Professional Documents
Culture Documents
II. Written warning with attestation from the violator that he has violated this policy and he will not be
repeating such violation
III. Written report and fine of P1500 per violation. (This will be deducted from your salary)
Works that impose high risk to the company will need safe work permit before proceeding.
CBTI Daily Operation: 5am to 2pm
1) Truck loading starts at 5am daily.
Safety Checklist before loading:
a) Switch off engine
b) Put emergency stop sign in front of the Truck
c) Hand brake on
d) Wheels choke in place
e) Ground the Truck
f) Close all compartment’s gate valves
g) Close emergency shut off valves
h) Isolation Switch off
Note: No cellphone, no lighter or any source of iginition allowed. Violators will be penalized.
2) Closing of gate valves of each Tanks After Truck loading
3) Shipment Receiving usually ones or twice a month or sometimes of thrice.
Things not to do during unloading of products from Vessel:
1) No withdrawal of products (unless need to have flushing).
2) Withdrawal of products will be 12 hours after discharged.
3) No Hot works in the Site.
Prepared by:
RAMON IAN D. CARLOS, PE
Project Engineer/PCO
Calaca Bay Terminal Inc.
Noted by:
LORENZO LLEVA JR.
Terminal Supervisor
Calaca Bay Terminal Inc.