MATERIAL TRANSMITTAL SHEET-CONSULTANCY PROVECT. = esfea[asir
acorn 1
consort
S POYRY GQ rressenen Hh Eitan
ADDRESS: | RODRESS: Po woX:aees7, —CONTNCTOR AE
P.OOx 29972, 0u8N, | OUBAL URE BYIATIONPOVEYiWASSIOoT:
tae Tend 4 «290666
TEL 04-099 00 Fax sari 4obe 70 DATE: 2.062017, RECEIVED ON
FAX: 046060501 oace2017
GRIO Solutions SAS
Dual Branen, 38% Foor, U-Bora Tower
‘Business Bay, Al Aba Sree,
O'Box 40967, Oubs, UAE.
-Attertion: Project Manager
| CONSULTANT CONTRACTOR
SRS, [onaner SEVEN, —_[ocronsave
SeScRBTIon | Design & Construction of 192/11KV Substation at Aviation ity
| sussrarion
SCADANAME — AVIATION
ae | AERTS AVATION SALE =F
‘Sescpon tT
Tepecret | pov] PRR | Sao Canny edn?
Jaen! emit” | ieacnny fae
Valine ETI | T 5 condoning |
tsar.) A | Rate” | seuuse | Seiming | Ae Aches
“Buea as |_| Psckge unis | | Siete
Looatn of Usa: | Tha Out Sbston
Halal Usedor [Fx Fe Onno, Rare an Non |
[rao opened rare bite
‘Sontaon Coss | 8. Approved asbecod sta conte wih mendes rnc
‘proved sleet angles win Cmmaric Resa erd
nmeomF
n
Notapproved. Revs th subi sper cents and resume fer agora
L Centers resporslly or compan wih he equeni pecteaan
eae
—————————E
Eee bape eee ee ed
‘Seo ad rai cna cane ennaiMATERIAL TRANSMITTAL SHEET - CONSULTANCY PROJECT
EEE SRS SE rtp etiam ee
Angesure:A,
MOTE Sas ot a fs an
on raed
“Tho Talowing are POVAY camamanie Tor GE FP DST DOT SAMIANION MASSON ADS —
021092017, Received 039.2017 are as fofows
Following materalis aproved subject to compliance o he below comments
2) In Materia Transnitl Sheet T-Specs numbers not matching wih onthe CO Fes covering
page place checc and clarty
») Alo inthe whole Fe document on CD Material code isnot complete, And the Modal rumber
is enclosed yot on he Hardcopy the medol numbers missing please arange documest
Propet,
<6) Please tach Approved VENDOR (SKM) approval rom DEWA for his spect project
«tach DEWA aproval forthe proposed model
«) n equpmen: schedule, include PACU tg nos. and AC aeasitis serving
{) Furnish details of ant.corocive coatings inthe mato submital. Condenser col shall be
provided wih quad
6) Include tocneal datasheet Indcatng constuctinal features ofthe complete package uns,
1h) Package units cabinet shall be provided wih corrosion reitant coating, Contractoiupoiior
{o.com the compliance.
1) Packago unit bower fans shall be selected to have non overloading operation
(Contractorsuppier to confi the compliance,
|) Furnish the projet pact; factory carted wining clagram of package unt skid mounted
power cum contra panel
erty he proper model cluding the motor blower of each unselected and its shoul bo as
por approved Hea: Load Calculation data
1) The Capacty ofthe selected et should base onthe approved heat oad caloation,
'm) Sutjoct to ful compliance to manufacturer ‘staan instructions & avalabilty ct room
peratures urder project spectied ambient conten.
omar ge AAT PataMATERIAL TRANSMITTAL SHEET - CONSULTANCY PROJECT
Fe. of the matorialsubmital shall be submited after complying al the comments. As per MSCMS
Ist this materal is pony 8 material, hence Rev.0 ofthe MTS shall be submited afer suomting al
IMTS which is prionty 1 8.2
ee Paxaola