Professional Documents
Culture Documents
Appendix B-I
Typical Cross Sections for the project highway to be followed are given below:-
In LHS In RHS
Design Chainage Design Chainage Length Length TCS Type
S.No. (LME) (RME) (LHS) (RHS) No. Remarks
m m (As attached)
From To From To
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)
In LHS In RHS
Design Chainage Design Chainage Length Length TCS Type
S.No. (LME) (RME) (LHS) (RHS) No. Remarks
m m (As attached)
From To From To
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)
In LHS In RHS
Design Chainage Design Chainage Length Length TCS Type
S.No. (LME) (RME) (LHS) (RHS) No. Remarks
m m (As attached)
From To From To
NOTE :-
Median and carriageway width tapering shall be provided as per IRC-SP-84-2019
Section no. 2.5.4 and section 2.12.2.3.
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)
Four laning of Haridwar Nagina section of NH-74 in the state of Uttrakhand on EPC mode (Package-III: From Design Chainage
LME (Km. 2/500 to Km 13/765 and Km 28/470 to km 29/990) & Design Chainage RME(Km 2/505 to Km 13/798 and Km 28/475 to
Km 30/000)