Work :: Improvements to Shankarpally to Marpally road from Km.0/0 to 4/0 in Ranga Reddy District.

DETAILED CUM ABSTRACT ESTIMATE


SNo

Particulars No L B D Qty

1 2 3 4 5 6 7

1 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet
Mix Macadem specification including cost of all materials and including premixing the
material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to
site, laying in uniform layers with Full Width Hydrostatic sensor Paver in base courses on
well prepared surface and compacting with Vibratory roller to acheive the desired density
etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th
revision) for finished item of work for patch work.
S-M road
0/0-2 1 x 1 1.35 1.05 0.100 0.142
1 x 1 2.20 1.20 0.150 0.396
0/2-4 1 x 1 3.30 1.85 0.150 0.916
1 x 1 2.90 3.30 0.150 1.436
1 x 1 7.25 3.90 0.150 4.241
1 x 1 4.95 2.30 0.100 1.139
1 x 1 3.25 0.90 0.100 0.293
0/4-6 1 x 1 9.50 7.00 0.150 9.975
Km 0/6-8 1 x 1 5.60 1.35 0.150 1.134
1 x 1 6.40 7.00 0.150 6.720
1 x 1 3.05 2.80 0.100 0.854
1 x 1 1.35 1.55 0.100 0.209
1 x 1 1.15 0.90 0.100 0.104
1 x 1 0.85 0.80 0.100 0.068
1 x 1 1.25 1.20 0.100 0.150
1 x 1 2.00 1.10 0.100 0.220
1 x 1 3.00 1.15 0.100 0.345
1/0-2 1 x 1 2.40 1.25 0.150 0.450
1 x 1 2.30 1.70 0.100 0.391
2/4-6 1 x 1 2.90 1.05 0.100 0.305
1 x 1 2.75 1.55 0.150 0.639
2/8-10 1 x 1 1.90 1.70 0.150 0.485
1 x 1 1.95 2.30 0.100 0.449
1 x 1 0.60 0.40 0.100 0.024
1 x 1 1.45 0.90 0.150 0.196
1 x 1 2.05 0.85 0.100 0.174
3/0-2 1 x 1 2.60 1.25 0.100 0.325
1 x 1 1.50 0.85 0.100 0.128
3/2-4 1 x 1 2.90 1.60 0.150 0.696
1 x 1 2.75 1.70 0.100 0.468
4/0-2 1 x 1 2.10 1.75 0.150 0.551
4/4-6 1 x 1 4.25 1.90 0.150 1.211
34.830 Cum 1470.00 Cum
P-T road
9/2/2004 1 x 1 3.20 1.80 0.150 0.864
1 x 1 4.40 1.60 0.100 0.704
1 x 1 2.80 2.20 0.150 0.924
2.492 Cum 1556.00 Cum

2 Providing and aplying Prime coat with bitumen emulsion (slow setting) bulk using emulsion
pressure distributor on prepared surface of Granular base including cleaning of road surface
and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for
finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the
Engineer - in charge.
0/0-2 1 x 1 1.35 1.05 1.418
1 x 1 2.20 1.20 2.640
0/2-4 1 x 1 3.30 1.85 6.105
1 x 1 2.90 3.30 9.570
1 x 1 7.25 3.90 28.275
1 x 1 4.95 2.30 11.385
1 x 1 3.25 0.90 2.925
0/4-6 1 x 1 9.50 7.00 66.500
Km 0/6-8 1 x 1 5.60 1.35 7.560
1 x 1 6.40 7.00 44.800
1 x 1 3.05 2.80 8.540
1 x 1 1.35 1.55 2.093
1 x 1 1.15 0.90 1.035
1 x 1 0.85 0.80 0.680
1 x 1 1.25 1.20 1.500
1/0-2 1 x 1 2.40 1.25 3.000
1 x 1 2.30 1.70 3.910
2/4-6 1 x 1 2.90 1.05 3.045
1 x 1 2.75 1.55 4.263
2/8-10 1 x 1 1.90 1.70 3.230
1 x 1 1.95 2.30 4.485
1 x 1 0.60 0.40 0.240
1 x 1 1.45 0.90 1.305
1 x 1 2.05 0.85 1.743
3/0-2 1 x 1 2.60 1.25 3.250
1 x 1 1.50 0.85 1.275
3/2-4 1 x 1 2.90 1.60 4.640
1 x 1 2.75 1.70 4.675
4/0-2 1 x 1 2.10 1.75 3.675
4/4-6 1 x 1 4.25 1.90 8.075
245.84 Sqm 22.70 Sqm
P-T road
9/2/2004 1 x 1 3.20 1.80 5.760
1 x 1 4.40 1.60 7.040
1 x 1 2.80 2.20 6.160
18.960 Cum 22.70 Cum
4 Providing and applying tack coat with bitumen emulsion (Medium setting) using Bitumen
pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular
surface cleaned with mechanical broom for finished item of work as per MoRT&H
Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

Before Laying SDBC


S-M road
0/0-2 1 x 1 2.55 1.70 4.335
1 x 1 4.15 2.10 8.715
1 x 1 1.90 1.45 2.755
0/2-4 1 x 1 5.60 3.40 19.040
1 x 1 1.00 0.60 0.600
1 x 1 1.50 1.20 1.800
1 x 1 7.50 4.60 34.500
1 x 1 10.10 4.80 48.480
1 x 1 7.00 3.20 22.400
1 x 1 4.00 1.00 4.000
1 x 1 5.00 1.00 5.000
0/4-6 1 x 1 2.90 2.00 5.800
1 x 1 12.00 7.00 84.000
Km 0/6-8 1 x 1 7.60 1.90 14.440
1 x 1 8.00 7.00 56.000
1 x 1 2.80 1.00 2.800
1 x 1 5.00 3.10 15.500
1 x 1 2.40 2.20 5.280
1 x 1 0.75 0.80 0.600
1 x 1 1.30 1.00 1.300
1 x 1 1.00 1.00 1.000
1 x 1 1.50 1.00 1.500
1 x 1 0.90 0.80 0.720
1/0-2 1 x 1 3.00 2.00 6.000
1 x 1 1.50 1.00 1.500
1 x 1 0.90 0.80 0.720
1 x 1 3.60 2.10 7.560
1 x 1 2.00 1.30 2.600
1/8-10 1 x 1 3.00 1.50 4.500
2/4-6 1 x 1 2.80 0.90 2.520
1 x 1 2.65 1.40 3.710
2/8-10 1 x 1 1.40 1.50 2.100
1 x 1 1.80 2.20 3.960
1 x 1 0.50 0.40 0.200
1 x 1 1.35 0.80 1.080
1 x 1 1.95 0.70 1.365
3/0-2 1 x 1 3.00 1.50 4.500
1 x 1 2.00 1.00 2.000
1 x 1 2.00 0.90 1.800
1 x 1 1.35 0.80 1.080
3/2-4 1 x 1 3.00 1.00 3.000
1 x 1 3.40 0.60 2.040
1 x 1 2.00 0.80 1.600
1 x 1 3.30 1.80 5.940
1 x 1 1.50 2.00 3.000
1 x 1 3.40 0.60 2.040
1 x 1 3.00 4.00 12.000
1 x 1 5.90 1.60 9.440
1 x 1 1.30 1.00 1.300
3/4-6 1 x 1 3.00 1.00 3.000
3/6-8 1 x 1 1.50 1.00 1.500
4/0-2 1 x 1 1.90 1.70 3.230
1 x 1 1.70 1.60 2.720
1 x 1 3.30 2.10 6.930
1 x 1 1.70 1.40 2.380
1 x 1 0.90 0.70 0.630
1 x 1 0.80 0.90 0.720
1 x 1 1.90 1.40 2.660
1 x 1 5.00 3.50 17.500
1 x 1 3.00 2.00 6.000
1 x 1 5.00 2.50 12.500
1 x 1 2.00 1.00 2.000
4/4-6 1 x 1 1.50 1.00 1.500
1 x 1 5.10 2.00 10.200
1 x 1 1.00 1.00 1.000
1 x 1 2.60 1.60 4.160
5/8-10 1 x 1 2.00 1.80 3.600
1 x 1 0.90 0.60 0.540
7/4-6 1 x 1 3.00 1.50 4.500
515.390 Sqm 8.00 Sqm
P-T road
2/0-2 1 x 1 1.00 0.80 0.800
1 x 1 1.80 1.50 2.700
1 x 1 1.90 1.80 3.420
2/2-4 1 x 1 4.50 1.20 5.400
1 x 1 4.20 1.70 7.140
2/4-6 1 x 1 1.00 1.00 1.000
Km 2/6-8 1 x 1 1.90 1.10 2.090
3/2-4 1 x 1 1.20 3.10 3.720
3/8-10 1 x 1 1.20 3.70 4.440
1 x 1 3.00 1.10 3.300
1 x 1 2.50 1.10 2.750
4/0-2 1 x 1 3.40 0.50 1.700
1 x 1 4.10 0.50 2.050
1 x 1 1.10 3.40 3.740
4/8-10 1 x 1 1.10 3.10 3.410
5/0-2 1 x 1 2.60 2.40 6.240
1 x 1 1.70 2.70 4.590
1 x 1 1.40 3.40 4.760
5/2-4 1 x 1 1.10 2.10 2.310
5/4-6 1 x 1 1.00 0.70 0.700
5/6-8 1 x 1 1.20 2.10 2.520
1 x 1 0.80 0.70 0.560
1 x 1 5.80 0.90 5.220
1 x 1 5.20 1.80 9.360
1 x 1 2.70 1.00 2.700
1 x 1 3.10 0.60 1.860
1 x 1 0.90 0.60 0.540
1 x 1 2.30 1.00 2.300
1 x 1 2.00 1.00 2.000
5/8-10 1 x 1 2.70 1.00 2.700
1 x 1 1.80 0.90 1.620
1 x 1 1.20 0.90 1.080
1 x 1 1.10 0.50 0.550
1 x 1 1.40 1.20 1.680
1 x 1 1.40 0.70 0.980
1 x 1 1.60 1.00 1.600
6/0-2 1 x 1 1.00 0.70 0.700
1 x 1 1.20 1.10 1.320
1 x 1 5.90 1.60 9.440
6/2-4 1 x 1 1.80 0.60 1.080
6/4-6 1 x 1 0.70 0.60 0.420
1 x 1 0.80 0.70 0.560
1 x 1 1.60 1.10 1.760
1 x 1 0.90 0.80 0.720
1 x 1 1.10 0.70 0.770
1 x 1 2.60 1.00 2.600
1 x 1 1.70 1.10 1.870
1 x 1 0.90 0.50 0.450
1 x 1 2.30 1.20 2.760
1 x 1 0.50 0.40 0.200
1 x 1 1.20 0.70 0.840
7/0-2 1 x 1 0.70 1.50 1.050
1 x 1 0.70 0.90 0.630
1 x 1 1.10 0.50 0.550
7/8-10 1 x 1 2.80 1.10 3.080
8/0-2 1 x 1 1.00 0.70 0.700
9/0-2 1 x 1 1.50 0.80 1.200
9/2-4 1 x 1 1.60 1.10 1.760
1 x 1 4.90 2.60 12.740
1 x 1 5.60 2.40 13.440
1 x 1 3.10 1.60 4.960
1 x 1 3.80 3.40 12.920
1 x 1 1.90 1.70 3.230
1 x 1 1.20 1.10 1.320
1 x 1 1.70 1.10 1.870
1 x 1 3.10 1.40 4.340
192.810 Sqm 8.00 Sqm

6 Providing 25 mm thick compacted Semi-Dense Bituminous Concrete by hot mix plant using hard
blasted granite crushed aggregates of Grading -2 as per table 500-15 of specification 508 of
MoRT&H (4th Revision), premixed with bituminous binder 60/70 grade @ 5% of mix and filler,
transporting the hot mix to work site, laying to the required grade, level and rolling with smooth
wheeled tandem roller to achieve the desired compaction as per MoRT&H Specification 508 (4th
Revision) complete for finished item of Patch Work in all respects as directed by Engineer-in-charge.

S-M road
0/0-2 1 x 1 2.55 1.70 0.025 0.108
1 x 1 4.15 2.10 0.025 0.218
1 x 1 1.90 1.45 0.025 0.069
0/2-4 1 x 1 5.60 3.40 0.025 0.476
1 x 1 1.00 0.60 0.025 0.015
1 x 1 1.50 1.20 0.025 0.045
1 x 1 7.50 4.60 0.025 0.863
1 x 1 10.10 4.80 0.025 1.212
1 x 1 7.00 3.20 0.025 0.560
1 x 1 4.00 1.00 0.025 0.100
1 x 1 5.00 1.00 0.025 0.125
0/4-6 1 x 1 2.90 2.00 0.025 0.145
1 x 1 12.00 7.00 0.025 2.100
Km 0/6-8 1 x 1 7.60 1.90 0.025 0.361
1 x 1 8.00 7.00 0.025 1.400
1 x 1 2.80 1.00 0.025 0.070
1 x 1 5.00 3.10 0.025 0.388
1 x 1 2.40 2.20 0.025 0.132
1 x 1 0.75 0.80 0.025 0.015
1 x 1 1.30 1.00 0.025 0.033
1 x 1 1.00 1.00 0.025 0.025
1 x 1 1.50 1.00 0.025 0.038
1 x 1 0.90 0.80 0.025 0.018
1/0-2 1 x 1 3.00 2.00 0.025 0.150
1 x 1 1.50 1.00 0.025 0.038
1 x 1 0.90 0.80 0.025 0.018
1 x 1 3.60 2.10 0.025 0.189
1 x 1 2.00 1.30 0.025 0.065
1/8-10 1 x 1 3.00 1.50 0.025 0.113
2/4-6 1 x 1 2.80 0.90 0.025 0.063
1 x 1 2.65 1.40 0.025 0.093
2/8-10 1 x 1 1.40 1.50 0.025 0.053
1 x 1 1.80 2.20 0.025 0.099
1 x 1 0.50 0.40 0.025 0.005
1 x 1 1.35 0.80 0.025 0.027
1 x 1 1.95 0.70 0.025 0.034
3/0-2 1 x 1 3.00 1.50 0.025 0.113
1 x 1 2.00 1.00 0.025 0.050
1 x 1 2.00 0.90 0.025 0.045
1 x 1 1.35 0.80 0.025 0.027
3/2-4 1 x 1 3.00 1.00 0.025 0.075
1 x 1 3.40 0.60 0.025 0.051
1 x 1 2.00 0.80 0.025 0.040
1 x 1 3.30 1.80 0.025 0.149
1 x 1 1.50 2.00 0.025 0.075
1 x 1 3.40 0.60 0.025 0.051
1 x 1 3.00 4.00 0.025 0.300
1 x 1 5.90 1.60 0.025 0.236
1 x 1 1.30 1.00 0.025 0.033
3/4-6 1 x 1 3.00 1.00 0.025 0.075
3/6-8 1 x 1 1.50 1.00 0.025 0.038
4/0-2 1 x 1 1.90 1.70 0.025 0.081
1 x 1 1.70 1.60 0.025 0.068
1 x 1 3.30 2.10 0.025 0.173
1 x 1 1.70 1.40 0.025 0.060
1 x 1 0.90 0.70 0.025 0.016
1 x 1 0.80 0.90 0.025 0.018
1 x 1 1.90 1.40 0.025 0.067
1 x 1 5.00 3.50 0.025 0.438
1 x 1 3.00 2.00 0.025 0.150
1 x 1 5.00 2.50 0.025 0.313
1 x 1 2.00 1.00 0.025 0.050
4/4-6 1 x 1 1.50 1.00 0.025 0.038
1 x 1 5.10 2.00 0.025 0.255
1 x 1 1.00 1.00 0.025 0.025
1 x 1 2.60 1.60 0.025 0.104
5/8-10 1 x 1 2.00 1.80 0.025 0.090
1 x 1 0.90 0.60 0.025 0.014
7/4-6 1 x 1 3.00 1.50 0.025 0.113
12.885 Cum 6459.00 Cum
P-T road
2/0-2 1 x 1 1.00 0.80 0.025 0.020
1 x 1 1.80 1.50 0.025 0.068
1 x 1 1.90 1.80 0.025 0.086
2/2-4 1 x 1 4.50 1.20 0.025 0.135
1 x 1 4.20 1.70 0.025 0.179
2/4-6 1 x 1 1.00 1.00 0.025 0.025
Km 2/6-8 1 x 1 1.90 1.10 0.025 0.052
3/2-4 1 x 1 1.20 3.10 0.025 0.093
3/8-10 1 x 1 1.20 3.70 0.025 0.111
1 x 1 3.00 1.10 0.025 0.083
1 x 1 2.50 1.10 0.025 0.069
4/0-2 1 x 1 3.40 0.50 0.025 0.043
1 x 1 4.10 0.50 0.025 0.051
1 x 1 1.10 3.40 0.025 0.094
4/8-10 1 x 1 1.10 3.10 0.025 0.085
5/0-2 1 x 1 2.60 2.40 0.025 0.156
1 x 1 1.70 2.70 0.025 0.115
1 x 1 1.40 3.40 0.025 0.119
5/2-4 1 x 1 1.10 2.10 0.025 0.058
5/4-6 1 x 1 1.00 0.70 0.025 0.018
5/6-8 1 x 1 1.20 2.10 0.025 0.063
1 x 1 0.80 0.70 0.025 0.014
1 x 1 5.80 0.90 0.025 0.131
1 x 1 5.20 1.80 0.025 0.234
1 x 1 2.70 1.00 0.025 0.068
1 x 1 3.10 0.60 0.025 0.047
1 x 1 0.90 0.60 0.025 0.014
1 x 1 2.30 1.00 0.025 0.058
1 x 1 2.00 1.00 0.025 0.050
5/8-10 1 x 1 2.70 1.00 0.025 0.068
1 x 1 1.80 0.90 0.025 0.041
1 x 1 1.20 0.90 0.025 0.027
1 x 1 1.10 0.50 0.025 0.014
1 x 1 1.40 1.20 0.025 0.042
1 x 1 1.40 0.70 0.025 0.025
1 x 1 1.60 1.00 0.025 0.040
6/0-2 1 x 1 1.00 0.70 0.025 0.018
1 x 1 1.20 1.10 0.025 0.033
1 x 1 5.90 1.60 0.025 0.236
6/2-4 1 x 1 1.80 0.60 0.025 0.027
6/4-6 1 x 1 0.70 0.60 0.025 0.011
1 x 1 0.80 0.70 0.025 0.014
1 x 1 1.60 1.10 0.025 0.044
1 x 1 0.90 0.80 0.025 0.018
1 x 1 1.10 0.70 0.025 0.019
1 x 1 2.60 1.00 0.025 0.065
1 x 1 1.70 1.10 0.025 0.047
1 x 1 0.90 0.50 0.025 0.011
1 x 1 2.30 1.20 0.025 0.069
1 x 1 0.50 0.40 0.025 0.005
1 x 1 1.20 0.70 0.025 0.021
7/0-2 1 x 1 0.70 1.50 0.025 0.026
1 x 1 0.70 0.90 0.025 0.016
1 x 1 1.10 0.50 0.025 0.014
7/8-10 1 x 1 2.80 1.10 0.025 0.077
8/0-2 1 x 1 1.00 0.70 0.025 0.018
9/0-2 1 x 1 1.50 0.80 0.025 0.030
9/2-4 1 x 1 1.60 1.10 0.025 0.044
1 x 1 4.90 2.60 0.025 0.319
1 x 1 5.60 2.40 0.025 0.336
1 x 1 3.10 1.60 0.025 0.124
1 x 1 3.80 3.40 0.025 0.323
1 x 1 1.90 1.70 0.025 0.081
1 x 1 1.20 1.10 0.025 0.033
1 x 1 1.70 1.10 0.025 0.047
1 x 1 3.10 1.40 0.025 0.109
4.820 Sqm 6556.00 Sqm

5 Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps including all
labour charges etc., complete for finished item of work.

SM road
L/S Km 0/6-8 1 x 1 65.00 1.75 113.75
R/S 1 x 1 55.00 1.90 104.50
L/S Km 0/8-10 1 x 1 175.00 1.85 323.75
R/S 1 x 1 181.00 1.70 307.70
L/S Km 1/0-2 1 x 1 160.00 1.85 296.00
R/S 1 x 1 177.00 1.90 336.30
L/S Km 1/2-4 1 x 1 185.00 1.85 342.25
R/S 1 x 1 178.00 1.75 311.50
L/S Km 1/4-6 1 x 1 162.00 1.90 307.80
R/S 1 x 1 168.00 1.90 319.20
L/S Km 1/8-10 1 x 1 183.00 1.75 320.25
R/S 1 x 1 167.00 1.65 275.55
L/S Km 2/4-6 1 x 1 178.00 1.90 338.20
R/S 1 x 1 156.00 1.80 280.80
L/S Km 3/0-2 1 x 1 172.00 1.75 301.00
R/S 1 x 1 169.00 1.90 321.10
L/S Km 3/4-6 1 x 1 184.00 1.95 358.80
R/S 1 x 1 175.00 1.85 323.75
L/S Km 3/6-8 1 x 1 183.00 1.90 347.70
R/S 1 x 1 174.00 1.90 330.60
L/S Km 4/6-8 1 x 1 184.00 1.80 331.20
R/S 1 x 1 186.00 1.95 362.70
L/S Km 5/0-2 1 x 1 174.00 1.75 304.50
R/S 1 x 1 196.00 1.75 343.00
L/S Km 5/2-4 1 x 1 167.00 1.80 300.60
R/S 1 x 1 181.00 1.80 325.80
L/S Km 5/6-8 1 x 1 176.00 1.85 325.60
R/S 1 x 1 172.00 1.90 326.80
L/S Km 5/8-10 1 x 1 187.00 1.90 355.30
R/S 1 x 1 183.00 1.85 338.55
L/S Km 6/0-2 1 x 1 178.00 1.90 338.20
R/S 1 x 1 169.00 1.90 321.10
L/S Km 6/2-4 1 x 1 186.00 1.85 344.10
R/S 1 x 1 170.00 1.90 323.00
L/S Km 6/4-6 1 x 1 167.00 1.80 300.60
R/S 1 x 1 159.00 1.75 278.25
L/S Km 6/8-10 1 x 1 172.00 1.85 318.20
R/S 1 x 1 188.00 1.75 329.00
L/S Km 7/0-2 1 x 1 168.00 1.90 319.20
R/S 1 x 1 175.00 1.60 280.00
L/S Km 7/2-4 1 x 1 164.00 1.80 295.20
R/S 1 x 1 186.00 1.95 362.70
L/S Km 7/4-6 1 x 1 174.00 1.95 339.30
R/S 1 x 1 196.00 1.80 352.80
L/S Km 7/6-8 1 x 1 176.00 1.90 334.40
R/S 1 x 1 181.00 1.75 316.75
14427.35 3.5 3.5 0.6
P-T road
L/S Km 2/0-2 1 x 1 89.00 1.65 146.85
R/S 1 x 1 96.00 1.30 124.80
L/S Km 2/4-6 1 x 1 65.00 1.65 107.25
R/S 1 x 1 72.00 1.30 93.60
L/S Km 3/0-2 1 x 1 44.00 1.00 44.00
R/S 1 x 1 92.00 1.55 142.60
L/S Km 3/4-6 1 x 1 144.00 1.85 266.40
R/S 1 x 1 161.00 1.80 289.80
L/S Km 3/6-8 1 x 1 121.00 1.90 229.90
R/S 1 x 1 112.00 1.65 184.80
L/S Km 3/8-10 1 x 1 132.00 1.85 244.20
R/S 1 x 1 102.00 1.80 183.60
L/S Km 4/2-4 1 x 1 95.00 1.90 180.50
R/S 1 x 1 145.00 1.65 239.25
L/S Km 4/4-6 1 x 1 162.00 1.90 307.80
R/S 1 x 1 176.00 1.65 290.40
L/S Km 4/6-8 1 x 1 138.00 1.80 248.40
R/S 1 x 1 186.00 1.95 362.70
L/S Km 5/0-2 1 x 1 154.00 1.65 254.10
R/S 1 x 1 196.00 1.40 274.40
L/S Km 5/2-4 1 x 1 176.00 1.65 290.40
R/S 1 x 1 181.00 1.60 289.60
L/S Km 5/6-8 1 x 1 167.00 1.85 308.95
R/S 1 x 1 172.00 1.60 275.20
L/S Km 5/8-10 1 x 1 187.00 1.90 355.30
R/S 1 x 1 143.00 1.65 235.95
L/S Km 6/0-2 1 x 1 183.00 1.50 274.50
R/S 1 x 1 167.00 1.90 317.30
L/S Km 6/2-4 1 x 1 146.00 1.65 240.90
R/S 1 x 1 184.00 1.75 322.00
L/S Km 6/4-6 1 x 1 167.00 1.75 292.25
R/S 1 x 1 144.00 1.60 230.40
L/S Km 6/8-10 1 x 1 172.00 1.85 318.20
R/S 1 x 1 112.00 1.65 184.80
L/S Km 7/0-2 1 x 1 124.00 1.70 210.80
R/S 1 x 1 176.00 1.70 299.20
L/S Km 7/2-4 1 x 1 135.00 1.80 243.00
R/S 1 x 1 182.00 1.75 318.50
L/S Km 7/4-6 1 x 1 148.00 1.80 266.40
R/S 1 x 1 154.00 1.75 269.50
L/S Km 7/6-8 1 x 1 139.00 1.75 243.25
R/S 1 x 1 168.00 1.60 268.80
L/S Km 8/0-2 1 x 1 103.00 1.65 169.95
R/S 1 x 1 167.00 1.75 292.25
L/S Km 8/4-6 1 x 1 123.00 1.60 196.80
R/S 1 x 1 139.00 1.65 229.35
L/S Km 8/8-10 1 x 1 121.00 1.70 205.70
R/S 1 x 1 148.00 1.50 222.00
L/S Km 9/2-4 1 x 1 135.00 1.45 195.75
R/S 1 x 1 123.00 1.65 202.95
11985.30 3.5 0.6
CB road
L/S Km 0/0-2 1 x 1 139.00 1.10 152.90
R/S 1 x 1 143.00 1.60 228.80
L/S Km 0/2-4 1 x 1 103.00 1.65 169.95
R/S 1 x 1 88.00 1.45 127.60
L/S Km 0/4-6 1 x 1 123.00 1.25 153.75
R/S 1 x 1 146.00 1.65 240.90
1073.90 3.5 0.6

6 Stripping the excess soil from the shoulder surface to achieve the approved level for sectioning the
berms, shoulders as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO.
Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005)

SM road
L/S Km 0/0-2 1 x 1 78.00 1.75 136.50
R/S 1 x 1 55.00 1.70 93.50
L/S Km 0/4-6 1 x 1 115.00 1.70 195.50
R/S 1 x 1 188.00 1.85 347.80
L/S Km 0/6-8 1 x 1 174.00 1.90 330.60
R/S 1 x 1 166.00 1.75 290.50
Km 1/0-2 1 x 1 178.00 1.80 320.40
1 x 1 182.00 1.80 327.60
L/S Km 1/4-6 1 x 1 178.00 1.75 311.50
R/S 1 x 1 159.00 1.65 262.35
L/S Km 1/8-10 1 x 1 163.00 1.75 285.25
R/S 1 x 1 172.00 1.50 258.00
L/S Km 2/4-6 1 x 1 166.00 1.65 273.90
R/S 1 x 1 163.00 1.90 309.70
L/S Km 3/0-2 1 x 1 178.00 1.80 320.40
R/S 1 x 1 167.00 1.75 292.25
L/S Km 3/2-4 1 x 1 156.00 1.85 288.60
R/S 1 x 1 168.00 1.60 268.80
L/S Km 3/6-8 1 x 1 174.00 1.90 330.60
R/S 1 x 1 165.00 1.65 272.25
L/S Km 4/0-2 1 x 1 171.00 1.80 307.80
R/S 1 x 1 163.00 1.95 317.85
L/S Km 4/2-4 1 x 1 179.00 1.65 295.35
R/S 1 x 1 174.00 1.90 330.60
L/S Km 4/4-6 1 x 1 173.00 1.65 285.45
R/S 1 x 1 184.00 1.85 340.40
L/S Km 5/0-2 1 x 1 164.00 1.65 270.60
R/S 1 x 1 165.00 1.90 313.50
L/S Km 5/4-6 1 x 1 154.00 1.50 231.00
R/S 1 x 1 177.00 1.60 283.20
Km 5/8-10 1 x 1 162.00 1.65 267.30
1 x 1 183.00 1.80 329.40
L/S Km 6/0-2 1 x 1 168.00 1.85 310.80
R/S 1 x 1 157.00 1.90 298.30
L/S Km 6/2-4 1 x 1 165.00 1.65 272.25
R/S 1 x 1 174.00 1.90 330.60
L/S Km 6/4-6 1 x 1 168.00 1.80 302.40
R/S 1 x 1 163.00 1.75 285.25
L/S Km 6/8-10 1 x 1 159.00 1.85 294.15
R/S 1 x 1 152.00 1.90 288.80
L/S Km 7/0-2 1 x 1 162.00 1.90 307.80
R/S 1 x 1 168.00 1.60 268.80
L/S Km 7/6-8 1 x 1 172.00 1.80 309.60
R/S 1 x 1 173.00 1.60 276.80
11860.70 3.5 10.4
P-T road
L/S Km 2/0-2 1 x 1 138.00 1.40 193.20
R/S 1 x 1 146.00 1.50 219.00
L/S Km 2/4-6 1 x 1 165.00 1.75 288.75
R/S 1 x 1 172.00 1.30 223.60
L/S Km 3/0-2 1 x 1 158.00 1.00 158.00
R/S 1 x 1 162.00 1.75 283.50
L/S Km 3/4-6 1 x 1 144.00 1.85 266.40
R/S 1 x 1 161.00 1.80 289.80
L/S Km 4/2-4 1 x 1 95.00 1.90 180.50
R/S 1 x 1 145.00 1.75 253.75
L/S Km 4/4-6 1 x 1 162.00 1.90 307.80
R/S 1 x 1 176.00 1.65 290.40
L/S Km 4/6-8 1 x 1 138.00 1.80 248.40
R/S 1 x 1 186.00 1.95 362.70
L/S Km 5/0-2 1 x 1 154.00 1.70 261.80
R/S 1 x 1 196.00 1.80 352.80
L/S Km 5/2-4 1 x 1 176.00 1.70 299.20
R/S 1 x 1 181.00 1.60 289.60
L/S Km 5/6-8 1 x 1 167.00 1.85 308.95
R/S 1 x 1 172.00 1.60 275.20
L/S Km 5/8-10 1 x 1 187.00 1.90 355.30
R/S 1 x 1 143.00 1.65 235.95
L/S Km 6/0-2 1 x 1 183.00 1.50 274.50
R/S 1 x 1 167.00 1.50 250.50
L/S Km 6/2-4 1 x 1 146.00 1.65 240.90
R/S 1 x 1 184.00 1.25 230.00
L/S Km 6/4-6 1 x 1 167.00 1.40 233.80
R/S 1 x 1 144.00 1.80 259.20
L/S Km 6/8-10 1 x 1 172.00 1.85 318.20
R/S 1 x 1 112.00 1.40 156.80
L/S Km 7/0-2 1 x 1 124.00 1.65 204.60
R/S 1 x 1 176.00 1.70 299.20
L/S Km 7/2-4 1 x 1 135.00 1.70 229.50
R/S 1 x 1 182.00 1.80 327.60
L/S Km 7/4-6 1 x 1 148.00 1.75 259.00
R/S 1 x 1 154.00 1.70 261.80
L/S Km 7/6-8 1 x 1 139.00 1.75 243.25
R/S 1 x 1 168.00 1.80 302.40
L/S Km 8/0-2 1 x 1 103.00 1.65 169.95
R/S 1 x 1 167.00 1.75 292.25
L/S Km 8/4-6 1 x 1 123.00 1.80 221.40
R/S 1 x 1 139.00 1.65 229.35
L/S Km 8/8-10 1 x 1 121.00 1.70 205.70
R/S 1 x 1 148.00 1.80 266.40
L/S Km 9/2-4 1 x 1 135.00 1.75 236.25
R/S 1 x 1 123.00 1.80 221.40
11878.55 10.4
CB road
L/S Km 0/0-2 1 x 1 139.00 1.75 243.25
R/S 1 x 1 143.00 1.45 207.35
L/S Km 0/2-4 1 x 1 103.00 1.65 169.95
R/S 1 x 1 88.00 1.45 127.60
L/S Km 0/4-6 1 x 1 123.00 1.25 153.75
R/S 1 x 1 146.00 1.65 240.90
1142.80 3.5 0.6
In Km 0/0 to4/0 1 x 1 534.00 3.00 0.100 160.20
say 161.000 sqm 702.00 sqm
9 Supplying & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded from
HIPS(HIImpact
In Km 0/0 to4/0 Polysterene)
1 x or
1 ABS or ASA ---
534.00 ( Acrylic----Strene Acrylonitrite
534.00 and reflective panels with
micro prismatic lens capable of providing total say internal reflection of the light entering
534.000 316.00 the lens face
No's No's
and shall support a load of 13635 kg tested in accordance to ASTM D 4280 Type H and complying to
10 Providing and fixing Village name board size 600x800 mm made out of Type – XI of ASTMD 4956-09
Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 – DO III Dt 11.06. 1997.
wide
In angle cube cornered micro Prismatic Retro
---andreflective sheeting and confirming to IRC 67:2012
TheKm 0/0 to4/0
height and width 2 shall
x not 2 exceed --- 20 mm 130----mm with 4.00
minimum reflective area of 13 Sqcm
for full background of Green Colour & White Letters and fixed over 3MM Alluminium Composite
on each side and the slope to the base shallsay be 35 +/- 5 degree.4.000 No's
The strength of 4903.00
detachmentNo's of the
Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted
11 integrated and
Providing cylindrical shanks, markers
fixing Object (of diameter
48.3mmnot less thanpipe,keep
dia.MS 19 +/- 2 mm at 50and
cmheight
abovenot less than
ground level30+/-
with
grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with
2
3MM
In mm) from the
Aluminium
Km 0/0 to4/0 body is
Composite
15 x on to be a minimum
material
4 a MS--- sheet value
havingof 700
minimum
--- of size75x75x6mm
---- Kgs. Fixing
0.30 will
mm
60.00 be by
thick drilling
Aluminium holes on
skin the
fully
35x35x4mm and mounted angle post with clear height of not less than
road for with
covered the twin
typeshanks to go
IV if High inside, Retro
intensity without nails
reflectiveand using
sheeting epoxy
fixed resin
in to based
trench adhesive
of as
30X30X30cm per
2.1 m from the ground level to the bottom say of the board. The signpost 60.00 No's should be814.00
painted with No'sone
manufacturer’s
filled with CC M20recommendation
conforming and complete as&MORTH&H
to IRC-67:2012 directed by the engineer. no 805 and approved
Specification
coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of
drawing etc.
12 30cm of height.
Cleaning The signpost
and grubbing shall including
road land be firmly fixed with MS base
uprootingrank angle 35x35x4
vegetation mm in to the ground
,grass,bushes,shrubs,saplings
by
andKmM-15
treesConcrete foundation of size 450x450x600mm including cost and conveyance
disposal ofofunserviceable
all materials
In 0/0girth
to4/0upto 1 300mm,removal
x 2 4000.00 of stumps
2.00 of --- trees cut16000.00
earlier andSqm
,equipment, machinery and labour with
material to be used or auctioned ,up to leadSay all leads and lift, loading
of 1000 mtrs removal charges necessary
and disposal of### for satisfactory
top organic soil
1.60 HCtrs HCtrs
completion of the work as
not excluding 150mm in thickness directed by Engineer –in-Charge.

Asst. Executive Dy. Executive Engineer Executive Engineer (R&B)


Engineer
R&B Section, R&B Sub-Division, Shamshabad Ranga Reddy Dist
Shamshabad

Superindenting Engineer (R&B)


Rural Circle, HYDERABAD
4 Forming embankment with the useful earth obtained from trench by mechanical means
up toFilling
Total SDR Qty
including pre-watering
As per Sheet Enclosed of soil Km
, removal
6/800 -of top soil,
9/340 excavation of soils , depositing the
47320.000
soils on the embankment, spreading soil, breaking clods, sectioning
47320.00, grading
cum and consolidation with
8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H,
including all hire and operational charges of T&P and seigniorage charges, complete for finished
15 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG/HBT crushed
item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on levels
stone aggregate
For finished
for Drain under ofand
itemFootpathfine aggregate conforming to table 1000-2 of MoRT&H including cost,
work).
seigniorage conveyance of all materials to site and labour charges, centering, machine
Km
mixing,
6/8 - laying, Vibrating, curing etc., including all other incidental and operational charges
1
of all T&P etc., complete
9/340 x for 2 finished
2540.00 item 2.00 0.150
of work 1524 specification 1500,1700,
as per MoRT&H
2100 (4th Revision) and as directed by the Engineer-in-Charge for BASE SLAB in CC Drain
1524 3386.00 1.0

16 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size
HBG/HBT crushed
For Drain Side Walls stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
under Footpath
aggregate
Km conforming to table 1000-2) including cost, seigniorage and conveyance of all
materials
6/8 - to site and all labour charges , centering, machine mixing, laying in position,
1 x 2 2540.00(0.30+0.20)/21.800 2286
Compacting, Vibrating
9/340 and curing including all other incidental and all other operational
charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (4th
Revision) for SIDE WALLS 2286 4219.00 1.0

17 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG/HBT
crushed
For Drain stone aggregate
Top Slab (Coarse aggregate conforming to table 1000-1 and fine aggregate
under Footpath
conforming to table 1000-2) including cost, seigniorage conveyance of all materials to site
Km
and-labour charges, centering, machine mixing, laying, vibrating, curing etc., including other
6/8
incidental hire and
9/340 1 operational
x 2 2540.00
charges 2.00 0.200
of all T&P 2032 as per approved drawings
etc., complete
and as directed during execution but excluding cost of steel and its fabrication charges for
finished item as per MoRT&H specification 1500,1600,17002032 & 2200 (4th revision
5200.00 ) and1.0 as
directed by the Engineer-in-Charge for TOP SLAB
18 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all
diameters including cost and conveyance of steel to site and all labour charges for
fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing
them in position etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over lapping welding if
For Drain Top Slab under Footpath
Km
6/8 -
9/340 1 x 1 2032.00 75 Kgs/cum 152

152 MT 60240 1.0


19 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG/HBT crushed stone
aggregate
Km 6/800 -and9/340fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage
conveyance
for Footpath materials
of all 2 x to1 site and labour
2540.00 charges,
1.800 centering,914.40
0.100 machine mixing, laying, Vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for
deduct PVC pipe Qty -2 x ∏/4 2540.00 0.200 0.200 -159.51
finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed
Add extra at curve portion - 101.71
by the Engineer-in-Charge for base coarse below chequered tiles & CRS Median.
Below CRS Median 2 x 1 2540.00 0.600 0.100 304.80
1161.40
say 1161 cum 3244.00 1.0

#REF! Footpath Below P 1 x 2 2540.00 1.80 0.400 3658

21 Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to
21 specified
Km 6/800 lines,
- 9/34grades,
1 levels
x 2 and2540.00
dimensions- to the requirement
- of clause 301 and 309. Excavated
5080
material to be used in embankment within a lead of 50 metres (average
5080 RM lead 25 metres)
58.00 1.0
19 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG/HBT crushed stone
aggregate
Km 6/800 -and9/340fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage
conveyance
for Footpathof all materials
2 x to 1 site and labour
2540.00 charges,
1.800 centering,914.40
0.100 machine mixing, laying, Vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for
for Footpath 2 x 1 2540.00 0.600 0.300 914.40
finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed
deduct PVC pipe Qty -2 x ∏/4 2540.000 0.200 0.200 -159.51
by the Engineer-in-Charge for base coarse below chequered tiles & CRS Median.
Add extra at curve portion - 101.71
Below CRS Median 2 x 1 2540.00 0.600 0.100 304.80
2075.80
say 2076 cum 3244.00 1.0
16 Plastering in CM (1:5) 12 mm thick including cost and conveyance of all materials , seigniorage
charges
Km 6/800, labour
- 9/340charges , curing etc complete for finished item of work as directed by the Engineer
-in-Charge
Median Coping 2 x 1 0.00 0.500 - 0
Footpath Kerb S 2x 2 0.00 0.375 - 0
0 0 sqm 72.90 1.0
15 Vibrated cement concrete M 20 grade using 20mm & 10mm HBG/HBT crushed stone
aggregate
Table Drains(Coarse1aggregate
x 2 conforming
2540.00 to0.600table 0.200
1000-1 and fine610 aggregate conforming to table
1000-2) including
Kerb Blocks cost,
2 seigniorage
x conveyance
2 4235.00 0.036 of all materials
- to site
610and labour charges, centering,
machine mixing, laying, vibrating, curing
Nos etc., including other incidental hire and operational charges
(Each Block Qty = 0.6*0.15*0.40 = 0.036)
of all T&P as per approved drawings and as directed during execution but excluding cost of steel
deduct PVC
and its pipe Qty
4x127 x
fabrication
∏/4 -0.200 0.200 0.150 -2.39
charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200
(No
(4thof 200mm) dia
revision andPVCas Pipes = 2540/20
directed by the=Engineer-in-Charge
127 for Table1217Drains & Kerb Blocks.
0 say 1217 cum 4751.00 1.0

12 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of
scarified
Qty As permaterial with all leads and lifts up to 1000 m as17480.00
Sheet Enclosed per MoRT&H (4th Revision) Specn.
No.305.4.3 say 17480.00 cum 5.50 1.0
Ranga Reddy District.

Cutting 29208.4

4.50
51200.65

3877.55

4.50

5580.4545
430.39

4.50
4123.12

4.50
1542.48

4.50
83222.60025

4.50
31601.559
30,297
25,169
2,255
239,301
123,351
123,537
486,189

2,400

113,022

168,744

19,612

48,840

50,510

11,446,358

)
Filling 7730.44

34527778

5160264 5160264

9644634 9644634

2032

10566400 10566400

243840
243.84

9156480 9156480 243840

914.4

0.785 2.39268

3766284 3766284

294640 294640

914.4

0.785 2.39268

6734544 6734544

0 0
5781967 5781967

96140 96140
1161
3766284

93
1.5E+07