PLUMBING DRAWING CHECK LIST
JOB NAME, JOB NO.
DATE, ENGINEER,
1. North arrow on all plans; company name on
all plans. eee ee
2. Contact and send two (2) site plans
with loads to Utility Company... 2 ee eee ees
2. Colum numbers, room names and numbers on
ii ph enantio ene te reeeeo aia tieteecteatfaetetinearisteecteitsiacib
4. Floor elevations on all floors of riser
diagram or on floor plans if no risers... ++ +e eee ee
5. General notes, legend and symbols... +--+ eee ee
6. Show fixture units on all waste and
vent stacks and water risers and
mainlines... ee tt eee
7. completeness of titles and title block... +. +++
8. Reference notes between plans, details,
risers, Architectural, Structural,
Electrical, ete. - eee eee tee
9. Indicate elevation and house drain leaving building
and elevation of curb and property line where waste
crosses, check if lowest gravity line is below curb
property line to see if backwater valve is required
{only on these fixtures actually below floor sinks/
floor drains, etc.) eee ee ee eee
10. Indicate hose bibbs, etc. around building;
landscape watering, stubbed tees, shut-off
valves, frost-proof, if required... - +e eee eres
21, Check against other trades for clearances
etc. particularly structural... ee ee eee
12. Provide expansion loops, bends, breaks,
anchors, etc. in horizontal, vertical and
branches se ee ee ees
13. Check electrical for our pickups, include fire
protection systems (fire sprinkler alarm) connection
to building fire alarm system, etc. - also for
emergency generator requirements (fuel oil, tanks,
pumps, vents. ete.) see ee ee ee tt eee14.
15.
16.
17.
18.
19.
20.
a1.
22.
23.
24.
25.
26.
27.
28.
29.
30.
a.
32.
33.
34.
Send Architect plumbing and fire protection cuts... . . +
Sectional shut-off valves, access panels, for hot
and cold water and gas, air steams... ee ee ee ee
Water softeners with bypass-softener back-wash,
verify capacity of drain. 22... ee ee ee ee
Housekeeping pads under all floor mounted equipment... . -
Protection against freezing, wet standpipe, valved
outlets, stop and drain valve to roof, exposed
pipes against exterior walls, in attic spaces, hose
bibbs, dry barrel fire hydrants, etc... -.- ++ - eee
Combustion air for gas fired equipment; water heater,
fboULona ft ees tes alsarte ce fetiatee rector ne tareerees tea ae tee
Make-up water for all air conditioning systems, hot,
chilled, boilers, product, refrigeration, condensers,
cooling towers and after coolers... +++ eee tee
Send coordination drawings to:
Electrical Eng. dated tistee teeta
Send coordination drawings to:
Architect's Office dated eres
Send coordination drawings to:
Structural Eng. dated Ree eerie
Reduced pressure device with hose bibb at sewage
ejector with double check back-flow preventor
at meter (check with water Dept. on type)... +. 22 ee
Coordinate with food preparation equipment... 2+. 5
Acid waste system (acid vents? acid floor
sinks? acid floor cleanouts?) ..- +. +e ee eee eee
Cold water make-up to heating hot water boilers -
sufficient pressure to overcome static head?» . 1... .
Adequate drinking fountains? ..--- 2-7 ee eee
Adequate hose bib coverage? .- +--+ e+e eee eee
Adequate wet standpipes (fire hose cabinet), dry
standpipes, coverage? . 2s ee eet te tee
Cooling tower - evaporative condenser bleed and
overflow to sanitary storm? catch basin?» - 1. 2-1 ee
Floor drains/oil interceptor catch basin (garage)... - «+
Condensate drainage from fan coil mits... ...+-.--
Thrust block table... ee ee35.
36.
31.
38.
39.
40.
41.
42.
43.
44.
45.
4s.
47.
Number of fixtures required by code... ee ee es
Fire extinguishers 75! travel distance. Type ABC
Boiler Rooms... ee ee eee
Fusible links on combusion air and not permitted
Ber daraneeet eae eee te rece eter petra neneeneesg tC eet prscdststerct
Sump pumps in elevators... ee ee ee es
Comon trench detail, general note coordinate
with all trades 6. ee ee ee ees
Gas meter with regulator on supply side of gas
meter (7" water colum) -. eee eee ee ee ee
Circulation pump on time clock. -- 2-2-2 +02 ee
Backflow reduce pressure on double check... 1...
Sprinkler riser with flow switch, alarm bell,
‘tamper witch on isolation valves in line with
service, test station... ee eee ee ee eee
Provide electrical with information on control
connections to item on fire system. +... eee eee
Medical gas systems are per NFPA S6F. Locate
isolation valves, pressure senser and alarm panels
Check on expansion joints... -- eee ee ee ee
rap primers on floor drain where required... 2.2...= }
PLUMBING CHECKLIST
FIXTURE SCHEDULE
SYMBOLS & ABBREVIATIONS
GENERAL NOTES
TITLE BLOCK & DATE
LIST & FEHR DECAL
WATER HEATER REQ'TS. FOR CIRCULATING
Loop
IROOM NANES
PLAN TITLES
Prpe stzes
ISITE PLAN
ATER
AS
(ASTE
LEAN-OUTS
ENTS
OSE BIBBS
INSULATION
P.G. & E. NOTIFIED
ATER COMPANY NOTIFIED
ITY OR COUNTY PUBLIC WORKS NOTIFIED
LEC. REQ'TS. TO ELEC. DEPT.
EVIEW FOR NOISE TRANSMISSION
IPING DIAGRAM
‘OUNDATION DRAINAGE
REA DRAINAGE
OOF DRAINAGE
“BAMITARY SEWER INV. EL,
ANDSCAPE IRRIGATION
EALING PIPE PENETRATIONS WATERTIGHT
UFFICIENT WATER PRESSURE
EWAGE DISPOSAL METHOD
NER FURNISHED EQUIPMENT
QUIP. FURNISHED UNDER OTHER SECTIONS
AINTING & FINISH REQ.'TS
RITTEN SPECIFICATION
ELECT PUMPS
SAFETY. HAZARDS
ICCESS TO CONTROLS & EQUIPMENT
JOB NO.
1ATE
SPECIAL SYSTEMS (AIR, VACUUM, N20, Oo)
VENT HIGH POINTS, DRAIN LOW POINTS
FIRE PROTECTION
DRINKING FOUNTAINS
FLASING TO MAKE WATER TIGHT
MIN. 30" COVER OVER PIPES AT PAVING
SUFFICIENT SHUT OFF VALVES TO ISOLATE
SYSTEMS
DRAINAGE OF ALL PTS. BELOW GRADE
NORTH ARROW
SCALE OF PLANS AND DETAILS
UTILITY METERS
S.0.V. TO BUILDING
SHOCK ABSORBERS = ALL SOLANOID VALVES
(DISHWASHERS, ETC.)
TRAP PRIMERS
PRESSURE REDUCING VALVE TO BUILDING
WASHING MACHINE DETAIL
PRESSURE RELIEF ON ALL PRESSURE VESSELS
ALL TYPE WATER HEATERS - ALLOW PATH FOR
STEAMING
RESTEICTED WORK TIMES, :
SHUTDOWN Me Phe SxSnNG
SYSTEMS. |
OPERATING £ MAITAINA WCE
WereRucrions:
| Peeeze PRCTECTION
) Tirte 24