You are on page 1of 2

DESCRIPTION DIMENSION (m) VOLUME (m3) QUANTITY TOTAL

VOLUME(m3)
COLUMN #1 7.25 x 0.3 x 0. 3 0.62525 21 13.7025
FOOTING #1 1 X 1 X 0.3 .3 21 6.3
BEAM #1 0.2 X 0.3 X .3325 0.01995 5 0.09975
BEAM #2 0.2 X 0.3 X .3050 0.0183 4 0.0732
BEAM #3 0.2 X 0.3 X .2850 0.0171 4 0.0684
BEAM #4 0.2 X 0.3 X .2700 0.0162 10 0.162
BEAM #5 0.2 X 0.3 X .2275 0.01365 5 0.06825
BEAM #6 0.2 X 0.3 X .1900 0.0114 5 0.057
BEAM #7 0.2 X 0.3 X .1200 0.0072 3 0.0216
TOTAL 20.5527 = 21

ESTIMATES FOR FOOTING, COLUMN AND BEAM (CLASS A)


MATERIAL VOLUME (m3) MULTIPLIER PRICE (PHP) TOTAL
CEMENT (40kg) 21 9 P 255 P 48,195.00
GRAVEL 21 1 P 700 P 14,700.00
SAND 21 0.5 P 700 P 7,350.00
TOTAL P 70,245.00

ESTIMATES FOR WALLS


GROUND FLOOR
DESCRIPTION AREA m3 CHB ( 0.15 X 0.30 ) PRICE PER CHB TOTAL
EXTERIOR WALLS 121.77 2706 P 10 P 27,060
INTERIOR WALLS 57.5025 1277.833 = 1278 P 10 P 12,780
SECOND FLOOR
EXTERIOR WALLS 110.2 2448.88 = 2449 P 10 P 24,490
INTERIOR WALLS 84.3175 1873.7 = 1874 P 10 P 18,740
8307 P 10
TOTAL P 83,070

ESTIMATE OF PLASTERING FOR WALLS


MATERIAL # OF CHB ( BY MULTIPLIER # OF BAGS PRICE TOTAL
HUNDRED
BLOCK
METHOD)
CEMENT 83.07 6.36 528.3252 = 255 P 134,895
529
QUANTITY OF PRICE TOTAL
SAND IN m3
SAND 21 0.348 17.308 = 18 700 P 12,600
TOTAL P 147,495
PLASTERING FOR EXTERIOR WALLS (CLASS A)
MATERIAL AREA MULTIPLIER PRICE TOTAL
CEMENT 373.79 0.216 P 255 P 20,588.3532
SAND 373.79 0.012 P 700 P 3,139.8360
TOTAL P 23,728.1892

SLAB ESTIMATES
GROUND FLOOR
DESCRIPTION VOLUME CEMEN AREA PRICE TOTAL
(m3) T SAND GRAVEL SAND GRAVEL CEMENT
SLAB 12.25 110.25 6.125 12.25 P 700 P 700 P 255 P 40,976.25

SECOND FLOOR
SLAB 18.3375 159.23 9.14 18.3375 P 700 P 700 P 255 P 55,061
TOTAL P 96,037.25