Practical No.23 e
0.1 Title : Use the relevant software to prepare Detailed estimate of Septic Tank.
Use relevant software for estimating the quantities and cost of items of work.
Septic Tank
Sr
Particulars Amount
no.
Estimate Cost of abstract sheet: Rs. 12886.87
a) Septic tank
1) 0.50 m wide
7.80 0.50 0.4 1.56
L= 2*2.30+2*1.6 7.80m
2) 0.40m wide
3) 0.30m wide
3.1
8 )
RCC Work
0.822
4 Cement concrete in bottom:- 1.80 i.10 0.075 0.150 0.150
a) Septic tank
6.946
Abstract sheet
Name ofwork: Estimate for Septic Tank
2 1.72 cement concrete providing and laying Cubic 1090 Cubic meter 1874.8
in situ cement concrete in 1:4:8 of meter
3.71 brick masonry providing brick Cubic 1375 Cubic meter 5101.25
masonry in cement mortar 1:6 using meter
second class burnt brick in
0.819 RCC work: providing and costing in | Cubic 2840 Cubic meter 2005.04
situ cement concrete of m20 grade of meter
0.15 cement concrete providing and laying| Cubic 1090 Cubic meter 163.5
in situ cement concrete in 1:4:8 of meter
4.58 soak pit:- providing and constructing Cubic 273 Cubic meter 1250.34
soak pit of specified sizre as per meter
10 2.5 Pipe (0.15m diameter pipe) providing meter 137 meter 342.5
and laying 150 mm diameter concrete
pipes ofIS np2 class in proper line.
Level and slope including necessaryy
collars excavation, laying fixing with
collars in cement mortar 1:1 and rein
filling the trench complete spec.no.
Bc/v41.pg 573.
total cost-
Total = 12886.187
P P T Si30
DETAIL DRAWING OF SEPTIC TANK AND SOACKPIT
Mn holo aov
0.60%0.45
L20
PLAN
R.C.C.lut
R.C.C. prdi
0.07S. tuc.
0 40
Bnck bua
iausycomb
ickwa
g220.39
SECTION
-23
Practical No. 4
0.1 Title: Use the relevant software to prepare Detailed estimate of Well.
Use relevant software for estimating the quantities and cost of items of work.
Community Well
Sr Amount
Particulars
no.
Sr no. Description of item of work No. length breadth Depth Quantity Total Quantity
Excavation in soft soil for lead 30m 0.7853 (9.6)^2 1.5 108.57 108.57
and lift 1.5m below ground level upto
i.Sm
2 Excavation in soft soil , below ground 0.7853 (9.6)^2 1.5 108.57 108.57
level from 1.5 to 3 m
Excavation in soft rock, from 6 to 7.5m 0.7853 (9.6)^2 1.5 108.57 108.57
Excavation in softrock, from 7.5 to 9m1 0.7853 (9.6)^2 1.5 |108.57 108.57
Excavation in Hard rock, from 10.5 to 0.7853 (8.4)^2 1.5 83.126 83.126
12m
meter
and lift 1.5m below ground level upto
1.5m
83.126 Excavation in Hard rock, from 9 to Cubic 840 Cubic meter 69825.84
10.5m meter
83.126 Excavation in Hard rock, from 10.5 Cubic 840 Cubic meter 69825.84
to 12m meter
Total SO8398.08
PP Siso
- O9 6000
- 09.6000
09.401D
O114
C8.4138
PLAN
-GG. COPNG (1:4:3)
14
1.0000
- U . C R MASONRY 60 CM THCX
0000
TRIAL PIT
SOIL 3 M FROM G.L.
HARD MURUM -3 M TO 6M
-L4000-
SOFT ROCK -6 M TO 9M
HARD ROCK 9M TO 12 M