Design of Septic Tank

Item Lit
Input no of users or population 50.000
Input LPCD 135.000
Asummed period of cleaningin years 2.000
Quantity of water used 6750.000
Quantity of water coming to septic tank 5400.000
Space required for retension of sewage 5400.000
Input digestion rate of sewage 0.035
Space required for digestion of sludge 1.750
Input Sludge storage capacity per capita 0.071
Space required for storage of digested sludge 3.540
Total space required for septic tank
Assume depth of liquid in meter 1.200
Area of Septic tank 8.908
Assume L/B ratio 2.000
Width of Septic tank 2.110
Length of septic tank 4.221
Assumed depth of free board 0.300
Total depth of septic tank 1.500
Designed Length of Septic Tank (L) in meters 4.221
Designed Width of Septic Tank (B) in meters 2.110
Designed Depth of Septic Tank (D) in meters 1.500

Design of Soak Pit for 50 Users


1.Assuming absorption capacity of soil as 1250 Lit/Cum/Day
2.Volume of soak pit required = Quantity of effluent coming to s

1.Assuming depth of soak pit = 1.80 m, having circular size


2.Area of soak pit = Volume/Depth = 4.32/1.80 = 2.40 Sqm
3.Diameter of soak pit = 3.142/4 X d X d = 2.40

4.Designed size of Soak pit = Diameter and Depth


diameter = 1.75 m
depth = 1.80
Design of Septic Tank for 50 Users
1.Population = 50
2.Assuming LPCD = 135
3.Assuming period of cleaning = 2 Years
4.Qty of water used = 50X135 = 6750 Liters
5.Qty coming to the septic tank = 80/100 X 6750 = 5400 Liters =
6.Space required for retention of sewage = 5.40 Cum
7.Space required for digestion of sludge = No of users X rate of d
8.Space required for storage of digested sludge = No of users X S

9. Total space required for septic tank = 5.40 + 1.75 + 3.54 = 10.69 C
10. Area of septic tank assuming depth of liquid as 1.20 m = Total vol

11. Size of septic tank considering L/B ratio as 1.5 to 3 = 2

12. Total depth of septic tank = Depth of liquid + Free board = 1.20 +
13. Designed size of Septic tank = L X B X D = 4.20 X 2.10 X 1.50 m
Design of Soak Pit
Cum Item
Assume absorption capacity of soil lit/Cum/day
Quantity of effluent coming to soak pit
Volume of soak pit required
Assume depth of soak pit in meters
5.40 Area of soak pit
5.40 Diameter of soak pit in meters
0.04 Designed diameter of Soak pit (D) in meters
1.75 Designed Depth of Soak Pit (d) in meters

3.54
10.69

4.45

250 Lit/Cum/Day
f effluent coming to soak pit/Absorption capacity of soil
= 5400/1250 = 4.32 Cum
ing circular size
1.80 = 2.40 Sqm

d = 1.75 m

depth = 1.80 m
6750 = 5400 Liters = 5.40 Cum
5.40 Cum
No of users X rate of digestion = 50X 0.035 = 1.75 Cum
udge = No of users X Sludge storage capacity per capita
= 50 X 0.0708 = 3.54 Cum
1.75 + 3.54 = 10.69 Cum
as 1.20 m = Total volume/assumed dep = 10.69/1.2 = 8.90 Sqm

5 to 3 = 2
= 1 B X 2B = 8.90
B = 2.10 m
L = 2B = 2 X 2.10 = 4.20 m
+ Free board = 1.20 + 0.30 = 1.50 m
0 X 2.10 X 1.50 m
ak Pit
Lit Cum
1250.00 1.25
5400.00 5.40
4.32
1.80
2.40
1.75
1.75
1.80
Material Labour and other Rates

Sr. Unit Quantity


no Item
A) Materials:
Cement bag 1.00
Sand Cum 1.00
Brick Nos 1.00
Aggregates Cum 1.00
Reinforcement Kg 1.00
Binding wire Kg 1.00
Vitrified tiles Sqm 1.00
Ceramic tiles Sqm 1.00
Acid Lit 1.00
White cement Kg 1.00
Kadappa Sqm 1.00
CCTW Wood Cum 1.00
Holdfast Nos 1.00
Nails Kg 1.00
Wood polish Lit 1.00

B) Labour:
Mistry day 1
Head Mason day 1
Mason day 1
Male mazdoor day 1
Female mazdoor day 1
Barbender day 1
Tile polisher day 1
Carpenter day 1
Helper day 1
Polisher day 1

Bhisti day 1
C) Add Contractors profit 10 % L/S
Add for T&P & Contingencies 5% L/S
Add Water charges 1.5 % L/S
Rate
(Rs.)

330.00
1500.00
8.75
850.00
85.00
80.00
650.00
300.00
30.00
35.00
40.00
125000.00
10.00
100.00
500.00

1000.00
850.00
800.00
600.00
500.00
800.00
600.00
800.00
600.00
600.00

400.00
10%
5%
1.50%
Completed Item Rates for Septic Tank

Item No Description of Item Quantity Rate


1 Cleaning of site 1 1000
2 Site Layout 1 500
3 Excavation 47.19 250
4 PCC 1:3:6 1.62 7500
5 BB Masonry 5.81 7500
6 External Plaster 37.91 450
7 Internal Plaster 37.8 500
8 RCC Slab 1.136 15000
9 PVC 100 mm pipe 1.5 90
10 100 mm dia Tee 2 125
11 Vent Pipe 1.5 90
12 PVC Cowl 1 75
CI Man hole cover
13 2 650
0.60X0.45 size

14 Concrete for 0.66 8500


Waterproofing base
Measurement Sheet

Item No Description of Item No Length Breadth Height Quantity


1 Cleaning of site 1 1
2 Site Layout 1 1
3 Excavation 1 6.5 4.4 1.65 47.19
4 PCC 1:3:6 1 4.5 2.4 0.15 1.62
1 13.52 0.23 1.5 4.66
5 BB Masonry 2 2.1 0.23 1.2 1.15
5.81
1 14.44 1.8 25.99
6 External Plaster 1 4.66 2.56 11.92
37.91
1 12.6 1.5 18.9
4 2.1 1.2 10.08
7 Internal Plaster 2.1
1 4.2 8.82
37.8
8 RCC Slab 1 4.66  2.56 0.1 1.19
Deduction for manholes 2 0.6 0.45 0.1 0.054
9 PVC 100 mm pipe 2 0.75 1.5
10 100 mm dia Tee 2 2
11 Vent Pipe 1 1.5 1.5
12 PVC Cowl 1 1
13 CI Man hole cover 0.60X0.45 size 2 2
14 Concrete for Waterproofing base 1 4.2 2.1 0.075 0.66
Total Quantity
1.0 Job
1.0 Job
47.19 Cum
1.62 Cum

5.81 Cum

37.91 Sqm

37.80 Sqm

1.136 Cum

1.50 m
2 Nos
1.50 m
1.0 No
2.0 Nos
0.66 Cum
Abstract Sheet

Item No Description of Item Quantity Rate Per Amount


1 Cleaning of site 1 1000 Job 1000
2 Site Layout 1 500 Job 500
3 Excavation 47.19 250 Cum 11797.5
4 PCC 1:3:6 1.62 7500 Cum 12150
5 BB Masonry 5.81 7500 Cum 43575
6 External Plaster 37.91 450 Sqm 17059.5
7 Internal Plaster 37.8 500 Sqm 18900
8 RCC Slab 1.136 15000 Cum 17040
9 PVC 100 mm pipe 1.5 90 M 135
10 100 mm dia Tee 2 125 No 250
11 Vent Pipe 1.5 90 M 135
12 PVC Cowl 1 75 No 75
13 CI Man hole cover 0.60X0.45 size 2 650 No 1300
14 Concrete for Waterproofing base 0.66 8500 Cum 5610
Total Rs. 129527
Add 10 % contractors profit Rs. 12952.7
Net Total Rs. 142479.7
Say Rs. 142480