OCB pole mount, as described in Pole
Mount Preliminary Assembly on page 31.

Ceragon Proprietary and Confidential Page 127 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

9 Mount the radios to the OCBs, as described in Outdoor Branching Network


(OBM) Housing Hanging Procedure on page 41.

10 Attach two S-bend to both left OCBs, as described in Installing S-Bends and
the DCB on page 33.

Ceragon Proprietary and Confidential Page 128 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

11 Attach two DCBs to both right OCBs, as described in Installing S-Bends and
the DCB on page 33.

12 Attach the U-Bend between the two DCBs.

Ceragon Proprietary and Confidential Page 129 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

13 Attach the two terminations, as described in Termination Installation on


page 35.

14 Attach short on the DCB, as described in Short Installation on page 34.

Ceragon Proprietary and Confidential Page 130 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

15 Attach the pole mount bracket to the pole mount beneath the 2+2 SD SP
assembly that is already installed, as described in Pole Mount Preliminary
Assembly on page 31.

Already
installed

Upgrade addition

16 Attach flexible waveguide 1 from the Main port of the radio to coupler 1.

Flexible WG #1

Coupler #1

Main Radio

Ceragon Proprietary and Confidential Page 131 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

17 Attach flexible waveguide 2 from the bottom DCB to coupler 2.

Flexible WG #2

Coupler #2

DCB

Ceragon Proprietary and Confidential Page 132 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

18 Mount a flexible waveguide with O-ring between the main antenna and the
Antenna port on the top coupler using the screws and washers supplied
with the Flexible Waveguide kit, as described in Connecting a Flexible
Waveguide on page 42.

Flexible WG to
Main antenna

Ceragon Proprietary and Confidential Page 133 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

19 If the diversity antenna is connected with a coax cable, connect a


waveguide to coax adapter on the diversity coupler and connect the coax
to the diversity antenna.

Coax to WG to
diversity antenna

If a waveguide connection is to be used, connect a waveguide directly to


the Coupler port and the diversity antenna.

Ceragon Proprietary and Confidential Page 134 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

20.5 Upgrading from 2+2 SD DP to 3+3 SD DP

List of Additional Items per Terminal

Description Marketing Model Quantity

RFU 2Rx 15HP-RFU-f 2


OCB 2Rx with filters 15OCBfx-xxxY-aa-L/H 2
OCB Pole mount kit OCB-Pole Mount 1

OCB-Sbend Kit OCB-SBend-f 2


1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 2
DCB Diversity Block fxGHz kit DCBfx 2
Flexible WG Kit 3200T Flx WG xFT fGHz 2

Procedure

1 Start with a 2+2 SD DP configuration.

Ceragon Proprietary and Confidential Page 135 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Disconnect the couplers and the terminations on the first and third OCB.

3 Mount S-Bends and DCBs to the OCBs, as shown below and as described in
Installing S-Bends and the DCB on page 33.

Ceragon Proprietary and Confidential Page 136 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Mount a termination to each DCB, as shown below and as described in


Termination Installation on page 35.

5 Mount the coupler to the OCB, as shown below and as described in


Installing Couplers on page 32.

6 Mount the OCB to the pole mount, as described in Pole Mount Preliminary
Assembly on page 31.

Ceragon Proprietary and Confidential Page 137 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7 Mount a flexible waveguide and O-ring between the MAIN (upper) port of
both OCBs and the coupling port of the upper couplers using the screws
and washers supplied with the Flexible Waveguide kit, as described in
Connecting a Flexible Waveguide on page 42.

8 Mount a flexible waveguide and O-ring to the antenna port of each coupler
using the screws and washers supplied with the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.

9 On the second OCB pole mount, perform a mounting similar to a 1+1 HSB
SD configuration, as described in 1+1 HSB on page 55.
Ceragon Proprietary and Confidential Page 138 of 175
FibeAir® 1500HP/RFU-HP Installation Guide

20.6 Upgrading from 2+2 HSB SP to 3+3 HSB SP

List of Additional Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2

OCB-Sbend OCB-SBend-f 2
15HP Short for WRccc 15HP-SHORT-ccc 2
OCB-Pole Mount OCB-Pole Mount 1

Procedure

1 Start with a 2+2 HSB SP configuration.

Ceragon Proprietary and Confidential Page 139 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Install an additional pole mount bracket on the pole beneath the existing
pole mount bracket, as described in Pole Mount Preliminary Assembly on
page 31.
3 Disconnect the flexible waveguides from the MAIN port on radio 3.
4 Disconnect the terminations from the EXT port on radio 2 and radio 4.
5 Disassemble OCB 3 with radio 3 and OCB 4 with radio 4 from the old pole
mount bracket.

Ceragon Proprietary and Confidential Page 140 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Mount OCB 3 with radio 3 and OCB 4 with radio 4 on the new pole mount
bracket, as described in Pole Mount Preliminary Assembly on page 31.

7 For the two radios on the rear side, mount a termination plate to the EXT
ports using the screws and washers supplied in the termination kit, as
described in Termination Installation on page 35.

Ceragon Proprietary and Confidential Page 141 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8 For the two new radios on the rear side, mount a short to the DIV ports
using screws and washers supplied in the short kit, as described in Short
Installation on page 34.
9 Mount one new radio to each pole mount bracket, as described in Outdoor
Branching Network (OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 142 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

10 Mount two S-Bends in the top and bottom assemblies; between the EXT
port of radio 2 and the MAIN port of radio 3, as described in Installing S-
Bends and the DCB on page 33.

Ceragon Proprietary and Confidential Page 143 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

11 Connect the loose side of the flexible waveguide with O-ring to the MAIN
port on radio 1 in the bottom assembly, as described in Connecting a
Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 144 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Ceragon Proprietary and Confidential Page 145 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

20.7 Upgrading from 3+3 DP to 4+4 DP

List of Additional Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2

OCB-Sbend Kit OCB-SBend-f 2


1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 2
15HP Short for WRccc Kit 15HP-SHORT-ccc 2
Flexible WG Kit 3200T Flx WG xFT fGHz 1

Ceragon Proprietary and Confidential Page 146 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Procedure

1 Start with a 3+3 DP configuration.

2 On the OCB pole with two OCBs, disconnect the coupler, add two OCBs, and
slide in two radios.

Ceragon Proprietary and Confidential Page 147 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

3 Mount the termination on the fourth OCB, as shown below and as


described in Termination Installation on page 35.

4 Mount the S-Bend to the OCBs, as shown below and as described in


Installing S-Bends and the DCB on page 33.

Ceragon Proprietary and Confidential Page 148 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

5 Mount the coupler to the OCBs, as shown below and as described in


Installing Couplers on page 32.

6 Mount the OCB to the pole mount, as described in Pole Mount Preliminary
Assembly on page 31.
7 Mount a flexible waveguide and O-ring between the MAIN (upper) port of
the OCB and the Coupling port of the coupler using the screws and
washers supplied with the Flexible Waveguide kit, as described in
Connecting a Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 149 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

8 Mount a flexible waveguide and O-ring to the antenna port of the coupler
using the screws and washers supplied with the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 150 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

20.8 Upgrading from 3+3 SD DP to 4+4 SD DP

List of Additional Items per Terminal

Description Marketing Model Quantity

RFU 2Rx 15HP-RFU-f 2


OCB 2Rx with filters 15OCBfx-xxxY-aa-L/H 2
OCB-Sbend Kit OCB-SBend-f 2

1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 2


DCB Diversity Block fxGHz kit DCBfx 2
Flexible WG Kit 3200T Flx WG xFT fGHz 2

Ceragon Proprietary and Confidential Page 151 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Procedure

1 Start with a 3+3 SD DP configuration.

Ceragon Proprietary and Confidential Page 152 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 On the OCB pole with two OCBs, disconnect both couplers, add two OCBs,
and slide in two radios as shown below.

3 Mount S-Bends and DCBs to the OCBs, as shown below and as described in
Installing S-Bends and the DCB on page 33.

Ceragon Proprietary and Confidential Page 153 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Mount a termination to each DCB, as shown below and as described in


Termination Installation on page 35.

5 Mount the coupler to the OCB, as shown below and as described in


Installing Couplers on page 32.

6 Mount the OCB to the pole mount, as described in Pole Mount Preliminary
Assembly on page 31.

Ceragon Proprietary and Confidential Page 154 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

7 Mount a flexible waveguide and O-ring between the MAIN (upper) port of
both OCBs and the coupling port of the upper couplers using the screws
and washers supplied with the Flexible Waveguide kit, as described in
Connecting a Flexible Waveguide on page 42.

8 Mount a flexible waveguide and O-ring to the antenna port of each coupler
using the screws and washers supplied with the Flexible Waveguide kit, as
described in Connecting a Flexible Waveguide on page 42.

Ceragon Proprietary and Confidential Page 155 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

20.9 Upgrading from 3+3 SD SP to 4+4 SD SP

List of Additional Items per Terminal

Description Marketing Model Quantity

RFU 2Rx 15HP-RFU-fx 1


OCB 2Rx with filters 15OCBfx-SD-xxxY-aa-L/H 1
OCB-Sbend OCB-SBend-f 2

Procedure

1 Start with a 3+3 SD SP configuration.

Ceragon Proprietary and Confidential Page 156 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Remove the two shorts from the DCBs.

3 Mount an OCB on each of the hanging profiles, as described in Pole Mount


Preliminary Assembly on page 31.

Ceragon Proprietary and Confidential Page 157 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Tighten the screws between both DCBs and the assembled OCBs.

5 Mount the radio to the OCBs, as described in Outdoor Branching Network


(OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 158 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Attach an S-bend between the new OCB and the one close to it. Do this for
both pole mounts.

7 Mount two terminations to the new OCBs, as described in Termination


Installation on page 35.

Ceragon Proprietary and Confidential Page 159 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

20.10 Upgrading from 3+3 HSB SP to 4+4 HSB SP

List of Additional Items per Terminal

Description Marketing Model Quantity

RFU-HP-1R-f or
RFU 1Rx 2
15HPS-1R-RFU-f
OCB with filters 15OCBfx-xxxY-aa-L/H 2

OCB-Sbend OCB-SBend-f 2
15HP Short for WRccc 15HP-SHORT-ccc 2

Procedure

1 Start with a 3+3 HSB configuration.

Ceragon Proprietary and Confidential Page 160 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Disconnect the terminations from the EXT port on radio 3 in the bottom
and top assemblies.

3 For the two new radios on the rear side, mount terminations to the EXT
ports using screws and washers supplied in the termination kit, as
described in Termination Installation on page 35.
4 For the two new radios on the rear side, mount shorts to the DIV ports
using screws and washers supplied in short kit, as described in Short
Installation on page 34.

Ceragon Proprietary and Confidential Page 161 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

5 Mount one new radio to each pole mount bracket, as described in Outdoor
Branching Network (OBM) Housing Hanging Procedure on page 41.

Ceragon Proprietary and Confidential Page 162 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

6 Mount two S-Bends in the top and bottom assemblies between the EXT
port of radio 3 and the MAIN port of radio 4, as described in Installing S-
Bends and the DCB on page 33.

Ceragon Proprietary and Confidential Page 163 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

Ceragon Proprietary and Confidential Page 164 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

21. All Indoor Horizontal Installation


For minimal rack space usage, the OCB can be installed in a 19” rack (open
rack, frame rack) in a horizontal position.
Note that this installation type and configuration does not require a fan tray.
The All-Indoor horizontal placement is available for the following
configurations:
 1+0
 1+0 East/West
 1+1
 1+1 East/West
The IDU can be installed above or below the RFUs as shown in the following
illustrations.
1+1 SD IP-10

1+0 IP-10

Ceragon Proprietary and Confidential Page 165 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

21.1 1+0 Installation

21.1.1 Parts Used


Picture Item Number Description QTY P/N
JC-0061-
1 Washer Flat for M6 8
0
JA-0150-
2 Screw Pan Head M6 x 16 8
0
JC-0062-
3 Washer Helical Spring for M6 8
0
Screw Socket Head #10-32UNC JA-0192-
4 16
x 7/16" 0
JC-0026-
5 Washer Spring #10 16
0

21.1.2 Assembly
1 Insert the termination gaskets in their places on the OCB 19” Rack Adapter
(MK-3230-0), and fasten the Termination Plates to the Adapter using 16
screws (4 in the table above) and 16 washers (3), as shown in the
following illustration.

Ceragon Proprietary and Confidential Page 166 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Fasten the left bracket to the OCB 19” Rack Adapter (MK-3230-0) using 8
screws (number 2 in the table above) 8 washers (3), and another 8
washers (1), as shown in the following illustration.

3 Repeat step 2 above for the right bracket.

Ceragon Proprietary and Confidential Page 167 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

The following illustrations show the New OCB assembled with the 19” Rack
Adapter.

Ceragon Proprietary and Confidential Page 168 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

21.2 1+0 East-West Installation

21.2.1 Parts Used

Picture Item Number Description QTY P/N


JC-0061-
1 Washer Flat for M6 16
0
JA-0150-
2 Screw Pan Head M6 x 16 16
0
JC-0062-
3 Washer Helical Spring for M6 16
0
Screw Socket Head #10-32UNC JA-0192-
4 32
x 7/16" 0
JC-0026-
5 Washer Spring #10 32
0

21.2.2 Assembly
1 Insert the termination gaskets in their places on the OCB 19” Rack Adapter
(MK-3230-0), and fasten the Termination Plates to the Adapter using 24
screws (4 in the table above) and 24 washers (3), as shown in the
following illustration.

2 Fasten the left bracket to the OCB 19” Rack Adapter (MK-3230-0) using 8
screws (number 2 in the table above) 8 washers (3), and another 8
washers (1), as shown in the following illustration.

Ceragon Proprietary and Confidential Page 169 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

3 Repeat step 2 above for the right bracket.

Ceragon Proprietary and Confidential Page 170 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

The following illustrations show the New OCB assembled with the 19” Rack
Adapter.

Ceragon Proprietary and Confidential Page 171 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

21.3 1+1 HSB (Hot Standby) Installation

21.3.1 Parts Used

Picture Item Number Description QTY P/N


JC-0061-
1 Washer Flat for M6 16
0
JA-0150-
2 Screw Pan Head M6 x 16 16
0
JC-0062-
3 Washer Helical Spring for M6 16
0
Screw Socket Head #10-32UNC JA-0192-
4 32
x 7/16" 0
JC-0026-
5 Washer Spring #10 42
0
Screw Socket Head #10-32UNC JA-0123-
6 10
x 1/2" 0

21.3.2 Assembly
1 Insert the termination gaskets in their places on the OCB 19” Rack Adapter
(MK-3230-0), and fasten the Termination Plates to the Adapter using 24
screws (4 in the table above) and 24 washers (3), as shown in the
following illustration.

Ceragon Proprietary and Confidential Page 172 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

2 Fasten the left bracket to the OCB 19” Rack Adapter (MK-3230-0) using 8
screws (number 2 in the table above) 8 washers (3), and another 8
washers (1), as shown in the following illustration.

3 Repeat step 2 above for the right bracket.

Ceragon Proprietary and Confidential Page 173 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

4 Fasten the HSB Coupler to the New OCB 19” Rack Adapter Main Terminals
using 10 screws (number 4 in the table above), and 10 washers (5), as
shown in the following illustration.

The following illustrations show the New OCB assembled with the 19” Rack
Adapter.

Ceragon Proprietary and Confidential Page 174 of 175


FibeAir® 1500HP/RFU-HP Installation Guide

22. Appendix A: Electrical Diagrams

Ceragon Proprietary and Confidential Page 175 of 175

You might also like