Line From Len Total Design Total Sewer Sewer flow Grade Fall Pipe Velo Capac
no MH gth Leng Popula tri- Flow Of Of dia- -city ity
to Of th -tion butary Rate sewer sewer met- Flow Flowi
MH line Of populat l/d 𝑚3 /𝑠 er -ing ng
line ion lpcd mm
m m/s 𝑚3 /𝑠
m
1-2 115 1443 1443 120 173160 0.002 0.003 0.345 150 0.6 0.0106
1 225
2-3 110 1693 3136 75 300135 0.003 0.003 0.33 150 0.6 0.0106
2 3-4 60 60 1484 4620 120 478215 0.005 0.003 0.18 150 0.6 0.0106
4-5 120 1653 6273 120 676575 0.008 0.003 0.36 150 0.6 0.0106
3 5-6 60 300 2344 8617 120 957855 0.011 0.003 0.18 166 0.6 0.013
6-7 120 3380 11997 120 1363455 0.016 0.003 0.36 191 0.6 0.017
PAGE 2
Specification:
I. Sewage generation rate = 120 lpcd (for district town
Pabna)
II. Minimum permissible diameter of sewer = 6”(in
many case we can use 8”)
III. Minimum design flow velocity = 0.6 m/s
IV. Maximum flow velocity = 3-3.5 m/s
V. Design period = 25 years
VI. Annual growth rate of population = 5%
VII. Mannings roughness co-efficient = 0.013
VIII. Grade of sewer = 0.003
IX. Manholes are to be placed at intersecton, changes
of grade or slope and an interval non exceeding
120m
X. Minimum cover about the vertical of the sewer
line = 2m
XI. No of apartments, buildings and families are =6,
29 and 42
XII. Person per apartment = 100
XIII. Person per storey = 12
XIV. Person per family = 6
PAGE 3
XV. Population in school =250
XVI. Population in shopping complex = 300
XVII. Population in park = 200
Calculation:
1. For line 1( total length =225m)
From M1 to M2( length 115 m)
Covered A-1 and A-2
Design population 𝑝𝑓 = 𝑝(1 + 𝑟)𝑛
=426(1 + 0.05)25
=1443
From mannings formula,
2
1
1 𝑑 3
𝑉= ∗ ( ) ∗𝑠 2
𝑛 4
2
𝜋𝑑 2 1 𝑑 3
We know, Q= AV = ∗ ∗ ( ) ∗ 𝑠1/2
4 𝑛 4
1
𝜋 1 1
= ∗ ∗ 2 ∗ (0.003) ∗ 𝑑 8/3
2
4 0.013
43
=1.31321 ∗ 𝑑 8/3
PAGE 4
So, d=0.90208 ∗ 𝑄3/8 -------------- (1)
From chart, Q= 0.002 𝑚3 /𝑠
So, d = 0.088 m = 88 mm
But minimum pipe diameter =150 mm
So required pipe diameter = 150 mm
2
1
Velocity of flowing, 𝑉 = 𝑛 ∗ 𝑅 ∗ 𝑆 1/2
3
2
1 𝑑 3
=0.013 ∗ (4) ∗ (0.003)1/2
= 1.67203 ∗ 𝑑 2/3 -------- (2)
150 2/3
So, 𝑉 = 1.67203 ∗ (1000) = 0.47 m/s
But minimum velocity= 0.6 m/s
Now capacity of flowing Q = AV
𝜋𝑑2 0.152
= ∗ 0.6 = 𝜋 ∗ ∗ 0.6
4 4
= 0.0106 𝑚3 /𝑠
Which is greater than 0.002 𝑚3 /𝑠 .
Hence design is ok.
= 500(1 + 0.05)25
PAGE 5
= 1693
From mannings formula,
2
1
1 𝑑 3
𝑉 = ∗( ) ∗𝑠 2
𝑛 4
2
𝜋𝑑 2 1 𝑑 3
We know, Q= AV = ∗ ∗ ( ) ∗ 𝑠1/2
4 𝑛 4
1
𝜋 1 1
= ∗ ∗ 2 ∗ (0.003) ∗ 𝑑 8/3 2
4 0.013
43
=1.31321 ∗ 𝑑 8/3
So, d=0.90208 ∗ 𝑄3/8
From chart, Q= 0.003 𝑚3 /𝑠
So, d = 0.102 m = 102 mm
But minimum pipe diameter =150 mm
So required pipe diameter = 150 mm
From equiation 2,
V= 1.67203 ∗ 𝑑 2/3
=1.67203 ∗ 0.1022/3
= 0.37 m/s
PAGE 6
= 0.0106 𝑚3 /𝑠
Which is greater than 0.003 𝑚3 /𝑠 .
Hence design is ok.
= 438(1 + 0.05)25
= 1484
From mannings formula,
2
1
1 𝑑 3
𝑉 = ∗( ) ∗𝑠 2
𝑛 4
2
𝜋𝑑 2 1 𝑑 3
We know, Q= AV = ∗ ∗ ( ) ∗ 𝑠1/2
4 𝑛 4
1
𝜋 1 1
= ∗ ∗ 2 ∗ (0.003) ∗ 𝑑 8/3 2
4 0.013
43
=1.31321 ∗ 𝑑 8/3
So, d=0.90208 ∗ 𝑄3/8
PAGE 7
From chart, Q= 0.005 𝑚3 /𝑠
So, d = 0.124 m = 124 mm
But minimum pipe diameter =150 mm
So required pipe diameter = 150 mm
From equiation 2,
V= 1.67203 ∗ 𝑑 2/3
=1.67203 ∗ 0.1242/3
= 0.42 m/s
PAGE 8
= 488(1 + 0.05)25
= 1653
From mannings formula,
2
1
1 𝑑 3
𝑉 = ∗( ) ∗𝑠 2
𝑛 4
2
𝜋𝑑 2 1 𝑑 3
We know, Q= AV = ∗ ∗ ( ) ∗ 𝑠1/2
4 𝑛 4
1
𝜋 1 1
= ∗ ∗ 2 ∗ (0.003) ∗ 𝑑 8/3
2
4 0.013
43
=1.31321 ∗ 𝑑 8/3
So, d=0.90208 ∗ 𝑄3/8
From chart, Q= 0.008 𝑚3 /𝑠
So, d = 0.148 m = 148 mm
But minimum pipe diameter =150 mm
So required pipe diameter = 150 mm
From equiation 2,
V= 1.67203 ∗ 𝑑 2/3
=1.67203 ∗ 0.1482/3
= 0.47 m/s
PAGE 9
𝜋𝑑2 0.152
= ∗ 0.6 = 𝜋 ∗ ∗ 0.6
4 4
= 0.0106 𝑚3 /𝑠
Which is greater than 0.008 𝑚3 /𝑠 .
Hence design is ok.
= 692(1 + 0.05)25
= 2344
From mannings formula,
2
1
1 𝑑 3
𝑉 = ∗( ) ∗𝑠 2
𝑛 4
2
𝜋𝑑 2 1 𝑑 3
We know, Q= AV = ∗ ∗ ( ) ∗ 𝑠1/2
4 𝑛 4
1
𝜋 1 1
= ∗ ∗ 2 ∗ (0.003) ∗ 𝑑 8/3 2
4 0.013
43
=1.31321 ∗ 𝑑 8/3
PAGE 10
So, d=0.90208 ∗ 𝑄3/8
From chart, Q= 0.011 𝑚3 /𝑠
So, d = 0.166 m = 166 mm
But minimum pipe diameter =150 mm
So required pipe diameter = 166 mm
From equiation 2,
V= 1.67203 ∗ 𝑑 2/3
=1.67203 ∗ 0.1662/3
= 0.5 m/s
= 998(1 + 0.05)25
PAGE 11
= 3380
From mannings formula,
2
1
1 𝑑 3
𝑉 = ∗( ) ∗𝑠 2
𝑛 4
2
𝜋𝑑 2 1 𝑑 3
We know, Q= AV = ∗ ∗ ( ) ∗ 𝑠1/2
4 𝑛 4
1
𝜋 1 1
= ∗ ∗ 2 ∗ (0.003) ∗ 𝑑 8/3 2
4 0.013
43
=1.31321 ∗ 𝑑 8/3
So, d=0.90208 ∗ 𝑄3/8
From chart, Q= 0.016 𝑚3 /𝑠
So, d = 0.191 m = 191 mm
But minimum pipe diameter =150 mm
So required pipe diameter = 191 mm
From equiation 2,
V= 1.67203 ∗ 𝑑 2/3
=1.67203 ∗ 0.1912/3
= 0.54 m/s
PAGE 12
= 0.017 𝑚3 /𝑠
Which is greater than 0.016 𝑚3 /𝑠 .
Hence design is ok.