1.00 Earthworks
1.02 Structural Excavation cu.m 5.12 0.00 200.00 0.00 1,024.00 1,024.00
1.03 Backfilling and Compaction cu.m 4.40 0.00 45.00 0.00 198.00 198.00
1.04 Gravel Bedding G-1 cu.m 0.64 700.00 169.90 448.00 108.73 556.73
Sub-total 1,778.73
2.00 Err:504
Wall Footing cu.m 0.72
2.01 Portland Cement bag 7.00 Err:504 Err:504 Err:504 Err:504 Err:504
2.05 Crushed Gravel 1" cu.m 0.75 Err:504 Err:504 Err:504 Err:504 Err:504
2.03 Washed Sand cu.m 0.50 Err:504 Err:504 Err:504 Err:504 Err:504
Column/Stiffener cu.m 0.45
2.01 Portland Cement bag 5.00 Err:504 Err:504 Err:504 Err:504 Err:504
2.02 Crushed Gravel 3/4" cu.m 0.50 Err:504 Err:504 Err:504 Err:504 Err:504
2.03 Washed Sand cu.m 0.25 Err:504 Err:504 Err:504 Err:504 Err:504
Beams cu.m 1.02
2.01 Portland Cement bag 10.00 Err:504 Err:504 Err:504 Err:504 Err:504
2.02 Crushed Gravel 3/4" cu.m 1.25 Err:504 Err:504 Err:504 Err:504 Err:504
2.03 Washed Sand cu.m 0.75 Err:504 Err:504 Err:504 Err:504 Err:504
Slab on Grade cu.m 16.20
2.01 Portland Cement bag 146.00 Err:504 Err:504 Err:504 Err:504 Err:504
2.05 Crushed Gravel 1" cu.m 16.25 Err:504 Err:504 Err:504 Err:504 Err:504
2.03 Washed Sand cu.m 8.25 Err:504 Err:504 Err:504 Err:504 Err:504
Sub-total Err:504
3.00 Rebar Works
Wall Footing kg 33.26
Columns kg 44.35
Beams kg 113.34
Slab on Grade kg 426.11
3.01 Deformed Round Bars, Grade 40 kg 617.07 Err:504 Err:504 Err:504 Err:504 Err:504
3.02 G.I. Tie Wire kg 13.00 Err:504 Err:504 Err:504 Err:504 Err:504
Sub-total Err:504
4.00 Formworks
Columns sq.m 11.00
4.01 Coco Lumber bd.ft 56.10 18.00 4.25 1,009.80 238.43 1,248.23
4.02 Plywood Ordinary, 1/4" x 4' x 8' pc 2.00 370.00 86.25 740.00 172.50 912.50
4.04 CWN, Assorted kg 1.00 60.00 15.00 60.00 15.00 75.00
Beams sq.m 13.60
4.01 Coco Lumber bd.ft 69.60 18.00 4.25 1,252.80 295.80 1,548.60
4.02 Plywood Ordinary, 1/4" x 4' x 8' pc 3.00 370.00 86.25 1,110.00 258.75 1,368.75
4.04 CWN, Assorted kg 1.00 60.00 15.00 60.00 15.00 75.00
Sub-total 5,228.08
5.00 Masonry Works
Masonry Wall sq.m 44.00
5.04 CHB 4" thk pc 550.00 Err:504 Err:504 Err:504 Err:504 Err:504
5.02 Portland Cement bag 22.00 Err:504 Err:504 Err:504 Err:504 Err:504
5.03 Washed Sand cu.m 2.00 Err:504 Err:504 Err:504 Err:504 Err:504
5.06 10mm x 6m RSB kg 59.00 Err:504 Err:504 Err:504 Err:504 Err:504
5.07 G.I. Tie Wire kg 2.00 Err:504 Err:504 Err:504 Err:504 Err:504
Plastering sq.m 88.00
BLDG. 2 - ONE STOREY THREE CLASSROOM SCHOOL BUILDING, BLSB TYPE II BLDG (6m x 8m)
9.00 Ceiling and Carpentry Works
Exterior Ceiling sq.m 11.68
9.13 Rough Lumber, Sun Dried, Tanguile bd.ft 20.00 43.00 6.71 860.00 134.20 994.20
9.06 Plywood, Marine 1/4" x 4' x 8' pc 4.00 405.00 89.10 1,620.00 356.40 1,976.40
9.22 Finishing Nails kg 1.00 70.00 15.40 70.00 15.40 85.40
9.23 Common Wire Nails kg 1.00 60.00 11.00 60.00 11.00 71.00
Sub-total 3,127.00
I. MATERIALS Err:504
II. LABOR Err:504
III. DIRECT COST (I + II) Err:504
IV. INDIRECT COST 22% of (III) Err:504
V. TAX 5% of (III + IV) Err:504
VI. TOTAL CONSTRUCTION COST (III + IV + V) Err:504
ARMANDO C. SORIANO JR. ROMEL L. LIBANG, Ph.D. GILBERT N. TONG, CEO VI, CESO VI
Division Engineer III Chief, SGOD Schools Division Superintendent
BLDG. 1 - ONE STOREY TWO CLASSROOM SCHOOL BUILDING , BOD BLDG. (7m x 8m)
2.00 Concreting Works
Slab on Grade cu.m 11.20
2.01 Portland Cement bag 101.00
2.05 Crushed Gravel 1" cu.m 11.25
2.03 Washed Sand cu.m 5.75
Sub-total
3.00 Rebar Works
Slab on Grade kg 294.60
3.01 Deformed Round Bars, Grade 40 kg 294.60
3.02 G.I. Tie Wire kg 6.00
Sub-total
5.00 Masonry Works
Masonry Wall sq.m 3.90
5.04 CHB 4" thk pc 49.00
5.02 Portland Cement bag 2.00
5.03 Washed Sand cu.m 1.00
5.06 10mm x 6m RSB kg 6.00
5.07 G.I. Tie Wire kg 1.00
Plastering sq.m 85.80
5.02 Portland Cement bag 29.00
5.03 Washed Sand cu.m 3.00
Sub-total
6.00 Doors and Windows
6.01 Removal of Door with Jamb set 4.00
BLDG. 2 - ONE STOREY TWO CLASSROOM SCHOOL BUILDING , BOD BLDG. (7m x 8m)
5.00 Masonry Works
Masonry Wall sq.m 3.90
5.04 CHB 4" thk pc 49.00
5.02 Portland Cement bag 2.00
5.03 Washed Sand cu.m 1.00
5.06 10mm x 6m RSB kg 6.00
5.07 G.I. Tie Wire kg 1.00
Plastering sq.m 85.80
5.02 Portland Cement bag 29.00
5.03 Washed Sand cu.m 3.00
Sub-total
6.00 Doors and Windows
BLDG.3 - ONE STOREY ONE CLASSROOM CLASSROOM SCHOOL BUILDING , DEPED/DPWH BLDG. (7m x 9m)
5.00 Masonry Works
Plastering sq.m 167.08
5.02 Portland Cement bag 56.00
5.03 Washed Sand cu.m 6.00
Sub-total
9.00 Ceiling and Carpentry Works
Interior and Exterior Ceiling sq.m 114.00
Metal Carrying Channel (12mm x 38mm x 5m x 0.8mm
9.13 pc 22.00
thk)
9.02 Plywood, Ordinary 1/4" x 4' x 8' pc 28.00
9.06 Plywood, Marine 1/4" x 4' x 8' pc 12.00
Metal Double Furring Channel (19mm x 50mm x 5m x
9.22 pc 39.00
0.5mm thk)
9.32 Wall Angle pc 26.00
W Clip pc 183.00
Suspension Clip & Rod Joiner pc 94.00
Steel Angle pc 94.00
Round Bar Hanger (8 mm diam.) kg 103.00
8.37 Blind Rivets pc 384.00
Nails (# 3) kg 2.00
9.19 Fascia Board, Fiber Cement 10" x 12' pc 12.00
9.15 Ceiling Vent 1" x 12" x 4' with Screen pc 4.00
Sub-total
10.00 Electrical Works
Roughing-ins
10.01 Electrical Conduit uPVC, 15mmØ pc 15.00
10.06 RSC 20mmØ pc 1.00
10.34 Entrance Cap 20mm dia. pc 1.00
10.16 Junction Box, 4" x 4" G.I. pc 6.00
10.17 Utility Box, 2" x 4" G.I. pc 4.00
10.37 Grounding Rod, 2.4m x 16mm dia. pc 1.00
Wires & Fixtures
10.11 3.5 mm2 THW Wire, Stranded m 135.00
10.12 5.5 mm2 THW Wire, Stranded m 5.00
10.28 Duplex C.O. with Plate pc 4.00
10.25 3-Gang Switch with Plate pc 1.00
10.23 Single Switch with Plate pc 1.00
FL 1 x 36W Fluorescent Lighting Fixture (Box Type -
10.21 set 4.00
Surfaced Ceiling Mounted)
18W Compact Fluorescent Lighting Fixture with Medium
10.21 keyless type Porcelain Receptacle (surfaced Ceiling set 2.00
Mounted)
10.39 Wall Fan (Standard/Any Equivalent) set 2.00
10.48 Panel Box, Flush Type, 4 Branches set 1.00
10.40 Circuit Breaker, 40A 2P set 1.00
10.38 Circuit Breaker, 20A 2P set 2.00
10.58 Electrical Tape pc 2.00
Sub-total
13.00 Painting Works
Concrete surfaces sq.m 226.45
13.01 Latex, Flat gal 5.00
13.02 Latex, Semi Gloss gal 10.00
13.20 Acri Color qrt 3.00
Wood surfaces sq.m 121.56
13.04 Enamel, Flatwall gal 5.00
13.15 Glazing Putty gal 3.00
13.05 Enamel, Semi Gloss gal 5.00
13.16 Paint Thinner gal 3.00
Sub-total
BLDG. 4 - ONE STOREY ONE CLASSROOM SCHOOL BUILDING , PTA BLDG. (6m x 9m)
6.00 Doors and Windows
6.02 Removal of Window with Jamb sq.m 5.85
W - 1, ( 1.3 x 1.5 m) Steel Casement Window with
6.51 Grilles, Semi French Type with 1/4 thk Clear Glass set 3.00
Panes complete with Accessories
Sub-total
8.00 Roofing Works
8.01 Removal of Roofing Sheets sq.m 110.00
Long-Span Roofing, Corrugated, Pre-Painted, 1220mm x
8.16 m 110.00
0.4mm thk
Ridge Roll, Pre-Painted, Ordinary, 0.610m x 2.440m x
8.17 pc 5.00
0.4mm thk
Flashing, Pre-Painted, Ordinary, 0.610m x 2.440m x
8.19 pc 10.00
0.4mm thk
8.35 Teckscrew 2-1/2" pc 880.00
8.36 Roof Sealant L 2.00
Sub-total
9.00 Ceiling and Carpentry Works
9.01 Removal of Ceiling sq.m 75.50
Interior and Exterior Ceiling sq.m 75.50
Metal Carrying Channel (12mm x 38mm x 5m x 0.8mm
9.13 pc 15.00
thk)
9.02 Plywood, Ordinary 1/4" x 4' x 8' pc 19.00
9.06 Plywood, Marine 1/4" x 4' x 8' pc 8.00
Metal Double Furring Channel (19mm x 50mm x 5m x
9.22 pc 26.00
0.5mm thk)
9.32 Wall Angle pc 17.00
W Clip pc 121.00
Suspension Clip & Rod Joiner pc 62.00
Steel Angle pc 62.00
Round Bar Hanger (8 mm diam.) kg 69.00
8.37 Blind Rivets pc 254.00
Nails (# 3) kg 1.00
9.19 Fascia Board, Fiber Cement 10" x 12' pc 11.00
9.15 Ceiling Vent 1" x 12" x 4' with Screen pc 4.00
Trusses/Purlins
9.34 Removal of Wooden Truss / Purlins bd.ft 144.00
9.13 Rough Lumber, Sun Dried, Tanguile bd.ft 144.00
9.23 Common Wire Nails kg 3.00
9.42 Wood Preservative, Brown L 1.00
Sub-total
10.00 Electrical Works
Roughing-ins
10.01 Electrical Conduit uPVC, 15mmØ pc 15.00
10.06 RSC 20mmØ pc 1.00
10.34 Entrance Cap 20mm dia. pc 1.00
10.16 Junction Box, 4" x 4" G.I. pc 6.00
10.17 Utility Box, 2" x 4" G.I. pc 4.00
10.37 Grounding Rod, 2.4m x 16mm dia. pc 1.00
Wires & Fixtures
10.11 3.5 mm2 THW Wire, Stranded m 135.00
10.12 5.5 mm2 THW Wire, Stranded m 5.00
10.28 Duplex C.O. with Plate pc 4.00
10.25 3-Gang Switch with Plate pc 1.00
10.23 Single Switch with Plate pc 1.00
FL 1 x 36W Fluorescent Lighting Fixture (Box Type -
10.21 set 4.00
Surfaced Ceiling Mounted)
18W Compact Fluorescent Lighting Fixture with Medium
10.21 keyless type Porcelain Receptacle (surfaced Ceiling set 1.00
Mounted)
10.48 Panel Box, Flush Type, 4 Branches set 1.00
10.40 Circuit Breaker, 40A 2P set 1.00
10.38 Circuit Breaker, 20A 2P set 2.00
10.58 Electrical Tape pc 2.00
Sub-total
13.00 Painting Works
Concrete surfaces sq.m 79.20
OTHERS
6.00 Doors and Windows
6.26 Security Grilles sq.ft 268.53
Sub-total
I. MATERIALS
II. LABOR
III. DIRECT COST (I + II)
IV. INDIRECT COST 22% of (III)
V. TAX 5% of (III + IV)
VI. TOTAL CONSTRUCTION COST (III + IV + V)
Prepared by:
PROGRAM OF WORKS
BEFF 2017 Repair - Region 02 - Cagayan
Item I.D. Item Description % of Total Unit Quantity Total Cost Remarks
I. DIRECT COST
General Requirements lot 1.00
BLDG. 1 - ONE STOREY TWO CLASSROOM SCHOOL BUILDING , BOD BLDG. (7m x 8m)
2 Concreting Works cu.m 11.20
3 Rebar works kg 294.60
5 Masonry Works sq.m. 3.90
6 Doors & Windows lot 1.00
8 Roofing Works m 266.00
9 Ceiling & Carpentry Works sq.m. 196.80
10 Electrical Works lot 1.00
13 Painting Works sq.m 552.27
BLDG. 2 - ONE STOREY TWO CLASSROOM SCHOOL BUILDING , BOD BLDG. (7m x 8m)
5 Masonry Works sq.m. 85.80
6 Doors & Windows lot 1.00
8 Roofing Works m 266.00
9 Ceiling & Carpentry Works sq.m. 196.80
10 Electrical Works lot 1.00
13 Painting Works sq.m 552.27
BLDG.3 - ONE STOREY ONE CLASSROOM CLASSROOM SCHOOL BUILDING , DEPED/DPWH BLDG. (7m x 9m)
5 Masonry Works sq.m. 167.08
9 Ceiling & Carpentry Works sq.m 114.00
10 Electrical Works lot 1.00
13 Painting Works sq.m 348.01
BLDG. 4 - ONE STOREY ONE CLASSROOM SCHOOL BUILDING , PTA BLDG. (6m x 9m)
6 Doors & Windows lot 1.00
8 Roofing Works m 110.00
9 Ceiling & Carpentry Works sq.m 75.50
10 Electrical Works lot 1.00
13 Painting Works sq.m 162.26
OTHERS
6 Doors & Windows lot 1.00
l. MATERIALS
ll. LABOR
lll. DIRECT COST
IV. INDIRECT COST 22% of (Ill)
Overhead Expenses (8%)
Contingencies (3%)
Miscellaneous (1%)
Contractor's Profit (10%)
Sub-Total
V. TAX 5% of (IIl+IV)
Sub-Total
Prepared: