The utilisation of biogas as a money for the client by Ramboll's services
vehicle fuel or in an existing gas establishing a detailed contract What is upgraded biogas In gas application projects Ramboll provides technical support and Why choose Ramboll for grid is an important contribution with an established vendor. We applied for? your biogas distribution advisory services to the client’s project organisation. Our clients are to sustainability as the fuel is prepare tender documents project? Biogas, produced by anaerobic municipalities as well as privately held organisations, and our services renewable and represents covering all aspects of the digestion of biomass, holds include: • Offer full-range services measurable environmental procurement process and benefits. When upgrading the participate in life cycle cost approximately 60-65 % CH4 (by within biogas distribution – biogas to biomethane, the gas evaluations and contract volume) and may be utilised as from feasibility studies and receives the same properties as negotiations. an energy carrier in a large permit applications to variety of applications in its Outline design/feasibility Basic design Detailed design natural gas, and the two are detailed design and • Review of technical and • System design and • Management of the exchangeable. Upgrading biogas Execution and installation untreated form, e.g. in CHP economic requirements layout for gas upgrading procurement process inspections using conventional separation During the execution and plants. It is, however, becoming • Cost estimate facility and gas • Project certification and • Have several senior technology is energy efficient and installation phase we act on more common to upgrade the • EIA and permits distribution system authority approval engineers with over 25 • Preparation of tender • Contract negotiations allows the biogas to meet local or behalf of our client to ensure that biogas by removing mainly CO2 • Budgeting and time documents years of experience of scheduling national quality requirements by project goals and technical and H2O, which results in a biogas removing CO2 as well as water requirements are met. The role product gas that typically • Have considerable and other unwanted compounds includes project management, on- contains 97-98 % CH4 by experience in biogas like H2S. The upgraded biogas site responsibilities, vendor volume. The CH4-enriched gas upgrading solutions, gas (biomethane) may then be used follow-up, as well as (biomethane) may then be used Post construction Test & commissioning Manufacturing & distribution solutions and as a vehicle fuel instead of fossil administrative and strategic as vehicle fuel by compression • Inspections by certified • Participation in construction systems and grid personnel commissioning • Project management fuels like gasoline or diesel. assignments. and distribution to a fuelling implementation • Follow-up on O&M • Performance testing of • Construction system, or for delivery to a gas installations management and • Have been responsible for Ramboll offers a wide range of Commissioning and testing grid where it may be used installation supervision 10 vehicle fuel systems at services within the field of gas Once the installation phase is unmixed or mixed with natural green-field bus depot application from biogas upgrade concluded, Ramboll takes full gas. projects with biogas as plants, gas distribution systems responsibility or participates in primary fuel like bus fuelling depots, and planning and executing distribution to existing or new grid commissioning activities, all systems. according to our client’s needs. Selected project references We test installations and ensure • Bekkelaget Waste Water Treatment Plant, Oslo Municipality, We participate in all phases of a that functionality and project from feasibility studies performance are according to Norway: Consulting services for complete turnkey upgrade plant for and planning to procurement, specified requirements. vehicle fuel. execution and installation. • Depå Fyrislund, Upplands Lokaltrafik AB, Uppsala, Sweden: Project Ramboll even undertakes Inspections management and technical consultancy for turnkey bus depot for responsibilities in the With experienced and certified LBG and CBG fuelling of 80 buses. commissioning and testing phase personnel, Ramboll may take full • Biogas Brålanda, Sweden: Biogas consortium project including AD and plans and performs responsibility for or participate in inspections according to relevant (biogas from manure), upgrade plant, compressor and filling station inspections. legislations and regulations. Our and pipelines. Performance test and final inspections. Project feasibility and competent employees may handle • Avloppsreningsverket Ön, UMEVA AB, Umeå, Sweden: Technical Ramboll's geographical biogas planning the whole process from planning, specifications and tender documents for two gas engines, gas distribution project experience The feasibility study is an overall to execution and reporting. boilers and gas- and heating distribution system at new WWTP. review of the technical and • Sundet Waste Water Treatment Plant, Växjö Municipality, Sweden: economic requirements. We Inspection, according to EGN2011, of a 4 km biogas pipeline, assess plant area requirements, installed partly subsea, connecting a WWTP and industrial facilities. establish overall system design and layout and estimate total project cost (investments, operation and maintenance), life Biogas distribution in cycle cost, and potential project Ramboll income. During this phase we also perform environmental impacts Number of specialists: 20 assessments as well as permit applications in accordance with Annual turnover: €800,000 relevant legislation. CONTACTS Years of experience: 25 Per Nilsson Procurement process Head of Department The main goal of the procurement per.nilsson@ramboll.com process is to ensure value-for- Phone +46 (0) 705954124