Professional Documents
Culture Documents
Azp 3hari
Azp 3hari
30
Data of Material
Correction
Addition of water, kg 0.45
Addition of SP, kg 0.00
Addition of WR, kg 0.00
Data of Material
Combination
Correction 613.6
per m3 813.1
191 960.4 12396.88
429 1097.1 27833.26
0 1132.5
599 1147.6
0 38911.45
0
1017
0.000 66018.26
1.715
1
2237
0.0721
Correction
per m3
191
480
0
557
0
0
1017
0.0
1.920
2247
f(x) = NaN ln(x) NaN
R² = NaN
12
water
10
8 Column Q
6 Logarithmic
(Column Q)
4
2
0
0 2 4 6 8 10 12
max. size
PROPORTIONING OF CONCRETE MATERIAL
Data of Material
Agg.vol
1080 28-Oct
18-Feb
11-Jun
3-Oct
24-Jan
128 21.73175 78.26825 18-May
311 52.80136 47.19864 324
8-Sep
422 71.64686 28.35314
494 83.87097 16.12903 30-Dec
553 93.88795 6.112054 30 40
570 96.77419 3.225806
589 100 0
2.4 0.64
613.6 2.6 0.62
813.1 2.8 0.6
960.4 3 0.58
1097.1
1132.5 61 52
1147.6
59.65 40.35 0.375 9.4125 3
0.5 12.55 2.5
0.75 18.825 2
1 25.1 1.5
1.5 37.65 1
2 50.2 0.5
15-Mar 12
6-Jul
10
Agg.vol
Agg.vol
28-Oct
18-Feb 8
11-Jun Column N Column N
6 f(x) = 556.152819192338 x − 29170.8265091921 Linear (Column N)
Linear (Column N)
3-Oct R² = 0.479513314984534
24-Jan 4
18-May
2
8-Sep
30-Dec 0
30 55 f(x)
40 = 0 60
50 60
65 70 70 80 75 90 80
100 110
85 90
R² = 0
FM FM
water
100 10 10
Column Q
Logarithmic
(Column Q)
PROPORTIONING OF CONCRETE MATERIAL
Data of Material
613.6
813.1
960.4
1097.1
1132.5
1147.6
PROPORTIONING OF CONCRETE MATERIAL
Data of Material
Combination
100
96
85
63
38
15
2
0
0.6
0.4
Correction 613.6
AB per m3 813.1
0.012 226 960.4
0.009 507 1097.1
0.000 0 1132.5
0.015 696 1147.6
0.000 0
0.017 778
0.00014 3.043
0.00010 2.029
0.0016
0.0543 2212
Correction
AB per m3
0.014 226
0.010 480
0.000 0
0.018 732
0.000 -13
0.020 778
0.00015 2.9
0.00011 1.920
0.0019
0.0634 2208