Today’s Talk:
Part 2 -Planning and Design General Design Steps
Planning to Construction
Bridge foundation types
Questa Engineering Corporation Environmental Review & Permits
Construction
Sydney Temple, P.E.
6/28/2011 1 6/28/2011 2
6/28/2011 3 6/28/2011 4
6/28/2011 5
6/28/2011 7 6/28/2011 8
Types of Drilling
Subsurface Investigations
6/28/2011 9 6/28/2011 10
Geotechnical Reports
Summarize geological hazards
Local site conditions
Provide recommendations for
foundation design
6/28/2011 11 6/28/2011 12
6/28/2011 13 6/28/2011 14
6/28/2011 15 6/28/2011 16
Geomorphic Analysis
Vertical & Lateral creek movement
Sediment transport
Bankfull channel
Low-Flow (scour line) channel
6/28/2011 17 6/28/2011 18
6/28/2011 19 6/28/2011 20
150
Driscoll Road
Palm Avenue
140
Flow Line Elevation (ft)
130
120 SF Aqueduct,
concrete
110 Mitigated Knickpoint (armored)
90
80
Reach 1 Reach 2 Reach 3
70
-1+50 3+50 8+50 13+50 18+50 23+50 28+50 33+50
6/28/2011 22
6/28/2011 23 6/28/2011 24
6/28/2011 25 6/28/2011 26
Right of Way
Alternative alignments
Approaches
ADA Requirements
Traffic/Roadway design issues
Utilities
6/28/2011 27 6/28/2011 28
6/28/2011 29 6/28/2011 30
6/28/2011 31 6/28/2011 32
6/28/2011 33 6/28/2011 34
6/28/2011 35
Site Map
Water of the USCOE Jurisdictional Area
Environmental Flood Control CEQA Project Description
Permits Public Safety Certification
Detailed
Alternatives examined/project justification
Permits 40% design drawings
Project Analysis
Technical analysis or separate back up design
memorandum (H&H, Geotech, etc.)
Implementation Biologic Reconnaissance
6/28/2011 37 6/28/2011 38
6/28/2011 39 6/28/2011 40
U.S. Army Corps of Engineers 404 Permit Reviews application and notifies
Endangered Species Act Consultation National Marine Fisheries Service
California Department of Fish & Game (NMFS) and/or US Fish and Wildlife
Streambed Alteration Agreement Service (USFWS)
Regional Water Quality Control Board May ask for formal or informal consultation
Water Quality Certification & General Stormwater May require preparation of a Biologic
Construction Permit Opinion (BO) and/authorization for take
Coastal Development Permit NMFS will review Fish passage analysis
6/28/2011 41 6/28/2011 42
6/28/2011 43 6/28/2011 44
6/28/2011 45 6/28/2011 46
90 90
standards.
100.2
100.2
100.2
100.2
100.2
94.4
94.4
94.3
95.3
94.1
96.2
93.5
97.1
93.1
98.0
90.7
98.8
89.7
99.7
86.0
82.9
81.2
83.9
86.5
92.5
99.2
96.0
98.2
97.0
97.2
96.8
96.7
California Department of Transportation 0+00 0+40 0+80 1+20 1+60 2+00 2+40 2+80 2+91
6/28/2011 47 6/28/2011 48
Public Trails -
Pedestrian/Bicycle/Equestrian/Disabled Users
6/28/2011 49 6/28/2011 50
6/28/2011 51 6/28/2011 52
6/28/2011 53 6/28/2011 54
6/28/2011 55 6/28/2011 56
3'-4"
1'
1'
14'-8"
3" COVER
4 #5
12"
7 #4
3'-8" 7 #4
SECTION C-C'
5'-8" #4 BARS
2 '-4" FOR STEM WALL
#4 BAR
12" 7 #4
12"
B B
#4 #5 8" 8"
12" 12" 14'-8"
4 #5
4 #5 4 #5
5
8"
X 12" ANCHOR
BOLT @ 48" O.C.
10'-0"
10'-0"
C C'
3" COVER
3" COVER 3" COVER 12"
6/28/2011 57 6/28/2011 58
6/28/2011 59 6/28/2011 60
6/28/2011 61 6/28/2011 62
Construction Specifications
Bidding instructions
Work hours
Contracting requirements
Construction and material specifications
6/28/2011 63 6/28/2011 64
6/28/2011 65 6/28/2011 66
6/28/2011 67 6/28/2011 68
6/28/2011 69 6/28/2011 70
Contact Info
Sydney Temple
Questa Engineering Corp.
Stemple@questaec.com
(510) 236-6114 ext 220
6/28/2011 71