Professional Documents
Culture Documents
S U M M A R Y
S.L Name of Works Tk
SHED Tk
HOUSE Tk
LAND Tk
COW Tk
GOAT Tk
HEN+DUCK Tk
GRASS Tk
TOTAL Tk
In word:
Submitted by :
GRO PARK
A R Y
Amount (Tk)
7,432,000.00
13,947,500.00
14,807,500.00
8,250,000.00
16,500,000.00
1,987,500.00
875,000.00
62,924,500.00
BOQ FOR SHED
Sl
Description of works Unit Quantity
No.
COW Shed laying of single polythene layer sheet weighting one
pound for thirty square feet in floor below cement concrete
1 reinforced etc . complete all respects as per direction of Engineer sft 3,220.00
in charge .
GOAT Shed laying of single polythene layer sheet weighting one
pound for thirty square feet in floor below cement concrete
2 reinforced etc . complete all respects as per direction of Engineer sft 2,500.00
in charge .
Total Amount
Rate in taka Amount (Tk)
600.00 1,932,000.00
600.00 1,500,000.00
450.00 1,350,000.00
300.00 600,000.00
850.00 850,000.00
200.00 600,000.00
200.00 600,000.00
Total Amount
Amount (Tk)
7,500,000.00
2,400,000.00
1,040,000.00
2,975,000.00
32,500.00
13,947,500.00
PARENTS AGRO PARK
BOQ FOR LAND PORTION
Sl
Description of works Unit Quantity
No.
1 415 Decmal Land Barisal Rural area, land size 300'x600' Decimal 415
Earth work in excavation in all kinds of soil for foundation trenches cft 100,000.00
including. layout, providing center lines, local bench-mark pillars,
leveling, ramming and preparing the base, fixing bamboo spikes
and marking layout with chalk powder, providing necessary tools
2 and plants, protecting and maintaining the trench dry etc.,
stacking, cleaning the excavated earth at a safe distance out of
the area enclosed by the layout etc. all complete and accepted by
the Engineer.
Sand filling in foundation trenches and plinth with sand having cft 1,000,000.00
F.M. 0.5 to 0.8 in 150 mm layers including leveling, watering and
compaction to achieve minimum dry density of 95% with optimum
3 moisture content (Modified proctor test) by ramming each layer up
to finished level as per design supplied by the design office only,
all complete and accepted by the Engineer-in-charge.
HBB works for roads, use of local made bricks sft 15,000.00
4
Boundary wall with rcc column,GB, brick flat soling in foundation or Rft 2,380.00
in floor with first class or picked jhama bricks including preparation
5 of bed and filling the interstices with local sand, leveling etc.
complete and accepted by the Engineer.
Total Amount:
ARK
ON
21,500.00 8,922,500.00
5.00 500,000.00
3.00 3,000,000.00
40.00 600,000.00
750.00 1,785,000.00
Total Amount
Rate in taka Amount (Tk)
150,000.00 450,000.00
150,000.00 450,000.00
150,000.00 450,000.00
150,000.00 450,000.00
150,000.00 450,000.00
100,000.00 1,500,000.00
150,000.00 4,500,000.00
Total Amount
Amount (Tk)
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
-
4,500,000.00
16,500,000.00
BOQ FOR HEN+DUCK
Sl
Description of works Unit Quantity Rate in taka
No.
1 Deshi Hen for Parents 100% Each 2,000.00 600.00
Total Amount
Amount (Tk)
1,200,000.00
600,000.00
187,500.00
1,987,500.00
BOQ FOR GRASS
Sl Rate in
Description of works Unit Quantity
No. taka
HIDROWFONIC SYSTEM GRASS FARMING complete all
1 respects as per direction of Engineer in charge . sft 1,500.00 250.00
Total Amount
Amount (Tk)
375,000.00
500,000.00
875,000.00