A. Concrete batching Plant (25 cumec/hour) = Tk. 5,200,000.00
B. Generator (85 kVa) = Tk. 1,400,000.00 C. Wheel Loader = Tk. 2,700,000.00 D. Pump with Pipe and Accessories = Tk. 4,300,000.00 E. Silo (Free of Cost by Cement Company) = Tk. 0.00 Tk. 13,600,000.00 Considering Period of 10 years, Tk. 2,400,000.00 Maintenance cost for 10 years = Total Tk. 16,000,000.00
Resale Value after 10 years (30% of total cost) Tk. 4,800,000.00
Net Cost= Tk. 11,200,000.00
If the machine uses 50,000 cft concrete per year, then