Annexure-1

Existing water tank Renovation work


Calculation of Circumference Length of Existing Water tank floor
Nos = 15.25/0.15(Spacing) = 102 Nos
Steel Calculation Sheet, 6mm dia & 8mm dia tar steel

Circumference Length
Round Diameter "d" "C" = 3.14xDiameter("d")
1 2 3
1 0.30 0.94
2 0.60 1.88
3 0.90 2.83
4 1.20 3.77
5 1.50 4.71
6 1.80 5.65
7 2.10 6.59
8 2.40 7.54
9 2.70 8.48
10 3.00 9.42
11 3.30 10.36
12 3.60 11.30
13 3.90 12.25
14 4.20 13.19
15 4.50 14.13
16 4.80 15.07
17 5.10 16.01
18 5.40 16.96
19 5.70 17.90
20 6.00 18.84
21 6.30 19.78
22 6.60 20.72
23 6.90 21.67
24 7.20 22.61
25 7.50 23.55
26 7.80 24.49
27 8.10 25.43
28 8.40 26.38
29 8.70 27.32
30 9.00 28.26
31 9.30 29.20
32 9.60 30.14
33 9.90 31.09
34 10.20 32.03
35 10.50 32.97
36 10.80 33.91
37 11.10 34.85
38 11.40 35.80
39 11.70 36.74
40 12.00 37.68
41 12.30 38.62
42 12.60 39.56
43 12.90 40.51
44 13.20 41.45
45 13.50 42.39
46 13.80 43.33
47 14.10 44.27
48 14.40 45.22
49 14.70 46.16
50 15.00 47.10
51 15.30 48.04
52 15.60 48.98
53 15.90 49.93
54 16.20 50.87
55 16.50 51.81
56 16.80 52.75
57 17.10 53.69
58 17.40 54.64
59 17.70 55.58
60 18.00 56.52
61 18.30 57.46
62 18.60 58.40
63 18.90 59.35
64 19.20 60.29
65 19.50 61.23
66 19.80 62.17
67 20.10 63.11
68 20.40 64.06
69 20.70 65.00
70 21.00 65.94
71 21.30 66.88
72 21.60 67.82
73 21.90 68.77
74 22.20 69.71
75 22.50 70.65
76 22.80 71.59
77 23.10 72.53
78 23.40 73.48
79 23.70 74.42
80 24.00 75.36
81 24.30 76.30
82 24.60 77.24
83 24.90 78.19
84 25.20 79.13
85 25.50 80.07
86 25.80 81.01
87 26.10 81.95
88 26.40 82.90
89 26.70 83.84
90 27.00 84.78
91 27.30 85.72
92 27.60 86.66
93 27.90 87.61
94 28.20 88.55
95 28.50 89.49
96 28.80 90.43
97 29.10 91.37
98 29.40 92.32
99 29.70 93.26
100 30.00 94.20
101 30.30 95.14
102 30.50 95.77
Total length (In Meters) 4948.01
Avegrage Weight = 0.39 ( 8 mm dia)+0.22( 6 mm dia)/2 = 0.305 kg/m
Quantity = Total Length x Avg Weight = 4948.01(m) x 0.305 kg/m = 1509.14 kgs

Below is current wrong measurement (without calculation) shown in Measurment book No.23
203 nos x 16(m) x 0.22 = 714.56 Kgs

Please see above calculation of steel used for Circumference Length/Quantity. Correct
should be 1509.14 Kgs, but as per wrong calculation in 1st R/A bill mentioend as 714.56 Kgs
Annexure-II
Existing water tank Renovation work
Calculation of Longitudinal Steel length of existing Water tank floor
Existing water tank Renovation work
Calculation of Longitudinal Length of Existing Water tank floor
Steel Calculation Sheet, 6mm dia & 8mm dia tar steel
Total Length
Round/Diameter Nos Average Nos Length (Column 3x4)
1 2 3 4 5
102nd / 30.50m Dia95.77/0.15 = 638+1 = 639 - -
1*0.10=0.10 -
75th / 22.50m Dia 70.65/0.15 = 471+1 = 472 555.50 Total = 4.00 2222.00
51st / 15.30m Dia 48.04/0.15 = 320+1 = 321 396.50 24*0.15=3.60 1427.40
25th / 7.50m Dia 23.55/0.15 = 157+1 = 158 239.50 26*0.15=3.90 934.05
1st / 0.30m Dia 0.94/0.15 = 6+1 = 7 82.50 25*0.15=3.75 309.38
Total 15.25m ( Radius) 4892.83m

Avegrage Weight = 0.39 ( 8 mm dia)+0.22( 6 mm dia)/2 = 0.305 kg/m


Qnty=4892.83m x 0.305kg/m = 1492.31kgs

Below is current wrong measurement (without calculation) shown in measurement book


638 nos. x 1.3(m) x 0.22 = 182.468 Kgs.

Please see above calculation on steel used for Longitudinal work. Correct should be 1492.31 Kgs
but as per wrong measurement in current bill mentioend as 182.468 Kgs
Existing water tank Renovation work
Calculation of Longitudinal Length of Existing Water tank floor
Steel Calculation Sheet, 6mm dia & 8mm dia tar steel
No. of (Column
Round/Diameter steel=Circumference Nos. Length 3x4)
1 length/Spacing
2 3 4 5

102nd / 30.50m Dia 95.77/0.15 = 639 639 13*0.15=3.90


1*0.10=0.10
Total = 2.05 1390.95
88th/26.40m Dia 82.90/0.15=553 553 13*0.15=1.95 1078.35
75th / 22.50m Dia 70.65/0.15 = 471 471 12*0.15=1.80 847.80
63th/18.90m Dia 59.35/0.15=396 396 12*0.15=1.80 712.80
51st / 15.30m Dia 48.04/0.15 = 321 321 13*0.15=1.95 625.95
38th/11.40m Dia 35.80/0.15=239 239 13*0.15=1.95 466.05
25th / 7.50m Dia 23.55/0.15 = 157 157 15*0.15=2.25 353.25
10th/3.00m Dia 9.42/0.15=63 63 08*0.15=1.20 75.60
2nd / 0.60m Dia 1.88/0.15 = 13 13 0 0.00
14.95+0.30=15.25m
Total ( Radius) 5550.75m

Avegrage Weight = 0.39 ( 8 mm dia)+0.22( 6 mm dia)/2 = 0.305 kg/m


Qnty=5550.75m x 0.305kg/m = 1692.98 kgs

Below is current wrong measurement (without calculation) shown in Measurement book No.23
638 nos. x 1.3(m) x 0.22 = 182.468 Kgs.

Please see above calculation of steel used for Longitudinal work. Correct should be 1692.98 Kgs, but
as per wrong calculation in 1st R/A bill mentioend as 182.468 Kgs
3rd R/A Bill
Guru Govind Singh Udyan, Mahasamund (Bill recorded in MB No.23)
S.No Item of Work Nos. Length(L) Breadth(B) Depth/Height(D/H) Quantity
1 2 3 4 5 6 7=3*4*5*6
Below measurement was not mentioned in
1st/2nd R/A bill,it need to be included in 3rd R/A
bill :-
1 Ordinary shrub jungle clearance (between
boundary wall and road) by JCB
Parking area of R/S of main gate 1 80.00 6.00 -- 480.00 Sqm
Removing/Dismentling of barbed wire fencing
2 by manual labour
Boundary wall 1 157.00 157.00 m.
Fencing wall 1 353.80 353.80 m.
manual labour(before start of construction
3 work) 1 157.00 157.00 m.
of barbed wire fencing(for layout of
4 boundary wall)
Dismentling of old plaster,either side of main 1 157.00 157.00 m.
5 gate wall
Wall L/S front & back 2 4.40 1.50 - 13.20
Wall R/S front & back 2 5.30 1.60 - 16.96
Wall in round front & back 2 10.70 0.85 - 18.19
Dewatering by 2 nos. electric pump on existing
6 circular water tank during construction
Rent need to be paid for using 2 pumps for 3 days to remove water from existing tank

7 Tree Cutting on new pathway construction( R/S of main gate)


3 Nos.tree cutting chagres need to be included in to 3rd R/A bill.
to give an even shade (i) on new work(two or
8 more coats) :-
Boundary wall
boundary wall Pillar
Gents toilet(inner & outer)
Ladies toilet(inner & outer wall)
more coats) to give an even shade
9 with(ii)Premium synthetic enamel paint
Boundary wall grill ....... ....... ....... ....... .......
....... ....... ....... ....... .......

10 White washing with lime


Fencing beam(inner & outer) 2 353.80 - ........ .......
......... - ........ .......

11 Providing and fixing checker


L/S of tiles parallel to
main gate
wall 1 45.00 1.88 - ......
R/S of main gate parallel to wall 1 ......... 1.88 - ......

12 Providing and fixing floor and wall tiles


Floor tiles:- Gents toilet
Ladies toilet
Wall tiles:- Gents toilet/Bathroom inner wall
Ladies toilet/Bathroom inner wall
Providing and fixing flush door shutters..........
13 (a)single leaf
Gents toilet door with frame
Ladies toilet door with frame
fixing with materials, fitting of PVC pipe from
14 urinal & toilet sheet to septic tank etc.
tape nal,over head tank.......etc. complete
15 fitting with materials

On 1st R/A bill


1 Excavation for all types of soils…….......
Columns
Drainsfor boundary
adjoining wall
boundary wall(old 63 1.00 1.00 1.00 63.00
measurement)
Drains adjoining boundary wall, where d=depth i/c
1 140.00 0.80 0.45 50.40
base concrete 1 172.40 0.80 0.70 96.54
Below measurement was not mentioned in 1st and 2nd R/A bill, it need to be included in 3rd
Parking area outer side of drain In between 1 150.00 6.00 0.30 270.00
road & drain(for moorum filling)
Fencing wall, beam 1 353.80 0.20 0.20 14.15
Fencing wall,Angle post 7 0.45 0.45 0.45 0.64
New pathway, excavation 1 1.00 1.00 0.90 0.90
Pathway R/S of main
for brick work 1 gate 0.20 0.20 ……...
for tree root cuting 3 0.60 0.60 0.60 0.65
for paver block 1 28.70 5.60 0.30 48.216
Centre of existing water tank:- Circular pillar 1 1.00 1.00 1.00 1.00

Excavation for Brick work (for making kyari) 1 72.00 0.15 0.0750.81
1 512.70 0.15 0.0755.77
1 92.90 0.15 0.0751.04
1 100.50 0.15 0.0751.13
503.846 Cum.
Add Countinue, measurment of work currently completed if any
…….. ……… ……… ………
TotalMB
Deduction of 1st R/A bill page no 2 of this Quantity
No.23 ………..
(-) 113.40 Cum
Net Quantity ………..

2 Providing and laying nominal mix C.C. 1:4:8 etc


Column base concrete 63 1.00
(172.40- 1.00 0.10 6.30
Drain base concrete 1 140.00)=32.40 0.80 0.10 2.59
Centre of existing water tank:-
Base concrete for circular pillar 1 1.00 1.00 0.10 0.10
Add Countinue, measurment of work currently completed if any ……… ……… ………… ……….
Total Quantity 8.99 Cum.
Providing and laying in position reinforcement
3 forRCC
RCCJali
workbelow
etc. column, 12mmØ(in place of
10mm)
Boundary
Nos wall:-
= 0.90/0.15 old =
= 6+1 measurement
7 Nos in both side 126 0.90 0.62 70.308 kgs.
Length & breadth for making jali 63x(2x7) 0.90m each - 0.89 kg/m 706.48
Old measurement 126 3.00 - 0.62 234.36 kgs.
Column 10mm Ø, whrer h=2.00(ht. of column) 63x2 3.40 - 0.62 kg/m 265.61
+0.20(beam thickness)+0.20(brick wall thickness) Nos.
Old measurement 126 3.00 0.89 336.42 kgs
Column 12mm Ø63x2 Nos. 3.40 0.89 kg/m 381.28
Nos = 3.40/0.15 = 23Column
Nos(inRing 8mm Dia(old mts.)
place of 20): Column
20 63.00 0.80 0.39 393.12 kgs.
Ring 8mm Ø 23x63 0.80 - 0.39 kg/m 452.09

Beam 12mm Ø 4 157.00 - 0.89 kg/m 558.92


Nos = 157/0.15 = 1046: Beam Ring 8mm Ø 1046 0.80 - 0.39 kg/m 326.352

Fencing wall:-
Beam 10mmØ 2 353.80 - 0.62 kg/m 438.712
Beam 12mmØ 2 353.80 - 0.89 kg/m 629.76
Beam Ring 8 mm Ø (Old measurement)
353.80/0.15=2358 Nos.(in place of 2350) Beam 2350 0.80 - @0.39 kg/m 733.20
Ring 8 mm Ø 2358 0.80 -- 0.39 kg/m 735.67

Existing Circular water tank:-


Floor circumference length (Old measurement) 203 16.00 - @0.22 714.56 kgs.
Calculation of floor circumference length(kindly
see Annexure-I) 6 mm & 8 mm Ø tar steel 4948.01 @0.305 kg/m 1509.14 Kgs.
Average weight=(0.39+0.22)/2=0.305 Kg/m

Floor Longitudinal length (Old measurement ) 67 16.00 @0.22 235.84 kgs.


Calculation of floor Longitudinal length(kindly
see Annexure-II) 6mm & 8mm Ø tar steel 5550.75 @0.305 kg/m 1692.98 Kgs.

Longitudinal length
Longitudinal length along
along circular
circular wallwall:-
(Old
95.77/0.15=638+1=639 Nos. : 6 mm & 8 mm Ø)
measurement 638 1.30 @0.22 182.468kgs.
tar steel Average weight=(0.39+0.22)/2=0.305 639 1.30 @0.305 kg/m 253.36 kgs
Kg/m
Below Measurement
Circumference lengthleft duecircular
along to mistake:-
wall:-
1.175/0.15=8+1=9 Nos. 6 mm & 8 mm Ø tar
(steel
measurement left)
Average weight=(0.39+0.22)/2=0.305
Kg/m 9 95.77 @0.305 kg/m 262.89

Centre of existing water tank:- Circular pillar


Jali below circular pillar,12mmØ 2x7 0.90 m. each @0.89 kg/m 11.21
for circular Pillar:- 10mm Ø, circumference 11 1.884 m. each @0.62kg/m 12.85
length C=3.14x0.60=1.884m,
Nos.=1.50/0.15=10+1=11 Nos.
Longitudinal length 10mm Ø,
Nos=1.884/0.30=6+1=7 Nos.,
L=0.90(foundation depth)+
0.60(above floor)=1.50 7 1.50m each @0.62kg/m 6.51

RCC precast drainage cover(Rectangular):-


Length portion10mmØ , Nos=0.75/0.15=5+1=6 25x6 0.75 - @0.62kg/m 69.75
Width portion10mmØ, Nos=0.60/0.15=4+1=5 25x5 0.60 - @0.62kg/m 46.50
Slab over septic tank:- Main bar, 12mmØ 8360.064 Kgs.
tar steel ....Nos ...... - @0.89 kg/m ........
Disribution bar, 10mmØ tar steel ....Nos ....... - @0.62 kg/m .......
Add continue, mts of work currently
completed if any …… ……. …… ……… ………
……. ……. ……. ………. ……….
....... ........ ........
......... ..........
Total qnty ……….. Kgs
Add 5% for overlap & westage(+) ………. Kgs
Deduction of 1st R/A bill qnty page No.4 of MB No.23 4854.024 kgs.
Net qnty. ………… kgs

4 Prviding & laying nominal mix reinforcement cement concrete 1:1.5:3 etc.
Above base concrete(for column
jali), Above
Lengthbase concrete(old
& Breadth same as base 63
aremeasurement) 0.90 0.90 0.15 7.655
concrete. 63 1.00 1.00 0.15 9.45
Old measurement 63 [0.35/3(0.9)² +(0.2)² +√(0.9)²x(0.2)²] 7.56
63
New measurement [0.35/3 (1.00)² +(0.2)²+√(1.0)²x(0.2)²] 9.11
Boundary wall :- Column (old measurement)63 0.20 0.20 2.50 6.30
Column 63 0.20 0.20 3.00 7.56
Beam 1 157.00 0.20 0.20 6.28

Fencing wall :- Beam 1 353.80 0.20 0.20 14.152

(Old measurement )Water tank circular 3.14 30.50 0.05 1.10 5.267
Water tank circular :- Wall concrete, 1 3.14x30.50 0.10 (1.10+0.075) 11.25
Circumference length C =πxd where h=1.10(ht. of
Floor concrete(Old measurement ) 1 3.14 (15.00)² 0.05 35.325
Floor concrete =πxR²xh, where 1 3.14 (15.25-0.10)² 0.075 54.05
R=d/2=15.25,but here R=[15.25-0.10(thickness
of circular wall concrete)], floor thickness
d=0.075of existing water tank:- Circular
Centre
Add extra rate for water proofing chemical on 10 Litres x 6 buckets
pillar,where h=0.90+0.60=1.50,
concrete(+) (for d=0.60,
protection to leakage of Q= π
x r²xh 1 3.14x(0.30)² 1.50 0.424

RCC precast drainage cover 25 0.75 0.60 0.10 1.13


113.406 Cum.
Slab over septic tank 1 ...... ...... 0.10 ......
Add continue, measurement of work currently
completed if any ……… …………… ……….. ………… …………
……. …….. …….. …….. …………
……… ………. ……… ………. ……….
Total qnty ………
Deduction 1st R/A bill qnty Page No.4 82.539Cum
of MB No.23 (-)
Net qnty ………..

5 Providing & laying nominal mix cement concrete………etc.


C.C.1:1.5:3
Drains (Old measurement ) 2 140.00 0.15 0.35 14.70
Drains:- Side Wall,where thickness
Base concrete(Upper coat) of (Old B=0.20 m 2 172.40 0.20 0.35 68.96
measurement) 1 140.00 0.40 0.05 2.80
Base concrete(Upper coat) 1 172.40 0.40 0.05 3.45
On Fencing wall (new angle post embeded)
Below Measurement left:-
(measurement left) Up to
plinth 7 0.40 0.40 0.60 0.67

Coping over brick wall (for making Kyari) 1 72.00 0.15 0.05 0.54
1 512.70 0.15 0.05 3.85
1 77.90+15.00=92.90 0.15 0.05 0.70
. 0.15 0.05 0.75
78.92 Cum.
Flooring infront of toilet biock(both side) 1 ......... ........ 0.30 .......
1 ......... ........ 0.30 .......
Add continue, measurement of work currently
completed if any ……… ………… …………. ………… …………
…… …….. …….. ……… ………
…….. …….. ……… ……… ………
(61.42 Cum) Total q …………Cum.
Deduction 1st R/A bill qnty Page No. 6 of MB No.23
(-)17.50
Net ………….Cum.

6 Brick work with modular well burnt clay..............etc.


L/S of main gate brick wall:- 1 4.40 0.20 0.30 0.264 cum

Brick work (for making kyari) 1 72.00 0.15 0.30 3.24


1 512.70 0.15 0.25 12.82
1 92.90 0.15 0.35 4.88
1 100.50 0.15 0.25 3.77

Add continue, measurement of work


currently completed if any ........ ......... ......... ......... ........
........ ......... ......... ......... ........
Total qnty 24.974 Cum.

9 Providing and fixing form work etc.


Below measurment was not mentioned in 1st R/A bill, it need be included in 3rd R/A bill
Boundary wall - D.P.C. 2 157.00 0.05 15.70
Column,Pillars(Old measurement) 63 4No.x0.20 2.40
Boundary wall - Column(Pillars), where 63 4x0.20 (3.00-2.40) = 0.60 30.24
h=2.00(Ht. of column)+0.20(Beam thickness)
+0.20(brick wall thickness)+(1.00-0.40) foundation
depth=3.00 m 32.40
(172.40-140.00) =
Drains 4 32.40 0.35 45.36
Centre of existingC=Circumference=2πr,
where r=d/2=0.30 water tank:- Circular pillar
A=2πrh 1 2x3.14x0.30 - 1.50 2.83

RCC precast drainage cover :- Length 2 0.75 - 0.10 0.15


Width 2 0.60 - 0.10 0.12

For coping over brick wall (for making Kyari) 1 778.10 - 0.05 38.90

Slab over septic tank:-Below slab 1 ...... ...... - ......


Length sides of slab 2 ...... - ...... ......
Width side of slab 2 ...... - ...... ......
Add countinue, measurment of work
currently completed if any …….. …….. …….. ……. …….
……… …….. …….. …….. ……..
Total qnty ……...sqm.

10 Providing and placing in position angle……………..etc


Below measurment was not mentioned in 1st R/A bill, it need to be included in 3rd R/A bill
Fencing wall:- On Top of straight Angle
post,longitudinal length 1 353.80 @3.00 kg/m 1061.40 kgs
Extended on top of angle post 162 0.30 3.00 kg/m 145.80
straight angle post(Which was already theft) 7 1.60 3.00 kg/m 33.60
Total qnty 1240.80 kgs

20 Providing and fixing cermic glazed wall tiles………..etc


On exisitng circular water tank:-
Circumference length of wall inner (old
measurement) 83 83.00 - 1.30 107.90
Circumference length of wall inner side
1 95.09 - 1.42(avg) 135.02
Top of Wall, where inner/outer (97.84+95.09)/2
1 0.45 - 43.41
circumference length=95.09/97.84
Add extra rate for water proofing chemical on 10 Litres x 6 buckets
mortar(+) (for protection to leakage
of water) Either side of main gate,Parallel to wall:-
Wall L/S front & back 2 4.40 - 1.50 13.20
Wall R/S front & back 2 5.30 - 1.60 16.96
Wall in round front & back 2 10.70 - 0.85 18.19

Total qnty 226.78 sqm.


Addbetween
(difference of rate Extra rate for dark
normal blue tiles
glazed glazed tiles ..........
and
dark blue glazed tiles)
Deduction for 2nd R/A bill on Page No. 20 of this (-)107.90
MB No.23
Net Quantit 118.88 sqm.

On 2nd R/A bill


15 15mm thick cement Plaster..........etc. ( Left on 2nd R/A bill)
On uneven Wall of
surface existing waterof tank:-
Add waterofproofing
circular wall
chemicalwater
on 1
tank,inside
plastering(for protection to leakage of 95.09 - 1.42(avg) 135.03
water) 10 litre x 3 buckets ……….
Either side of main gate wall:-New plastering
after dismentling :-
Wall L/S front & back 2 4.40 - 1.50 13.20
Wall R/S front & back 2 5.30 - 1.60 16.96
Wall in round front & back 2 10.70 - 0.85 18.19
183.38 Cum
Fencing beam(inner & outer side):- 2 353.80 - .......... .........

Above measurement was not mentioned in 1st & 2nd R/A bill, it need to be included in
3rd R/A bill

Add countinue, measurment of work


currently completed if any ...... ...... ........ ........ .......
...... ...... ........ ........ ......
Total qnty ..........sqm.

18 Providing & laying nominal mix cement


concrete.......etc. 1:3:6
Pathway concrete R/S of main gate( Parallel to
boundary wall) 1 ........... .......... ......... .........

Total qnty .........


22 Steel
Labourwork in tubaler
charge extra( round, square and
for bending or rectangular)……..etc
welding etc. Paid by normal grill rate@88.50/kg 2313.84 kgs.
(Add difference of rate between design grill and normal grill) ………
Total Amount
Tender rate @19.11% below SOR
Deductions:- @5% SD
@1% IT for individual (2% for Firm/Company)
@1% KKU
Royalty
@2% GST
Net Amount
Cum.
Kgs.

Kgs.
4 Kgs.

Cum.
um.
sqm.