ALTERNATIVE SOURCE FOR GAS SUPPLY TO INDORAMA PROJECT

INSTRUMENT TUBING SCHEDULE

Approved for SYL


EX-DE 03 8/8/2017 K.A.D E.B A.I
Construction

EX-DE 02 19/7/2017 Issued for Approval K.A.D E.B A.I SYL

EX-DE 01 12/7/2017 Issued for Approval K.A.D E.B A.I SYL

EX-DE 00 16/6/2017 Issued for Review K.A.D E.B A.I SYL

Validation Prepared Checked Approved Contractor Company


Rev. Date Description
Status by by by Approval Approval

Company logo and business name Project name Company identification

ALTERNATIVE SOURCE
FOR GAS SUPPLY TO 3202.31.DIES.24018
INDORAMA PROJECT

Contractor logo and business name Contractor Number


05048M-CTE-MOR-08-SCH-000002

Vendor logo and business name Vendor Identification

Facility Name Location Scale Sheet of Sheets

OBIAFU / OBRIKOM GAS PLANT LAND n.a. 1 OF 5


Document Title Supersedes N.
Superseded by N.
Instrument Tubing Schedule Plant Area Plant Unit

Projects Development, Engineering Division


This document is CONFIDENTIAL and the sole property of the Company. It shall neither be shown to third parties nor used for other purposes than those for which it has been issued/sent. Any unauthorized attempt to
reproduce it, in any form, is strictly prohibited.
Company Identification Contractor Identification Rev. index. Rev. No. Sheet of Sheets
Validity Status
3202.31.DIES.24018 03 2 OF 5
EX-DE
Projects Development, Engineering Division

REVISION RECORD

03 8-Aug-17 Approved for Construction Fourth Issue


02 17-Jul-17 Issued for Approval Third Issue
01 12-Jul-17 Issued for Approval Second Issue
00 16-Jun-17 Issued for Review First Issue
Rev. Date Reason for Revision Short Description of Changes

This document is CONFIDENTIAL and the sole property of the Company. It shall neither be shown to third parties nor used for other purposes than those for which it has been issued/sent. Any
unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Date Doc. No. Page

8/8/2017 3202.31.DIES.24018 3 of 5

Instrument Tubing Schedule


INDEX
SHEET REVISION DESCRIPTION
1 00 01 02 03 Cover Sheet
2 00 01 02 03 Revision Sheet
3 00 01 02 03 Index
4 00 01 02 03 General Notes
5 00 01 02 03 Instrument Tubing Schedule

Notes:

This document is property of eni Turkmenistan Ltd. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Date Doc. No. Page

8/8/2017 3202.31.DIES.24018 4 of 5

GENERAL NOTES:
1. ALL INSTRUMENTS SHALL COMPLY WITH THE FOLLOWING MINIMUM SPECIFICATIONS. ANY DEVIATIONS FROM THESE STANDARDS
SHALL BE CLEARLY IDENTIFIED IN THE VENDOR'S QUOTATION:
3202.31.DIST.24070 TECHNICAL SPECIFICATION FOR PRESSURE TRANSMITTERS
3202.31.DISG.24061 General Specification for Instrument Installation
20047.VAR.STA.SDS REQUIREMENTS FOR THE INSTALLATION OF INSTRUMENTATION
20048.VAR.STA.SDS INSTRUMENTATION PHILOSOPHY
08953 CMP.STA.STD SIGNAL TRANSDUCERS
15801.PIP.MEC.SDS MANUAL VALVES
06732.PIP.MEC.SDS PIPING CLASSES

2. ALL INSTRUMENTS SHALL BE TROPICALISED.


3. FOR ALL INSTRUMENTS, TAG Nos. SHALL BE PREFIXED WITH THE UNIT No. (e.g. 2570 -SDV-102).
ALL TAG NUMBERS SHALL BE IDENTIFIED AND CONFIRMED BEFORE MANUFACTURING.
4. ALL INSTRUMENTS AND DEVICES SHALL BE SUPPLIED WITH STAINLESS STEEL DATA PLATES WHICH SHALL BE AFFIXED TO THE
BODY OF THE DEVICE BY RIVETS OR SCREWS. THE PLATE SHALL CONTAIN AS A MINIMUM THE FOLLOWING INFORMATION: -
TAG NUMBER.
MANUFACTURER'S NAME AND CONTACT DETAILS
SERIAL & MODEL NUMBER
RANGE & CALIBRATION DETAILS
HAZARDOUS CERTIFICATION DETAILS
DEGREE OF PROTECTION

5. PAINTING AND COATING SHALL BE IN ACCORDANCE WITH COMPANY STANDARD 20000.VAR.PAI.FUN.

6. CONTRACTOR TO VERIFY ALL PROCESS DATA BEFORE SUPPLY OF INSTRUMENTS.


7. VENDOR SHALL PROVIDE MATERIAL TEST REPORT FOR ALL PRESSURE RETAINING PARTS, AS REQUIRED BY EN 10204 -3.1.B.
8. ABBREVIATIONS:
MFR - MANUFACTURER
N/A - NOT APPLICABLE
TBA - TO BE ADVISED
TBC - TO BE CONFIRMED
VTA - VENDOR TO ADVISE
TP - TIE-IN POINT
L - LOCAL

Eni S.p.A
ALTERNATIVE
SOURCE FOR
GAS SUPPLY TO
INDORAMA 3202.31.DIG
PROJECT A.24468

LAND

This document is property of eni Turkmenistan Ltd. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
INSTRUMENT TUBING SCHEDULE

ALTERNATIVE SOURCE FOR GAS SUPPLY TO INDORAMA PROJECT

UNIT : 2570 UNIT DESCRIPTION : SALES GAS DELIVERY MANIFOLD

Document Type: SCH Discipline: INS Rev Date: 8/8/2017 Page 5 of 5

Rev TUBING LENGTH


S/N TUBING TAG NO (Note-2) TUBING DESCRIPTION FROM TO TUBING SWAGELOK CODE TUBING DIMENSION TUBING MATERIAL REFERENCE DRAWING LOCATION REMARKS
No. (ESTIMATE)

1 00 2570TB-PT-002A Seamless Drawn Tubing PT - 002A Pipe (Isolation Valve) SS-T8-S-065 1/2'' OD x 0.065 24 Metres SS 316L 3202.31.DIFE.24026 HG-2570-030-12"-D52-V

2 00 2570TB-PT-002B Seamless Drawn Tubing PT - 002B Pipe (Isolation Valve) SS-T8-S-065 1/2'' OD x 0.065 24 Metres SS 316L 3202.31.DIFE.24026 HG-2570-030-12"-D52-V

3 00 2570TB-PT-101 Seamless Drawn Tubing PT - 101 Pipe (Isolation Valve) SS-T8-S-065 1/2'' OD x 0.065 24 Metres SS 316L 3202.31.DIFE.24026 HG-2570-027-12"-D52-V

4 00 2570TB-PY-002A Seamless Drawn Tubing PY -002A Instrument Air Manifold (Isolation Valve) SS-T8-S-049 1/2'' OD x 0.049 24 Metres SS 316L 3202.31.DIFE.24026 HG-2570-028-12"-D52-V

5 00 2570TB-PY-002B Seamless Drawn Tubing PY -002B Instrument Air Manifold (Isolation Valve) SS-T8-S-049 1/2'' OD x 0.049 24 Metres SS 316L 3202.31.DIFE.24026 HG-2570-029-12"-D52-V

6 00 2570TB-ESDV-002A Seamless Drawn Tubing ESDV -002A Instrument Air Manifold (Isolation Valve) SS-T8-S-049 1/2'' OD x 0.049 22 Metres SS 316L 3202.31.DIFE.24026 HG-2570-030-12"-D52-V

7 00 2570TB-ESDV-002B Seamless Drawn Tubing ESDV -002B Instrument Air Manifold (Isolation Valve) SS-T8-S-049 1/2'' OD x 0.049 22 Metres SS 316L 3202.31.DIFE.24026 HG-2570-030-12"-D52-V

8 00 2570TB-PSHH-101A Seamless Drawn Tubing PSHH - 101A Pipe (Isolation Valve) SS-T8-S-065 1/2'' OD x 0.065 12 Metres SS 316L 3202.31.DIFE.24026 HG-2570-030-12"-D52-V

9 00 2570TB-PSHH-101B Seamless Drawn Tubing PSHH - 101B Pipe (Isolation Valve) SS-T8-S-065 1/2'' OD x 0.065 12 Metres SS 316L 3202.31.DIFE.24026 HG-2570-030-12"-D52-V

10 00 2570TB-PSHH-102A Seamless Drawn Tubing PSHH - 102A Pipe (Isolation Valve) SS-T8-S-065 1/2'' OD x 0.065 12 Metres SS 316L 3202.31.DIFE.24026 HG-2570-030-12"-D52-V

11 00 2570TB-PSHH-102B Seamless Drawn Tubing PSHH - 102B Pipe (Isolation Valve) SS-T8-S-065 1/2'' OD x 0.065 12 Metres SS 316L 3202.31.DIFE.24026 HG-2570-030-12"-D52-V

NOTES:
1. The Tubing Length in this Schedule is based on the Estimated Length and not the exact Length.
2. The Tubing Tag Number in this Schedule follows the sequence shown below:
A B - C D
2570 TB - PT 101
A=2570 (Unit Code)
B=TB (Tubing)
C=PT (Instrument / Equipment Identification)
D= 101 (System Numbering)
3. Instruments Process Hook-up Details: (3202.31.DIFE.24026)