You are on page 1of 14

Peak time 17:00 ### 1-Jan 1-May 1-Oct

21:00 30/Sep ### 30-Apr 30-Sep 31-Dec


### 18:00 17:00 18:00
Crusher 23:59:58 Raw Mill 23:59:58
Stop Start Time Reason Stop Start Time
00:00 23:59 23:59 Raw Mill 00:00 23:59 23:59
Reason
Kiln stoppage overhoual
Kiln 23:59:58 Cement Mill 5:55:52
Stop Start Time Reason Stop Start Time
00:00 23:59 23:59 Kiln overhoual 00:00 05:55 05:55
Hide
Reason
Raw Mill Power 0.0 Crusher Peak 4.0
Shift Leader Date: CM Power 0.0 Raw Mill Peak 4.0
Ahmed Gad Sat, Jul 11, 2020 Coal Power 0.0 Kiln Peak 4.0
Cement Mill Peak 0.0 Gypsum % Ton
Crusher Daily Raw Mill Daily Kiln Daily Cement Mill Daily ypsum Cr. Peak 3.1 Gyp. Dyhydride 50% 158.7
Running Hours 0.00 Running Hours 0.00 Running Hours 0 Running Hours 18 Coal Peak 4.0 Gyp. Anhydride 50% 158.7
Mix 0.00 Production 0 Production Production 4,908 Gyp. Anhydride Reject 0.0
HG 0.00 Consumption Clinker to OY 0 Consumption 0.0
Production 0 Mix Number of trucks Clinker 4,296.19 Num trucks
Mix 0 0 H.G limestone Consumption WNCC Pile 0 Griding_Aid R/h Factor cons. unit
HG 0.00 0 sand Feed Off silo to FD500 0 GA Nivakem 17.2 2.0 2,063.0 lit/m
Stock Pile L/S iron Ore Gas 0 Local Pile 0 GA Mapie 0.0 lit/m
Pile 1, filled % Hot gas-oil feed 0 Pressure (bar) Gypsum 317.44 GA Aquatrust 0.0 lit/m
Pile 2 Stacked Full Meter Hot gas-gas feed 0 0 Calciner 0 ADD. 293.96 R/H Factor 0.0 lit/m
Pile 3 Reclaimer Remain/M Stock Tons Main Burner 0 HGG 5,783 21.29 1
CF Silo 42.00 Diesel 0 Griding_Aid 2,063 17.19 Reducer_Powder R/h Factor cons. unit
Dispatch Daily Calciner 0 Reducer_Powder 0 0.00 CR Powder 2.0 0.0 lit/m
Packer 1 Received Material Ton lit/Qy Main Burner 0 Reducer_liquid 0 0.00 CR Powder Trial 0.0 lit/m
Running Hrs 19.23 Exclay Coal 0 Stock % Tons 0.0 lit/m
Production WNCC Clay Calciner Silo 1 42.00 6,300 0.0 lit/m
Bags Break Sand Main Burner Silo 2 42.88 6,432
Company Suez Iron Ore Stock Tons HGG Level 0.00 Reducer_liquid R/h Factor cons. unit
Brand Gyp. Dyhydride Dome 69.58 CR Liquid 2.0 0.0 lit/m
Packer 2 Gyp. Anhydride OFF silo 15.82 CR Liquid Trial 0.0 lit/m
Running Hrs 16.94 Gyp. Anhydride Reject Silo 1 Silo 2 0.0 lit/m
Production Diesel to Main Tank Solar from Radar 1,474,746 point 1 0.0 lit/m
Bags Break Diesel to RHI point 2
Company Egypt Diesel to FLS Points Dome point 3
Brand Diesel to WNCC Center Below point 4
Packer 3 Diesel to HGG Cement Below Total
Running Hrs 15.31 Diesel to Water Station Center Upper
Production Bypass Cement Upper Coal Daily
Bags Break Ex. Local Clinker Total Dome Measure Running Hours 0
Company NPP Water Production 0 Another coal cons.
Brand Griding_Aid 0 0 Water Meas. Consumption Shipment hrs Shipment
Bulk 1 GA Nivakem Main Raw Coal
Running Hrs 5.60 GA Mapie Cooler 4.53 Pet Coke
Production GA Aquatrust Total 2,787
Bulk 2 CR Powder
Running Hrs 8.62 CR Powder Trial
Production CR Liquid m3/h
Total Dispatch, Required 0.00 CR Liquid Trial Main Water tank totalizer 3.5
Total Breaks Bags 0.00 Bags Brand 0
Dispatch, Num. of trucks Suez Reject Material
Total Bags Dispatch, Required 0 Egypt Sack Num of trucks
El-Masry Bags, Required NPP tonnage 0
Wadi El-Nile Bags, Required 0 SUV
Total Bags Dispatch, Actual Coal 0 0
Bulk, Num. of trucks Shipment 22
Total Bulk, Actual 0 Shipment 22
Total Bulk, Required
Emission more than 50mg/nm³
main EP 0:00:00 Cement
Start Stop Duration Reason Start
8:03:24
12:04:33
16:05:39
20:06:45
0:08:54 cooler EP 0:00:00
Stop Duration Reason Start Stop Duration
8:05:36 0:02:11
12:06:48 0:02:15
16:07:54 0:02:15
20:08:57 0:02:11
Reason
Date 11 July 2020

In Time
Point Code Description
00:00
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Forced Signal Register

Out time
Duration
00:00
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Forced Signal Register

Reason for Force the signal