You are on page 1of 1

NCS Core Abilities Level 2 NCS Core Abilities Level 1

CA

KURSUS
NAMA AGENSI

KOD PROGRAM
NAMA PROGRAM
Z-009-02-2015 Z-009-01-2015

KOD
KURSUS

CA04
CA03
CA02

CA04
CA03
CA02
CA01
CA01
KOD CA
CU
: EE-320-2:2012

AND

CULTURE
PERSONAL

BEHAVIOUR
BEHAVIOUR

ADAPTATION
AWARENESS
AWARENESS

WORKPLACE
APPLICATION
CORE ABILITIES

BASIC WORKING
COMMUNICATION

HEALTH, SAFETY
HEALTH, SAFETY

INTERPERSONAL
ENVIRONMENTAL
BEHAVIOUR SKILL

COMMUNICATION
WORKPLACE ETHICS
: SMK DATUK BENDAHARA (K05647)

reasonably

2. Adopt work punctuality

1. Respond to instructions

TAHAP
TAHAP
ABILITY
CU/DUTY
WA/TASK
OUTLINE

1. Apply practice work culture


NO. WA/TASK

3. Understand reading material


(English/ national language etc).

1. Apply two-way communication


3. Demonstrate team cooperation

AND ENVIRONMENT 2. Demonstrate safety compliance


1. Demonstrate health compliance
4. Apply information confidentiality
: PEMASANGAN DAN PENYELENGGARAAN ELEKTRIK SATU FASA

3. Disseminate information manually


1. Demonstrate honesty and integrity

3. Demonstrate initiative and flexibility


2. Adhere to safety awareness activity
1. Adhere to health awareness activity
2. Demonstrate discipline at workplace
2. Apply oral communication and speak

2. Apply teamwork cooperation concept


1. Apply working language appropriately

2. Disseminate information electronically

3. Demonstrate environment compliance


1. Demonstrate responsibility at workplace

3. Initiate problem solving skills at workplace

4. Demonstrate work performance awareness


3. Adhere to environmental awareness activity

2. Respond appropriately to unusual situations


Identify single phase
1

drawing specifications
and requirement
2

Carry out layout drawing

Carry out single line /


3

schematic diagram
CoCU1

drawing

Tahap 2
Tahap 1

Carry out single phase


4

wiring drawing

Inspect single phase


5

drawing

Identify single phase


1

wiring specifications and


procedures
BORANG MATRIKS PEMETAAN KURIKULUM PROGRAM AGENSI BERDASARKAN STANDARD KEMAHIRAN PEKERJAAN KEBANGSAAN (SKPK)

Identify single phase


2

wiring tools, equipment


and materials
3

Carry out wiring activities

Carry out single phase


4

earthing system
installation
Carry out single phase
Distribution Board (DB)
5

(metallic or insulated)
installation
CoCU2

Tahap 2
Tahap 1

Carry out fitting and


6

accessories installation

Carry out wiring system


7

visual inspection

Carry out dead circuit test


8

Carry out live circuit test


9

circuit test
Prepare single
phase work activities
report
10

circuit test

Identify single phase wiring


1

maintenance requirement
Identify single phase
wiring tool, equipment
2

and material
circuit test
3

Carry out electrical wiring


inspection circuit test
KEMENTERIAN PENDIDIKAN MALAYSIA
BAHAGIAN PEMBANGUNAN KURIKULUM

CoCU3

Tahap 2
Tahap 1

Carry out electrical wiring


4

maintenance
Prepare single phase
motor and motor control
installation,
Inspect electrical
maintenance, wiring
tools,
5

functionality
equipment
and materials
1. Prepare single phase
motor and motor control
6

installation,
Record wiring system
maintenance, tools,
maintenance activities
equipment
Identify
and single phase
materials
motor & motor
1

1. Prepare singlecontrol
phase
installation
motor specifications
and motor control
and procedures
installation,
maintenance, tools,
equipment
2

and materials

Carry out single phase


3

motor installation
CoCU4

Tahap 2
Tahap 1

Carry out single phase


4

motor control
termination

Inspect single phase


5

motor and motor control


functionality

Record single phase


6

motor and motor control


installation.
Identify electrical appliances
1

maintenance requirement,
specification and manuals
Prepare single phase
electrical appliances
2

maintenance tools,
equipment and materials
CoCU5

Tahap 2
Tahap 1

Carry out electrical


3

appliances inspection

Carry out electrical


4

appliances maintenance
Identify single phase
testing and
commissioning
1

specifications and
procedures
Prepare single phase
testing and
2

commissioning tools,
equipment and materials

Carry out single phase


3

insulation resistance
testing

Carry out single phase


4

polarity testing
CoCU6

Tahap 2
Tahap 1
5

Carry out single phase


continuity testing

Carry out single phase


6

earthing resistance
testing

Carry out testing


7

commissioning

Prepare testing and


8

commissioning report

You might also like