Input no of users or population 50.000
Input LPCD 135.000
Asummed period of cleaningin years 2.000
Quantity of water used 6750.000
Quantity of water coming to septic tank 5400.000
Space required for retension of sewage 5400.000
Input digestion rate of sewage 0.035
Space required for digestion of sludge 1.750
Input Sludge storage capacity per capita 0.071
Space required for storage of digested sludge 3.540
Total space required for septic tank
Assume depth of liquid in meter 1.200
Area of Septic tank 8.908
Assume L/B ratio 2.000
Width of Septic tank 2.110
Length of septic tank 4.221
Assumed depth of free board 0.300
Total depth of septic tank 1.500
Designed Length of Septic Tank (L) in meters 4.221
Designed Width of Septic Tank (B) in meters 2.110
Designed Depth of Septic Tank (D) in meters 1.500
9. Total space required for septic tank = 5.40 + 1.75 + 3.54 = 10.69 C
10. Area of septic tank assuming depth of liquid as 1.20 m = Total vol
12. Total depth of septic tank = Depth of liquid + Free board = 1.20 +
13. Designed size of Septic tank = L X B X D = 4.20 X 2.10 X 1.50 m
Design of Soak Pit
Cum Item
Assume absorption capacity of soil lit/Cum/day
Quantity of effluent coming to soak pit
Volume of soak pit required
Assume depth of soak pit in meters
5.40 Area of soak pit
5.40 Diameter of soak pit in meters
0.04 Designed diameter of Soak pit (D) in meters
1.75 Designed Depth of Soak Pit (d) in meters
3.54
10.69
4.45
250 Lit/Cum/Day
f effluent coming to soak pit/Absorption capacity of soil
= 5400/1250 = 4.32 Cum
ing circular size
1.80 = 2.40 Sqm
d = 1.75 m
depth = 1.80 m
6750 = 5400 Liters = 5.40 Cum
5.40 Cum
No of users X rate of digestion = 50X 0.035 = 1.75 Cum
udge = No of users X Sludge storage capacity per capita
= 50 X 0.0708 = 3.54 Cum
1.75 + 3.54 = 10.69 Cum
as 1.20 m = Total volume/assumed dep = 10.69/1.2 = 8.90 Sqm
5 to 3 = 2
= 1 B X 2B = 8.90
B = 2.10 m
L = 2B = 2 X 2.10 = 4.20 m
+ Free board = 1.20 + 0.30 = 1.50 m
0 X 2.10 X 1.50 m
ak Pit
Lit Cum
1250.00 1.25
5400.00 5.40
4.32
1.80
2.40
1.75
1.75
1.80
Material Labour and other Rates
B) Labour:
Mistry day 1
Head Mason day 1
Mason day 1
Male mazdoor day 1
Female mazdoor day 1
Barbender day 1
Tile polisher day 1
Carpenter day 1
Helper day 1
Polisher day 1
Bhisti day 1
C) Add Contractors profit 10 % L/S
Add for T&P & Contingencies 5% L/S
Add Water charges 1.5 % L/S
Rate
(Rs.)
330.00
1500.00
8.75
850.00
85.00
80.00
650.00
300.00
30.00
35.00
40.00
125000.00
10.00
100.00
500.00
1000.00
850.00
800.00
600.00
500.00
800.00
600.00
800.00
600.00
600.00
400.00
10%
5%
1.50%
Completed Item Rates for Septic Tank
5.81 Cum
37.91 Sqm
37.80 Sqm
1.136 Cum
1.50 m
2 Nos
1.50 m
1.0 No
2.0 Nos
0.66 Cum
Abstract Sheet