Identification Data
WWTP type:
Locality:
Investor/Owner:
Operator:
Designer:
Contractor of constructional part:
Contractor of the technological
part/Supplier of WWTP:
Person responsible for WWTP
operation:
Water law authority:
Water law decision:
The person appointed to perform
technical revision of a water work
notified pursuant to Section 15(a)
of the Water Act:
Permanent operation:
Permanent operation –
extended:
other data:
1/71
1
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
1 TABLE OF CONTENTS
1 TABLE OF CONTENTS.................................................................................................................. 2
2 DESIGNATION OF COMPLIANCE ON THE PRODUCT .............................................................. 4
3 INTRODUCTION ............................................................................................................................. 5
3.1 Generally ................................................................................................................................................................... 5
3.2 Graphical labelling of instructions .............................................................................................................................. 5
4 USING AND GENERAL DESCRIPTION OF WWTP ..................................................................... 5
5 WWTP OPERATING CONDITIONS ............................................................................................... 6
6 SAFETY PRECAUTIONS ............................................................................................................... 7
6.1 Requiremenets for the staff (companies) qualification ................................................................................................ 7
6.2 Principle of sage use ................................................................................................................................................. 7
6.3 Stop and shutdown .................................................................................................................................................... 7
6.4 Protection against possible danger ............................................................................................................................ 7
6.4.1 Generally .......................................................................................................................................................... 7
6.4.2 Contact with wastewater ................................................................................................................................... 7
6.4.3 Falling into the tank ........................................................................................................................................... 8
6.4.4 Handling the waste ........................................................................................................................................... 8
6.4.5 Other dangers ................................................................................................................................................... 8
7 VARIANTS AND CAPACITIES OF THE WWTP ........................................................................... 9
7.1 Generally ................................................................................................................................................................... 9
7.2 WWTP capacity and tank shape ................................................................................................................................ 9
7.3 Static tank dimensioning .......................................................................................................................................... 10
7.4 WWTP material ....................................................................................................................................................... 10
7.5 Operation comfort .................................................................................................................................................... 10
7.6 WWTP equipment ................................................................................................................................................... 11
8 IDENTIFICATION AND LABELLING ........................................................................................... 13
9 INSTALLATION AND PUTTING INTO OPERATION .................................................................. 14
9.1 Recommended setting of the air distributor for BC 51 – 200 WWTP ........................................................................ 15
9.2 The reference values of dissolved oxygen in individual zones (operating conditions) ............................................... 15
10 BRIEF DESCRIPTION OF WWTP ............................................................................................... 16
10.1 Generally ................................................................................................................................................................. 16
10.2 BIO CLEANER® biological reactor ........................................................................................................................... 16
10.3 Equipment options ................................................................................................................................................... 17
10.4 WWTP function........................................................................................................................................................ 19
11 CONTAINER WWTPS .................................................................................................................. 23
11.1 WWTP of COMFORT type....................................................................................................................................... 23
11.1.1 WWTP operation control ................................................................................................................................. 23
11.1.2 Air distribution ................................................................................................................................................. 24
11.2 WWTP of EXCLUSIVE type..................................................................................................................................... 25
11.2.1 WWTP operation control ................................................................................................................................. 25
11.2.2 Air distribution ................................................................................................................................................. 26
11.3 WWTP of EXCLUSIVE UV type ............................................................................................................................... 27
11.3.1 WWTP operation control ................................................................................................................................. 28
11.3.2 Air distribution ................................................................................................................................................. 28
12 WWTP OF DUO TYPE.................................................................................................................. 29
13 WWTP OPERATION CONTROL.................................................................................................. 33
13.1 COMFORT PLUS control unit¤) ................................................................................................................................ 33
13.1.1 Control mode .................................................................................................................................................. 34
13.1.2 Setting mode .................................................................................................................................................. 34
13.2 Control unit M4016 .................................................................................................................................................. 42
14 DOSING EQUIPMENT FOR PHOSPHORUS PRECIPITATION ............................................... 44
14.1 Description .............................................................................................................................................................. 44
14.2 Packaging, storing ................................................................................................................................................... 44
14.2.1 Packaging ....................................................................................................................................................... 44
14.2.2 Storage ........................................................................................................................................................... 45
14.3 Location and installation of the dosing equipment .................................................................................................... 45
14.3.1 Location .......................................................................................................................................................... 45
14.3.2 Installation ...................................................................................................................................................... 45
14.4 Dosing ..................................................................................................................................................................... 46
14.5 Operation and maintenance..................................................................................................................................... 47
14.5.1 Check of the Flocculant PAX amount .............................................................................................................. 47
14.6 Occupational safety and health at work with coagulant ............................................................................................ 47
15 RIPENING OF WASTEWATER TREATMENT PLANT ............................................................... 48
16 OPERATION AND MAINTENANCE ............................................................................................ 49
16.1 Generally ................................................................................................................................................................. 49
16.2 Utilities/gadgets ....................................................................................................................................................... 49
16.3 WWTP switching on and off ..................................................................................................................................... 49
16.4 Summary of activities performed during operation and maintenance ....................................................................... 49
16.5 Description of activities performed during operation and maintenance ..................................................................... 50
16.5.1 Daily inspection............................................................................................................................................... 50
16.5.2 Weekly inspection ........................................................................................................................................... 50
2/71
2
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
3/71
3
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Rated daily flow rate (m3/day): 7.5; 9.0; 11.25; 15.0; 18.75; 22.5; 30.0 *
Rated organic daily load (kg of BOD5/day) 3.06; 3.6; 4.8; 6.0; 7.5; 9.0; 12.0 *
Compressive strength (at the failure limit): In compliance with the calculation
Fire resistence: F
MANUFACTURER:
ENVI-PUR, s.r.o., Na Vlčovce 13/4, 160 00 Prague 6 – Dejvice, Czech Republic
Phone: +420 381 203 211; Fax: +420 381 251 739; Email: info@envi-pur.cz
SERVICE:
Authorized person (or authorized dealer) according to the list at www.envi-pur.cz
OR
4/71
4
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
3 INTRODUCTION
3.1 GENERALLY
This instructions are intended to familiarize you with the wastewater treatment plant. Following the
instructions given herein will ensure safe and trouble-free operation of the WWTP.
If you follow this Manual, it is guaranteed the rules of safe use will be kept at the level corresponding
the currently valid safety standards, rules and right technical procedures while using the WWTP.
It is necessary to be familiarized with this Manual before you start using the WWTP. Do not carry out
any activities before you have become familiar with this service manual thoroughly and have understood
all the instructions listed in it.
Very important instructions and warnings are highlighted in this Manual as follows:
Prohibited activities.
WWTP tank – BIO CLEANER® biological reactor is formed by a plastic (eventually stainless steel or
concrete) container, which is intended to be installed into the terrain. Based on special order, a
technological built-in unit of the WWTP can be also placed into the concrete tank of appropriate
dimensions. The blower is the basic equipment for air supply, mixing of mixed liquor and pumping of
return sludge. The mixing and aeration of the activation mixture is carried out by means of aeration
elements. Forced pumping of return sludge and floating impurities from the secondary settling tank is
ensured with the aid of so called hydraulic-pneumatic pumps (air-lift pumps).
The WWTP also includes a control unit, or more precisely, electric switchboard (depending on the
WWTP variant and operation comfort), and an air blower; these components are installed near the tank,
for example to the cellar, garage, pillar, technical house, etc.
At the customer's request, the WWTP technology can also be equipped with, for example, a dosing
pump (excess phosphorus precipitation), an oxygen probe, a tertiary filter or a UV disinfection at the
outlet.
In terms of construction, the WWTP can be supplemented with, for example, a pumping pit, a septic
tank, or sludge box.
5/71
5
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Since there are biological procedures during the treatment, supplying of substances that could kill living
microorganisms must be avoided to keep the proper operation of the WWTP.
It is NOT allowed to supply the sewerage connected to the WWTP or the WWTP tank
itself with:
- High concentration of grease,
- Regenerative softener solutions,
- Backwash from filters of household water treatment installations,
- Paints, varnish and diluents,
- Strong disinfectants, acids, and alkali,
- Wastewater from condensing boilers (having low pH),
- Rain water,
- Waste from the kitchen garbage disposal unit.
The quality of the wastewater treatment is negatively influenced by higher amount of detergents and
surfactants. We recommend to avoid doing laundry too frequently (many times during weekend). The
negative effect is shown by the pH value increase and poorer transfer of oxygen to water, which are
factors influencing the activity of microorganisms. It is better to do your laundry within a few days.
We strongly recommend using disinfection solutions which do NOT contain chlorine compounds
(sodium hypochlorite)!
However, usually used amount of detergents (during normal operation of your household) should not
affect the WWTP operation.
The WWTP inlet is mechanically filtered from larger and floating impurities (toilet paper, kitchen waste,
etc.) in the trash rack; these are necessary to be removed and disposed periodically (otherwise, the
drainage may become blocked).
To reduce the interval of cleaning the trash racks we recommend to avoid supplying the WWTP
with:
6/71
6
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
6 SAFETY PRECAUTIONS
6.1 REQUIREMENETS FOR THE STAFF (COMPANIES) QUALIFICATION
To ensure people’s safety and failure-free operation, activities connected with the operating,
maintenance, and service of the WWTP must only be carried out by the staff (companies) with
appropriate qualification.
Operation and maintenance of the WWTP described in this Manual can only be carried out by people
over 18 years of age and who are physically and mentally able to practice/perform the activities
described and are familiar with this Manual.
Service of the WWTP can be only done by ENVI-PUR, s. r. o., or any other person or company
(hereinafter referred to as authorized dealer) authorized and trained by ENVI-PUR.
Children and pregnant (nursing) women must not operate or maintain the
WWTP.
To avoid possible danger and in case of need, it is possible to turn off the WWTP:
By switching off the circuit breaker in the electrical cabinet or by disconnection of the blower from
the power socket (depending on the WWTP type).
6.4.1 Generally
Although the WWTP has been designed in accordance with current applicable safety standards, rules
and right technical procedures, during its construction it was not possible to exclude the further
described dangers, which result from its character and the purpose of the use.
7/71
7
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
In case of exceptional events, when it is necessary to enter the tank, follow all generally applicable
safety principles and rules for entering underground premises.
Excess sludge is possible to drain with the aid of septic truck and assure its disposal at a bigger WWTP
with sludge ending.
Drained excess sludge must not be stored so that a quality of ground and surface waters is influenced.
Operator/owner of WWTP is responsible for waste disposal.
Sludge and water pumped of the WWTP are dangerous waste and
handling must be done in accordance with legal rules.
8/71
8
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
This Operating Manual is made for the entire type series of WWTPs – COMFORT, EXCLUSIVE,
EXCLUSIVE UV – that differ in:
The capacity in terms of possible flow rate of wastewater and related construction of a tank,
the variant in terms of the static tank dimensioning,
the variant in terms of the material design of the tank,
the variant according to the comfort of operation,
WWTP equipment.
You need to know the exact type and capacity of the WWTP you are operating for easy use
of this Manual. This data is to be found in the Warranty Card, which is included in the
Service Book.
Due to the diverse of WWTP series, all pictures in this manual do not have to correspond
with your operated WWTP.
¤)
The products marked with the sign can be replaced by similar type or by comparable
product from third-party producer.
The capacity of a WWTP is defined by the number next to the BC mark (51, 60 75, 100, 125, 150, and
200), which defines the population equivalent (PE) in the connected building.
The WWTP is able to operate at loading of 50–100 %.
Abnormal load on
BC100, 125, 150
BC 100, 125, 150 Container K … Slim Standard transport BC 100 K PP COMFORT Slim
narrowed
BC 200 Two K … Slim Standard transport BC 200 K PP COMFORT Slim
narrowed
containers
9/71
9
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
The self-supporting tank is a wastewater treatment plant tank designed to be installed below ground
level (gravel pack) under specified conditions without further static securing.
The non-self-supporting tank must be secured against the anticipated loading by suitable building
modifications (e.g. by concreting).
In case of occurrence of ground water or increased terrain load around the wastewater treatment plant
it is necessary to place concrete the plant under any circumstance (does not apply to wastewater
treatment plants in a concrete tank).
Designation:
The variant in terms of operation comfort and related design modifications is defined by the labelling
behind the nominal capacity number. The plant is produced in basic variants:
COMFORT, EXCLUSIVE, EXCLUSIVE UV – equipped with COMFORT Plus control unit or, more
precisely, control unit with switching relays and automatic removal of floating impurities.
10/71
10
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
BC COMFORT
COMFORT Plus control unit¤)
13 programmable modes – WWTP control (start/stop of blower) by the
control unit where one of the 13 pre-set programmes of the blower running
can be selected.
Selection of other modes – weekend, holiday…
Remote control via mobile phone or internet.
Other device connection possible (phosphorus precipitation device, oxygen
probe...).
Tank design:
Container:
BC 51 K PP COMFORT to BC 200 K PP
COMFORT – PP tank
BC EXCLUSIVE
COMFORT Plus control unit¤)
13 programmable modes – WWTP control (start/stop of blower) by the
control unit where one of the 13 pre-set programmes of the blower running
can be selected.
Selection of other modes – weekend, holiday…
Remote control via mobile phone or internet as option.
Other device connection possible (phosphorus precipitation device, oxygen probe...).
Tank design:
Container:
BC 51 PP K EXCLUSIVE to BC 150 K PP
EXCLUSIVE – PP tank
BC 51 K B EXCLUSIVE to BC 150 K B
EXCLUSIVE – concrete tank
11/71
11
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
BC EXCLUSIVE UV
COMFORT Plus control unit¤)
13 programmable modes – WWTP control (start/stop of blower) by the control
unit where one of the 13 pre-set programmes of the blower running can be
selected.
Selection of other modes – weekend, holiday…
Remote control via mobile phone or internet as option.
Other device connection possible (phosphorus precipitation device, oxygen
probe...).
Tertiary filter at the outlet – capturing of impurities larger than 0.5 mm.
Tank design:
Container:
BC 51 K PP EXCLUSIVE UV to BC 150 K PP
EXCLUSIVE UV – PP tank 8 mm
BC 51 K B EXCLUSIVE UV to BC 150 K B
EXCLUSIVE UV – concrete tank
Tertiary filter –
Internal UV disinfection
Phosphorous precipitation (P-LESS)
Optional oxygen/pH probe connection
Optional connection using GSM (remote management)
Optional monitoring of operation, faults, and control via server
standard equipment, possible to order additionally, optional for new WWTP, ** – manual start
Discharge into surface water Yes Yes Yes
Discharge into groundwater (infiltration) *Yes Yes Yes
*With P-Less
12/71
12
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
ENVI-PUR, s.r.o.
TYP ČOV
WWTP TYPE BC ___ _ _
VÝROBNÍ ČÍSLO
SERIAL NUMBER _ __ _
ROK VÝROBY
YEAR OF PRODUCTION 20 _
EL. NAPĚTÍ
VOLTAGE 230/400 V
MAX. PŘÍKON
MAX. INPUT W
A separate Declaration of Conformity is issued for each wastewater treatment plant, containing specific
data indicating the design of the plant according to the following legend.
Explanation of identifiers:
“Tank shape” K – container, Slim – design for standard transport (not abnormal load)
13/71
13
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Installation has to be carried out in accordance with the project documentation completed by a
competent person on the basis of supporting documents from ENVI-PUR, s. r. o. After installation and
putting the WWTP into operation, the authorized personnel shall train the operating personnel
and hand it to the owner/operator.
After installation the tank is filled with clean water and air valves are adjusted on air distributor, see
Chapter 9.1.
WWTP processing possibilities are given in Chapter 15.
At the handover of the WWTP, you have been given the following documentation:
This Operating Manual,
Service Book (containing warranty card, water-proof tank test report, report on the inspection of
electric apparatus/equipment),
Operating and maintenance manual for the blower,
Wiring diagram,
Operating and maintenance manual for the dosing pump, if included,
Operating and maintenance manual for external UV disinfection (if included).
Once specific data that pertain to the installed WWTP have been completed (see page 1) and the
approval by the competent Water Authority has been obtained, the Operating Manual can be used as
the WWTP Working Rules.
Do not run the WWTP unless it has been handed over by the authorized person.
14/71
14
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
1. The coarse-bubble aeration element under the trash-rack basket – set to moderate aeration.
The element assures mixing of the return sludge with wastewater and aeration of the basket of
the coarse mechanical impurities in order to comminute and breakup these impurities.
2. Fine-bubble aeration elements/grate in the nitrification zone – leave the air into aeration
elements fully open. The elements ensure mixing of the mixed liquor in the nitrification zone.
3. The coarse-bubble aerator in the sedimentation zone is to be adjusted to breakup the surface
layer of floating impurities. ONLY moderate aeration is recommended. (Sludge should settle in
the sedimentation tank, so it is inappropriate to feed too much air into this zone and
unnecessarily swirl it. The aeration is used only for the purpose of breaking the sludge layer on
the surface level.) Aeration in the sedimentation zone is not always necessary.
4. Air-lift pump of the return sludge – set equal flow – about half the pipe diameter, water must not
be sprayed.
A small air leak from the air system does not affect the functionality of the
WWTP.
15/71
15
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
This chapter gives a brief description of the WWTP you should become familiar with before proceeding
with operation and maintenance.
Liquid + Air
Pumps – Air-lift pumps
In case of need, inside the Bio Cleaner ®
reactor, the hydraulic-pneumatic pump (so
called air-lift pump, mammoth) starts pumping.
The air-lift pump is a device, which utilizes the
density difference of its own liquid and mixture
of liquid and air for pumping. The function of Liquid
the air-lift pump is shown in the following
picture in a simplified way:
Air
Biological reactor is designed as plastic (or stainless steel or concrete) tank, plastic built-in installation
is placed inside. All metal parts of the construction are made from stainless steel.
Installation in the tank creates three hydraulic-separated zones:
- Inlet zone (denitrification zone),
- Activation zone (nitrification zone),
- Secondary settling area (secondary settling zone).
Wastewater is transported into the WWTP through sewerage. Removable trash-rack basket (hereinafter
referred to as the basket) with holes of approximate diameter of 16 mm is placed under the sewerage
inlet pipe. Aeration element is located under the basket to facilitate removal of the trapped organic
impurities. The amount of air under the basket is regulated manually using the separate valve. The
amount of air should be only as large as to assure sufficient breaking of the trapped impurities (e.g. toilet
paper). It is inconvenient to let excessive amount of air under the basket because there will not be
enough air for the next air system elements!
16/71
16
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Denitrification zone
The inlet zone serves for biological removal of nitrogen pollution from wastewater in the absent
of atmospheric oxygen. Wastewater, return sludge and possible floating impurities are fed to this zone
from the secondary settling zone. Coarse-bubble aeration element provides mixing of return sludge with
wastewater; the element serves for aeration of coarse impurities basket as well. Intensity of mixing is
adjusted by control valve. Amount of air should be such that geysers cannot form on water level when
mixing.
Nitrification zone
Nitrification zone occupies the part of biological reactor between walls of tank, denitrification and
secondary settling zone. The step 2 of the nitrogen removal takes place here in the presence of oxygen.
The mixing and oxygenation of mixed liquor is provided by the air driven into the fine-bubble aeration
elements mounted at the bottom. Individual air supplies to the elements must be always fully open.
Tertiary final treatment – mechanical filter (equipment for EXCLUSIVE and EXCLUSIVE
UV model)
Mechanical filter can be installed at the outlet from WWTP to trap possible impurities escaped from the
secondary settling tank. The filter is fitted in a separate tank on the outlet pipe. The impurities trapped
on the filter or settled in the tank are pumped off automatically by the air lift pump back to the activation
system.
We recommend to check the filter once a month and, if necessary, rinse the filter manually in a bucket
with water or using the stream of clean water from a hose.
Detail description is given in Chapter 14.
17/71
17
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Oxygen/pH probe (optional equipment for BC COMFORT, EXCLUSIVE and EXCLUSIVE UV)
The oxygen probe (oximeter) is used to control the blower operation depending on the actual demand
of oxygen in the nitrification zone. This results in a reduction of blower operation costs as compared to
the control by time intervals as well as in achievement of the optimum conditions of the activation
process.
The pH probe is suitable to install into the WWTP where no inlet of the standard wastewater is present
– e.g. the inlet of industrial wastewater. The pH probe can be used to monitor the water quality and, if
necessary, optimize the pH value in the activation process. The pH values outside of the optimum range
of 6–8 inhibit the wastewater treatment processes.
The waste water treatment plant equipped with the COMFORT Plus control unit with GSM can be
controlled using the command SMS sent from a mobile phone. In fault condition, the WWTP can
simultaneously sent notification in a form of SMS to the selected mobile phone number.
PRIM pre-tank (the WWTP complies with the requirements of class III)
The primary sedimentation tank –PRIM – is installed upstream of the actual WWTP tank. The
wastewater supplied by sewerage flow firstly into the tank that is used as a primary sedimentation of
coarse impurities. The water free of coarse impurities flows through a gravity overflow into the biologic
reactor.
Excessive sludge from the WWTP can be pumped into the PRIM tank.
18/71
18
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Wastewater is treated in the BIO CLEANER® reactor divided by partitions and installations into separate
functional zones according to the diagram below:
COMFORT variant
Wastewater is treated in the BIO CLEANER® reactor divided by partitions and installations into separate
functional zones according to the diagram below:
Sedimentation takes
place in the secondary
settling zone resulting in
separation of treated
water and activated
sludge. The sludge
accumulates at the
bottom.
During the treatment period, 2 phases C1 and C2 alternate cyclically. The blower is ON during phase
C1 (this results in aeration) and OFF during phase C2.
19/71
19
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
During phases C1 and C2, floating impurities may accumulate in the secondary settling zone. That is
why the secondary settling zone is treated automatically in a frequency of 1- to 12-times a day
(depending on the setting). Treatment process is divided into the phases marked below as C3 to C6
and it takes place according to the following diagram:
Phase C3 Phase C4
Phase C5 Phase C6
20/71
20
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
EXCLUSIVE/EXCLUSIVE UV variant
Part of the settled sludge is transferred
back into the denitrification zone by the
by the air lift pump.
The effluent
water is exposed
to UV radiation
Sedimentation takes place in the secondary that eliminates
settling zone resulting in separation of bacteria and
treated water and activated sludge. The viruses.
sludge accumulates at the bottom.
During the treatment period, 2 phases C1 and C2 alternate cyclically. The blower is ON during phase
C1 (this results in aeration) and OFF during phase C2.
21/71
21
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
During phases C1 and C2, floating impurities may accumulate in the secondary settling zone. That is
why the secondary settling zone is treated automatically in a frequency of 1- to 12-times a day
(depending on the setting). Treatment process is divided into the phases marked below as C3 to C6
and it takes place according to the following diagram:
Phase C5 Phase C6
Cleaning the tertiary Settling the sludge in the Removing the sludge
filter with an air jet tertiary filter casing from the tertiary filter
casing
22/71
22
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
11 CONTAINER WWTPS
If necessary, the WWTP technology can be inserted into a rectangular tank. Material of such tank can
be made of polypropylene (PP), polyethylene (PE), stainless steel (SL), or concrete (B).
Depending on the type of control of the wastewater treatment plant, the WWTP can be of the
COMFORT, EXCLUSIVE or EXCLUSIVE UV type.
Inlet
Outlet
Sampling
point on inlet
Nitrification
zone
Air-lift pump of
return sludge Point for introduction
Air-lift pump for final of the septic truck
treatment of the hose ending
secondary settling
23/71
23
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Fig. 5: Air distribution scheme for the WWTP of COMFORT type (BC 51K, 60K, 75K, 100K, 150K,
200K)
24/71
24
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Data plate
Air supply
Outlet
Inlet
Tertiary filter
Sampling
point on inlet
Nitrification
zone
The operation is controlled by the COMFORT Plus control unit (see Chapter 12.1) or M4016 (see
Chapter 12.2)¤)
25/71
25
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Fig. 7: Air distribution scheme for the WWTP of EXCLUSIVE type (BC 51K, 60K, 75K, 100K, 150K,
200K)
26/71
26
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Data plate
Air supply
Outlet
Inlet
Tertiary filter
Sampling Nitrification
point on inlet zone
UV radiation
The equipment is fitted with UV lamp that emits the C-type UV radiation. This radiation may damage the
sight, skin and possibly other organs. To prevent exposure to radiation the reactor is enclosed by cover
with a safety switch that cuts off the power supply to UV lamp once the cover is open.
To ensure the high efficiency of the UV lamp, it is necessary to check its cleanliness once a month (or
according to the load of WWTP operation) and wipe it, if necessary – spray dirt with water.
Before removing the UV lamp from its protective cover, it is absolutely necessary
to put the UV lamp out of operation by switching it off or by switching the main
circuit breaker of the WWTP control unit off.
Expected lifetime of the UV lamp is 1 year. If the lamp is used for a longer period of time, its efficiency
may be significantly reduced, resulting in a deterioration of the microbiological count at the WWTP outlet.
We recommend to replace the UV lamp after 1 year of continuous operation.
The switchboard contains electrical parts necessary for powering and operation of the UV lamp. On the
switchboard, there is a circuit breaker for switching on/off the device and the monitoring current relay,
which triggers light signalling in the case of UV lamp failure.
27/71
27
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Always use original spare parts supplied by ENVI-PUR, s.r.o. or an authorized person.
Fig. 9: Air distribution scheme for the WWTP of EXCLUSIVE UV type (BC 51K, 60K, 75K, 100K,
125K, 150K, 200K)
28/71
28
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Inlet
Outlet
29/71
29
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Fig. 11: Wiring diagram of air distribution for WWTP of COMFORT type ((BC 51K DUO, 60K DUO,
75K DUO, 100K DUO, 125K DUO, 150K DUO, 200K DUO)
30/71
30
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Fig. 12: Wiring diagram of air distribution for WWTP of EXCLUSIVE type ((BC 51K DUO, 60K DUO,
75K DUO, 100K DUO, 125K DUO, 150K DUO, 200K DUO)
31/71
31
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Fig. 13: Wiring diagram of air distribution for WWTP of EXCLUSIVE UV type ((BC 51K DUO, 60K
DUO, 75K DUO, 100K DUO, 125K DUO, 150K DUO, 200K DUO)
32/71
32
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
While putting the wastewater treatment plant into operation, the supposed optimum
setting of the blower operation has been done. Avoid changing this setting wilfully
without prior consultation with the authorized dealer or manufacturer because
improper setting may cause malfunction of the WWTP.
The electric cabinet contains electrical elements and parts, by means of which the blower is switched
on and off and opens and closes the air supply to selected parts of the wastewater treatment plant. On
the front wall of the electrical cabinet, there is a circuit breaker for switching off/on all electrical parts of
the treatment plant and the control panel of the control unit. On the side of the electric cabinet, there is
a socket for connecting the blower.
Modes of the COMFORT Plus control unit and their use for BC wastewater
treatment plants
Difference
from Connecting the air
Design of
WWTP CU mode* Comfort to the electrical
switchboard
programme switchboard
setting
Capacity Type
BC 51-
Plastic
200 COMFORT COMFORT
switchboard
container
33/71
33
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Plastic P8 – filter
EXCLUSIVE (polylok) COMFORT+
switchboard desludging
P10 – filter
EXCLUSIVE Plastic
(polylok+UV) COMFORT++ desludging +
UV switchboard
UV
The control unit is used to control the WWTP operation (for gradual performance of phases C1 to C6.
The operation panel can be used to monitor and, if necessary, change the functions described below.
The control unit can operate in two operation modes:
Control mode,
Setting mode.
The pushbutton functions in the setting mode are given in the following table:
If no button is pressed, the control unit automatically enters the Control Mode after 30 seconds.
34/71
34
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
35/71
35
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Diagnostics
- Use the MODE button to select the Diagnostics mode and confirm it by pressing the SET button.
The menu is displayed. Use the arrow keys to select the desired function according to the following
table and confirm with the SET button.
Service Enter the value of the Numbers are entered using the arrows
performance: sedimentation test here (in %) at the selected position. To move to
the next position, press the SET
button.
Interval Here, set the max. sludge The recommended set value is 70 %.
settings value (%), at which you will be
prompted to remove the sludge
from wastewater treatment
plant.
36
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Operation Number of days since last Calculated from running hours of the
time replacement treatment plant.
Operation Number of days since last Calculated from running hours of the
time replacement treatment plant.
Operation Number of days since last Total switch-on time of RE1 relay
time replacement (blower operation).
MTH2 Last Date of putting the WWTP into Total operating time of the control unit.
operation operarion
Operation Total time of fault signalling The control unit has an input for
time except the time of complete connecting a pressure switch at the
shutdown outlet of the blower. Connection of a
switch, which is opened when no
pressure is present and closed if
operating pressure is present, is
required.
37/71
37
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
In the case of sing of exclamation (!) in front of the selected function, the CU prompts you to do an
action:
!Sludge removal Remove the sludge from the wastewater treatment plant
Evaluation of blower failure. The control unit has an input for connecting a pressure switch at
the outlet of the blower. Connection of a switch which is opened when no pressure is present
and closed if operating pressure is present is required.
Failure indication and outputs for an alarm horn. The control unit has two outputs for failure
indication and LED indication on the panel (ALARM); the model with GSM module also enables
sending a failure message via SMS. At the same time, the failure is indicated on the display of
38/71
38
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
the control unit and with the intermittent light of the ALARM-labelled LED. The failure indication
by an alarm horn can be temporarily interlocked by pressing the “SET” button. The text
indication on the display remains active. If the failure is not remedied within 10 days, the acoustic
alarm will be re-triggered automatically.
Mixing – Setting the mixing interval for the nitrification zone Recommended setting – each 10 min of
standstill mode, mixing is needed for 10 seconds.
Use the arrow keys to select the desired parameter and confirm with the SET button and confirm
by pressing the SET button again to return to the MODE selection.
Setting the parameters of phases C3 to C6 (cleaning of the reactor secondary settling zone)
P4 – Secondary mode
Use the MODE button and the ARROW keys to select P4 mode and confirm it by pressing the
SET button. The current mode will be shown on the display.
Use the arrow keys to select the desired parameter and confirm with the SET button and confirm
by pressing the SET button again to return to the MODE selection.
P4 parameter Meaning
0 Secondary mode is off.
1 Secondary timing mode daily from 11:00 p.m. to 5:00 a.m.
2 Secondary timing mode from Saturday 0:00 a.m. to Monday 0:00 a.m.
39/71
39
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
P5 – C1, C2 in the Secondary mode (Setting of time intervals C1, C2 in the Secondary mode)
Use the MODE button and the ARROW keys to select P5 mode and confirm it by pressing the
SET button. The mode will be shown on the display and the code of the set parameter will be
displayed at the same time according to the following table:
Mode Code 0 1 2 3 4 5 6 7 8 9 10 11 12 Oxygen probe
C1 The blower operation is controlled by
10 10 10 10 10 10 10 10 15 20 30 40 60 oxygen probe only – no time control.
(min)
P1
C2
120 60 50 40 30 20 15 10 10 10 10 10 5
(min)
Use the arrow keys to select the desired code and confirm with the SET button and confirm by
pressing the SET button again to return to the MODE selection.
Codes 0 to 12 are used for the WWTP operation time control only. If the oxygen probe code is
selected the WWTP operation is controlled by the oxygen sensor only (it is located in the
nitrification part of WWTP).
In case of selecting the operation with oxygen probe, use the arrow keys to set the parameter
– limit and hysteresis.
Use arrow keys and SET button to set the parameters – limit and hysteresis to the desired
values (the basic values are already preset), limit is 1.5 mg/l and hysteresis is 0.5 mg/l. The
blower is activated when the amount of dissolved oxygen drops below 1.5 mg/l and deactivated
when the value of 2 mg/l is exceeded.
After you have selected and confirmed the mode, you can change the parameters by down- and
up-arrow keys. After you have SET the desired parameter, confirm it by pressing the SET
button. By pressing the SET button again, you can return to the MODE selection.
Use arrow keys and SET button to continue setting of the parameter AERATION to set it to 20
seconds (blower operation) and 10 minutes (pause). Setting of these parameters is operational
regardless of the amount of dissolved oxygen.
After you have selected and confirmed the mode, you can change the parameters by down- and
up-arrow keys. After you have SET the desired parameter, confirm it by pressing the SET
button. By pressing the SET button again, you can return to the MODE selection.
Use arrows and SET button to continue setting of the parameter DENITRIFICATION. Set it to
40 minutes (blower operation disabled) and 120 minutes (periodic repetition period). CAUTION:
Regular aeration function remains operational during the disabled period.
After you have selected and confirmed the mode, you can change the parameters by down- and
up-arrow keys. After you have SET the desired parameter, confirm it by pressing the SET
button. By pressing the SET button again, you can return to the MODE selection.
P6 – Dosing (Setting the dosing pump operation – dosing of chemicals for phosphorous precipitation)
It is possible to set the switching time in seconds (size of dose) and the interval of repeating in
hours. Setting the former or the latter time value to 0 will cause disabling the dosing function.
Once the relay RE9 is engaged, indication on the control unit LCD will be turned on. The first
engaging of the dosing relay occurs one minute after turning on the control unit or after making
a change in the parameter settings.
Use the MODE button and the ARROW keys to select the mode P and confirm it by pressing
the SET button. The mode will be shown on the display together with the currently set dosing
time (in seconds) and currently set delay of the dosing start-up time (in hours).
After you have selected and confirmed the mode, you can change the parameters by down- and
up-arrow keys. After you have SET the desired parameter, confirm it by pressing the SET
button. By pressing the SET button again, you can go back to the MODE selection.
40/71
40
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
You can go on by selecting another mode using the ARROW keys or exit the setting and the
unit will switch automatically to the Control mode after 30 seconds.
P8 – sludge removal from the tertiary filter – polylok (for BC51-200 K EXCLUSIVE)
It is possible to set the time of filter desludging process by engaging the relay RE7 via the menu
P8. It is possible to set the engaging time in seconds and the interval of repeating in hours.
Once the relay RE7 is engaged, indication on the control unit LCD will be turned on. Initial sludge
removal is done in 30 minutes after the main cycle, and the follow-up removals are carried out
at the pre-set intervals.
Use the MODE button and the ARROW keys and select P8 mode and confirm it by pressing
the SET button. The mode will be shown on the display together with the currently set purging
time (in seconds) and currently set delay of the purging start-up time (in hours).
After you have selected and confirmed the mode, you can change the parameters by down- and
up-arrow keys. After you have SET the desired parameter, confirm it by pressing the SET
button. By pressing the SET button again, you can go back to the MODE selection.
You can go on by selecting another mode using the ARROW keys or exit the setting and the
unit will switch automatically to the Control mode after 30 seconds.
P10 – filter desludging + UV (setting of phases C7–C9 for BC7-200 EXCLUSIVE UV)
Use the MODE button to select the P10 parameter and confirm it by pressing the SET button.
The current desludging process interval setting is displayed (e.g. 03 h means the desludging
process is repeated every 3 hours). Modify the parameter by pressing the ARROW keys and
confirm the selection by pressing SET button.
Press again the SET button. The parameters for setting the time intervals of phases C7–C9 are
displayed. The first numeric value is used to set the phase C7 (filter blow), the second numeric
value is used to set the phase C8 (standstill time), the third numeric value is used to set the
phase C9 (pumping off the settled impurities from the tertiary filter casing). Use the UP ARROW
and DOWN ARROW keys to set the phase C7 value (filter blow), and press the SET button to
confirm. The filter blow-off time is set in seconds in the range of 0–999 s. Now, use the UP
ARROW and DOWN ARROW keys to set the phase C8 value (standstill time), and press the
SET button to confirm. The standstill time is set in minutes in the range 0–99 min. Finally, use
the UP ARROW and DOWN ARROW keys to set the phase C9 value (pumping off the settled
impurities from the mechanical filter casing), and press the SET button to confirm. Time for
pumping off settled impurities from the mechanical filter casing is set in seconds in the range of
0–999 s. Press SET button again to exit the setting of phases C7–C9.
The basic setting when putting the process into operation is as follows:
3h
C7 – 70 s; C8 – 1 min.; C9 – 70 s.
Current time
Use the MODE button and the ARROW keys to select the current time mode and confirm it by
pressing the SET button. The mode will be shown on the display in the following order: DAY,
MONTH, YEAR, HOURS and MINUTES.
Use the SET button to select the parameter to be set. Use the ARROW keys to set the required
parameter and confirm it by pressing the SET button. Continue to do so until the time and date
are set.
After you have selected and confirmed the mode, you can change the parameters by down- and
up-arrow keys. After you have SET the desired parameter, confirm it by pressing the SET
button. By pressing the SET button again, you can go back to the MODE selection.
41/71
41
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
New password (enter the password to access the editing of the control unit settings – the password is
in the form of a four-digit number).
The control program for the M4016 registration units is written in such a way
that several functions are running simultaneously. Even during user control
of the unit, background measurement, data archiving, etc. take place.
Energy saving mode – In the Energy saving mode, the unit display is
off. To activate it, just press any key.
42/71
42
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
The instructions for operation of the M4016 control unit vary according to the particular WWTP.
Instructions for the M4016 control unit will be a part of the documentation with your WWTP.
43/71
43
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
14.1 DESCRIPTION
14.2.1 Packaging
3 Drip pan
Peristaltic pump has a maximum output of 1.0 l/h (depending on the distance of installation from
WWTP), power input of 3.5 W, 230 V. The standard pump accessories are composed of the suction
basket and injection valve, suction hose 4×6 (2 m), discharge hose 4×6 (2 m).
Flocculant PAX is supplied in 13 kg canisters to start working. Other deliveries of PAX are solved by
the customer themselves with a supplier of chemistry.
To ensure the equipment functions correctly, use exclusively Flocculant PAX approved
by the manufacturer!
The drip pan prevents the solution of Flocculant PAX from leaking into the environment should the
canister is damaged. In the case of PAX deliveries in larger packages, it is necessary to equip the
supplied tank with a drip pan of appropriate dimensions.
44/71
44
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
14.2.2 Storage
Store flokulant PAX in original packaging only. Limited shelf life is 6 months.
14.3.1 Location
We recommend to locate the dosing equipment into the area protected against the weather influences.
The dosing pump should not be placed at a maximum distance of 10 meters from WWTP.
14.3.1.1 External location
We recommend to locate it in the wooden ENVI-PUR house.
45/71
45
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
7) If the WWTP is equipped with the ComfortPlus control unit with a socket for the dosing pump it
is possible to adjust dosing on the control unit that will assume function of the digital time switch.
The necessary amount of Flocculant PAX is within the order of millilitres. As it is very low
quantity, the dosing pump operation must be time-controlled. The least time unit to be set on
the digital time switch is 1 minute.
8) Connect the pump to the socket on the digital time switch that needs to be connected to the
power socket.
In the ComfortPlus control unit with the dosing pump socket, connect the pump directly to this
socket. In this case, the digital time switch is not used.
14.4 DOSING
The table below specifies the daily doses of Flocculant PAX to obtain the resultant phosphorus
concentration of about 3 mg/l at the outlet from WWTP. The calculation considered the input phosphorus
concentration of 17 mg/l (80 % efficiency in the phosphorus removal). The actual necessary dose can
be higher or lower depending on the input phosphorus concentration.
We recommend to set the initial dose lower to consequently correct the dosed amount depending on
the analysis results. The dose should be uniformly distributed throughout the entire day.
Never dose a larger amount into WWTP than necessary! Increased doses of Flocculant PAX may
reduce improperly pH in WWTP that would result in the inhibition of the treatment processes. Increasing
dose goes hand in hand with increased production of sludge (inorganic ballast) and the need to remove
the sludge from the WWTP more frequently.
51 7.50 0.80
60 9.00 0.96
75 11.25 1.20
100 15.00 1.60
125 18.75 2.00
150 22.50 2.40
200 30.00 3.20
Peristaltic pump has a maximum output of 1.0 l/h depending on the distance of installation from WWTP.
After the dosing pump has been activated, the actual dosed amount of Flocculant PAX into WWTP must
be measured. The necessary dosing interval per day must be set based on this measuring.
Ex.: In the ComfortPlus control unit, the required interval must be selected according to the table in the
manual.
46/71
46
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
The pump must be OFF when the WWTP is being shut down!
The aqueous solution of Flocculant PAX is used as a coagulant. Chemical composition is specified in
the Safety Data Sheet that comes together with the supplied medium.
All the occupational measures for the work with caustic chemicals must be adhered to. In case
of contact with the skin, the affected place must be rinsed with sufficient flow of pure, potable water and
washed with soap. In case of eye contact, immediately start rinsing with a flow of cold water and seek
medical help without delay. Use the nearest drinking water reservoir. If swallowed do not induce vomiting
and seek medical help without delay. All the vessels that contain coagulant must be visibly marked with
relevant pictogram for caustic chemicals. They must NOT be confused with the packages for food and
beverages! When working near the atomizing nozzles at the dosing points and during the dosing pump
assembly and disassembly, the inflow from the reservoir tank must be stopped and the warning plate –
Work in progress on the equipment – Do not start! – must be posted on the equipment and its controls.
47/71
47
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
In order to treat the wastewater to the level specified, it is necessary to ripen the biological process.
There are two ways of biological process ripening:
Progressive ripening, i.e. inflow of waste water and permanent loading, even above the
specified technological parameters,
Import of activated sludge, so-called inoculum, from other biological WWTP.
In both cases all elements of aeration system are necessary to be opened in a right position (see
Chapters 9.1, 10.2). Aeration system, air-lift pump of return sludge and aeration of screen
basket/denitrification zone have to be in operation.
Ripening mode has been set when putting the WWTP into operation. In case of
repeated putting into operation (e.g. after a long-time weaning from permanent
operation), it must be set up again.
Mixture of activated sludge – bacteria, which get into the WWTP from intestinal tract of people – is
created in the WWTP by gradual ripening. They multiply gradually in wastewater.
When ripening WWTP with inoculum sludge, it is important to choose the activated sludge from different
WWTP that functions correctly. The sludge must sediment in correct manner. In the process of
inoculation, it is convenient to apply such an amount of a return sludge that corresponds to about ¼ of
the volume of your WWTP.
The WWTP is ripened if the sedimentation test result given about 25–30 % of sludge.
After ripening, it is necessary to set the operation time and the blower operation interruption according
to the actual substance load and hydraulic load acquired from the long-term monitoring of the WWTP
operation. We recommend to perform this activity by an authorized person or manufacturer.
48/71
48
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Operation and maintenance of the WWTP is not time consuming or technically demanding, but it is the
basic prerequisite for the right function of the WWTP.
- Perform all the activities, which are further described, in timely manner and
carefully.
- If not sure about any process or activities contact ENVI-PUR, s. r. o. or the
authorized person.
16.2 UTILITIES/GADGETS
For carrying out the maintenance correctly and easily, you need the following items:
Rubber gloves,
perforated scoop,
long brush,
measuring cylinder (1 L),
pH-indicator strips,
shovel,
scoop for the activated sludge.
Variant COMFORT , EXCLUSIVE , EXCLUSIVE UV – Switch on (switch off) using circuit breaker on
the electrical cabinet.
Interval Activity
Half a
Day Week Month Other Name Procedure
year
x Daily inspection 16.5.1
x Weekly inspection 16.5.2
x pH measuring 16.5.3
x Sludge concentration measuring 0
x As required Sludge pumping off 16.5.5
As required Wastewater sampling 16.5.6
Check and clean, if necessary, the tertiary filter (this
x As required applies for the case that the WWTP is fitted with the 16.7
tertiary filter)
Check and clean, if necessary, the UV lamp (this applies
x As required 16.8
for the case that the WWTP is fitted with the UV lamp)
Blower revision, if necessary, replacement of filter and See the
membranes, replacement of UV lamp after 1 year (this blower
1–2 years
applies for the case that the WWTP is fitted with the UV operation
lamp) and
maintenance
3–4 months Clean the blower filter manual
49/71
49
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
The following parts of the treatment plant must be checked as a part of the inspection:
The basket catches coarse impurities and rushes paper and biologically degradable substance using
air fed below the basket into the denitrifying zone. The basket is necessary to be checked whether or
not clogged and whether its aeration is working well.
Wait until the WWTP reaches the phase C1 when the blower is on.
Check whether distinct bubbles of air go through the basket. If not, slightly increase the airflow
below the basket by turning the appropriate valve on the air distributor.
If there are larger pieces of non-biodegradable substances (plastics, rubber, textiles) in the
basket or the water level in the basket is higher than the water level in the denitrification zone,
clean the basket.
While the basket is being cleaned, ensure that wastewater is not fed into the WWTP
(do not use appliances connected to the sewerage leading into the WWTP).
Sprinkle rakings with bleaching powder or any other similar disinfectant and put
them into a municipal-waste vessel.
50/71
50
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
The air-lift pump provides removal of the activated sludge from the secondary settling zone. It is
necessary to check if it has not been blocked. It is necessary to check whether it is not clogged.
Wait until the WWTP reaches the phase C1 when the blower is on.,
Check whether there is water flowing out of the air-lift pump of the return sludge in the
denitrification zone, stream of water is uniformed and doesn´t squirt on the basket.
If not, follow the Chapter 16.
Operation of air-lift pump for return sludge implicates right operation of the WWTP.
The air-lift pump has to pump at all times, if the blower is on.
Output of air-lift pump may not be blocked and clogged.
D. Nitrification zone
The nitrification zone should be aerated equally.
Wait until the WWTP reaches the phase C1 when the blower is on.
Check whether air bubbles are evenly distributed at the surface level of the nitrification zone. If
not, follow Chapter 16.
It is appropriate to open drain valves at aeration grids in container WWTP every week to drain
any condensate. If condensate is not drained, the aeration efficiency will be reduced.
Check the injection valve of the coagulant dosing hose (PAX) to see if the solution is dosed
correctly when the feeding pump is in operation and if the solution flows through spontaneously
when the feeding pump is stopped. If not, proceed as instructed in Chapter 17. In addition, check
the injection valve for impurities (sludge) and remove them if necessary.
51
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
16.5.3 pH measuring
It is strongly recommended to measure pH once a week at least with pH indicator strips. Measure with
a sample of water from the nitrification zone. The pH value should be in the neutral range. The activated
sludge can be adapted to pH values in the range 6.5–9.0.
The removal of pollution in the nitrification zone releases hydrogen ions, reducing alkalinity of
wastewater. In the case of insufficient alkalinity, nitrification can lead to a spontaneous drop in pH to
process inhibiting values. During the inflow of common sewage water into the WWTP, there is a partial
increase in alkalinity in the inlet area and, thus, compensation of possible pH drop during nitrification.
pH-value can be dramatically and suddenly reduced with bad dosing of PAX or spontaneous escape of
solution through damaged injection valve or broken hose with solution. In this case it is necessary to
correct it immediately (change of valve or hose, change dosing setting) and increase pH according to
the following procedure. Observe safety instructions when handling PAX solution!
The inflow of wastewater with low buffering capacity (mostly in the use of "soft" water, water from ion
exchange resin treatment, rain water), wastewater containing higher concentration of ammonia or low
ratio of C:N, or in the proportion of industrial wastewater treatment plant on low pH may be a breach of
this balance. Turbid effluent from the WWTP and a supernatant during the sedimentation test can be
used as an indicator (sludge is in the form of small flakes that do not settle). If the pH value below 6.5 is
detected it is necessary to initiate dosing alkalinizing chemical (lime) into the activation-nitrification zone.
Instructions on how to do this are provided below. If you are not sure, so this problem is advised to
consult the authorized person or WWTP manufacturer.
Aids:
A bag with slaked lime, scoop, pH indicator strips (or a pH meter).
Procedure:
Use the indicator strip to determine pH value in WWTP (measured in the aerated nitrification zone). In
case of pH value lower than 6.5, scatter a scoop of slaked lime over the water level of the aerated part.
Measure pH again after half an hour of WWTP operation. If the pH value ranges within 7.5–8.0, the
dosing can be terminated; if the pH value is outside of this range, proceed analogically until you reach
pH of 7.5–8.0. The pH value in WWTP may not exceed the value of 8.5!
Measure pH in the WWTP gradually in the interval of one or two days (depending on the rate of pH drop)
until the moment when pH about 6.5 is reached. Consequently, perform neutralization to pH 7.5–8.0.
The further procedure includes dosing of the half a dose of lime than required to obtain pH 7.5–8.0 in
the half interval than the time identified during the pH drop from pH 7.5–8.0 to the pH value below 6.5.
After reaching the required pH value, check the pH value once every two weeks. If the value is near 7
there is no need for the lime to be dosed. If lower or higher values are identified, increase or decrease
slightly the dosed amount of lime. It is not possible to extend the interval between dosing by increasing
the lime dose!
If the WWTP operator has already found the optimum procedure for lime dosing the operator does not
have to dose the lime on the WWTP water level but anywhere into the sewerage system upstream of
the WWTP providing that sufficient flow of wastewater through this part is ensured.
In principle, other alkalinizing agents such as sodium hydroxide can be used to neutralize the plant.
However, the use of strong alkalis bears the risk of overdose and subsequent treatment plant collapse,
therefore caution should be exercised when determining the appropriate dose. Generally, the dosage
amount is substantially lower than that of slaked lime and is in the order of units of grams, with the
dosage interval being shorter. The advantage of this procedure is the possibility of easy dosing directly
into the toilet, sink outlet, etc. When working with these agents, it is necessary to observe the rules of
occupational safety as stated in the product leaflet.
If the mode of operation of the wastewater treatment plant changes (e.g. long-term change in load,
change in wastewater composition, etc.) it is necessary to test again and find the dose and dosing
interval, or interrupt dosing of alkali.
52/71
52
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Sludge and water pumped of the WWTP are dangerous waste and handling must
be done in accordance with legal rules.
53/71
53
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
- Take care not to damage the reactor when handling the hose and end.
- Refill the pumped volume immediately after pumping off.
16.5.6 Sampling
Sampling and subsequent analysis of sampled wastewater will enable to obtain information about the
treatment plant function. You can do this for your own use or because it is required by the relevant water
authority. The samples taken must always be analysed in a laboratory specialized in wastewater
analysis. Normally, it is sufficient to determine the biological oxygen demand in five days (BOD (5)),
chemical oxygen demand (COD), and suspended solids (NL).
Always agree on the number and quantity of samples taken with the analytical
laboratory before performing the sampling. At the same time, the laboratory should
provide you with water sampling bottles (special bottles), in which you take the
samples to the laboratory, and detailed instructions for sampling.
Samples can be taken with a PVC bottle, which is attached to a stick of about 1.5 meter. Rinse the bottle
with clean water and allow it to dry before sampling.
Take the inlet sample directly below the inlet pipe.
Take the outlet samples from a specific object which should be placed behind the WWTP within
the project design of the treatment plant.
In case the WWTP is not equipped with the specific object, it is possible to sample from the
discharge channel or, in emergency, from the secondary settling zone.
In case of taking a sample from the secondary settling zone be careful so that floating
impurities from the water level does not get in the sample being taken. It is necessary
to dip the sampling bottle just gently under water level, otherwise settled sludge will
whirl up in the secondary settling zone, leading to result misrepresentation.
Pour the taken sample into the sampling bottle and transport it to the laboratory as quick as
possible. Keep the sampling bottles with the taken samples away from direct sunlight, the best
temperature is under 5 °C.
Generally, it is possible to take so-called point sample or mixed sample. The point sample means that
the quantity needed for the analysis is taken in one scoop. In case of the mixed sample, the quantity
needed for the analysis is gradually poured from the same smaller quantity of the taken samples in the
given time interval. As a rule, pouring of 8 volumetrically same samples taken in 15-minute intervals,
which is within 2 hours, is done.
- Taking samples and arranging their analysis based on the decision of Water
Authority are the WWTP operator’s responsibilities.
- Specified sampling and analysis can be found in the water decision. In case
of WWTP installation according to Sec. 15(a) of the Water Act (on
announcement) it is not necessary to carry out the analyses. However, the
WWTP must be inspected by a person authorized by the Ministry of the
Environment every 2 years.
Under no circumstances, the blower may be operated with a closed discharge pipe!
The blower is operated and maintained according to the supplied technical documentation. Herein, just
some of the information are included that does not replace the “Blower Operation and Maintenance
Manual”.
Before starting maintenance, the blower must always be disconnected from the mains (removing the
plug from the socket, disconnecting the circuit breaker).
54/71
54
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
The Effepizeta blower also includes a safety valve, the function of which is to protect the blower from
overheating and subsequent seizure. The safety valve reduces the air pressure in the system and it is
very important that this valve is open. Leaking air through the safety valve is a manifestation of its correct
function. Restricting the air flow through this valve can destroy the blower.
The WWTP operation is assured by the intermittent blower operation. The intermittent blower operation
is ensured by the control unit in the electrical cabinet. The individual stages of filter cleaning ensure by
gradually opening and closing of the solenoid valves, which are controlled by the control unit.
While putting the wastewater treatment plant into operation, the supposed optimum
setting programme has been done. Avoid changing this setting wilfully without prior
consultation with the authorized person or manufacturer because improper setting
may cause malfunction of the WWTP.
55/71
55
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
However, this setting may vary depending on the cleaning efficiency of the individual WWTP. The most
variable parameter is the phase C7, when it is necessary to trace the required length of filter blowing,
when the mesh is sufficiently shaken and cleaned with air.
16.7.1 Operation and maintenance of mechanical filter
Solenoid valves
The solenoid valves, which are used to clean the tertiary filter, are located in the switchboard. When the
valve is in operation, check for proper opening and closing at least once a month. A metal clicking sound
means the valve is working.
Observe the operating instructions for the solenoid valves. During the warranty period, all service work
must be carried out by an authorized person or the manufacturer.
The WWTP can be optionally equipped with a germicidal UV lamp, which ensures disinfection of the
treated wastewater from a microbiological point of view. It is located at the outlet of treated water from
the WWTP. It is put into operation together with WWTP.
56/71
56
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Before cleaning the UV lamp, switch off the equipment using the circuit breaker (shutting
down the entire WWTP).
We recommend to have the UV lamp replaced by an authorized person within the equipment
service.
57/71
57
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
- Always use only the UV lamp supplied as a spare part for the equipment.
- Never pull out the plug with the UV lamp by pulling the supply cable.
- Never remove the sealing ring from the tube.
- In the event of damage to individual parts, do not operate the equipment and
contact ENVI-PUR, s.r.o. or the authorized person.
If handling reveals damage to any part of the tube, including the supply cable, if
water got into the tube or if the safety switch or the cable to the switch was
damaged, stop immediately operation of the UV equipment and contact ENVI-
PUR, s.r.o. or the authorized person.
- Do not clean the tube with sharp objects or materials to avoid scratching the
tube.
- Use extreme care when handling the tube to avoid damaging it.
- Wear gloves when working – never touch glass cover or UV lamp with bare
hands (a fat that compromises efficiency of UV radiation is left on the glass).
- Use technical alcohol to clean the glass cover or UV lamp.
- Never look directly at the UV lamp while it is turned on. Risk of sight
damage!!!
To replace the lamp, follow the pictures:
58/71
58
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
The WWTP tank is installed underground and no additional thermal insulation is required for winter
operation. In winter season, it is necessary to pay increased attention to the observance of OHSAS
regulations. In particular, care must be taken to ensure that access to the equipment and objects to be
serviced is kept in working order (snow removal and ice scattering).
Before winter season, it is advisable to remove sludge from the WWTP if necessary. Suitable amount
of sludge for winter operation is about 40–50 %. In winter, the wastewater temperature in the WWTP
decreases and, thus, the activity of bacteria is also reduced. The cleaning efficiency is lower during this
period and the waste water temperature should not fall below 5 °C.
If the sewage wastewater is permanently fed to the WWTP and the blower is in operation, there is no
risk of the technology freezing.
However, pay special attention to the blower control if it is placed in a pillar or other object, e.g. in the
ground.
It is also recommended to check that there is no condensation water on the “discharge pipe” of the
blower to avoid freezing.
In accordance with the valid legal regulations, it is necessary to keep written records of the operation
of the wastewater treatment plant in the form of the WWTP Operations Log. It is sufficient to keep
the Log as a separate textbook. The following must be recorded in the Log (as minimum):
Weekly maintenance performance,
occurrence of failures,
sludge pumping off,
results of sedimentation tests,
sampling,
service and repairs,
changes in the control unit,
shutdown of the wastewater treatment plant.
If the operator does not submit to the manufacturer the WWTP Operations Log when applying
the warranty repair, the complaint may not be accepted!!!
59/71
59
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Functional or technological failures may arise during the operation of the wastewater treatment plant.
Functional failures usually lead to an immediate stop of the treatment plant, technological failures lead
to short or long term degradation of the cleaning efficiency.
60/71
60
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
61/71
61
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Technological failures can be caused by the treatment plant load not complying with the design
documentation (high amount of water fed to the wastewater treatment plant, feeding of water of the
composition not corresponding to domestic wastewater or change in composition of industrial water
being fed) or by neglecting of operation and maintenance. The technological failures may show by:
Inappropriate quantity of the activated sludge (see 0),
Occurrence of white foam at the level of the nitrification zone,
Smell of water in the reactor,
Increased occurrence of impurities on the level surface of the secondary settling zone,
Increased occurrence of small flakes at the outlet,
Failure to comply with the guaranteed indicators in the wastewater discharged as detected
during sampling.
62
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
In case of higher occurrence of the floated sludge (i.e. the surfaced impurities) on the level of
the secondary settling zone:
- Check the quantity of sludge in the WWTP by sedimentation
test
- If sludge is more than 70 %, remove it. sludge
- If the sludge is less or the result is similar to that shown in
figure, it is probably an over-oxygenation of the nitrification
zone or insufficient sludge recirculation with the air-lift pump
of the return sludge. clear
watter
63/71
63
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
- Always try one procedure first, if this does not result in remedy, try the other
one.
In all cases, wait until the next weekly inspection to see if the treatment plant
operation is improved.
If the failures have not been rectified, ask for the service intervention.
17.3.1 UV lamp
Failure of the UV lamp or its power supply circuit will result in CIRCUIT BREAKER failure. IN THIS
CASE, SWITCH THE CIRCUIT BREAKER on again. If it trips again it is possible to replace the UV lamp
as described in CHAPTER 20.8.3.
If the failure is not remedied by replacing the UV lamp, do not operate the equipment and
contact ENVI-PUR, s.r.o. or the authorized person.
64/71
64
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
In the event that no longer wastewater is fed into the reactor (e.g. during long-term holidays or in the
case of seasonal operation), actions must be taken to allow the plant to be put back into operation
without any problems.
Stopping the inlet for a maximum of three weeks (e.g. during a holiday) does not disrupt the treatment
plant operation. While the inlet is stopped, it is recommended:
For the COMFORT/EXCLUSIVE/EXCLUSIVE UV variant, set the C1 and C2 phase intervals
in P1 mode to code 0 on the control unit. Switch the PAX dosing pump off.
After the inlet is restored, remember to set the original time intervals of the phases
when the blower is on and off.
If the inlet is stopped for a long time, the plant must be shut down.
Upon re-commissioning, the treatment plant must be re-ripened – see chapter 15.
65/71
65
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
19 OPTIONAL ACCESSORIES
19.1 GERMICIDAL UV LAMP
The WWTP can be supplied with a tertiary filter with a treatment for a submersible
germicidal UV lamp, which ensures disinfection of the treated wastewater from a
microbiological point of view. It is put into operation together with WWTP.
The modification requires that the existing power switchboard is replaced with the power
switchboard modified for UV and tertiary filter and that the cables for the UV lamp control
and powering are pulled through.
The oxygen probe (oximeter) is used to control the blower operation depending on the actual demand
of oxygen in the nitrification zone. This results in a reduction of blower operation costs as compared to
the control by time intervals as well as in achievement of the ideal conditions of the activation process.
The oxygen probe setting is discussed in Chapter Chyba! Nenalezen zdroj odkazů.. Maintenance
onsists of occasional water spraying – as required. The probe is set up by an authorized person.
If it is necessary to increase the storage capacity of excess sludge and thus to extend the interval of
pumping excess sludge from the treatment plant, the WWTP can be equipped with a sludge sump. The
excess sludge is pumped from the WWTP to the sludge sump using a pump (submersible electric) or
air-lift. Settled sludge is disposed of in accordance with applicable legislation.
The pump sump is used primarily for balancing the hydraulic load of the WWTP over time (eliminates
the unevenness of the inflow) or the unevenness of the terrain. Consult the authorized person for the
use and maintenance of the pump sump.
The primary sedimentation tank (hereinafter referred to as PRIM) serves to equalize the hydraulic load
of the WWTP over time (eliminates the unevenness of the inflow). The PRIM tank also serves to reduce
the load of WWTP mainly for COD and suspended solids. It can also be used for retention of excess
sludge from WWTP (so-called sludge removal from the WWTP to a septic tank). In this case, the PRIM
tank can be used partly as a sludge sump.
66/71
66
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
The sludge dewatering equipment is designed to dewater primary, stabilized or raw activated or mixed
sludge. It is characterized by simplicity, versatility, operational reliability and low energy consumption.
Dewatering equipment can be used not only for new wastewater treatment plants, but also to upgrade
existing wastewater treatment plants. The sludge dewatering is made possible by the use of special
filter bags with the addition of polyflocculant to the fed sludge
67/71
67
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
20 TECHNICAL SPECIFICATIONS
20.1 HYDRAULIC AND TECHNICAL PARAMETERS
BC 150 SLIM
BC 200 SLIM
BC 100 SLIM
BC 125 SLIM
BC 150
BC 200
BC 100
BC 125
BC 51
BC 60
BC 75
BIO CLEANER®
SS (mg/l) 10 97% 4)
COD (mg/l) 32 95 % 4)
BOD5 (mg/l) 5 98 % 4)
SS (mg/l) 17 95 % 4)
N-NH4+ (mg/l) *) 15 73 % 4)
COD (mg/l) 32 95 % 4)
BOD5 (mg/l) 5 98 % 4)
SS (mg/l) 17 95 % 4)
68/71
68
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
N-NH4+ (mg/l) *) 15 73 % 4)
COD (mg/l) 49 92 %
SS (mg/l) 13 96 %
N-NH4+ (mg/l) *) 10 77 %
N-total (mg/l) – –
P-total (mg/l) – –
Comment:
The stated values that correspond to the "Declaration of Properties“ are the values obtained according to ČSN EN 12566-3+A2
1)
PE = population equivalent is defined by the production of pollution equal to 60 g of BOD5 a day and the production of
wastewater of 150 l/day
2)
The rated material and hydraulic load of the wastewater treatment plant must not be exceeded.
3)
At input load of N-total of maximum 11 g/resident*day
4)
The mean value of all the results
5)
Geometrical mean
* If the wastewater temperature at the outlet from the biological stage is not lower than T ˃ 12 oC
)
** If the waste water temperature is within the value range of Tmin = 3.4 oC; Tmax = 19.8 oC
)
69/71
69
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
BC 125 K PP SLIM
BC 150 K PP SLIM
BC 100 K PP SLIM
BC 200 SLIM PP
BC 100 K PP
BC 125 K PP
BC 150 K PP
BC 51 K PP
BC 60 K PP
BC 75 K PP
BIO CLEANER®
Denitrification zone volume (m 3) 2.90 3.00 3.50 6.90 7.30 8.13 11.25
Nitrification zone volume (m3) 6.75 7.10 8.40 16.80 17.00 18.98 26.25
Secondary settling tank volume (m3) 2.10 2.10 3.50 3.90 5.15 5.15 6.61
The noise load for the BioCleaner® wastewater treatment plants (BC 51-200):
BC 100 K
BC 125 K
BC 150 K
BC 200 K
BC 51 K
BC 60 K
BC 75 K
BIO CLEANER®
FPZ R 40 MD
FPZ R 30 MD
FPZ R 30 MD
FPZ R 30 MD
FPZ R 40 MD
FPZ R 40 MD
FPZ R 40 MD
Blower type
Noise emissions
68 68 68 72 72 72 72
(Lp) dB (A)
Note: The given values measured at a distance of 1 m from the machine set are in compliance with the technical certificates
handed over by the equipment manufacturer.
Only the blower is the source of noise in the BioCleaner® BC 51-200 waste water treatment plants.
BC 51 to BC 200
BIO CLEANER®
(identical for all the variants)
70/71
70
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.
PURECO – OPERATING INSTRUCTIONS FOR WWTP – BIOCLEANER BC 4 – 200 PP, PE, SL, B
Note: *) Installed input power of blowers delivered with Bio Cleaner WWTPs.
71/71
71
address: H-1118 Budapest, Rétköz u. 5. - BudaWest Office Building
phone: +36 1 224 0670 • e-mail: info@pureco.hu • web: www.pureco.hu
The figures are for illustration. The technical changes, errors
and typographical errors subject to change. Published by Pureco Ltd.