You are on page 1of 4
PLUMBING DRAWING CHECK LIST JOB NAME, JOB NO. DATE, ENGINEER, 1. North arrow on all plans; company name on all plans. eee ee 2. Contact and send two (2) site plans with loads to Utility Company... 2 ee eee ees 2. Colum numbers, room names and numbers on ii ph enantio ene te reeeeo aia tieteecteatfaetetinearisteecteitsiacib 4. Floor elevations on all floors of riser diagram or on floor plans if no risers... ++ +e eee ee 5. General notes, legend and symbols... +--+ eee ee 6. Show fixture units on all waste and vent stacks and water risers and mainlines... ee tt eee 7. completeness of titles and title block... +. +++ 8. Reference notes between plans, details, risers, Architectural, Structural, Electrical, ete. - eee eee tee 9. Indicate elevation and house drain leaving building and elevation of curb and property line where waste crosses, check if lowest gravity line is below curb property line to see if backwater valve is required {only on these fixtures actually below floor sinks/ floor drains, etc.) eee ee ee eee 10. Indicate hose bibbs, etc. around building; landscape watering, stubbed tees, shut-off valves, frost-proof, if required... - +e eee eres 21, Check against other trades for clearances etc. particularly structural... ee ee eee 12. Provide expansion loops, bends, breaks, anchors, etc. in horizontal, vertical and branches se ee ee ees 13. Check electrical for our pickups, include fire protection systems (fire sprinkler alarm) connection to building fire alarm system, etc. - also for emergency generator requirements (fuel oil, tanks, pumps, vents. ete.) see ee ee ee tt eee 14. 15. 16. 17. 18. 19. 20. a1. 22. 23. 24. 25. 26. 27. 28. 29. 30. a. 32. 33. 34. Send Architect plumbing and fire protection cuts... . . + Sectional shut-off valves, access panels, for hot and cold water and gas, air steams... ee ee ee ee Water softeners with bypass-softener back-wash, verify capacity of drain. 22... ee ee ee ee Housekeeping pads under all floor mounted equipment... . - Protection against freezing, wet standpipe, valved outlets, stop and drain valve to roof, exposed pipes against exterior walls, in attic spaces, hose bibbs, dry barrel fire hydrants, etc... -.- ++ - eee Combustion air for gas fired equipment; water heater, fboULona ft ees tes alsarte ce fetiatee rector ne tareerees tea ae tee Make-up water for all air conditioning systems, hot, chilled, boilers, product, refrigeration, condensers, cooling towers and after coolers... +++ eee tee Send coordination drawings to: Electrical Eng. dated tistee teeta Send coordination drawings to: Architect's Office dated eres Send coordination drawings to: Structural Eng. dated Ree eerie Reduced pressure device with hose bibb at sewage ejector with double check back-flow preventor at meter (check with water Dept. on type)... +. 22 ee Coordinate with food preparation equipment... 2+. 5 Acid waste system (acid vents? acid floor sinks? acid floor cleanouts?) ..- +. +e ee eee eee Cold water make-up to heating hot water boilers - sufficient pressure to overcome static head?» . 1... . Adequate drinking fountains? ..--- 2-7 ee eee Adequate hose bib coverage? .- +--+ e+e eee eee Adequate wet standpipes (fire hose cabinet), dry standpipes, coverage? . 2s ee eet te tee Cooling tower - evaporative condenser bleed and overflow to sanitary storm? catch basin?» - 1. 2-1 ee Floor drains/oil interceptor catch basin (garage)... - «+ Condensate drainage from fan coil mits... ...+-.-- Thrust block table... ee ee 35. 36. 31. 38. 39. 40. 41. 42. 43. 44. 45. 4s. 47. Number of fixtures required by code... ee ee es Fire extinguishers 75! travel distance. Type ABC Boiler Rooms... ee ee eee Fusible links on combusion air and not permitted Ber daraneeet eae eee te rece eter petra neneeneesg tC eet prscdststerct Sump pumps in elevators... ee ee ee es Comon trench detail, general note coordinate with all trades 6. ee ee ee ees Gas meter with regulator on supply side of gas meter (7" water colum) -. eee eee ee ee ee Circulation pump on time clock. -- 2-2-2 +02 ee Backflow reduce pressure on double check... 1... Sprinkler riser with flow switch, alarm bell, ‘tamper witch on isolation valves in line with service, test station... ee eee ee ee eee Provide electrical with information on control connections to item on fire system. +... eee eee Medical gas systems are per NFPA S6F. Locate isolation valves, pressure senser and alarm panels Check on expansion joints... -- eee ee ee ee rap primers on floor drain where required... 2.2... = } PLUMBING CHECKLIST FIXTURE SCHEDULE SYMBOLS & ABBREVIATIONS GENERAL NOTES TITLE BLOCK & DATE LIST & FEHR DECAL WATER HEATER REQ'TS. FOR CIRCULATING Loop IROOM NANES PLAN TITLES Prpe stzes ISITE PLAN ATER AS (ASTE LEAN-OUTS ENTS OSE BIBBS INSULATION P.G. & E. NOTIFIED ATER COMPANY NOTIFIED ITY OR COUNTY PUBLIC WORKS NOTIFIED LEC. REQ'TS. TO ELEC. DEPT. EVIEW FOR NOISE TRANSMISSION IPING DIAGRAM ‘OUNDATION DRAINAGE REA DRAINAGE OOF DRAINAGE “BAMITARY SEWER INV. EL, ANDSCAPE IRRIGATION EALING PIPE PENETRATIONS WATERTIGHT UFFICIENT WATER PRESSURE EWAGE DISPOSAL METHOD NER FURNISHED EQUIPMENT QUIP. FURNISHED UNDER OTHER SECTIONS AINTING & FINISH REQ.'TS RITTEN SPECIFICATION ELECT PUMPS SAFETY. HAZARDS ICCESS TO CONTROLS & EQUIPMENT JOB NO. 1ATE SPECIAL SYSTEMS (AIR, VACUUM, N20, Oo) VENT HIGH POINTS, DRAIN LOW POINTS FIRE PROTECTION DRINKING FOUNTAINS FLASING TO MAKE WATER TIGHT MIN. 30" COVER OVER PIPES AT PAVING SUFFICIENT SHUT OFF VALVES TO ISOLATE SYSTEMS DRAINAGE OF ALL PTS. BELOW GRADE NORTH ARROW SCALE OF PLANS AND DETAILS UTILITY METERS S.0.V. TO BUILDING SHOCK ABSORBERS = ALL SOLANOID VALVES (DISHWASHERS, ETC.) TRAP PRIMERS PRESSURE REDUCING VALVE TO BUILDING WASHING MACHINE DETAIL PRESSURE RELIEF ON ALL PRESSURE VESSELS ALL TYPE WATER HEATERS - ALLOW PATH FOR STEAMING RESTEICTED WORK TIMES, : SHUTDOWN Me Phe SxSnNG SYSTEMS. | OPERATING £ MAITAINA WCE WereRucrions: | Peeeze PRCTECTION ) Tirte 24

You might also like